E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

12
E.T. Design Study & E.T. Design Study & European roadmaps European roadmaps Michele Punturo/Harald Lück Michele Punturo/Harald Lück

Transcript of E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

Page 1: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

E.T. Design Study &E.T. Design Study &European roadmapsEuropean roadmaps

Michele Punturo/Harald LückMichele Punturo/Harald Lück

Page 2: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

ASPERA RoadmapASPERA Roadmap

ASPERA = collaboration of European funding agencies involved into ASPERA = collaboration of European funding agencies involved into astro-particle physics to coordinate research at European levelastro-particle physics to coordinate research at European level

Goals:Goals:

– Promote Promote Astroparticle PhysicsAstroparticle Physics within the member states of within the member states of ASPERAASPERA

– Stimulate coordination and cooperation within the European Stimulate coordination and cooperation within the European astroparticle communityastroparticle community

– Prepare future decisions at Prepare future decisions at National and European levelsNational and European levels

Write roadmap to define goals on 10 year timescaleWrite roadmap to define goals on 10 year timescale

– Cosmology and the early Universe Cosmology and the early Universe

– Particle Properties Particle Properties

– Neutrinos as messengers from the Sun, supernovae and the Earth Neutrinos as messengers from the Sun, supernovae and the Earth

– The non-thermal Universe The non-thermal Universe

– Gravitational Waves (cochairs: Punturo, Lueck)Gravitational Waves (cochairs: Punturo, Lueck)

Page 3: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

Astronet RoadmapAstronet Roadmap

ERA-Net-Project within FP6 of the EU; duration 2005 ERA-Net-Project within FP6 of the EU; duration 2005 + 4 years.+ 4 years.

Participants: 9 European national ‚funding agencies‘ Participants: 9 European national ‚funding agencies‘ (CNRS-INSU, BMBF, ESO, INAF, STFC, NOTSA, MEC, NWO, PT-DESY; + ESA, MPG (CNRS-INSU, BMBF, ESO, INAF, STFC, NOTSA, MEC, NWO, PT-DESY; + ESA, MPG assosciated)assosciated)

Goal: create basis for coordination of long term Goal: create basis for coordination of long term planning of astronomy in Europeplanning of astronomy in Europe

Write roadmap to define goals on 20 year timescaleWrite roadmap to define goals on 20 year timescale– LISA LISA

– … …

Page 4: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

´06´06 ´07´07 ´08´08 ´09´09 ´10´10 ´11´11 ´12´12 ´13´13 ´14´14 ´15´15 ´16´16 ´17´17 ´18´18 ´19´19 ´20´20 ´21´21 ´22´22

VirgoVirgo

GEOGEO

LIGOLIGO

LISALISA

E.T.E.T.

Virgo+

LIGO+

Advanced Virgo

GEO HF

Advanced LIGO

DS PCP Construction Commissioning

HanfordHanford

LivingstonLivingston

Launch Transfer data

data

TimelinesTimelinesYou are here

1st Generation 2nd Generation 3rd Gen.

Page 5: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

1st generation2nd generation3rd generation

1 10 100 1000 1000010

-25

10-24

10-23

10-22

10-21

10-20

10-19

Page 6: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

1st generation2nd generation3rd generation

1 10 100 1000 1000010

-25

10-24

10-23

10-22

10-21

10-20

10-19

3 main noise sources3 main noise sources

Thermal Noise

Seismic

Shot Noise

Page 7: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

ET: Baseline ConceptUnderground location– Reduce seismic noise

– Reduce gravity gradient noise– Eases low frequency suspensions

Cryogenic

Overall beam tube length ~ 30km

Possibly Δ instead of L geometry

Page 8: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

ConceptualConceptual Design Study Design Study Start Feb. / March 2008Start Feb. / March 2008

Working Packages:Working Packages:

11 Site and infrastructureSite and infrastructure22 Thermal noise of mirrors and Thermal noise of mirrors and suspensions / cryogenicssuspensions / cryogenics33 Optical configurationOptical configuration44 Astrophysics issuesAstrophysics issues55 ManagementManagement

Jo Van den Brand

P. Rapagnani

A. Freise

B. Sathyaprakash

M. Punturo

Page 9: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

The Participants

Participant no.

Participant organization name Country

1 European Gravitational Observatory Italy

2 Istituto Nazionale di Fisica Nucleare Italy

3 Max-Planck-Gesellschaft zur Foerderung der Wissenschaften e.V., acting through Max-Planck-Institut fuer Gravitationsphysik

Germany

4 Centre National de la Recherche Scientifique France

5 University of Birmingham United Kingdom

6 University of Glasgow United Kingdom

7 Vereniging voor christelijk hoger onderwijs, wetenschappelijk onderzoek en patiëntenzorg

The Netherlands

8 University of Cardiff United Kingdom

Page 10: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

Science TeamScience Team

Initially co-chaired byInitially co-chaired by– GEO spokesperson GEO spokesperson (Karsten Danzmann)(Karsten Danzmann)– Virgo spokesperson Virgo spokesperson (Benoit Mours)(Benoit Mours)– Virgo-EGO Scientific Forum (VESF) coordinator Virgo-EGO Scientific Forum (VESF) coordinator (Francesco (Francesco

Fidecaro)Fidecaro)

MembersMembers– Open to all members of GW community Open to all members of GW community willing to contribute to the willing to contribute to the

DSDS– Initial members will be the coordinators of the research groups

participating in the project and the main scientists of the European gravitational wave community, indicated by the three co-chairpersons

Meetings:Meetings:– must meet at least once a year, during the annual project plenary

meeting

ESF proposal being written to support Science teamESF proposal being written to support Science team

Page 11: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

Results to be achieved in the DS Results to be achieved in the DS within the next three yearswithin the next three years

Site selection: scientific, operative, legal, Site selection: scientific, operative, legal, financial, administrativefinancial, administrativeSeismic isolation, suspension, substrates, Seismic isolation, suspension, substrates, coatings compatible with cryogenic coatings compatible with cryogenic operationoperationGeometry, topology, configuration of IFO Geometry, topology, configuration of IFO with sensitivity < SQL; high power effectswith sensitivity < SQL; high power effectsOptimize scientific output and define DA Optimize scientific output and define DA requirementsrequirements

Page 12: E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.

´06´06 ´07´07 ´08´08 ´09´09 ´10´10 ´11´11 ´12´12 ´13´13 ´14´14 ´15´15 ´16´16 ´17´17 ´18´18 ´19´19 ´20´20 ´21´21 ´22´22

VirgoVirgo

GEOGEO

LIGOLIGO

LISALISA

E.T.E.T.

Virgo+

LIGO+

Advanced Virgo

GEO HF

Advanced LIGO

DS PCP Construction Commissioning

HanfordHanford

LivingstonLivingston

Launch Transfer data

data

TimelinesTimelinesYou are here

1st Generation 2nd Generation 3rd Gen.