The case for a system integration approach to ERTMS deployment
Eu strategy for ertms deployment breakthrough ten-t
3
• Breakthrough program for ERTMS • 2015-2016
-
Upload
european-commission -
Category
Documents
-
view
297 -
download
5
Transcript of Eu strategy for ertms deployment breakthrough ten-t
![Page 1: Eu strategy for ertms deployment breakthrough ten-t](https://reader035.fdocuments.in/reader035/viewer/2022071909/55cdc9e2bb61ebc7218b457d/html5/thumbnails/1.jpg)
• Breakthrough program for ERTMS
• 2015-2016
![Page 2: Eu strategy for ertms deployment breakthrough ten-t](https://reader035.fdocuments.in/reader035/viewer/2022071909/55cdc9e2bb61ebc7218b457d/html5/thumbnails/2.jpg)
1. “Users first” and not “Designers first” approach
2. Running everywhere in Europe
3. Focus on deployment
4. ERTMS System Cost reduction
Key principles
![Page 3: Eu strategy for ertms deployment breakthrough ten-t](https://reader035.fdocuments.in/reader035/viewer/2022071909/55cdc9e2bb61ebc7218b457d/html5/thumbnails/3.jpg)
1. A realistic and committed deployment plan 2. Stable and mature set of specifications 3. An interoperable and compliant infrastructure 4. A clear and transparent regulatory framework 5. Facilitation of the deployment
Identified objectives