    Construction of UHV AC test base of SGCC

    Yao Tao*,y, Li Shu-sen and Wu Xiong

    State Grid Electric Power Research Institute of SGCC, Wuhan 430074, China

    SUMMARY

    In order to research ultra high voltage (UHV) transmission technology systematically, State Grid Corpor-ation of China launched the UHV AC test base project to provide strong technical support for UHV gridconstruction. The facilities including UHV power supply, UHV test lines, equipments qualified field,electromagnetic environmental laboratory, climate laboratory, UHV corona cage, impulse test field werebuilt at the test base. Much useful experience had been achieved through the construction and research in thefields of UHVelectromagnetic environment, external insulation characteristic, equipment technical require-

    ments, equipments manufactory, electrical design, construction, test, and operation. It accelerated theconstruction of the UHV pilot project of China. Copyright # 2011 John

    key words: UHV; AC; test base; test line; construction; achievement

    1. INTRODUCTION

    Ultra high voltage (UHV) power grid not only realizes the super-capacity and long-distance power

    transmission, but also greatly improves security and reliability of the power grid. It can optimize

    energy distribution and save the land resources and construction investment. The development of UHV

    power grid can improve the utilization efficiency of energy resources and reduce environmental

    pollution, which is an important strategic move to build a resource saving and environment-friendly

    society.

    In the areas of engineering design and construction, UHVAC test base of SGCC played an important

    role in the construction process of first 1000 kV UHVAC projects in China. Much experience has been

    gained in the filed of UHV electromagnetic environment, equipment technical requirements,

    electrical design, engineering construction, test debugging, and operation through construction of the

    test base [1].

    This paper focuses on the major facilities and achievements of UHV AC test base.

    2. OVERVIEW OF UHV TEST BASE

    Ultra high voltage AC test base (shown in Figure 1) is located at Jiangxia district, Wuhan city, whichcovers an area of 365 acres. The construction starts from December 2005 to December 2008. The test

    base included UHV power supply, UHV test line, equipments qualified field, electromagnetic

    environmental laboratory, climate laboratory, corona cage, the impulse test field, and other ancillary

    facilities. The electromagnetic environment measurement, corona characteristics detection, live line

    work, operation, and maintenance could be carried out at UHV single circuit and double circuit

    transmission lines and substations. The test base also provides a best test platform of electromagnetic

    environment and external insulation of UHV projects.

    EUROPEAN TRANSACTIONS ON ELECTRICAL POWEREuro. Trans. Electr. Power 2012; 22:108118Published online 13 April 2011 in Wiley Online Library (wileyonlinelibrary.com). DOI: 10.1002/etep.575

    *Correspondence to: Yao Tao, State Grid Electric Power Research Institute of SGCC, Wuhan 430074, China.yE-mail: [email protected]

    Copyright # 2011 John

    Wiley & Sons, Ltd.

    Wiley & Sons, Ltd.

  • 7/29/2019 etep575

    2/11

    3. MAJOR TEST FACILITIES

    3.1. UHV power supply

    Power of the test base is supplied by a three-phase two-winding transformer which is connected to a

    220 kV line from Phoenix Hill 500 kV Substation. Thousand kilovolts UHV line voltage is boosted

    from 35 kV by three single-phase UHV transformers whose capacity is 3 40MVA [2]. The main

    electrical connection is as shown in Figure 2. Figure 3 shows the UHV substation equipments.

    Figure 1. UHV AC test base.

    Figure 2. The main connection of UHV AC test base.

    Figure 3. UHV substation equipments.

    Copyright # 2011 John Euro. Trans. Electr. Power 2012; 22:108118

    DOI: 10.1002/etep

    CONSTRUCTION OF UHV AC TEST BASE OF SGCC 109

    Wiley & Sons, Ltd.

