Eternity Arch - epd.gov.hk · 02-02 Main Bridge piles & pile caps 02-03 Eastern Approach piles &...

4
209506/JP/SYC Cross Bay Link Design Option 5 - Eternity Arch Activity Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01) Preliminary works 01-01 Site compound 01-02 Barge landing point 01-03 Arch fabrication site 02) Dredging & Foundations 02-01 Pre-drilling holes 02-02 Main Bridge piles & pile caps 02-03 Eastern Approach piles & pile caps 02-04 Western Approach piles & pile caps 02-05 Eastern Abutment Piles ` 03) Substructure 03-01 Main Bridge piers 03-03 Eastern Approach piers 03-02 Western Approach piers 03-04 Eastern Abutment 04) Approach Superstructure 04-01 Fabricate concrete deck segments 04-02 Deck segment erection & stitching for EA 04-03 Deck segment erection & stitching for WA 05) Main Bridge Superstructure 05-01 Fabricate steel deck segments 05-02 Fabricate steel arch segments 05-03 Assemble main bridge 05-04 Assemble side spans 05-05 Install Main Bridge 05-06 Install Side spans and make connection 06) Cycle Track Ramp 06-01 Foundations & substructure 06-02 Superstructure 07) Road D9 07-01 Earthworks for seawall modification 07-02 Sea Wall Strengthening 07-03 Ground Improvement works (TBC) 07-04 Piling for noise barrier 07-05 Noise barrier erection 08) Finishing Works 08-01 Street furniture, pavement & road markings 08-02 Planting & Landscaping 08-03 TCSS installation & testing 09) Contract Completion 09-01 Contract Completion CRITICAL ASSUMPTIONS 1. Steel work and precast concrete deck segments are fabricated in China. 4. There are two marine piling fronts. 7. Southern Bridge Programme is not confirmed, hence not included here. 2. Arch bridge is assembled in China and transported to the site in one piece by a barge. 5. The overall construction contract period is 4 years. 8. Critical path is shown in red. 3. There are three proposed options for installation of main bridge & side spans 6. Ground improvement works on Road D9 are TBC. Activity Code 2020 2017 2018 2019 G:\env\project\209506-50\report\EIA Additional Service 2012\Appendices\Chapter 4_Consturction methodology\ Appendix A 2013-01-02 Construction Programme.xlsx : Sheet1 Page 1 of 1 Printed 2/1/2013 Time 11:28

Transcript of Eternity Arch - epd.gov.hk · 02-02 Main Bridge piles & pile caps 02-03 Eastern Approach piles &...

Page 1: Eternity Arch - epd.gov.hk · 02-02 Main Bridge piles & pile caps 02-03 Eastern Approach piles & pile caps 02-04 Western Approach piles & pile caps 02-05 Eastern Abutment Piles `

209506/JP/SYC Cross Bay Link Design Option 5 - Eternity Arch

Activity

Ja

n

Fe

b

Ma

r

Ap

r

Ma

y

Ju

n

Ju

l

Au

g

Se

p

Oct

No

v

De

c

Ja

n

Fe

b

Ma

r

Ap

r

Ma

y

Ju

n

Ju

l

Au

g

Se

p

Oct

No

v

De

c

Ja

n

Fe

b

Ma

r

Ap

r

Ma

y

Ju

n

Ju

l

Au

g

Se

p

Oct

No

v

De

c

Ja

n

Fe

b

Ma

r

Ap

r

Ma

y

Ju

n

Ju

l

Au

g

Se

p

Oct

No

v

De

c

Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

01) Preliminary works

01-01 Site compound

01-02 Barge landing point

01-03 Arch fabrication site

02) Dredging & Foundations

02-01 Pre-drilling holes

02-02 Main Bridge piles & pile caps

02-03 Eastern Approach piles & pile caps

02-04 Western Approach piles & pile caps

02-05 Eastern Abutment Piles

`

03) Substructure

03-01 Main Bridge piers

03-03 Eastern Approach piers

03-02 Western Approach piers

03-04 Eastern Abutment

04) Approach Superstructure

04-01 Fabricate concrete deck segments

04-02 Deck segment erection & stitching for EA

04-03 Deck segment erection & stitching for WA

05) Main Bridge Superstructure

05-01 Fabricate steel deck segments

05-02 Fabricate steel arch segments

05-03 Assemble main bridge

05-04 Assemble side spans

05-05 Install Main Bridge

05-06 Install Side spans and make connection

06) Cycle Track Ramp

06-01 Foundations & substructure

06-02 Superstructure

07) Road D9

07-01 Earthworks for seawall modification

07-02 Sea Wall Strengthening

07-03 Ground Improvement works (TBC)

07-04 Piling for noise barrier

07-05 Noise barrier erection

08) Finishing Works

08-01 Street furniture, pavement & road markings

08-02 Planting & Landscaping

08-03 TCSS installation & testing

09) Contract Completion

09-01 Contract Completion

CRITICAL ASSUMPTIONS

1. Steel work and precast concrete deck segments are fabricated in China. 4. There are two marine piling fronts. 7. Southern Bridge Programme is not confirmed, hence not included here.

2. Arch bridge is assembled in China and transported to the site in one piece by a barge. 5. The overall construction contract period is 4 years. 8. Critical path is shown in red.

3. There are three proposed options for installation of main bridge & side spans 6. Ground improvement works on Road D9 are TBC.

Activity

Co

de

20202017 2018 2019

G:\env\project\209506-50\report\EIA Additional Service 2012\Appendices\Chapter 4_Consturction methodology\

Appendix A 2013-01-02 Construction Programme.xlsx : Sheet1

Page 1 of 1

Printed 2/1/2013 Time 11:28

Page 2: Eternity Arch - epd.gov.hk · 02-02 Main Bridge piles & pile caps 02-03 Eastern Approach piles & pile caps 02-04 Western Approach piles & pile caps 02-05 Eastern Abutment Piles `

Pier 1

Pier 2 Pier 3

Page 3: Eternity Arch - epd.gov.hk · 02-02 Main Bridge piles & pile caps 02-03 Eastern Approach piles & pile caps 02-04 Western Approach piles & pile caps 02-05 Eastern Abutment Piles `

Pier 4 Pier 5

Pylon A Pylon B

Page 4: Eternity Arch - epd.gov.hk · 02-02 Main Bridge piles & pile caps 02-03 Eastern Approach piles & pile caps 02-04 Western Approach piles & pile caps 02-05 Eastern Abutment Piles `

Pier 6

Pier 7Pier 8

Pier 9 Pier 10Abutment

Ramp Bridge