ESTIMATE OF STRUCTURE QUANTITIES - South Dakota … · superstructure consists of a 6.5” to 8”...
Transcript of ESTIMATE OF STRUCTURE QUANTITIES - South Dakota … · superstructure consists of a 6.5” to 8”...
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
DESIGNED BY DRAWN BY CHECKED BY
BRIDGE ENGINEERBRIDGE ENGINEER
- X020 -
+
PCN 5996
STR. NO. 23-466-090
+STA. 16 14. 00 TO 17 16. 75 BRF 3134(01)276
32’- 0’’ ROADWAY
TRIBUTARY TO SNAKE CR.
OF1 17
102’ - 9’’ CONTINUOUS CONCRETE BRIDGE
0 SKEW
HS25-44
(& ALT.)
DM/MM MM/DM
S. D. DEPT. OF TRANSPORTATION
MARCH 2005
EDMUNDS COUNTY
FOR
GENERAL DRAWING
LS
SEC. 14/23-T123N-R66W(T
yp.)
1421. 743 1422. 063
1422. 131
1421. 853
1421. 872
1421. 902 1422. 222
1421. 983
1422. 392
1422. 449
1422. 514
1422. 602
1422. 380 1422. 700
1422. 775
1422. 823
1422. 455
The elevations shown in these plans are based on the National Geodetic
Survey (NGS) North American Vertical Datum of 1988 (NAVD88).
1422. 503
1422. 072
1422. 194
1422. 282
Sheet No. 8 -
Sheet No. 9 -
Sheet No. 10 -
INDEX OF BRIDGE SHEETS-
General Drawing
Estimate of Structure Quantities & Notes
Notes (Continued)
Notes (Continued)
Details of Standard Plate No. 460. 02 & No. 460. 05
Abutment Details
Bent Details
Superstructure Details
Details of Bridge End Backfill
As - Built Elevation Survey
Riprap Details
Subsurface Investigation, Piling & Drilled Shaft Layout
PLANS BY :
OFFICE OF BRIDGE DESIGN, SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION
N
ELEVATION
- 4 -
- 2 - - 3 -
- 1 -
P. I.
P. C.P. T.
at Roadway
VERTICAL CURVE DATA
P. I.
++
+
= =
End Bridge
+
+
==
CL
+
Top of Subgrade
V. C. 200’
El. 1420. 40 (Subgr. )
Sta. 16 19. 00
Sta. 16 19. 00
Sta. 15 19. 00
g1 - 0. 2576% g2 1. 1264%
Begin Bridge
2
1
2
1
H.W. Elev. 141 7. 7
(25 year)
F.L. El. 1404. 0
El. 141 7. 24El. 141 7. 00
H.W. Elev. 1420. 8
CL == Top of Slab at Curb Elevation
Top of Slab at Centerline Elevation
Class B Riprap
Type B Drainage Fabric
2’
- 0
’’El. 1418. 00
Existing Ground
16’’ Surfacing
Sta. 1 7 19. 00
NOTE: T. S. at El.
T. S. at C. El.
Sta. 16 14. 00
Sta. 1 7 16. 75
El. 1416. 24
2’- 0
’’
Dam Crest Elev. 1413. 76 7’
- 0
’’-+
d
A d
V d
F
100
F
100
d
project based on 25 year frequency.
=
=
=
HYDRAULIC DATA
2497 cfs
743 sq. ft.
3. 4 fps
2497 cfs
5715 cfs
frequency. El. 141 7. 7
based on 100 year frequency. El. 1420. 8
maxV 5. 8 fps
=maxV Maximum computed outet velocity for the proposed bridge
based on 100 year frequency
Slab
PointLeft Curb
0
1
2
4
5
6
7
8
9
10
12
1 1
Right CurbCL
TABLE OF SLAB
ELEVATIONS
3
Abut. No. 1 Abut. No. 4
CL CL CLCL
1 2 3 40 5 6 7 8 9 10 121 1
(See TABLE OF SLAB ELEVATIONS for elevations)
CENTERLINE AND CURB ELEVATIONS
102’ - 9’’
Bent No. 3Bent No. 2
4 Spaces 7’ - 9’’
31’ - 0’’ 38’ - 9’’ 31’ - 0’’ 1’ - 0’’1’ - 0’’
Camber for Dead Load Deflection
plus Plastic Flow, Shown on Sheet
the elevations shown.
4 Spaces 7’ - 9’’
HP 10 X 42 Steel Pile (Typ.)
þÿ�4� �S�p�a�c�e�s� �
Sheet No. 2 -
Sheet No. 4 -
Sheet No. 5 -
Sheet No. 6 -
Sheet No. 1 -
Sheet No. 3 -
Sheet No. 7 -
Sheet No. 13 -
Sheet No. 1 1 -
Sheet No. 12 -
Sheet No. 14 -
Sheet No. 15 -
Details of Standard Plate No. 630. 92
Details of Standard Plate No. 510. 40 & No. 620. 18
End Block, Barrier Curb and Deck Drain Details
-X020-
(100 year)
(Typ.)
(Typ.)
1422. 303
1421. 743
1421. 853
1421. 872
1421. 902
1421. 983
1422. 380
1422. 455
1422. 503
1422. 072
1422. 194
1422. 282
1421. 81 1 1421. 81 1
1422. 1 73
1422. 192
1422. 129 1422. 129
Dril
led
Sh
aft
Ex
cav
ati
on
Un
cla
ssif
ied
Ex
cav
ati
on
Elev. 1377. 38 Elev. 1378. 01
FL
OW
Trib
.
to S
nak
e C
reek
CLCL
Abut. No. 1Bent No. 2
CL
CL
Bent No. 3Abut. No. 4
CL
+
+CL
7’- 0’’
PLAN
Berm
(Typ.)
34
’ -
8’’
O
vera
ll
32’
- 0’’
R
oadw
ay
+CL
+CL
Begin Bridge End Bridge
LC
Rd
wy
Sta. 16 14. 00 Sta. 1 7 16. 75
T. S. at El. 1422. 83T. S. at El. 1422. 06
T. S. at El. 1422. 51
Sta. 16 84. 75
Sta. 16 46. 00
+CLT. S. at El. 1422. 82
+CL
Sta. 16 15. 00
T. S. at El. 1422. 06
Sta. 1 7 1 5. 75
T. S. at C. El. 1422. 50 T. S. at C. El. 1422. 51
T. S. at C. El. 1422. 50 T. S. at C. El. 1422. 51T. S. at C. El. 1422. 19
T. S. at C. El. 1422. 19
T. S. at C. El. 1421. 90
T. S. at C. El. 1421. 90
T. S. at C. El. 1421. 74T. S. at C. El. 1421. 74
T. S. at C. El. 1421. 74 T. S. at C. El. 1421. 74
Existing Structure
T. S. at El. 1422. 22
15’ - 6’’15’ - 6’’ 15’ - 6’’15’ - 6’’
1’ - 0’’1’ - 0’’1
’ -
4’’
1’
- 4’’
31’ - 0’’ 38’ - 9’’ 31’ - 0’’
102’ - 9’’
16
’ -
0’’
16
’ -
0’’
Type B Drainage Fabric (Typ.)
Class B Riprap (Typ.)
10’ - 0’’ (Typ.)
CL
Deck Drain
CL
Deck Drain
Deck Drain (Typ.)
Ex
cav
ati
on
Str
uctu
re
No. 8 of 15, have been included in
1
2
3
4
5
6
Hydraulic Data
Index of Sheets
7
8
9
10
Title Block
REQUIRED LIST
Project Block
Plan View
Elevation View
Horiz.& Vert. Curve Data
Design Firm or Office
CLCurb & Elevations
Survey Datum Box
3
2
1
10
8
7
4
5
9
6
8
Sheet No. 16 -
Details of Approach Slab Adj. to Bridge
Sheet No. 1 7 -
Details of Approach Slab Joint Details
Reference
Continuous Concrete 01
11 North Arrow
11
ESTIMATE OF STRUCTURE QUANTITIES AND NOTES FOR
102’- 9” CONTINUOUS CONCRETE BRIDGE
Str. No. 23-466-090 August 2005
OF 2 15
BRIDGE ENGINEER
CHECKED BY:
MM/DM Notes
DESIGNED BY
MM/DM Continuous
DRAWN BY:
DC Concrete
PROJECT STATE OF
S.D. Reference
SHEET NO.
TOTAL SHEETS
ESTIMATE OF STRUCTURE QUANTITIES
DESCRIPTION QUANTITY UNIT REMARKS Bridge Elevation Survey Lump Sum LS See Sht.
13 of 17 Concrete Penetrating Sealer 363 Sq Yd See Spec.
Provision Bridge End Embankment 665 Cu Yd See Spec.
Provision Incidental Work, Structure Lump Sum LS Structure Excavation, Bridge 16.4 Cu Yd Granular Bridge End Backfill 18 Cu Yd Class A45 Concrete, Bridge Deck 176.8 Cu Yd Class A45 Concrete, Bridge 41.0 Cu Yd Deck Drain, Slab Bridge 4 Each Class A45 Concrete, Drilled Shaft 45.6 Cu Yd Drilled Shaft Excavation 29.7 Cu Yd 38” Permanent Casing 88 Ft Reinforcing Steel 13394 Lb Epoxy Coated Reinforcing Steel 55551 Lb Preboring Pile 80 Ft HP10x42 Steel Test Pile, Furnish and Drive 80 Ft HP10x42 Steel Bearing Pile, Furnish and Drive 210 Ft 4” Underdrain Pipe 129 Ft
Porous Backfill 23 Ton Class B Riprap 1049.0 Ton Type B Drainage Fabric 1269 Sq Yd
SPECIFICATIONS FOR BRIDGE 1. Design Specifications: AASHTO Standard Specifications for Highway
Bridges, 2002 Edition using Load Factor Design Method, except Working Stress Method is used for drilled shaft design depth and fatigue analysis.
