EU projects Four Marie Curie Networks being prepared with relevance for CLIC: – Structures and...
-
Upload
stephen-watts -
Category
Documents
-
view
213 -
download
0
Transcript of EU projects Four Marie Curie Networks being prepared with relevance for CLIC: – Structures and...
![Page 1: EU projects Four Marie Curie Networks being prepared with relevance for CLIC: – Structures and modules (lead: Helsinki) – RF power sources (lead: Lancaster)](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697c0301a28abf838cdaded/html5/thumbnails/1.jpg)
1
EU projects Four Marie Curie Networks being prepared with relevance for CLIC:
– Structures and modules (lead: Helsinki) – RF power sources (lead: Lancaster) – Alignment, stability with related components (lead: CERN)– Microelectronics design (65 nm technology) for pixel detectors (lead: CERN)
Deadline 22.11
EUCARD 2 starting in MayTIARA and EUCARD on-going
Several ERC and Syn-energy grants proposals are being consideredDeadline end November/January for advanced grants/syn-energy
![Page 2: EU projects Four Marie Curie Networks being prepared with relevance for CLIC: – Structures and modules (lead: Helsinki) – RF power sources (lead: Lancaster)](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697c0301a28abf838cdaded/html5/thumbnails/2.jpg)
2
Collaborators:
In preparation:The Hebrew University-Jerusalem (Israel-new), Tartu (Estonia-new), Alba (Spain), KVI Groeningen (the Netherlands), Sandia National Lab (US), METAS (Switzerland)
Under discussion:Vinca Institute Belgrade (Serbia) <= machine or detectors or both ?
Important renewal: SLAC
Selected agreements: CEA, Uppsala, Dubna, Ankara (brief oral update for each)
![Page 3: EU projects Four Marie Curie Networks being prepared with relevance for CLIC: – Structures and modules (lead: Helsinki) – RF power sources (lead: Lancaster)](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697c0301a28abf838cdaded/html5/thumbnails/3.jpg)
3
MoA for Physics and Detector study
• Draft MoA is with the CERN legal service
• Legal service has promised to finish document before November 12th