ETABS 2015 15.0.0-Print Drawings12

1
ETABS 2015 SCHEMATIC DESIGN DRAWINGS _____________________ THESE DRAWINGS HAVE BEEN AUTOMATICALLY GENERATED FROM INFORMATION THAT IS BASED ONLY ON CALCULATED STRENGTH REQUIREMENTS. THE DRAWING SHEETS ARE A REPRESENTATION OF THE DESIGN OUTPUT IN A SCHEMATIC FORM AND ARE NOT FOR CONSTRUCTION. ALL DETAILS SHOULD BE REVIEWED FOR COMPLIANCE WITH LOCAL DETAILING CODES AND OTHER REQUIREMENTS. THE INFORMATION ON THESE DRAWINGS MUST BE CHECKED BY A QUALIFIED AND EXPERIENCED ENGINEER. THE ENGINEER MUST INDEPENDENTLY VERIFY THE RESULTS AND TAKE PROFESSIONAL RESPONSIBILITY FOR THE FINAL INFORMATION THAT IS PRESENTED. CONSIDERABLE TIME, EFFORT AND EXPENSE HAVE GONE INTO THE DEVELOPMENT AND TESTING OF THIS SOFTWARE. HOWEVER, THE USER ACCEPTS AND UNDERSTANDS THAT NO WARRANTY IS EXPRESSED OR IMPLIED BY THE DEVELOPERS OR THE DISTRIBUTORS ON THE ACCURACY OR THE RELIABILITY OF THIS PRODUCT.

description

drawing

Transcript of ETABS 2015 15.0.0-Print Drawings12

Page 1: ETABS 2015 15.0.0-Print Drawings12

ETABS 2015

SCHEMATIC DESIGN DRAWINGS

_____________________

THESE DRAWINGS HAVE BEEN AUTOMATICALLY GENERATED FROM INFORMATION THAT IS BASED ONLY ONCALCULATED STRENGTH REQUIREMENTS. THE DRAWING SHEETS ARE A REPRESENTATION OF THE DESIGN OUTPUTIN A SCHEMATIC FORM AND ARE NOT FOR CONSTRUCTION. ALL DETAILS SHOULD BE REVIEWED FOR COMPLIANCE

WITH LOCAL DETAILING CODES AND OTHER REQUIREMENTS.

THE INFORMATION ON THESE DRAWINGS MUST BE CHECKED BY A QUALIFIED AND EXPERIENCED ENGINEER. THEENGINEER MUST INDEPENDENTLY VERIFY THE RESULTS AND TAKE PROFESSIONAL RESPONSIBILITY FOR THE

FINAL INFORMATION THAT IS PRESENTED.

CONSIDERABLE TIME, EFFORT AND EXPENSE HAVE GONE INTO THE DEVELOPMENT AND TESTING OF THISSOFTWARE. HOWEVER, THE USER ACCEPTS AND UNDERSTANDS THAT NO WARRANTY IS EXPRESSED OR IMPLIED BY

THE DEVELOPERS OR THE DISTRIBUTORS ON THE ACCURACY OR THE RELIABILITY OF THIS PRODUCT.