Ar MODULE: R&R, CSR and Envt Mgmt
QUESTION PAPER . CSR AND R&R..
ENVIRONMENT
1. What stand for SOLI Standard of living index2. The full form of MOEF is Ministry of environment and forests .
3. EIA stands forEnvironment impact assessment
4. AAS stands forAtomic absorption spectrometer5. WSSD stand forWorld summit sustainable development
6. SEAC stands forState expert appraisal committee .
7. SEIAA stands forState environment impact assessment authority .8. What is CSR?..Corporate social Responsibility .....
9. What is R&R? Resettlement and rehabitalition
10. The thermal power station should be surrounded by an exclusion zone of
a. 1.2 km b. 1.4 km c. 1.6 km d. 1.8 km
11. What should be the minimal national standard for condenser cooling watera. >5degree C of intake water temperature
b.
-
8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test
2/6
21. HSO will be provided a plot of ----------- sq. mt in the resettlement colony free of
cost if not opted for self resettlement
a. 150 sq. mt b. 200 sq. mt c. 300sq. mt d 100 sq. mt22. Cut of date for years of residence in the acquired area before notification is
a. 5 yrs. b. 2 yrs. c. 3 yrs. d. 7 yrs.
23. At regional level, the implementation of community development programme isreview by Regional ED on ----------------------- basis
a. Quaterly b. monthly c. Annually d. Half yearly
24. Location of thermal power plant should have a minimum distance from metrocities
a. 10 km b. 12 km c. 20 km d. 25km
25. PURA stands for Providing Urban Facilities in Rural Areas
26. MAW stands for Minimum agricultural Wage .27. DDGS stands for Decentralized Distributed Generation scheme
28. ICR stands forImplementation completion report
29. Multi lagoon is a concept of
a. Wet ash disposal b. coal storagec. Effluent water storage d. hazardous waste disposal
30. The passage of plank tonic weekly swimming organisms through the coolingsystem is called
a. plume migration b. entrainment c. reverse osmosis d. entrapment
31. Which one of the following is not eligible for giving public hearing documents ?
a. District magistrate b. Regional office of MOEFc. Zila perished d. None of the above
32. Appraisal for environmental issues should be completed within
..days of receipt of final EIA reporta. 45 days b. 60 days c. 30 days d. 75 days
33. Particulate pollutant may effect the plant growth by
a. Changes in epidermal layer of leaves b. Changes in endodermal leavesc. By stopping evapotranspiration d. All of the above
34. What is the minimum level of particulate matter emission in a thermal power
station ? of 210 MW or morea. 170 mg/ m3 b. 180 mg/ m3 c. 150 mg/ m3 d. 120 mg/m3
35. Which category project will not require a EIA on constructing TPS
a. Category A b. Category B1 c. Category B2 d. None of the above
36. Which of the following is the concerned authority for environment issues for aproject having < 500MW capacity
a. MOEF b. SEAC c. SEIAA d. WSSD
37. Noise limit in industrial area in day time isa. 90 dB b. 75dB c. 60 dB d. 70 dB
38. Indian coal is rich in
a. Sulpher b. arsenic c m. mineral atter d. none of these39. Which part of Thermal power plant collects fly ash
a. Stack b. ESP c. Hoffer d. CHP
40. Meteriologial and air quality study is a part of
a. EIA b. PFR c. EMP d. CSR
-
8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test
3/6
41. The NOx level is reduced in SOLONOx bumers by
a. increasing temperature b. decreasing temperature
c. decreasing pressure d. increasing pressure42. National policy on R&R is introduced in
a. 1993 b. 2000 c. 2003 d. 2005
43. Which of the following standards is responsible for environment protectiona. ISO 9001 b. ISO 14001 c. ISO 18001 d. ISO 22000
44.) -48. ) Complete the following statement
NTPC mission statement on CSR states Be a sociallyresponsible corporate entitywith thrust on enviroment. Protection, ash utilization
community development, and energy
.conservation
Write true / false against following statements (49-55)49. CSR funding is government funding True /False50. VDAC is formed by peoples from local community and company True /False
51. NTPC introduced PAP concept in 1993 True /False
52. There are four stages present in an EIA report True /False53. Hopper has the capacity of around 24 hours True /False
54. Indias desire forest level is 28% True /False55. NTPC come out with its environment policy in the year of 1995 True /False
56. RAC stands for Rehabilitation Advisory committee
57.)-60.) complete the following statement
A Socio Economic Survey (SES) will be conducted by aproffesional.. agency to collect detailed demographic. Details
of the area and which shall form the basis for the preparation of
RAP.. Briefly answer the following question :
61. What is the environment policy of NTPC ?
62. What are the basic differences between CSR and R&R ?63. What are the project sating criteria for a thermal power plant ?
