SL.NO DESCRIPTION UNIT NO'S LENGTH BREADTH DEPTH QUANTITY
1 BRICK WORK CUM 2 16.02 0.23 2.7 19.46214
2 PLASTERINGINSIDE WALLS SQ.M 4 15.1 2.58 37.068
OUTSIDE WALLS SQ.M 4 16.94 2.7 43.848
3 TOP SLAB CUM 1 5.31 3.16 0.12 2.013552
-
8/13/2019 Estimation of Room
2/4
DEDUCTIONS
0.4347
1.89
1.89
-
8/13/2019 Estimation of Room
3/4
111
Column1 Column2 Column3 Column4 Column5 Column6 Column7
SL.NO DESCRIPTION UNIT NO'S LENGTH BREADTH DEPTH
1 TOP SLAB CUM 1 3.46 3.46 0.12
2 BRICK WORK CUM 1 12.92 0.23 2.55
3
PARAPET WALL
.115*.9 CUM 1 12 0.115 0.9
4BEAM CONCRETE CUM 1 12.92 0.23 0.33
4PLASTERING
INSIDE WALLS SQ.M 1 12 2.88
OUTSIDE WALLS SQ.M 1 13.84 3
CEILING SQ.M 1 3 3
TOTAL
5 R.R MASONARY CUM 1 12.92 0.45 0.3
6 P.C.C CUM 1 12.92 0.45 0.1
7 STEEL
8 FLOORING SQ.M 1 3 3
9 DOOR (.9*2.1) NOS 1
10 PAINTING 1
11 SKIRTING RM 1 12
11
PLUMBING AND
ELECTRICAL
12
WEATHERING
COURSE SQM 1 3.23 3.23
-
8/13/2019 Estimation of Room
4/4
Column8 Column9
QUANTITY DEDUCTIONS
1.436592
7.57758 0.4347
1.242
0.980628
32.67 1.89
39.63 1.89
9
81.3
1.7442
0.5814
193.3776
9
1
81.3
11.1
10.4329