2. Construction Specifications: South Dakota Standard Specifications
for Roads and Bridges, 2004 Edition and required Provisions, Supplemental Specifications and/or Special Provisions as included in the Proposal.
BRIDGE DESIGN LOADING 1. AASHTO HS25-44 & Alternate, except HS20-44 & Alt. loading was
used for serviceability requirements. 2. Dead Load includes 22 psf for future wearing surface on the
roadway. UNIT DESIGN STRESSES 1. Ultimate Strength Design Concrete f’c = 4,500 psi Reinforcing Steel fy = 60,000 psi 2. Service Load Design Concrete fc = 1,800 psi Reinforcing Steel fs = 24,000 psi GENERAL CONSTRUCTION 1. All reinforcing steel shall conform to ASTM A615, Grade 60. 2. All exposed concrete corners and edges shall be chamfered 3/4”
unless noted otherwise. 3. Use 2” clear cover on all reinforcing steel except as shown. 4. Contractor shall imprint on the structure the date of new construction
as specified and detailed on Standard Plate No. 460.02. 5. Barrier Curbs and End blocks shall be built normal to the grade. 6. Request for construction joints or resteel splices at points other than
those shown, must be submitted to the Engineer for prior approval. If additional splices are approved, no payment will be allowed for the added quantity of resteel.
7. The elevation of the concrete bridge deck is 16” above subgrade
elevation.
INCIDENTAL WORK, STRUCTURE 1. In place centerline Sta. 16+19.21 to centerline Sta. 16+99.21 is a
80’-0” three span I-beam viaduct with a 24’-0” clear roadway. The superstructure consists of a 6.5” to 8” thick reinforced concrete slab supported on steel girders. Concrete barrier faced with W-beam runs the length of the bridge. The deck has been overlaid with an estimated 3.5” of asphalt. The substructure consists of 2 column reinforced concrete bents on timber piling and reinforced concrete spill through abutments supported on timber piling.
2. Break down and remove the existing bridge, and approach slabs if
applicable, to 1 foot below finished groundline, or as required to construct the new structure in accordance with Section 110 of the South Dakota Standard Specifications. All portions of the existing bridge shall be removed and disposed of by the Contractor on a site obtained by the Contractor and approved by the Engineer in accordance with the WASTE DISPOSAL NOTES found in the grading plans.
3. During demolition of the structure, asphalt shall not be allowed to fall
into the creek. 4. The foregoing is a general description of the in-place bridge and
should not be construed to be complete in all details. Before preparing the bid it shall be the responsibility of the Contractor to make a visual inspection of the structure to verify the extent of the work and materials involved. If desired by the Contractor, a copy of the original construction plans may be obtained through the Office of Bridge Design.
NOTICE - LEAD BASED PAINT Be advised that the paint on the steel surfaces of the existing structure contains lead. The Contractor should plan his/her operations accordingly, and inform his/her employees of the hazards of lead exposure.
3 2 4
11
2
3
4
Title Block
Project Block
Estimate of Quantities
Notes
REQUIRED LIST
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
DESIGNED BY DRAWN BY
BRIDGE ENGINEERBRIDGE ENGINEER
+STR. NO. 23-466-090
+STA. 16 14. 00 TO 17 16. 75 BRF 3134(01)276
32’- 0’’ ROADWAY
TRIBUTARY TO SNAKE CR.
OF5 15
0 SKEW
HS25-44
(& ALT.)
N
DM/MM DM/MM
S. D. DEPT. OF TRANSPORTATION
MARCH 2005
EDMUNDS COUNTY
FOR
15+00 16+00
17+00
18+00
M1M2 M3
M4
M5
M6CL ROADWAY
SUBSURFACE INVESTIGATION,
PILING AND DRILLED SHAFT LAYOUT
+Sta. 1 7 1 5. 75
FL
OW
Trib
.
to S
nak
e C
reek
+Sta. 16 46. 00
+Sta. 16 15. 00
Bent No. 2
CL
Bent No. 3
CL
Abut. No. 4
CL
Abut. No. 1
CL
+Sta. 16 84. 75
3 S
p 1
0’ -
0’’ 3
0’ -
0’’
=(T
yp
.)
20
’ -
0’’
5’
- 0’’
Drilled Shaft (Typ.)
PILING AND DRILLED SHAFT LAYOUT
5’
- 0
’’
10
’ -
0’’
10
’ -
0’’
(Typ.)
(Typ.)
(Typ.)
(Typ.)
HP 10 X 42 Steel Pile (Typ.)
(Ty
p.)
SEC. 14/23-T123N-R66W
CHECKED BY
LS
AUGER TEST
DRIVE TEST
LEGEND
RESULTS OF LABORATORY TESTS, IF ANY,
ARE AVAILABLE FOR REVIEW AT THE CENTRAL
OFFICE IN PIERRE.
THIS PROJECT. THESE LOGS AND ADDITIONAL
HAS ON FILE ALL OF THE BORING LOGS FOR
THE GEOTECHNICAL ENGINEERING ACTIVITY
RESISTANCE TO PENETRATION OF THE SOIL.
DRIVE TESTS CONDUCTED BY DROPPING A
490 POUND HAMMER 30 INCHES TO DRIVE A
RETRACTABLE PLUG SAMPLER FOR TAKING
þÿ�2 !� � �I�N�C�H� � � �D�R�I�L�L� � �S�
UNDISTURBED SAMPLES AND TO MEASURE THE
WATER
CAVED ZONE
SAMPLE
17+00 18+0015+00 16+00
1420 1420
1410
1400
1390
1380
1370
1360
1350
1340
1330
1320
1310
1300
1410
1400
1390
1380
1370
1360
1350
1340
1330
1320
1310
1300
M1 M2 M3 M4M5M6
O 50 100 150 200
BLOWS PER FOOT
O 50 100 150
BLOWS PER FOOT
MEASURED SKIN FRICTION
ELEV PSF
M2 1393.7 1,407
M4 1393.8 2,099
PI E R R E S H A L E I S A M A R I N E S H A L E W I T H
A T E X T U R A L C L A S S I FI C A T I O N
T H A T
V A R I E S F R O M SI L T - C L A Y T O C L A Y -
SI L T . C O L O R V A R I E S F R O M B U F F G R A Y
T O B L A C K . T H E F O R M A T I O N M A Y
C O N T A I N C O N C R E T I O N Z O N E S T H A T A R E
N O R M A L L Y T H I N
B U T O C C A S I O N A L L Y
A R E M A S S I V E . T H E S E Z O N E S M A Y B E
C O N S I D E R E D H A R D A N D D E N S E . T H I N
Z O N E S M A Y B E P R E S E N T T H A T A R E
C E M E N T E D R E S U L T I N G I N C L A Y S T O N E
O R S I L T - S T O N E S E A M S . B E N T O N I T E
Z O N E S M A Y B E E N C O U N T E R E D B U T A R E
N O R M A L L Y L E S S T H A N O N E
H A L F I N C H
T H I C K . N O N W E A T H E R E D PI E R R E S H A L E
I S C O N SI D E R E D T O B E " S O F T R O C K ".
HOLE NUMBER M2
DEPTH 28.0 ft
STATION 16+12
SOIL COLOR GRAY
CLASSIFICATION SILT-CLAY
DRY DENSITY 91.3 pcf
WET DENSITY 115.3 pcf
MOISTURE 26.2 %
PASS NO. 200 79.7 %
SAND CONTENT 17.6 %
SILT CONTENT 39.3 %
CLAY CONTENT 40.5 %
PASS NO. 10 97.3 %
PASS NO. 40 88.8 %
STRENGTH ( ) 49,372 psfQ u
HOLE NUMBER M2
DEPTH 26.3 ft
STATION 16+12
SOIL COLOR GRAY
CLASSIFICATION SILT-CLAY
DRY DENSITY 77.2 pcf
WET DENSITY 97.6 pcf
MOISTURE 26.4 %
PASS NO. 200 73.0 %
SAND CONTENT 12.4 %
SILT CONTENT 42.6 %
CLAY CONTENT 30.4 %
PASS NO. 10 85.4 %
PASS NO. 40 79.3 %
STRENGTH ( ) ----- psfQ u
GRAY SILT-CLAY
(PIERRE SHALE)
BROWN SILT-CLAY
(FILL)
BROWN SILT-CLAY
(FILL)
BROWN/GRAY
SILT-CLAY
HOLE NUMBER M4
DEPTH 28.0 ft
STATION 17+16
SOIL COLOR -----
CLASSIFICATION SILT-CLAY
DRY DENSITY 87.0 pcf
WET DENSITY 110.0 pcf
MOISTURE 26.5 %
PASS NO. 200 70.1 %
SAND CONTENT 26.2 %
SILT CONTENT 39.6 %
CLAY CONTENT 30.4 %
PASS NO. 10 96.3 %
PASS NO. 40 80.8 %
STRENGTH ( ) ----- psfQ u
GROUND WATER ELEVATIONS AS
M1 1412.5
M2 CAVED 1410.8
M3 1412.5
M4 ------
M5 DRY
M6 ------
OF FEBRUARY 2005
102’-9’’ CONTINUOUS CONCRETE BRIDGE
3
4
1
2
3
Title Block
REQUIRED LIST
Project Block
2
1
Continuous Concrete 03
Plan View (Piling Layout)
Reference
4
North Arrow5
5
Subsurface Profile
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
DESIGNED BY DRAWN BY CHECKED BY
BRIDGE ENGINEERBRIDGE ENGINEER
DM/MMLSDM/MM
FOR
+STR. NO. 23-466-090
+STA. 16 14. 00 TO 17 16. 75 BRF 3134(01)276
32’- 0’’ ROADWAY
TRIBUTARY TO SNAKE CR.
