ET07R&R,CSR&Envt Mgmt.module Test

download ET07R&R,CSR&Envt Mgmt.module Test

of 6

Transcript of ET07R&R,CSR&Envt Mgmt.module Test

  • 8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test

    1/6

    Ar MODULE: R&R, CSR and Envt Mgmt

    QUESTION PAPER . CSR AND R&R..

    ENVIRONMENT

    1. What stand for SOLI Standard of living index2. The full form of MOEF is Ministry of environment and forests .

    3. EIA stands forEnvironment impact assessment

    4. AAS stands forAtomic absorption spectrometer5. WSSD stand forWorld summit sustainable development

    6. SEAC stands forState expert appraisal committee .

    7. SEIAA stands forState environment impact assessment authority .8. What is CSR?..Corporate social Responsibility .....

    9. What is R&R? Resettlement and rehabitalition

    10. The thermal power station should be surrounded by an exclusion zone of

    a. 1.2 km b. 1.4 km c. 1.6 km d. 1.8 km

    11. What should be the minimal national standard for condenser cooling watera. >5degree C of intake water temperature

    b.

  • 8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test

    2/6

    21. HSO will be provided a plot of ----------- sq. mt in the resettlement colony free of

    cost if not opted for self resettlement

    a. 150 sq. mt b. 200 sq. mt c. 300sq. mt d 100 sq. mt22. Cut of date for years of residence in the acquired area before notification is

    a. 5 yrs. b. 2 yrs. c. 3 yrs. d. 7 yrs.

    23. At regional level, the implementation of community development programme isreview by Regional ED on ----------------------- basis

    a. Quaterly b. monthly c. Annually d. Half yearly

    24. Location of thermal power plant should have a minimum distance from metrocities

    a. 10 km b. 12 km c. 20 km d. 25km

    25. PURA stands for Providing Urban Facilities in Rural Areas

    26. MAW stands for Minimum agricultural Wage .27. DDGS stands for Decentralized Distributed Generation scheme

    28. ICR stands forImplementation completion report

    29. Multi lagoon is a concept of

    a. Wet ash disposal b. coal storagec. Effluent water storage d. hazardous waste disposal

    30. The passage of plank tonic weekly swimming organisms through the coolingsystem is called

    a. plume migration b. entrainment c. reverse osmosis d. entrapment

    31. Which one of the following is not eligible for giving public hearing documents ?

    a. District magistrate b. Regional office of MOEFc. Zila perished d. None of the above

    32. Appraisal for environmental issues should be completed within

    ..days of receipt of final EIA reporta. 45 days b. 60 days c. 30 days d. 75 days

    33. Particulate pollutant may effect the plant growth by

    a. Changes in epidermal layer of leaves b. Changes in endodermal leavesc. By stopping evapotranspiration d. All of the above

    34. What is the minimum level of particulate matter emission in a thermal power

    station ? of 210 MW or morea. 170 mg/ m3 b. 180 mg/ m3 c. 150 mg/ m3 d. 120 mg/m3

    35. Which category project will not require a EIA on constructing TPS

    a. Category A b. Category B1 c. Category B2 d. None of the above

    36. Which of the following is the concerned authority for environment issues for aproject having < 500MW capacity

    a. MOEF b. SEAC c. SEIAA d. WSSD

    37. Noise limit in industrial area in day time isa. 90 dB b. 75dB c. 60 dB d. 70 dB

    38. Indian coal is rich in

    a. Sulpher b. arsenic c m. mineral atter d. none of these39. Which part of Thermal power plant collects fly ash

    a. Stack b. ESP c. Hoffer d. CHP

    40. Meteriologial and air quality study is a part of

    a. EIA b. PFR c. EMP d. CSR

  • 8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test

    3/6

    41. The NOx level is reduced in SOLONOx bumers by

    a. increasing temperature b. decreasing temperature

    c. decreasing pressure d. increasing pressure42. National policy on R&R is introduced in

    a. 1993 b. 2000 c. 2003 d. 2005

    43. Which of the following standards is responsible for environment protectiona. ISO 9001 b. ISO 14001 c. ISO 18001 d. ISO 22000

    44.) -48. ) Complete the following statement

    NTPC mission statement on CSR states Be a sociallyresponsible corporate entitywith thrust on enviroment. Protection, ash utilization

    community development, and energy

    .conservation

    Write true / false against following statements (49-55)49. CSR funding is government funding True /False50. VDAC is formed by peoples from local community and company True /False

    51. NTPC introduced PAP concept in 1993 True /False

    52. There are four stages present in an EIA report True /False53. Hopper has the capacity of around 24 hours True /False

    54. Indias desire forest level is 28% True /False55. NTPC come out with its environment policy in the year of 1995 True /False

    56. RAC stands for Rehabilitation Advisory committee

    57.)-60.) complete the following statement

    A Socio Economic Survey (SES) will be conducted by aproffesional.. agency to collect detailed demographic. Details

    of the area and which shall form the basis for the preparation of

    RAP.. Briefly answer the following question :

    61. What is the environment policy of NTPC ?

    62. What are the basic differences between CSR and R&R ?63. What are the project sating criteria for a thermal power plant ?

