Estimation

10
1 1 1 eresource nfra ERP Estimation Module

description

nfrais an effective Customer Relationship Management software produced by eresource Infotech Pvt. Ltd., the pioneers of Web-based ERP solution in India. With the support of highly talented professional team, infra CRM is armed with full backing of professional training and consultancy, and firmly believe that all our customers should derive the maximum benefit from their investment.

Transcript of Estimation

Page 1: Estimation

1 1

1

eresource nfra ERP

Estimation Module

Page 2: Estimation

2 2

2

Estimation of a project cost begins with this page. This is where material items that are required for a project has been entered. While entering the material item, the estimated price of the item will be reflected in the column alongside as per the last purchased rate, which will be fetched from the item master page. Item-line wise cost of each materials will be displayed that can be added up to get the total cost of material required for the project.

Page 3: Estimation

3 3

3

BOQ Where you can add new BOQ details from this form.

Show list of item and its details which you enter

Save your details

Page 4: Estimation

4 4

4

BOQ Services

Add new services

Where you can add extra service along with the items

Page 5: Estimation

5 5

5

Add Material(Tools Rate)

Out generated from master

Your default set rate

System generated amount as per default rate set

List of your entered items

Page 6: Estimation

6 6

6

Installation (Tools Rate)

System generated amount as per default rate set

List of added items Resource involved in project with their wages

Assign Resources for project

The man power expenses or labour charge for the project that being carried out can be estimated using this page. Tool rate that are required to carry out the labour work along with the labour charge can be summed up and the total labour charge can be calculated using this page.

Page 7: Estimation

7 7

7

Subcontract(Hiring)

Select your resource type Unit of Measurement Auto generated amount

It is a common practice for project-based companies go for hiring services as all the services may not be functioning under their wing. Or sometime they are forced to hire equipments that are also considered services. Any hiring services that are hired by the company can be estimated and managed through this page, which will be ultimately reflected in the final estimate.

Page 8: Estimation

8 8

8

Add on MasterIncurring additional expense is a common scenario as far as a project-industry work is concerned. Additional cost like freight, loading, unloading, commissions cannot be avoided and these expenses, which falls under the additional expenses or Add on charges can be included in the final estimation using this module.

Select add on type Select profit type

Select the category on which you want to rate your user

Page 9: Estimation

9 9

9

Contact Us

AddressTMA House, 1st Floor, Road No:16Plot No. 6, Wagle Industrial EstateThane (West) 400 604, Maharashtra

+91 22 41118000/8049(50 lines)www.eresourceerp.com

Page 10: Estimation

9 9

9