64. what are the major issues of EIA ?
65. What is displacement and how does it affect common peoples surrounding aHydropower plant ?
66. What do you mean by Global Compact ?
67. What are the basic elements of CSR ?
68. What are the main functions of EMG ?69. What are the main principles of R&R ?
70. What do you mean by different categories of PAP ?
71. What do you the different benchmarking policies in CSR ?72. What do you mean by homested outsees (HSO) ?
(72-75) Fill in the blanks .
NTPC will take measures forR&R.ofPAP. With the objective that the PAP will improve or atleast regain their
previous standard of living. A National Policy on Resettlement and Rehabilitation of
project Affected Families 2003 has recently been issued by Ministry of rural
-
8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test
4/6
developement Department of Land Resources, Government of India, which aims at
laying down basic norms and packages for project Affected Families (PAFs).
76. Any any amendment / modification due site specificRequirements, while formulating and/or implementing the rehabilitation action plan
(PAP) as per the policy, the power to approve such modifications would be exercised
By a. GM (R&R) b. ED (HR) c. CMD Head 9VDAC )
77. NTPC become the first public utility to bring out a comprehensive document
entitled NTPC Environment Policy and Environment Management System. Amongstthe guiding principle, adopted in the document in year
a. 1990 b. 1995 c. 2003 d. 2005
78. NTPC has adopted a online environmental system called Pravaran monitoring
system79. What is remedial action plan ? A remedial plan for these projects which came
before the R&R policy to bridge the gaps
80. Evidence of status as a PAP is to be provided by a person in the form of
a. written legal document orb. reference to a record such as revenue officer certificate ,
c. ration cardd. none of the above
e. a, b, c, all
*****************************
Key for R & R, CSR and Envt. Mgmt.
Q.No. Answer
1. Standard of living index
2. Ministry of environment and forests
3. Environment impact assessment
4. Atomic absorption spectrometer
5. World summit sustainable development
6. State expert appraisal committee
7. State environment impact assessment authority
8. Corporate social Responsibility
9. Resettlement and rehabitalition
10. 1.6 km11. < 5 degree C of intake water temp.
12. 5.5-9
13. 200 m
14. 150 mg/ nm3
15. Tiny solid particles filled with gas
16. 1000
17. 9
-
8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test
5/6
18. Tahsildar
19. I
20. 500 days
21. 200 sq. mt.
22. 3 yrs
23. Monthly24. 25 km
25. Providing Urban Facilities in Rural Areas
26. Minimum agricultural Wage
27. Decentralized Distributed Generation scheme
28. Implementation completion report
29. Wet ash disposal
30. Entrainment
31. None of the above
32. 60 days
33. Changes in epidermal layer of leaves
34. 150 mg/ m335. Category B2
36. SEIAA
37. 75 db
38. Mineral matter
39. ESP
40. EIA
41. Decreasing temperature
42. 2003
43. ISO 14001
44. 4, responsible, environment, utilization, community, energy.
49. False
50. False
51. True
52. True
53. False
54. False
55. True
56. Rehabilitation Advisory committee
57. 60. Professional, demographic, RAP.
72. R&R
73. PAP74. 2003
75. Ministry of rural development
76. CMD
77. (b) 1995
78. Pravaran monitoring system
79. A remedial plan for these projects which came before the R&R policy to bridge the
gaps
-
8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test
6/6
80. (e) a, b, c, all
TO;Mr; Alreck John;
11; Church Road;
Toronto, Canada
Dear Sir;
Thank You forYour inquiry regarding a group tour of the Centre Museum;Yes Our current exhibition features clocks; Whether ornate or humorus;
Gives insight into how we view pm on Sunday; we are closed on
MondayPlease let us know if we can provide any further assistance
Sincerely
Roger D/ Silva
The Centre Museum
3