  • 7/29/2019 etep575

    3/11

    According to GB311.1-1997 Insulation coordination for high voltage transmission and distribution

    equipment, the coordination factor of lighting impulse got 1.4 and the coordination factor of

    switching impulse got 1.15.

    3.2. UHV test lines

    Ultra high voltage test lines at the test base include UHV single-circuit test line and UHV double-

    circuit test line in the same tower which is both 1 km long (shown in Figure 4). Each line is composed

    with two tension towers and two suspension towers [3]. The single-circuit line uses 8 LGJ-500 wire.

    And the double-circuit transmission Lines uses 8LGJ-630 wire. The typical tower structures of

    china transmission project are adopted at the test base. Several hanging points are set at the tower cross

    arms, which provide the conditions for the adjustment of the phasephase distances. The phase

    distance range is up to 4 m, which is satisfied the electromagnetic environment measurement at

    different phases. UHV test lines can carry out electromagnetic environment effects test and corona

    characteristics experimental research of UHV transmission line. And they are a best platform to study

    UHV live line work and line maintenance training.

    3.3. Equipments qualified field

    Equipments qualified field is below the truss structure of test lines, length 216 m, and width 58 m [4].

    Used of truss structure and 1000 kV lead, the power equipments such as power transformers, CVT,

    surge arresters, post insulators, bushing, switch, GIS equipments, and so on can be long-term charged

    with full voltage.

    3.4. Electromagnetic environmental laboratory

    The research of electromagnetic environment parameters measurement and simulation of UHV line

    has been carried out in electromagnetic environmental laboratory, which is composed of the screening

    room, outdoor test site, vehicle-mounted electromagnetic compatibility measurement system, and

    Electromagnetic environment simulation platform. Two outdoor test sites are 120m 10m below in

    single-circuit and double-circuit test line. Electromagnetic environment measurements are as follows.

    Two 9 k30 MHz and two 9 k3 GHz Schwarzbeck radio interference receivers.

    Two PMM PMM8053A and two Holday HI3406 frequency electric field measurements.

    Four Bruel and Kjr noise meters and 3560B PULSE Multi-analysis system.

    Test site layout of the multiple electromagnetic environment testers can carry out multi-parameters

    long-term remote automatic measurement under all-weather. Vehicle-mounted measurement system as

    shown in Figure 5 consists of transient electromagnetic interference test vehicle and the

    Figure 4. UHV test lines.

    Copyright # 2011 John Euro. Trans. Electr. Power 2012; 22:108118

    DOI: 10.1002/etep

    110 Y. TAO, L. SHU-SEN AND W. XIONG

    Wiley & Sons, Ltd.

  • 7/29/2019 etep575

    4/11

    electromagnetic environment test vehicle, which can easily carry out the transient electromagnetic

    disturbance survey and equipment field immunity test of substation and converter station, the

    electromagnetic environmental monitoring of transmission and Distribution Project.

    3.5. Artificial climate laboratory

    Artificial climate laboratory as shown in Figure 6 mainly composes of the tank testing hall, AC and DC

    power supplies, and auxiliary facilities test. The external insulation test of UHV transmission

    equipment under the simulated pollution, high-altitude, icing, and other special natural climate could

    be carried out in this lab. The clearance diameter of test hall is 20 m and the height is 25 m. The lowest

    temperature of the hall is 20 8C. The internal air pressure is as low as 50 kPa (equivalent to simulate

    altitude 5500 m).

    AC power supply is include of 4800 kVA regulator and 1000 kV/6000 kVA test transformer. The

    impedance voltage of regulator is above 5% under (50100)% rated output voltage. The1000 kV/2A

    DC power supply took the one double rectifier circuit with the voltage feedback control. AC and DC

    power supplies meet IEC60507 and IEC61245 requirements.

    3.6. Corona cage

    Figure 5. Vehicle-mounted electromagnetic compatibility measurement system.

    Figure 6. Artificial climate laboratory.