OF6
0 SKEW
HS25-44
(& ALT.)
ABUTMENT DETAILS
Abutm
ent
C L
12
’’1
2’’
Sym. Abt.
CL
Abutment
PLAN
T4
U3
S2S3
(Ty
p.)
Level
ELEVATION
6’’
12’’ 3’’
Steel Pile Spacing
A
B
C
A
++
Back Face
U2 & U4
(Typ.)
= 2’ - 9’’
(Typ.)
Roadway
&
þÿ�5
�’� �-
�
2’
- 0
’’
3 Spaces
1 1’’
HP 10 X 42
1’ - 4’’ 1’ - 2’’ 3’ - 0’’
2’
- 0
’’
6’ - 6’’5’ - 0’’
32’ - 0’’ Roadway
Front Face
( Abut. No. 1 shown; Abut. No. 4 opposite hand )
INC
RE
AS
ING
ST
AT
ION
S
Ab
ut.
N
o.
4
INC
RE
AS
ING
ST
AT
ION
S
Ab
ut.
N
o.
1
4’
- 6
’’1
’ -
6’’
Abut. No. 1 El. 1416. 24
Construction Joint
þÿ�4
�’�
�-�
þÿ�1
�’� �-
�
V1
V2
V3
V4
þÿ�2
�’�
�-�
V1
V2
V3
V4
S0 - Back Face
T3 - Back Face
10’ - 0’’
16’ - 0’’
43’ - 0’’ Overall
& 1 - T4
U1, U2 & L 1
1 - S2, 5 - T1 & 1 - S1
2 - T3
2 - T5
T2 - Front Face
T3 - Front Face
4 - T2, 1 - S0
Crown Slope 0. 02 ft./ft.
þÿ�3
�’� �-
�
6’
- 0
’’
(Ty
p.)
1’ - 4’’1’ - 2’’3’ - 0’’
16’ - 0’’
Abut. No. 4 El. 141 7. 00
10’ - 0’’ 5’ - 0’’6’ - 6’’
U4
2 - S3NOTE:
All dimensions are out to out of bars.
Bend in field as necessary to fit.
U2
U4
10’’
U1
Type 18
1
2
Type 19B
T1
Type 2
Horizontal Leg
4
3
U3
Type S12A
Type T1
REINFORCING SCHEDULE
Mk. No. Size Length Type Bending Details
9 Str.
1 9 Str.
2 9 Str.
4 9 19B
5 5 2
4 5 Str.
5 Str.
2 5 Str.
4 5 Str.
6 18
4
4 S12A
6 1 7
4 4 T1
2 4 T1
2 4 T1
2 4 T1
4
( For One Abutment )
1 7A
1 7
Type 1 7
þÿ� �7� �
Type 1 7A
Bars to be Epoxy Coated.
L 1
þÿ� �7� �
S3
ITEM UNITQUANTITY
ESTIMATED QUANTITIES
Cu. Yd.
Cu. Yd.
=
Epoxy Coated Reinforcing Steel
Reinforcing Steel
Abutment No. 1 Abutment No. 4
Structure Excavation Bridge
Class A45 Concrete Bridge
HP 10 x 42 Steel Test Pile, Furnish & Drive
HP 10 x 42 Steel Bearing Pile, Furnish & Drive
Preboring Pile
Ft.
Ft.
Ft.
===
Lb.
Lb.
12. 0
4 10’ 40’
3 35’ 105’=3 35’ 105’
=4 10’ 40’
3’ - 3’’
V1
V2
V3
V4
L 1
S0
S1
S2
S3
T1
T2
T3
T4
T5
U1
U2
U3
U4
12. 0
32
32
36
36
42’ - 8’’
34’ - 4’’
34’ - 4’’
37’ - 8’’
42’ - 8’’
34’ - 4’’
3’ - 6’’
4’ - 3’’
5’ - 9’’
4’ - 7’’
9’ - 8’’
6’ - 0’’
2’ - 10’’
10’ - 4’’
13’ - 2’’
12’ - 4’’
1 1’ - 4’’
10’ - 6’’
34
’ -
4’’ 2’
- 2’’
4’
- 4’’
2’
- 9
’’
1’
- 7’’
1’
- 1’’
1’
- 9
’’
þÿ�1�’� �-�
þÿ�1�’� �-�
1’ - 8’’
4’
- 3
’’
Abutment
1’ - 0’’
S3
T5
T2
S0
T3
S2
T5
T3
T4
T2
S0
T3
S1
U2
T1
U3
U4
S2
U1
T4
T2
3’’
S0
1’ - 0’’
(Typ.)
S1
U2
2’
- 0’’
(T
yp.)
T1
3’’3
’’
U3 3’’
T3
T3
T4
=
1’’
Cl.
Back Face
Back Face
Back Face
Steel Pile HP 10 X 42
CL
þÿ�4
� ��’
�’� �C
�l
1’ - 0’’
CL
Abutment
CL
( U
1
bar
)
Abutment
Construction JointConstruction Joint
V1
3’- 4’’
Front Face Front Face
Front Face
SEC. C C-
5’
- 7’’
5’
- 2’’
4’
- 8
’’
B
C
1 1’
’1
2’’
3’’
4 S
paces
10
’’
3’
- 4
’’=
L 1
4 S
paces 1
0’’
V1
V2
V3
V4
1 7
SEC. B B-SEC. A A-
15MARCH 2005
S. D. DEPT. OF TRANSPORTATION
EDMUNDS COUNTY
102’ - 9’’ CONTINUOUS CONCRETE BRIDGE
14
1
Steel Pile HP 10 X 42
(Typ.)
S1 - Front Face
S0 - Back Face
U1 U2
L 1
T2 - Back Face
T1 - Front Face
T4 - Back Face
2 - S2
T4U3
6’’ =U1, U2, U3 & L 1 bars ~ 15 Spaces 12’’ 15 - 0’’
T1 - Front Face
4
1003 1003
994 994
8. 2 8. 2
1 40’ 40’ 1 40’ 40’
SEC. 14/23-T123N-R66W
þÿ�3
�
Varie
s
12’’
Begin Bridge Sta. 16 14. 00
End Bridge Sta. 1 7 16. 75
1
2
3
4
5
7
Title Block
REQUIRED LIST
Project Block
Plan View
Elevation View
Reinforcing Schedule
Estimated Quantities
6
1
3
2
4
7 7
7
6
5
Reference
Continuous Concrete 04
Sections as Requried
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
CHECKED BY
BRIDGE ENGINEERBRIDGE ENGINEER
DM/MMLSDM/MM
DESIGNED BY DRAWN BY
SEC. A - A
TOP STEEL BOTTOM STEEL
Column
ELEVATION
Constr. Joint (Typ. )
Slope 0. 02 ft. /ft.
4’’ Level
F1C L
Bent
CL
A
B
B
=
A41
2’’
12
’’
1’ - 9’’
4’’
(Typ. )
þÿ�2
�’� �-
�
3’ - 2’’
CL
5’ - 3’’
2’’
F2
Rdwy
H1
Dril
led
Sh
aft
Bent No. 3 Elev. 1377. 67
Bent No. 2 Elev. 1418. 38
Bent No. 3 Elev. 1418. 67
Groundline Elevation
5’ - 5’’ 8’ - 5’’
3’ - 0’’ D D
41
’ -
0’’
CL
Column
A
3’’
C
=
3’ - 2’’
F3
C
6’’
J1
3’ - 0’’
3’’
Cl.
Min
.
1 7’ - 0’’ 1 7’ - 0’’
34’ - 0’’
34’ - 8’’ ( Overall )
32’ - 0’’ Roadway
16’ - 0’’ 16’ - 0’’
1 7’ - 0’’
2 - G1
4 - F5
2 - G12 - F4
4 - F1 & 4 - F2
1’ - 4’’ 1’ - 4’’
2 - G4
8 Spaces 12’’ 8’ - 0’’10’ - 0’’
3’
- 0’’
Proje
cti
on
Brid
ge
Dril
led
Sh
aft
Ex
cav
ati
on
4 - F3
Substructure shoring shall remain in place
SEC. C - C
F5
F4
F2
F1
Varie
s
2’’
Cl.
(Typ. )
Cl.
Co
v.
SEC. B - B
G1 G1
G1
G1
þÿ�3
�
6 Equal Spaces
A4
7 Equal Spaces
NOTE:
until Superstructure shoring is removed.
F2 bars are to be placed symmetrically between
columns.
þÿ�3� þÿ�3�
F3
Cl.
Co
v.
