EU-Korean Symposium on 5G 3-1 180223_5G... · EU 5G 'Pioneer' Frequency Bands Urban mobile data...
Transcript of EU-Korean Symposium on 5G 3-1 180223_5G... · EU 5G 'Pioneer' Frequency Bands Urban mobile data...
EU-Korean Symposium on 5G
“From the 5G challenge to 5G CHAMPION Trials at Winter Olympic Games”
Roadmap towards 5G testbeds in Europe
23 February 2018
Bernard Barani
European Commission
DG CONNECT E1- Future Connectivity Systems
Supporting 5G in the Digital Single Market (DSM)
The 5G Public Private Partnership (5G PPP)
- 700 M€ initiative under R&I H2020 programme
- Technologies, systems, applications,
- spectrum, standards;
- International cooperation
- Supply Side
The 5G Action plan
- Commission Communication: to support European industrial leadership;
- Part of the September 2016 "Connectivity Package"
- Preparing Framework Conditions at EU level for 5G deployment
- Demand Side
3
"Single Market" approach to EU 5G Introduction: The 5G Action Plan
Commercial launch of 5G services in at least one major city in all MS
Early 5G launch in selected areas
20185G in all urban areas andAlong main transport paths
2025
2020
Coordinated/quasi-simultaneous launch throughout single market
Aggressive roll-out with geographical and sectorial focus
EU 5G 'Pioneer' Frequency Bands
Urban mobile data speeds
Hot Spot data speeds
700 MHz
3.6 GHzUrban coverage with dense small cells (1-3 Gb/s) e.g. mobile Gb/s society, smart cities, option for connected highways
Hot spots coverage (up to 10 Gb/s) e.g. fixed wireless access, railway stations, sport events, smart factories,
26 GHz
Universal coverage (10’s of Mb/s) of reliable connectivity
5G Infrastructure Fabric
Reliable coverage
Source: 5G-PPP
COM Decisions
on '5G bands'(?)
Roadmap5GAP;
RSPG 'pioneer bands';
5G Mandate
2017 2018 2019 2020 2021 2022 2023 2024
5G
Everyw
here
5G
lau
nch
in a
ll M
Ss
2025
UHF Decision
700 MHz
RSPG 5G roadmap; WRC-19
CPO
COM Decisions 26 GHz 1.5 GHz 3.6 GHz? 900 MHz?
WRC-19
5G Standards
EECC in
force?
5G follow-up Mandate
WRC-23
Coordination of spectrum re-farming & assignment
today
Review: sub-700
MHz
5G Standardization Roadmap
• 5G features are phased. Not possible to standardize all in time for Rel-15 completion and earlydeployments (2018-2020) Early Drop (ED) end of 2017. Done!
• Release 15 (aka phase 1, by June ‘18): a first phase of expected deployments in 2020 (JapanOlympic Games) NR+NC
• Release 16 (aka phase 2, by Dec ’19) will target the ITU IMT-2020 submission
Standards
• Operators: 2020 appears to be a likely start date:
– Nordic & Baltic Regions: common 5G development plan for earlier launches (2018)
– Italy 5G cities
– DT will introduce 5G in its entire footprint from 2020
– Orange 5G launches between 2020 & 2022; trials with Ericsson & Nokia, and recent agreement with Peugeot to develop the 5G connected car. 3 new trialsannounced.
– Telefonica committed to 5G, but wants to adapt the network to the customer and not the other way around…
• Verticals:
– Smart cities drive interest: 15 « trial cities »
– Interest shown for connected car: 5GAA creation
– CAD as flagship EU case
Trials/deployment EU initiatives
Supporting the industry "European Trials Roadmap"
Trials roadmap announced in the 5G Action Plan
5G Pan-European Trials Roadmap v2: 4th 5G Global Event
https://5g-ppp.eu/the-5g-pan-eu-trials-roadmap-version-2-0-has-been-released/
Trials roadmap including:
▪ Building Europe 5G readiness through 5G Private Trials
▪ 5G for Vertical Industries - Building the case through Pilots
▪ 5G for UEFA EURO 2020 - Pan-European Showcase Event
▪ 5G Trials Cities
"FLAGSHIP" 5G TRIALS:
Cooperative, Connected and Automated Mobility (CCAM)
EU Strategic Support to 5G CCAM
▪ Preparation of CCAM trials through cross border 5G corridors
▪ EC policy on CCAM defined with MS through "Letter of Intent" signed at ministerial level:(https://ec.europa.eu/digital-single-market/en/cooperative-connected-and-automated-mobility-Europe)
▪ EC, European Ministers and Industry agreed to work together on digital cross-border corridors and started mapping them
▪ Current test sections see: (https://ec.europa.eu/digital-single-market/en/news/cooperative-connected-and-automated-mobility-stepping-efforts-Frankfurt)
▪ Further test sections soon to be added in the to the set of test sections agreed among MS (e.g. Munich-Brenner-Bologna)
EU Strategic Support to 5G CCAM
▪ Preparation of CCAM trials through cross border 5G corridors
▪ EC policy on CCAM defined with MS through "Letter of Intent" signed at ministerial level:(https://ec.europa.eu/digital-single-market/en/cooperative-connected-and-automated-mobility-Europe)
▪ EC, European Ministers and Industry agreed to work together on digital cross-border corridors and started mapping them
▪ Current test sections see: (https://ec.europa.eu/digital-single-market/en/news/cooperative-connected-and-automated-mobility-stepping-efforts-Frankfurt)
▪ Further test sections soon to be added in the to the set of test sections agreed among MS (e.g. Munich-Brenner-Bologna)
5G Private Trials (Fall 2017 Highlights)
https://www.telekom.com/en/media/media-information/archive/europes-first-5g-antennas-are-transmitting-in-berlin-505686
https://www.telecompaper.com/news/vodafone-portugal-5g-tests-achieve-speeds-of-20-gbps--1214817
https://www.telecompaper.com/news/tele2-latvia-builds-5g-ready-base-stations--1216101
https://www.ericsson.com/en/news/2017/10/ericsson-and-magyar-telekom-demostrate-first-5g-link-in-hungary
https://www.mobileeurope.co.uk/press-wire/orange-spain-hits-15gbps-in-5g-demonstration
http://www.telecomitalia.com/tit/en/archivio/media/comunicati-stampa/telecom-italia/mercato/business/2017/PR-Progetto-Bari-Matera-5G-8-11-2017-EN.html
https://www.mobileeurope.co.uk/press-wire/telenor-norway-to-launch-5g-testing-in-kongsberg-next-year
https://5g-ppp.eu/5g-trials-2
Use Cases
▪ Multi Media, immersive
▪ Public safety
▪ Connected cars
▪ In buiding arena, ultra dense
5G PPP Phase 2: example demo/trials
Phase 3 a) Verification Demo/Trial Platform- Integration radio+ network
Y2015 2016 2017 2018 2019 2020 2021 2022
Phase 2 - Demos PoC*- Core Techs Components
Phase 3 b) Integrated Verification Trial
- radio+network+applications -
Early 5G introductionLower frequency bands
Later 5G introductionHigher frequency bands
Phase I Core Techologies
User needs, partnerships with vertical industries
5G PPP Phase 3, WP18-20, final.> € 200 millions for trials
5G Connected Cars in EU cross-border corridors
5G R&I for "Long Term Evolution"
Kick off at EUCNC Conference 12-15 June,
Oulu, Fin
*Proof of Concept
Thank you for your attention