euclidcreek.blogspot.com Euclid Creek Tunnel Community Update April 23, 2013

Transcript of Euclid creek tunnel ppt apr2013

euclidcreek.blogspot.com

Euclid Creek Tunnel

Community Update

April 23, 2013

euclidcreek.blogspot.com

Agenda

• Project Overview

• Construction Updates

• Shaft Updates

• Contact Info

euclidcreek.blogspot.com

Project Overview

euclidcreek.blogspot.com

Euclid Creek Tunnel: By the Numbers

• Tunnel

– 24’ diameter

– 9,500/17,750’

– 60,100,000 gallons

• ~30 near surface structures

– 11 complete

– 12under construction

• Shafts: 5 total

– 24’ to 60’ diameter

– 185-225’ deep

• 2,465 linear feet of open cut pipe placed

• 2,110 linear feet of microtunnel complete

– 240 more to go

euclidcreek.blogspot.com

Shaft #1: Construction Staging Site

• “Mackenzie” tunneled and lined 9,450’

• Operating 24/7 with regularly-scheduled maintenance periods

• Lake Erie tunneling completed

euclidcreek.blogspot.com

Project Overview

euclidcreek.blogspot.com

euclidcreek.blogspot.com

Shaft #2: Easterly WWTP

• Shaft 2: 95 feet excavated

– Blasting last 100 feet; will begin this year

• Structure 2-2: installing final lining

• Structure 2-8: installing support of excavation

euclidcreek.blogspot.com

euclidcreek.blogspot.com

euclidcreek.blogspot.com

• East 156th Street

– West side sidewalk still closed

– Currently reduced to single lane for dewatering well installation; flaggers are present

– Commenced soft ground excavation

Shaft #3: Beulah Park

euclidcreek.blogspot.com

euclidcreek.blogspot.com

euclidcreek.blogspot.com

euclidcreek.blogspot.com

• Shaft 3 area

– Excavation began 4/23/13

Shaft #3: Beulah Park

euclidcreek.blogspot.com

euclidcreek.blogspot.com

• Structure Monitoring

– Letters distributed April 10, 2013

• DMP installed April 22, 2013

Shaft #3: Beulah Park

euclidcreek.blogspot.com

Site #4: Triangle Park

• Excavation work is complete at this site

• Currently installing baffle drop structures

• Fencing will remain throughout 2014

• Completed structure in Nottingham

euclidcreek.blogspot.com

euclidcreek.blogspot.com

Site #4: Lakeshore Blvd. Relief Sewer

• 66” trenchless sewer pipe, microtunneledfrom Euclid Creek Pump Station to Shaft 4

euclidcreek.blogspot.com

Site #5: Nottingham & St. Clair

• Excavation complete of Shaft 5:225 feet excavated

• Commenced excavation of Structure 5-4

• 500 cy concrete pour April 8th

euclidcreek.blogspot.com

euclidcreek.blogspot.com

euclidcreek.blogspot.com

Stay Informed

• Blog

– EuclidCreek.blogspot.com

• Collinwood Observer

– Ads and articles

• Semi-Monthly Newsletter

– E-mail distribution

[email protected] to be added to the list

euclidcreek.blogspot.com

How to Reach Us

Social Mediafacebook.com/yoursewerdistrict@neorsd | @wallywaterdrop

Customer Service (216) 881-8247

Emergencies: NEORSD ECT Field Office(216) 268-5469

Ryan Sullivan, [email protected] Elting, [email protected]

euclidcreek.blogspot.com

Next Meeting

Tuesday, May 21, 20136:00 p.m.Cleveland Public Library,Memorial-Nottingham Branch

Save the Date!

June 18

July 16

August 20