þÿ�3
�
Constr. Joint
(G3
)(G
1)
Spiral
REINFORCING SCHEDULE
Mk. No. Size Length Type Bending Details
Type 1
12
Type S3
G4
Exact
Exact
Str.
Str.
Str.
S3
2
F3
J1
Type 1A
4
6
4
4
4
A4
H1
Type T1
(for One Bent)
þÿ�I�n�c�l�u�d�e�s� �S�p�a�c�e�r� �B�a�r�s�:� � �1�8�6� �L�b�s�.� � � � �p�e�r� �
ITEM UNITQUANTITY
ESTIMATED QUANTITIES
=
Bent No. 2 Bent No. 3
F1
F2
F3
F4
F5
G1
G2
G3
G4
H1
J1
4
28
2
1
Str.
19B
S3
T1
1A
Spiral
Class A45 Concrete, Bridge
Reinforcing Steel
Epoxy Coated Reinforcing Steel
Drilled Shaft Excavation
Class A45 Concrete, Drilled Shaft
38’’ Permanent Casing
Cu. Yd.
Cu. Yd.
Cu. Yd.
Lb.
Lb.
Ft.
3’ - 0’’ Drilled Shaft Excavation per foot of depth per column equals 0. 262 Cu. Yds.
7 36’ - 10’’
4 8 23’ - 6’’
8 1 7’ - 0’’
Type 19B
8 4 8’ - 5’’
33’ - 8’’
33’ - 8’’
4
9
34’ - 4’’
þÿ�2
1’ - 10’’
S. D. DEPT. OF TRANSPORTATION
EDMUNDS COUNTY
5’’
Const. Joint (Typ.)
3’ - 2’’
7 - A4
Permanent Casing (Typ.)
Bottom of Casing
Elev. 1397. 00
3’
- 4
’’
1’
- 8’’
1’
- 8’’
G4
3’ - 4’’
F5
F4Varie
s
2’’
Cl.
(Typ. )
G3
G3
6 Equal Spaces
A4
þÿ�3� þÿ�3�
3’ - 4’’
G4
Lbs. per Lin. Ft. regardless of type furnished.
2 22’ 44’ =2 22’ 44’
43’ - 9’’
1400
14. 8
22. 8
1400
14. 9
22. 8
3’ - 3’’4
68
12
12
9A4
2’
- 6’’
G3
G2
G1
SEC. D - D
H1
3’ - 0’’
J1
Cl. Cov.
3’’
4G5 T12
4
S3
G5
G5
G5
All dimensions are out to out of bars.
Bars to be Epoxy Coated.
þÿ�S�p�i�r�a�l�s� �-� � �U�s�e� �6�’�’� � �p�i�t�c�h� �a�n�d
þÿ�U�s�e� �1� � ��� �t�u�r�n�s� �f�o�r� �l�a�p� �a�t� �s
as approved by the Office of Bridge Design. Use 3
vertical spacer bars per column. Spirals may be smooth
bars. Bar length shown does not include Splices.
3’ - 2’’ Drilled Shaft Excavation per foot of depth per column equals 0. 292 Cu. Yds.
2’
- 7’’
8’ - 3’’
1’ - 2’’þÿ�9� þÿ�9�
H1
3
45’ - 0’’
13’ - 2’’
10’ - 1 1’’
7’ - 3’’
7’ - 9’’
2’
- 3’’
1’
- 9’’
3’ - 0’’
G1
G2 & G3
3’
- 3’’
þÿ�3
�’�
�-�
1’ - 10’’
3’ - 0’’
G4
5694 5694
FOR
+STR. NO. 23-466-090
+STA. 16 14. 00 TO 17 16. 75 BRF 3134(01)276
32’- 0’’ ROADWAY
TRIBUTARY TO SNAKE CR.
0 SKEW
HS25-44
(& ALT.)
102’ - 9’’ CONTINUOUS CONCRETE BRIDGE
BENT DETAILS
OF7 15MARCH 2005
1’
- 6’’
1’
- 6’’
Bent No. 2 Elev. 1404. 74
Bent No. 3 Elev. 1405. 50
7’’
4’ - 7’’
5 Spaces 1 1’’
G5
18
’’
Roughen Concrete (Typ. )
Roughen Conc.
(Typ.)
Constr. Joint (Typ. )
Roughen Concrete (Typ. )
G5
SEC. 14/23-T123N-R66W
2-G2 2-G1
2-G1
2-G1
2-G1
2-G2
2-G3
G2
G2
G3
SEC. E - E
H1
3’ - 2’’
J1
Cl. Cov.
3’’
Permanent
Casing
E E
Cla
ss A
45
Co
ncre
teC
on
cre
te
Cla
ss A
45
2-G3
CSL Access Tubes
CSL Access Tubes
Top of Casing
664’ - 6’’
8. 5 8. 5
Bent No. 2 Elev. 1377. 38
1
2
3
4
5
7
8
Title Block
REQUIRED LIST
Project Block
Reinforcing Schedule
Estimated Quantities
6 Elevation View
Plan Section
Sections as Required
Standard Notes
1
4
2
3
7
7
7
75
6
Continuous Concrete 05
8
Reference
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
DESIGNED BY DRAWN BY CHECKED BY
BRIDGE ENGINEERBRIDGE ENGINEER
LSDM/MM DM/MM
FOR
+STR. NO. 23-466-090
+STA. 16 14. 00 TO 17 16. 75 BRF 3134(01)276
32’- 0’’ ROADWAY
TRIBUTARY TO SNAKE CR.
OF8
0 SKEW
HS25-44
(& ALT.)
SUPERSTRUCTURE DETAILS
ESTIMATED QUANTITIES
I TEM UNI T QUANTI TY
HALF LONGITUDINAL SECTIONAL VIEW
Optional Construction Joint
12’’
6’’
Construction Joint
C1
C1
12’’
6’’
1’’ Cl. Cover
7’’7’’
12’’
6’’
C1
2’-
8’’
C1
12’’
6’’
6’’
12’’
C1
6’’
12’’
C1
CL
CL
Bent No. 2 or 3
CAMBER DIAGRAM
Camber is calculated for dead load deflection plus plastic flow and has been
the elevations of the top of the finished roadway slab.
added to the proposed grade elevations at the respective stations to establish
L
NOTES-
All dimensions are out to out of bars.
C2
12
B4
Type 1A
Type T1
6’’
9’’
C1
7’’
9’’
C10
C12
C13
Type 1 7
B20
Type 19B
12
þÿ
C1
3
C1
2
B18
12
3
B5
=
=
==
2’’
B5
3’’
1
0’’
1
’- 7
’’
B13
B13
B13
B13
Abut. No. 1 or 4
Sym. Abt. C Bridge
A3
A2
A3
A1
A3
A2A1
A3A3
A2A1
All reinforcing steel shall be epoxy coated.
Epoxy Coated Reinforcing Steel
-SEC. A A
SEC. B B-
SEC. C C-
Str.
A2 Str.
A3
B1 Str.
Str.
Str.
Str.
Str.
Str.
Str.
Str.
Str.
Str.
Str.
Str.
Str.12
4 Str.
4 19B8
812
5 Str.12
6 1 7A12
4 Str.
5C1
5 S1 1
54
54
5
5
5
5
5
616
516
6 1 74
5 1 74
1A
B2
B3
B4
B5
B6
B7
B8
B9
B10
B1 1
B12
B13
B15
B16
B1 7
B18
B19
B20
B21
1A
19B
C2
C3
C4
C5
C6
C7
C8
C9
C10
C1 1
C12
C13
4
4
4
4
4
T1
T1
T1
T1
T1
Type S1 1
þÿ�3�
Class A45 Concrete, Bridge Deck
End of B4,
B6, B8 & B10
9’’
Bent
Sym. Abt.
Bridge
CL
S2
See Abut. Details
C AbutmentL 12’’
B2B3
B10
B6B8
Min. Lap
(Bottom)
B4 B1
B7 B1 1 B9
(Top)
(Bottom)=
= =
=
7’’ 7’’
2’’
þÿ�2� ���’�’� �C
Level across curb.
See DETAIL ’’D’’
Note: Place B9 and B1 1 bars
symmetrically about center
of interior span.
Emergency Const. Jt.
See Detail ’’E’’
1’’ Cl. Cover (Typ.)
3’’
DETAIL ’’D’’
3’’ 3
’’
Cu. Yd.
Lb.
Bend in field as necessary to fit.