    Copyright # 2011 John Euro. Trans. Electr. Power 2012; 22:108118

    DOI: 10.1002/etep

    CONSTRUCTION OF UHV AC TEST BASE OF SGCC 111

    Wiley & Sons, Ltd.

  • 7/29/2019 etep575

    5/11

    Corona cage is the important testing methods to study line corona characteristics and electromagnetic

    environment of UHV AC transmission. The audible noise, radio interference, electric field strength,

    and corona loss of different section, number, and split conductors could be measured in the corona

    cage.

    The corona cage structure of UHVAC test base is taken with the rigid double-cage design, as shown

    in Figure 7. The cage body section is a 8 m 8 m square, with a total length of 35 m. The protection

    sectionof the cage body with the length 5m is used to overcome the end effect caused by the conductors

    surface electric field distortion. Corona cage equipped with a rain system can carry out conductor

    corona test under different rainfall characteristics. Corona cage can install the 112 split conductors.

    The conductors tension can be adjusted by the mechanical power unit. The test power is introduced

    with non-corona conductor.

    3.7. Impulse test field

    The impulse test field covers an area about 21 000 m2, included the control building, the impulse

    generator, voltage divider, door-type structure, and supporting tower, as shown in Figure 8. The

    Figure 7. UHV corona cage.

    Figure 8. 7500 kV impulse generator.

    Copyright # 2011 John Euro. Trans. Electr. Power 2012; 22:108118

    DOI: 10.1002/etep

    112 Y. TAO, L. SHU-SEN AND W. XIONG

    Wiley & Sons, Ltd.

  • 7/29/2019 etep575

    6/11

    7500 kV/750 kJ generator can produce switching impulse with 10002500ms front time. Voltage

    utilization factor of up to 60%. The clearance space of door-type structure is 70 m 70 m. The research

    of the long gap discharge characteristics and the external insulation experimental could be taken in this

    field, especially long before time impulse discharge characteristic test.

    4. ACHIEVEMENTS

    The overall goal of UHV AC test base is to carry out UHV technical studies and meet UHV AC pilot

    project which is the first UHV power transmission project of china. Since February 2007, the test bases

    work is focused on UHVelectromagnetic environmental impact studies, external insulation, long-term

    live assessment of high voltage electrical equipment, operation, maintenance, testing, and training. A

    number of major issues related to UHV engineering were completed.

    4.1. Obtain the electromagnetic environment measurement of UHV test lines [5,6]

    Since February 2007 UHV test lines has been put into operation and immediately launched the

    measurement of electric field, radio interference and audible noise. The measurement results on the

    given route under fair weather are as follows. The maximum value of power frequency field strength is

    6.1 kV/m. The RI level is 53.5 dB(1mV/m is defined as 0 dB). And the AN level is 36.4 dB(A weight).

    But the corona in the rainy weather is much serious, which makes RI and AN about 12 or 10 dB higher

    than fair weather. The results of electromagnetic environment UHV test lines confirmed that single-

    circuit line using 8 500 conductors and double-circuit line using 8 630 conductors of UHV project

    is feasible. The important designs of substation buss selection and connections were also confirmed.

    All of these verifies the validity of previous research results, which can directly used for UHV pilot

    project.

    4.2. Optimize substation fittings and reduce noise levels [7]

    When the substation and lines were charged for the first time, local large corona noise may exceed therequirements of environmental protection in China. So the related research was carried out. The

    structure size of substation fittings took the design optimization. And the corona discharge of the test

    base decreased significantly as shown in Figure 9. The ball diameters changed from 400 to 630 mm in

    front of the bus with no argument of wiring and jumper. The conducting rod diameter of switch

    changed from 100 to 180 mm. It ensured that the electromagnetic environment of UHV AC test

    demonstration project was accepted by the State Environmental Protection Agency.

    Figure 9. Corona discharge UV imaging map of bus before and after optimization.

