EUDET Module Plans of integration and assembly

11
Thursday Sept 17, 2009 CALICE week IPN Lyon 1 EUDET Module Plans of integration and assembly Julien Bonis [email protected] .fr SLAB assembly : Process phases Assembly and insertion equipments Facilities (hall) Conclusions

description

EUDET Module Plans of integration and assembly. SLAB assembly : Process phases Assembly and insertion equipments Facilities (hall) Conclusions. Julien Bonis [email protected]. Process Phases for one slab. Brazing 2 ASUs line gluing HT kapton on each ASUs line - PowerPoint PPT Presentation

Transcript of EUDET Module Plans of integration and assembly

Page 1: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 1

EUDET ModulePlans of integration and assembly

Julien Bonis

[email protected]

• SLAB assembly : Process phases• Assembly and insertion equipments• Facilities (hall)• Conclusions

Page 2: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 2

Process Phases for one slab

1. Brazing 2 ASUs line

2. gluing HT kapton on each ASUs line

3. Integrating first ASUs line with kapton in H structure

4. Integrating first copper drain in H structure

5. Turn over H structure

6. Integrating second ASUs line in H structure

7. Integrating second copper drain in H structure

8. Clamp and close the slab with copper tape

Page 3: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 3

ASU assembly bench (brazing) Patrick Cornebise

Assembly and insertion equipmentsBinocular

ASU

Heating lamp under fabrication

P. Cornebise, Y. Peinaud M. Lacroix et J. Dubois

Fastening

Guide

Temperature sensors

Page 4: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 4

Manipulation equipment for ASUs line (suction pads)

Assembly and insertion equipments

Suction pads

ASUs line

G. Guilhem

Page 5: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 5

Manipulation equipment for ASUs line (suction pads)

Assembly and insertion equipments

Manipulator into ASUs lin

ASUs line « stick » on manipulator

Page 6: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 6

HT Kapton

We need equipment to fix and keep flat HT Kapton sheet during gluing on ASUs line

Heating suction table under study

HT Kapton

Assembly and insertion equipments

Page 7: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 7

• The mecanique resistance of conductive glue seem weak

Epoxy glue points will be probably required.

• Final approach of ASUs line must be without cross mouvement

Guidance équipement for ASUs manipulator

HT kapton test gluing on glass

Lead by Patrick Cornebise (LAL)

and Remi Cornat (LLR)

Assembly and insertion equipments

Page 8: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 8

Facilities (Building)

• ASUs line assembly bench *

• HT kapton gluing bench (suction table and guidance)

• Side table *

• Turn table *

• Module stand (module = 800kg)

• Cosmic bench

• ASUs line box beam storage *

• SLAB box beam storage

• Electronique test bench (ASUs line, HT…)

• Wardrobes for equipments, tools, spare parts…*

• Computeur office

Equipements liste

*Quite clean environment required

Page 9: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 9

Facilities

Patrick Cornebise office :

• Too small

• The floor not support heavy object

• Use for other project (not empty).

• Inadequate access

Location in hall 2 (LAL, bat 200) : OK but

• Unclean, dusty.

Build a clean zone (budget)

Mind to delay

EUDET area

Hall 2, bat 200 LAL

Page 10: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 10

10 m 4 m

Hall 2

Facilities

Page 11: EUDET Module Plans of integration and assembly

Thursday Sept 17, 2009 CALICE week IPN Lyon 11

• The team have make good progress on equipments.

• Assembly and integration zone still abeyance

• Next steps are :- Thermal test in module with several « slab »

- See real PCB/ASU to finalise SLAB in mecanical point of view

- Start facilites devolpment

Conclusions