Type 1 7A
þÿ�7�
þÿ�7�
C1 1
C6
C7
C8
C9
9’’
þÿ�8�
8’’
7’’
þÿ�6�
1’- 6’’
CL
( T
yp
. )
B4 12’’
B8 24’’
B6 12’’
B10 24’’
B1 7
Rustication not Optional
Rustication not Optional
=(Top) (Top) (Top)
A4 ( See Bent Details )
B
B
A
A
C
C
REINFORCING SCHEDULE
Mk. No. Size Length Type Bending Details
( End Span ) ( Interior Span )
DETAIL ‘‘E’’
1’’
þÿ �� �P�o�i�n�t
1’’
2’’
5’ - 0’’
5’ - 0’’
5’ - 0’’
S1 1
S1 1
S1 1
C3 þÿ�4�
5’’C4
6’’C5
Type S1 1
3’ - 9’’
16’ - 0’’ 16’ - 0’’
7’ - 9’’
6’’
4’’
þÿ�1
�’� �-
�
A1 141
64
6
5
6
34’ - 4’’
34’ - 4’’
6’ - 3’’
9
9
8
44’ - 6’’
32 16’ - 3’’
21’ - 10’’34
64 8 13’ - 9’’
20 5 31’ - 9’’
64 9
9
9
8
9
8
5
5
31’ - 3’’
32 38’ - 9’’
32
16 18’ - 0’’
34 24’ - 0’’
22’ - 6’’
24
10
41’ - 0’’
38’ - 9’’
4 50’ - 6’’
8 51’ - 9’’
188 6’ - 4’’
160
6’ - 0’’
15’ - 0’’
8’ - 6’’
4’ - 3’’
2’ - 4’’
5’ - 1’’
6’ - 8’’
6’ - 9’’
6’ - 1 1’’
7’ - 0’’
7’ - 1’’
5’ - 4’’
1’ - 1’’
þÿ�1�
þÿ�2
�’� �-
�
2’
- 4
’’
2’
- 4’’
þÿ�2
�’� �-
�
3’ - 0’’
1’ - 0’’
B18
B1 7
7’ - 6’’ Transition3’ - 0’’1’ - 6’’
6’ - 2’’
31’ - 0’’ 38’ - 9’’
102’ - 9’’ Overall
36’ - 0’’
7’ - 9’’
31’ - 0’’ 38’ - 9’’
102’ - 9’’
1’ - 0’’
0.
03
5’
0.
04
0’
0.
01
6’
0. 018’
0. 037’
7’ - 6’’
32’ - 0’’ Roadway
31’ - 0’’
30’ - 0’’
31’ - 0’’
32’ - 0’’
=
==
30’ - 0’’
31’ - 0’’
32’ - 0’’
=
==
32’ - 0’’
31’ - 0’’
30’ - 0’’
B9 24’’
B7 12’’
B3 24’’
B2 24’’
B1 1 24’’
B1 12’’
31’ - 0’’B1 12’’ =
= 31’ - 0’’B7 12’’
18’’ Haunch
þÿ�1�3� ���’
28’ - 0’’
þÿ�1�3� ���
4’ - 9’’ Min. Lap
18’’ þÿ�1�8�
T1A
12’ - 10’’
Type T1A
50763
Concrete Quantity for Barrier Curb is 0. 0842 cu. yd./ft. and Concrete Quantity
21’ - 2’’
8’’ 4’ - 8’’
16’’ (Top)1 7’ - 4’’
8’’
4’ - 0’’ 4’ - 0’’
þÿ�7�’� �-� 16’’ 24’ - 0’’
A1 8’’
þÿ�9�’� �-�7’ - 9’’ 7’ - 9’’ 7’ - 9’’ þÿ�9�’� �-�
A2
A3 A3
A1
5’ - 7’’
94
1 7
5
3’ - 8’’
6’ - 6’’
MARCH 2005
S. D. DEPT. OF TRANSPORTATION
EDMUNDS COUNTY
102’ - 9’’ CONTINUOUS CONCRETE BRIDGE
15
=16’’ (Top)18’ - 8’’A2 =8’’A2 4’ - 8’’ 8’’A2 5’ - 4’’= 16’’A2 = 25’ - 4’’ (Top)
94
21’ - 3’’
4 - B13
4 - B54 - B5
4 - B13
4 - B13
4 - B13
SEC. 14/23-T123N-R66W
10’ - 1 1’’
þÿ�8�’� �-�
Crown Slope 0. 02’ ft. /ft. ( Typ. )
LC
Bent
LC
Abut.
þÿ�9�’� �-�0. 000’
0. 000’
Note: All barrier curb details shown
Concrete Penetrating Sealer
Each 4
Sq. yd. 363
1 76. 8
2’
- 8
’’
þÿ�1
�’� �-
�þÿ�1
�’� �-
�
þÿ�1
�’�
�-�
Deck Drain, Slab Bridge
2’’
þÿ��
20
2’’
þÿ�C�h�a�m�f
( conforms to crown slope )
4’ - 0’’ on center
4’’
1’’ Installation Hole
DETAIL ‘‘Y’’
( See Notes Regarding Armor Angle Assembly)
þÿ�2�
See DETAIL ‘‘Y’’
þÿ�6�’�’� � �X� �4�’�’� � �X� �
and Deck Drain Details
on End Block, Barrier Curb
1’ - 0’’
1’ - 0’’
6’’
Type T1A
T1A
Abut. No. 1 shown, Abut. No. 4 similar
by rotation except as shown.
Includes 1595 lbs. of Structural Steel in the Armor Assembly.
Concrete Quantity for one 12 ft. End Block is 1. 1659 cu. yd.
3’’
þÿ� �3�2� �~� ���’�’� � � � � �X� �1�2�’�’� �l�o
Deformed Bar Anchor Studs bent at 20 and spaced at 12’’
þÿ� �3�1� �~� ���’�’� � � � � �X� �1�2�’
Welded Deformed Bar Anchor Studs spaced at 12’’
31 ~ 1’’ holes spaced at 12’’
1
2
3
Title Block
REQUIRED LIST
Project Block
Fill out remainder of Std. Base Sheet
1
2
Continuous Concrete 06
Reference
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
DESIGNED BY DRAWN BY CHECKED BY
BRIDGE ENGINEERBRIDGE ENGINEER
LSDM/MM DM/MM
FOR
+STR. NO. 23-466-090
+STA. 16 14. 00 TO 17 16. 75 BRF 3134(01)276
32’- 0’’ ROADWAY
TRIBUTARY TO SNAKE CR.
9
0 SKEW
HS25-44
(& ALT.)
4’’
B15
C6
C1
1’
- 1’’
2’’ Cl.
C1
C2
3’’
8’’
þÿ�1
�’�-
� �
þÿ�4
�
1’- 6’’
2’- 4’’
4’- 6’’
þÿ�7
� �
þÿ�4
� �þÿ
�8� �
4’’
3’’
1 1’
’
Begin or
End Bridge
PART PLAN
Optional Constr. Joint
Make level across Curb
VIEW A - A
RECESS DETAIL
Sides may be beveled slightly
þÿ�1� �
to facilitate form removal.
ISOMETRIC
VIEW
See RECESS DETAIL
3’- 0’’
41
1 1
’’
þÿ�4
�
B5B5
B21 B21B21
B21B21
B5 B5 B5
B12
B16 B16
1’’ Cl.
4’’
4
’’
4’’
4
’’
2’’
2’’
Cl.
þÿ�1� ���’
þÿ�4�
8’’
B5B5
B5 B5
B5
2’’ Cl.
1’- 0’’
þÿ�5�
Construction Joint,
C1 1
þÿ�7�
SEC. C C-
B18
B19
B20
C12
C13
B15
B18
-VIEW B B SEC. D D-
B16
C10
- ESEC. E
B15
B18
B15
B1 7
- FSEC. F - GSEC. G
A A
B
B
See Std. P No. 630. 92L
1’
- 9’’
2’
- 8
’’
1’
- 4’’
2’
- 8’’
1’
- 9
’’
4’ - 6’’
3’ - 0’’ 1’ - 6’’
7’’ 7’’
1’’
1’’
þÿ��Optional
Constr. Jt.
10
’’
þÿ�S�l�o�p�e� �S�l�a�b� �
drain from 12’’ away on 3 sides.
2’’
1’’
2’’
DECK DRAIN DETAIL
4’’ PVC Pipe
þÿ�4� ���’�’� � � �
See DETAIL ’’X’’
DETAIL ’’X’’
1
1
þÿ �
Inside Face
of Pipe
þÿ��
1’
- 2
’’
2’
- 8
’’
1’
- 7
’’
1’ - 4’’
Drip Groove
Rustication
2’’
1’’
þÿ��
3’’
(not optional)
1 ’
’
See Deck Drain Detail
1’- 0’’
DRAIN AND BARRIER DETAILS
Continuous
END BLOCK, BARRIER CURB AND DECK DRAIN DETAILS
( See General Drawing for spacing of Deck Drains
and Deck Drains in Notes. )
Schedule in Superstructure Details.
1’ - 4’’
NOTE -
For listing of re - bars, see Reinforcing
MARCH 2005
S. D. DEPT. OF TRANSPORTATION
EDMUNDS COUNTY
102’ - 9’’ CONTINUOUS CONCRETE BRIDGE
15
B19
B20
C13
C12
C1 1C9 C7C8 C6 C5 C4 C3
C1
7’’
7’’
C2
C10 B16
C13
B19
B18 C1 1
B20
B1 7 B15
C3
C4C5
C6
C7C8C9
3’’ 6’’
ELEVATION
PLAN
C12 C10
B12
B21
C2
B16
B5
B5
=
=
=
=
=
=
=
C1
Min. Lap
2’’
3 Spaces
5’’
C D E
C D E
F
F
G
G
( C1 & C2 bars ) 77 Spaces 12’’ 77’ - 0’’
3’ - 6’’
1’ - 6’’ 3’ - 0’’ 7’ - 6’’
12’ - 0’’
7 Spaces 12’’ 7’ - 0’’3 Spaces 12’’ 3’ - 0’’
Min Lap 2’ - 6’’
1’
- 4’’
Min. Lap 1’ - 0’’
þÿ�1�0�
2 - B19
2 - B20
2 - B214 - B5
1’ - 3’’
3 - B12
2 - B5
3 - B15
3 - B182 - B1 7
OF
Place as shown in Superstructure Details.