    Copyright # 2011 John Euro. Trans. Electr. Power 2012; 22:108118

    DOI: 10.1002/etep

    CONSTRUCTION OF UHV AC TEST BASE OF SGCC 113

    Wiley & Sons, Ltd.

  • 7/29/2019 etep575

    7/11

    4.3. Live assessment of UHV AC test demonstration project equipments

    At the equipments qualified field of test base, the surge arresters, CVT, post insulators, and various

    fittings were charged for about 1 year as shown in Figure 10 [4]. Under the 1000 kV assessment, the

    long-term reliability of domestic UHV equipments were scientifically verified in order to achieve a

    successful UHV project.

    Figure 10. Live assessments of UHV AC test demonstration project equipments.

    Figure 11. Corona loss measurement of UHV line.

    Copyright # 2011 John Euro. Trans. Electr. Power 2012; 22:108118

    DOI: 10.1002/etep

    114 Y. TAO, L. SHU-SEN AND W. XIONG

    Wiley & Sons, Ltd.

  • 7/29/2019 etep575

    8/11

    4.4. Corona performance test of UHV test line

    The first set corona loss measurement unit based on optical fiber insulator sensing technology was hung

    in UHV test line as shown in Figure 11 [8]. The results are useful for the corona loss assessment of

    UHV lines. While the simulation tests were carried on the corona cage. Those data can be used to

    modify the prediction formula and method for Transmission Conductor Selection.

    4.5. Anti-ice test

    After power grid suffered icing disasters in 2008, a large number of icing tests were carried out in the

    artificial climate laboratory [9]. The 500 kV long insulator strings icing flashover test as shown in

    Figure 12 was taken for the first time in the world, which can support the external insulation design.Various anti-icing and de-icing methods were verified in the artificial climate laboratory, such as robot,

    coating, shooting gun, and hot air.

    Figure 12. 500 kV long insulator strings icing flashover test.

    Figure 13. Impact test between UHV transmission and radio station.

    Copyright # 2011 John Euro. Trans. Electr. Power 2012; 22:108118

    DOI: 10.1002/etep

    CONSTRUCTION OF UHV AC TEST BASE OF SGCC 115

    Wiley & Sons, Ltd.

  • 7/29/2019 etep575

    9/11

    4.6. Influence of UHV transmission on radio station

    Using UHV test base, the test and flight inspection were carried on with short-wave radio direction

    finding station, short-wave radio receiving station, air intelligence radar station, aviation radio

    navigation station, sea range radio navigation station, AM broadcasting station, and televisionbroadcasting station, which accesses the worlds first test data as shown in Figure 13 [10].

    4.7. UHV live working

    Based on the research of minimum safe distance, the smallest combination space and the insulation

    tools minimum effective insulation length of UHVAC Transmission 1000 kV live work, the real live

    working was carried out in the UHV lines and live working operations safety rules and operating

    guidelines of 1000 kV UHVAC Transmission Line was established. Many UHV live working workers

    were trained at the test base as shown in Figure 14.

    Figure 14. UHV live work.

    Figure 15. 1000 kV GIS test platform.

    Copyright # 2011 John Euro. Trans. Electr. Power 2012; 22:108118

    DOI: 10.1002/etep

    116 Y. TAO, L. SHU-SEN AND W. XIONG

    Wiley & Sons, Ltd.

  • 7/29/2019 etep575

    10/11

    4.8. Study of VFTO

    Thousand kiloVolts GIS test platform of UHV AC test base was established as shown in Figure 15. And

    the typically VFTO waveform was measured by real-type GIS devices. The data confirmed the

    problems during UHV GIS disconnector operating process and the effect of related restrictions. While

    the measured data and simulation results were compared to modify the simulation model. It is very

    valuable for the GIS line design [11].

    5. LONG-TERM RESEARCH GOALS

    The research framework base on UHV test base has been drawn up. And it includes the following six

    aspects:

    (1) Optimization of UHV construction and design.