    64. what are the major issues of EIA ?

    65. What is displacement and how does it affect common peoples surrounding aHydropower plant ?

    66. What do you mean by Global Compact ?

    67. What are the basic elements of CSR ?

    68. What are the main functions of EMG ?69. What are the main principles of R&R ?

    70. What do you mean by different categories of PAP ?

    71. What do you the different benchmarking policies in CSR ?72. What do you mean by homested outsees (HSO) ?

    (72-75) Fill in the blanks .

    NTPC will take measures forR&R.ofPAP. With the objective that the PAP will improve or atleast regain their

    previous standard of living. A National Policy on Resettlement and Rehabilitation of

    project Affected Families 2003 has recently been issued by Ministry of rural

  • 8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test

    4/6

    developement Department of Land Resources, Government of India, which aims at

    laying down basic norms and packages for project Affected Families (PAFs).

    76. Any any amendment / modification due site specificRequirements, while formulating and/or implementing the rehabilitation action plan

    (PAP) as per the policy, the power to approve such modifications would be exercised

    By a. GM (R&R) b. ED (HR) c. CMD Head 9VDAC )

    77. NTPC become the first public utility to bring out a comprehensive document

    entitled NTPC Environment Policy and Environment Management System. Amongstthe guiding principle, adopted in the document in year

    a. 1990 b. 1995 c. 2003 d. 2005

    78. NTPC has adopted a online environmental system called Pravaran monitoring

    system79. What is remedial action plan ? A remedial plan for these projects which came

    before the R&R policy to bridge the gaps

    80. Evidence of status as a PAP is to be provided by a person in the form of

    a. written legal document orb. reference to a record such as revenue officer certificate ,

    c. ration cardd. none of the above

    e. a, b, c, all

    *****************************

    Key for R & R, CSR and Envt. Mgmt.

    Q.No. Answer

    1. Standard of living index

    2. Ministry of environment and forests

    3. Environment impact assessment

    4. Atomic absorption spectrometer

    5. World summit sustainable development

    6. State expert appraisal committee

    7. State environment impact assessment authority

    8. Corporate social Responsibility

    9. Resettlement and rehabitalition

    10. 1.6 km11. < 5 degree C of intake water temp.

    12. 5.5-9

    13. 200 m

    14. 150 mg/ nm3

    15. Tiny solid particles filled with gas

    16. 1000

    17. 9

  • 8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test

    5/6

    18. Tahsildar

    19. I

    20. 500 days

    21. 200 sq. mt.

    22. 3 yrs

    23. Monthly24. 25 km

    25. Providing Urban Facilities in Rural Areas

    26. Minimum agricultural Wage

    27. Decentralized Distributed Generation scheme

    28. Implementation completion report

    29. Wet ash disposal

    30. Entrainment

    31. None of the above

    32. 60 days

    33. Changes in epidermal layer of leaves

    34. 150 mg/ m335. Category B2

    36. SEIAA

    37. 75 db

    38. Mineral matter

    39. ESP

    40. EIA

    41. Decreasing temperature

    42. 2003

    43. ISO 14001

    44. 4, responsible, environment, utilization, community, energy.

    49. False

    50. False

    51. True

    52. True

    53. False

    54. False

    55. True

    56. Rehabilitation Advisory committee

    57. 60. Professional, demographic, RAP.

    72. R&R

    73. PAP74. 2003

    75. Ministry of rural development

    76. CMD

    77. (b) 1995

    78. Pravaran monitoring system

    79. A remedial plan for these projects which came before the R&R policy to bridge the

    gaps

  • 8/7/2019 ET07R&R,CSR&Envt Mgmt.module Test

    6/6

    80. (e) a, b, c, all

    TO;Mr; Alreck John;

    11; Church Road;

    Toronto, Canada

    Dear Sir;

    Thank You forYour inquiry regarding a group tour of the Centre Museum;Yes Our current exhibition features clocks; Whether ornate or humorus;

    Gives insight into how we view pm on Sunday; we are closed on

    MondayPlease let us know if we can provide any further assistance

    Sincerely

    Roger D/ Silva

    The Centre Museum

    3