Construction Joint
Level across curb
Roughen ConcreteSEC. 14/23-T123N-R66W
þÿ�1
�3�
1
2
3
Title Block
REQUIRED LIST
Project Block
Fill out remainder of Std. Base Sheet
1
2
Continuous Concrete 07
Reference
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
DESIGNED BY DRAWN BY CHECKED BY
BRIDGE ENGINEERBRIDGE ENGINEER
LS DM/MMDM/MM
FOR
+STR. NO. 23-466-090
+STA. 16 14. 00 TO 17 16. 75 BRF 3134(01)276
32’- 0’’ ROADWAY
TRIBUTARY TO SNAKE CR.
OF
0 SKEW
HS25-44
(& ALT.)
DETAILS OF BRIDGE END BACKFILL
15MARCH 2005
S. D. DEPT. OF TRANSPORTATION
EDMUNDS COUNTY
102’ - 9’’ CONTINUOUS CONCRETE BRIDGE
10
SEC. B - B
End of pipe shall protrude 6’’
SEC. C - C
DETAIL ‘‘X’’
Non-pervious Backfill Material.
Backfill to be compacted to the
satisfaction of the Engineer.
Porous Backfill
Vertical Composite Drain
6 Mil Polyethylene Sheeting
Type B Drainage Fabric
Granular Bridge End Backfill
Abutment Backwall
5’ - 0’’ 5’ - 0’’ 4’’ Std. Black
Steel Pipe (Typ.)
1’ - 0’’ 3’ - 0’’
1’
- 0’’
1’
- 0’’
LC
Abut. No. 1
1’
- 0’’
1’ - 6’’
þÿ�1
�6�’
� �-
�
beyond surface of berm slope. (Typ.)
ITEM UNIT
ESTIMATED QUANTITIES
Cu.Yd.
4’’ Underdrain Pipe
Porous Backfill
129
Cu.Yd.Granular Bridge End Backfill
Bridge End Embankment
Ft.
Ton
20 ft.
89 ft.
20 ft.
(For 2 Abutments and 2 Approach Slab Underdrains)
Shrinkage Factor of 1. 25 used.
QUANTITY
For estimating purposes only, a factor of 1. 89 tons/cu. yd.
was used to convert Cu. Yds. to Tons.
LC
Rdwy
9’’
Backfill to be compacted to the
satisfaction of the Engineer.
Non-pervious Backfill Material.
3
1
3
19’’
Porous Backfill
1’
- 0’’
Granular Bridge End Backfill
4’’ Dia. Corrugated Polyethylene
Drainage Tubing.
3
1
3
1
þÿ�3�2�’� �-
Top of Finished Roadway
on Approach Slab
Granular Bridge End Backfill
Vertical Composite Drain
Bridge Berm
Abutment
See DETAIL ‘‘X’’
3’ - 0’’
6 Mil Polyethylene Sheeting
Porous Backfill
Type B Drainage Fabric
16
’’
Bridge End Embankment
2
1
Benched according to Section 120. 3. B. 1
of the Construction Specifications.
Top of Subgrade
(at Roadway)
SEC. A A-
Su
rfacin
g
1
1
CL
1’ - 0’’
PLAN
18
665
23
64 Sq. yd.
71
’ -
8’’
-+
8’
- 1
0’’
-+8
’ -
10
’’-+
27
’ -
0’’
27
’ -
0’’
3:
13:
1
NOTE: Bridge End Backfill shown adjacent to Abut. No. 1.
Abut. No. 4 similar by rotation except as shown.
B
B
C
C
LC
Rdw
yA A
þÿ�1
�6�’
� �-
�
Rodent Screen (Typ.)
44
’ -
6’’ ~
4’’
Dia
. C
orru
gate
d P
oly
eth
yle
ne P
erfo
rate
d D
rain
ag
e T
ub
ing
þÿ�S
�l�o
�p�e
� �D
�r�a
�i�n
þÿ�S
�l�o
�p�e
� �D
�r�a
�i�n
Subgrade Shoulder
Subgrade Shoulder
SEC. 14/23-T123N-R66W
4’’ Dia. Corrugated Polyethylene
Perforated Drainage Tubing
þÿ�3�3�’� �-� �1�0� ���’�’� �w�i�d�t�h� �o�f� �G�r�a�n�u
Vertical Composite Drain
7’ - 0’’
4’’ Corrugated Polyethylene
Drainage Tubing (Typ.)
Limits of Bridge End Embankment Bridge End Embankment
Bridge End Embankment
þÿ�S�l�o�p�e� ��’�’
2. Type B Drainage Fabric
3. 4’’ Dia. Corrugated Polyethylene Perforated Drainage Tubing
1. 6 mil Polyethylene sheeting (not including laps)
6. Vertical Composite Drain
5. 4’’ Dia Black Steel Pipe with Rodent Screens
4. 4’’ Dia. Corrugated Polyethylene Drainage Tubing
Items 1 and 2 are approximate quantities contained in the Granular Bridge
End Backfill bid item and are for information only.
Items 3 thru 6 are approximate quantities contained in the 4’’ Underdrain
Pipe bid item and are for information only.
299 Sq. ft.
267 Sq. ft.
Top of Subgrade
Top of Subgrade
Surfacing
þÿ�3�
3�’�
�-� �
1�0�
���’
�’� �
w�i�
d�t�h
� �o�
f� �G
�r�a
�n�u
�l�a�
r� �B
�r�i�
d�g�
e�
4’’
Top of Vertical Composite Drain
þÿ�S�l�o�p�e�:� � �
1
2
3
4
5
7
8
Title Block
REQUIRED LIST
Project Block
Plan View
Estimated Quantities
6
Sec.A-A at Center Line
Detail "X"
1
2
3
4
5
6
Section at Abutment Face
Section at Sleeper Slab
7
8
Continuous Concrete 08
Reference
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
FOR
DETAILS OF APPROACH SLAB ADJACENT TO BRIDGE
Mk. No. LengthSize Type
REINFORCING SCHEDULE
Bending Details
c1
d1
d2
e1
e2
g1
144 g2
g3
g4
4
1’- 5’’
Type T2
d2
Type 2
5’’
d1
All dimensions are out to out of bars.
ITEM UNIT QUANTITY
ESTIMATED QUANTITIES
Sq. Yd.
Sq. Yd.
1.
2.
3.
4.
5.
Cu. Yds. Concrete in Sleeper Slabs.
Lbs. Epoxy Coated Re-Steel in Approach Slabs.
Cu. Yds. Concrete in Approach Slabs.
Lbs. Epoxy Coated Re-Steel in Sleeper Slabs.
Items 1 thru 5 are approximate quantities contained in the above
Lbs. Structural Steel in Armor Assembly
a3
1
1
a3 3’- 4’’
2’- 0’
’
Type 19A
1’-
3’’
( For Two Approach Slabs & Two Sleeper Slabs )
bid items and are for information only.
NOTE:
48
4
49
’’’’
’’
3’’R.
þÿ�1� �1�
þÿ�7�
g3
g1 g2
g4
þÿ���’�’� �
DETAIL ’’Y’’
0. 02 ft/ft Slope
e1
2’- 0’’ 2’- 0’’
Drop Inlet
CL
2’-
9’’
DETAIL ’’Z’’
e Bars
g Bars
1’-
3’’
a3
Cut all bars in area of
drop inlet as shown.
Add a3 bar at top and bottom
layer of steel as shown.
( Typical plan for steel revision when
þÿ�1� �
5’’ 4’’
Approach SlabJoint
þÿ�1�0�
Sleeper Slab
Sleeper Slab
CL
G
G
9’’
6’’ 4’- 0’’
Curb Transition
Top of Curb
Sleeper Slab
Approach Slab
18 ga. galv. sheet metal ( Cut
extension ) See DETAIL ’’J’’.
#
D-
PLAN - DETAIL ’’J’’
1 1’
’
-
VIEW D
in field to accommodate seal
4’’
sheet metal
18 ga. galv.#
Faste
ners (
2)
C L
CL
approved by the Engineer.
has been poured. Use fasteners
to Sleeper Slab only, after slab#Attach 18 ga. galv. Sheet Metal
e2
that will not spall concrete, as
1’’
2’’
cl.
þÿ�2� ���’
All bars to be epoxy coated.
SEC. C C-
- GSEC. G
-SEC. A A
- ESEC. E
e2
e1
B
A
C
= =B
ott
om
Ste
el
~ 7
5 S
paces 6
’’ 37’- 6
’’
To
p S
teel
~ 2
5 S
paces
18
’’
3
7’- 6
’’
PLAN
Top Ste
el
Bottom
Ste
el
þÿ�2
� þÿ�2
�
þÿ�2
� þÿ�2
�
þÿ�3
�7�’
�-�
D D
A
3’’ 9’’
20’- 0’’
=Bottom Steel ~ 19 Spaces 12’’ 19’- 0’’
C
g2
3’’ 3’’
20’- 0’’
=Top Steel ~ 13 Spaces 18’’ 19’- 6’’
C L
See DETAIL ’’X’’
+End Bridge
Abut. No. 1CL CL
B
h1
þÿ���’�’� �P�r�e�f�o�r�m
Joint Material
End Block
Approach Slab
Wing Wall
44. 2
12680
1888
1 72. 3
1
1
4
4
5
19A
4
6
4
8
4
6’ - 0’’
20’- 2’’
19’- 8’’
20’- 2’’
19’- 8’’
37’- 7’’
6’- 1’’
37’- 7’’
7’- 4’’
37’- 7’’
Str.