    (2) UHV corona and environmental problems.

    (3) UHV power network security.

    (4) The operation characteristics of UHV equipment.

    (5) External insulation characteristics under special climate conditions.

    (6) UHV training system.

    Based on the test facilities of UHV test base, the research for UHV project design, environment,

    operation, construction, and equipment manufacture are carried on to guide and promote the UHV

    construction.

    6. CONCLUSION

    It has been proved that related UHV key designs are reasonable by the successful operation of UHVAC

    test base. The key technical achievements are obtained at the test base, including insulation gap

    selection of UHV tower, conductor selection, optimization of substation fittings, and construction

    technology, which can be directly applied to the design and construction of UHVAC pilot project and

    strongly supported its construction.The research results of the test base show that its integrated test ability has reached international

    advanced level, at the aspect of the electromagnetic environment, external insulation, UHV equipment

    live assessment, and UHV live working.

    7. LIST OF ABBREVIATIONS

    AC Alternating Current

    CVT Capacitor Voltage Transformer

    GIS Gas Insulated Switchgear

    SGCC State Grid Corporation of China

    UHV Ultra High VoltageVFTO Very Fast Transient Overvoltage

    REFERENCE

    1. Yang Y-J, Tang J, Wu Z-R. Construction of UHV AC test base of SGCC [J]. High Voltage Engineering 2007;

    33(11):69.

    2. Wu Z-R, Chen J-B, Li X. Structure selection and test of 1000 kV transformer UHVA. Test Base of SGCC 2008;

    34(9):1014.

    Copyright # 2011 John Euro. Trans. Electr. Power 2012; 22:108118

    DOI: 10.1002/etep

    CONSTRUCTION OF UHV AC TEST BASE OF SGCC 117

    Wiley & Sons, Ltd.

  • 7/29/2019 etep575

    11/11

    3. Li S, Su W, Zhao Q-J, Qi Y. Introduction to testing section design of 1000 kV UHV AC testing site. Electric Power

    Construction 2008; 29(1):13.

    4. Wu S-P, Yang Y-J, Wang X-Q, Li X, Wu Y-H, Wu G. Electrification qualify for AC UHV electric apparatus. High

    Voltage Engineering 2008; 34(9):18131819.

    5. Wan B-Q, Wu X, Lu Y, Zhang X-W. Study on radio interference of AC UHV double circuit transmission lines on the

    same tower [J]. High Voltage Engineering 2006; 32(12):5961.

    6. Zhang G-Z, Cheng G-S, Wan B-Q, Lu Y, Wu X, Zhang X-W. Study on EM Environment of UHV Test Line Segment.

    High Voltage Engineering 2008;34

    (3):438441.7. Zhang G-Z, Wan B-Q, Lu Y, Zhang X-W, Wu X, Yang Y-J. Restraint of corona noise in UHV AC test base. High

    Voltage Engineering 2008; 34(11):23002304.

    8. Liu Y-P, You S-H, Wan Q-F, Chen W-J. Design and realization of AC UHV corona loss monitoring system [J]. High

    Voltage Engineering 2008; 34(9):17971801.

    9. Tao Y, Yi Hu, Xiong Wu, Cai W, et al. The study of icing test techniques of EHV and UHV transmission and

    transformation equipment. High Voltage Engineering 2008; 35(3):574578.

    10. Gan Z-Y, Zhang X-W, Zhang G-Z, Wan B-Q, Wu X, Zhou W-J. Protected distance of AM receiving stations to UHV

    AC transmission lines [J]. High Voltage Engineering 2008; 34(5):856861.

    11. Gu D-X, Xiu M-H, Dai M, Zhou P-H. Study on VFTO of 1000kV GIS substation. High Voltage Engineering 2007;

    11(33):2732.

    Copyright # 2011 John Euro. Trans. Electr. Power 2012; 22:108118