Str.
Str.
Str.
Str.
Str.
Str.
T2
2
Str.
152
76
40
28
8
8
8
4
DETAIL ’’X’’
E
E
þÿ &�’�’� � � �
þÿ�5
�
þÿ�1
� �1
�
=T
op
An
ch
ors ~
37
Sp
aces
12
’’
3
7’- 0
’’
Drop Inlet
36
Sp
aces
12
’’
3
6’- 0
’’
=
+Begin Bridge
h1
g3 g4
þÿ�5
� =
d1 &
d2 b
ars ~
37 S
paces 1
2’’ 37’- 0
’’
g1
F
F
þÿ�5
�
þÿ�5
�
þÿ�1
� �1
�A
rmo
r A
ssem
bly
See DETAIL ’’Z’’
drop inlet is used. )
Bo
tto
m A
nch
ors &
1’’
B
leed
er H
ole
s
Inserts
+
h1 4 6 35’- 8’’ Str.
g5 50 4
similar opposite hand except as shown.)
g5
Z2 7 Str.2’ - 0’’
Concrete Approach Sleeper Slab for Bridge
(For Two Approach Slabs and Two Sleeper Slabs)
In-Place Z1 9’’
Mechanical Splice (Typ.)
Z2 9’’
(S
leep
er S
lab
)
96
2’’
cl.
2’’
cl.
2’’ cl.
1’- 9’’
Sleeper Slab
Appr. Slab
1
1
2’’ cl.
9’’
9’’
(Sleeper Slab)
for joint details.
c1
2’’
cl.
1’’
d2 d1
++
See DETAIL ‘‘Y’’
SEC. B B-
End Block
Fill with Hot-Poured
’’
Elastic Joint Sealer (Typ. )
Joint Material
Preformed Expansionþÿ���
þÿ��
þÿ���’�’�
þÿ�8
�
9’’
þÿ���’�’� � � � � �X� �1�2�’�’� �l�o�n�g�
Deformed Bar Anchor Studs bent at 20.
Welded Deformed Bar Anchor Studs.
þÿ���’�’� � � � � �X� �1�2�’�’� �l
2’’
þÿ��
20
2’’
þÿ�C�h�a�m�f
1’’ hole
( conforms to crown slope )
þÿ�6�’�’� � �X� �4�’�’� � �X� ���’
4’ - 0’’
þÿ�2�
on center
4’’
1’’ Installation Hole
9’’
9’’
Elastic Joint Sealer ( Typ. )
þÿ ��’�’� �x� ���’�’� � �D�e
filled with Hot-Poured
c1
Z1 9’’
The portion of the sleeper slab directly under the
Steel trowel and coat
sheetingpolyethylenewith asphalt paint or place 6 mil
to prevent bonding of concrete. ( Typ. )
1’’
d2d1
A double thickness of plastic sheeting to prevent
bond to bridge end backfill shall be placed between
e bars
g bars
g bars
e bars
movable slabs shall be smooth.
g5
Z2 9’’
Z1 bars and Mechanical Rebar Splices are listed and included
Mechanical Rebar Splice
Sleeper Slab see
SEC. B - B
in superstructure quantities.
þÿ�6�’�’� �x� �4�’�’� �x� ���’
Sleeper Slab
Note: Elevations top of Armor
Assembly on Sleeper Slab
at this Location
Concrete Approach Slab for Bridge
Slo
pe 0
. 02 f
t. /
ft.
Slo
pe 0
. 02 f
t. /
ft.
þÿ�3
�
VIEW F F
Assembly Sheet No. 3 of 1 7.)( See notes regarding Armor
h1
(Shown adj. to Abut No. 1, Abut No. 4
T. S. Elev. 1666. 70
T. S. Elev. 1666. 70
T. S. Elev. 1667. 13
T. S. Elev. 1667. 13
Abut. No. 4
Rd
wy
Sta. 40 49. 05
þÿ�4
�
þÿ�4
�
Sta. 39 44. 55
32
5’ - 0’’
4’ - 2’’
37. 9
13. 6
2071
Sta. 39 22. 58 (Begin Bridge)
Sta. 40 71. 02 (End Bridge)
4’- 6’’
6 Equal Spaces
Constr. Jt.
See Sheet No. 9 of 1 7.
backfill and slab in this area. See Sheet No. 1 1 of 1 7.
See Sheet No. 13 of 1 7
Sta. 39 29. 47
1 7. 62’ Lt.
Drop Inlet
See DETAIL ’’Z’’
+Sta. 39 29. 47
1 7. 62’ Rt.
Approach Slab
DESIGNED BY DRAWN BY
BRIDGE ENGINEERBRIDGE ENGINEER
+STR. NO. 23-466-090
+STA. 16 14. 00 TO 17 16. 75 BRF 3134(01)276
32’- 0’’ ROADWAY
TRIBUTARY TO SNAKE CR.
OF 15
0 SKEW
HS25-44
(& ALT.)
DM/MM DM/MM
S. D. DEPT. OF TRANSPORTATION
MARCH 2005
EDMUNDS COUNTY
SEC. 14/23-T123N-R66W
CHECKED BY
LS
102’-9’’ CONTINUOUS CONCRETE BRIDGE
REQUIRED LIST
1
2
3
4
6
7
8
Title Block
Project Block
Reinforcing Schedule
Sections as Required
Estimated Quantities
9
Plan View5
Section A-A at Centerline
Sleeper Slab Section10
Armor Angle Assembly11
12 Drop Inlet Detail
Joint Filler Details
Joint End Plate
1
4
7
7
3
2
12
9
9
8
8
11
6
5
7
10
Reference
Continuous Concrete 09
1 1
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
FOR
APPROACH SLAB JOINT DETAILS
ITEM UNIT QUANTITY
ESTIMATED QUANTITIES
TEMP. DIMENSION ’’X’’
30
40
50
60
70
80
90
10’’ 2’’
1’’
10’’ 2’’
1’’
CL
Plate
CL
Plate
CL
Plate
CL
Plate
CL
Plate
CL
Plate
Concrete Anchors
Concrete Anchors
PLAN OF STRIP SEAL
=
=
þÿ�1�’�-�
þÿ�1� �1� þÿ�1� �1�
þÿ�1�’�-�
þÿ�1� �1�þÿ�1� �1�
Strip Seal Expansion Joint
VIEW B - B
4’’ þÿ�7�
surface of Concrete
Approach Slab
þÿ�2�’�’� �x� �2�
welded steel plates
Top of Strip Seal to conform to
4’’
( For Two Approach Slabs )
( Neoprene Seal not shown )
Overall
GENERAL NOTES:
to Type A steel studs of Section 7 of the latest edition of the ANSI /AWS D1. 1 Structural Welding Code-Steel.
2. Material for the neoprene seal shall conform to ASTM D2628 modified to omit the recovery test. No splices
will be permitted in the neoprene seal.
3. The lubricant-adhesive used to install the neoprene seal shall conform to the requirements of ASTM D4070. The
neoprene seal and the lubricant adhesive should be supplied or recommended by the same source as they must be compatible.
4. The installation of the neoprene seal shall be as recommended by its Manufacturer and approved by the Engineer,
but in general shall be as follows: The neoprene seal shall be installed and bonded to the steel extrusion
with a high-solids lubricant adhesive. The neoprene surfaces shall be roughened with a wire brush before the
application of the lubricant adhesive. The neoprene seal may be installed either prior to or after the time the
steel extrusions are concreted in the approach slabs. The steel extrusion shall be dry, clean, free from dirt,
grease and contaminants at the time the neoprene seal is installed.
5. Due to the length of the steel extrusions, splices are permitted. No welds shall be permitted in the internal
section of the extrusion where the neoprene seal is located. Weld details shall be shown on the shop plans for
approval by the Engineer. Welding shall be in accordance with latest edition of the ANSI/AWS D1. 1 Structural
Welding Code-Steel. Galvanize the steel extrusions and anything welded to them after all welding is completed. They
shall be galvanized in accordance with AASHTO M1 1 1 (ASTM A123). If welded splices are used subsequent to
galvanizing, the weld details and the procedures for preparing the surface for welding and repairing the galvanizing
6. The thickness and shape of the neoprene seal may vary from the sketch shown (DETAIL ‘‘C’’ on this sheet)
according to the manufacturer’s design; however, the wedge lugs must properly fit the groove in the steel extrusion.
Before installation, the shop plans of the proposed neoprene seal showing the fixed dimensions, thickness of
neoprene seal, and dimensions pertinent to the fit of the neoprene seal in the steel extrusion shall be
submitted to and approved by the Engineer.
7. Since the configuration and dimensions of the steel extrusion may vary according to each manufacturer’s design,
they need not conform exactly to that shown in DETAIL ’’D’’, however, any deviations from the plan shown configuration
or dimensions must be approved by the Office of Bridge Design.
8. The Strip Seal Expansion Joint supplier shall submit a detailed gland installation procedure with the shop
plans.
10. The neoprene seal shall be of sufficient length such that a minimum length of 6’’ shall extend beyond each
end of the steel extrusions.
1 1. The Strip Seal Expansion Joint will be measured in linear feet to the nearest one-tenth foot, complete in place.
Measurement will be made of the overall horizontal length. The Strip Seal Expansion Joint will be paid for at the
contract unit price per linear foot complete in place. Payment for this item shall be full compensation for
furnishing all the required materials in place, inclusive of labor, equipment and incidentals necessary to complete
the work in accordance with plans and the foregoing specifications.
þÿ� � �w�e�l�d�e�d� �s�t�e�e�l� � �p�l�a�t�e�s� �s�h�a�l�l� � �c�o�n�f�o�r�m� �t�o� �A�S�T�M� �A�3�6�.� � � �M�a�t�e�r�i�a
þÿ�1�.� � � � �M�a�t�e�r�i�a�l�s� �f�o�r� �t�h�e� �S�t�e�e�l� � �E�x�t�r�u�s�i�o�n� �s�h�a�l�l� � �c�o�n�f�o�r�m� �t�o� �A
DETAIL ’’C’’
Wedge Lug
Neoprene Seal shall have a
’’X’’
Neoprene Seal
See DETAIL ’’C’’
Hot Rolled Steel Extrusion
See DETAIL ’’D’’
þÿ�2�’�’� �x� �2�’�’� �x�
Steel Plates
G
þÿ
SEC. A - A
Surface of Concrete
Approach Slab
Anchors (Typ. )
(Typ. )
þÿ &�’�’� � �
þÿ���’�’� � � � � �x� �
Conforms to Approach Slab and Sleeper
Slab Surface ( Slope and Grade )
Surface of Concrete
Sleeper Slab
þÿ 9
þÿ�1�
2’’
Hot Rolled Steel Extrusion
DETAIL ’’D’’
þÿ�’�’�X�’�’� +
1’- 6’’
þÿ�(� �2�’�’� �x� �2�’�’� �x� �‘�’�’� � �
=þÿ�(� �2�’�’� �x� �2�’�’� �x� �‘�’�’� � �
CL
Plate
CL
Plate1’- 2’’ 1’- 2’’
B BA
A
4’’ movement capability.
after welding shall be included with the shop plans. Repair of galvanizing shall be by the zinc-based solder method in
conformance with ASTM A780.
6’’
Ft.
þÿ�3�7�’�-� �
35 Spaces 1’- 0’’ 35’ - 0’’
34 Spaces 1’- 0’’ 34’ - 0’’
8 Spaces 2’- 0’’ 16’ - 0’’ 8 Spaces 2’- 0’’ 16’ - 0’’=
75. 8
0. 02 ft. per ft. slope
2’’
þÿ�1� �
þÿ�2� �
Neoprene Seal (See
Note No. 10.)
þÿ�1�
þÿ�2�
þÿ�2�
þÿ�2�
9. The cost of welding shall be incidental to the contract unit price per foot for Strip Seal Expansion Joint.
DESIGNED BY DRAWN BY
BRIDGE ENGINEERBRIDGE ENGINEER
+STR. NO. 23-466-090
+STA. 16 14. 00 TO 17 16. 75 BRF 3134(01)276
32’- 0’’ ROADWAY
TRIBUTARY TO SNAKE CR.
OF12 15
0 SKEW
HS25-44
(& ALT.)
DM/MM DM/MM
S. D. DEPT. OF TRANSPORTATION
MARCH 2005
EDMUNDS COUNTY
SEC. 14/23-T123N-R66W
CHECKED BY
LS
102’-9’’ CONTINUOUS CONCRETE BRIDGE
1
2
REQUIRED LIST
1
2
3Title Block
Project Block
Fill out Remainder of
Standard Base Sheet
Reference
Continuous Concrete 10
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
DESIGNED BY DRAWN BY CHECKED BY
BRIDGE ENGINEERBRIDGE ENGINEER
FOR
+STR. NO. 23-466-090
+STA. 16 23. 00 TO 17 25. 75 BRF 3134(01)276
32’- 0’’ ROADWAY
TRIBUTARY TO SNAKE CR.
OF12
0 SKEW
HS25-44
(& ALT.)
ITEM UNIT QUANTITY
ESTIMATED QUANTITIES
Bridge Elevation Survey Lump Sum
L. S.
LOCATION
ELEVATION - BRIDGE SURVEY MARKER
STATION - OFFSET ELEVATION
Begin Bridge
End BridgeNOTE:
The Contractor shall be responsible for producing the As-Built Elevation Survey
soon after construction is complete and before the bridge is opened to traffic.
The As-Built Elevations of the Bridge shall be taken and recorded at the locations
shown by the table on this sheet. The completed table shall be given to the Engineer
who will forward a copy to the Office of Bridge Design and the Region Office.
Location Location LocationElevation Elevation Elevation
22L 22C 22R
23L 23C 23R
Table of As-Built Elevations - Approach Roadway
Location Location LocationElevation Elevation Elevation
1 L
10L
12L
13L
10C
12C
13C
10R
12R
13R
1 C 1 R
Table of As-Built Elevations - Bridge Deck
2L
3L
4L
5L
6L
7L
8L
9L
1 1 L
2C
3C
4C
5C
6C
7C
8C
9C
1 1 C
2R
3R
4R
5R
6R
7R
8R
9R
1 1 R
14L
15L
16L
1 7L
18L
19L
20L
21L
14C
15C
16C
1 7C
18C
19C
20C
21C
14R
15R
16R
1 7R
18R
19R
20R
21R
The elevations to be recorded in these tables shall be based on the National
Geodetic Survey (NGS) North American Vertical Datum of 1988 (NAVD88).
PLAN
LC
Abut. No. 1
LC
Abut. No. 4
LC LC
Bent No. 2 Bent No. 3
1’ - 0’’ 1’ - 0’’=
Approach Roadway Elevations Bridge Deck Elevations Approach Roadway ElevationsBridge Deck Elevations
=== =
Curbline
Curbline
1 L 2L 3L 4L 5L 6L 7L 8L 9L 10L 1 1L 12L 13L
1 C 2C 3C 4C 5C 6C 7C 9C8C 10C 1 1C 12C 13C
1 R 2R 3R 4R 5R 6R 7R 8R 9R 10R 1 1R 12R 13R
14L 15L 16L 1 7L 18L
14C 15C 16C 1 7C 18C
14R 15R 16R 1 7R 18R
19L 20L 21L
19C 20C 21C
19R 20R 21R 22R 23R
22C 23C
22L 23L
102’ - 9’’
4 Spaces 8’ - 0’’ 4 Spaces 8’ - 0’’
38’ - 9’’32’ - 0’’ 32’ - 0’’
LC
Roadw
ay
1’
- 0’’
1’
- 0’’
þÿ�4� �S�p�a�c�e�s� �
AS-BUILT ELEVATION SURVEY
DM/MMLSDM/MM
15MARCH 2005
S. D. DEPT. OF TRANSPORTATION
EDMUNDS COUNTY
102’ - 9’’ CONTINUOUS CONCRETE BRIDGE
SEC. 14/23-T123N-R66W
5 spaces 20’ - 0’’ 100’ - 0’’5 spaces 20’ - 0’’ 100’ - 0’’
REQUIRED LIST
1
2
3
4
5
6
Title Block
Project Block
Estimate of Quantities
Plan View
Table for Shot Elevations
Bridge Survey Marker Table
3
1
5
5
6
4
2
Reference
Continuous Concrete 1 1
PROJECT SHEET
NO.
TOTAL
SHEETS
STATE
OF
S.D.
MARCH 2005
STR. NO. 23-466-090
102’ - 9’’ CONTINUOUS CONCRETE BRIDGE
OF 1513
REQUIRED LIST
1
2
3Title Block
Project Block
Insert Required Standard
Plate Sheets as Needed
1
2
Continuous Concrete 12
Reference
460.05
PLATE NUMBER
S
D
D
O
TSheet 1 of 1
NOTES:
3. There will be no separate measurement or payment made for survey markers.
All costs for this work shall be incidental to the other contract items.
1. Survey markers shall be located at each abutment on the same side of
the bridge as the year plate. Place survey markers on abutment wings as
shown. Two survey markers will be required at each bridge.
2. Survey markers shall be of a type intended for installation in concrete,
þÿ�T�y�p�e� �C� �D�i�s�c� �w�i�t�h� �a�
Center survey marker on top,
Begin or End bridgeSurvey marker
February 19, 2001
level portion of abutment wing
Endblock
ABUTMENT WITH ABUTMENT WITH
Endblock
( Endblock on top of wings)
ABUTMENT WITH
Abutment wing
be made of solid brass or bronze, have a domed top and be either a 3’’ top
þÿ�d�i�a�m�e�t�e�r� �(�w�i�t�h� �a� ���’�’� �X� �2�’�’� �l�o�n�g� �r�i�b�b�e�d�
BRIDGE SURVEY MARKER
’’STRAIGHT’’ WINGS ’’SWEPT BACK’’ WINGS
’’SWEPT BACK’’ WINGS
+- 8’’
LL/2
LL/2
Center survey marker on top,
level portion of abutment wing
Endblock
460. 02
PLATE NUMBER
S
D
D
O
TSheet 1 of 1
YEAR PLATE DETAILS
PLACE
APPROPRIATE
NUMBER
HERE
PLACE
APPROPRIATE
NUMBER
HERE
1 7’’
þÿ��� 1’’ þÿ�2� � 1’’ þÿ�2� � 1’’ þÿ�2� � þÿ���
þÿ��
�þÿ
���
3’’
þÿ
���
þÿ��
�
6’’
YEAR PLATE DETAILS
NOTES:
and attached to the forms in such a manner that the finished imprint in the
the other contract items.
box culverts and bridges. The year plates shall be constructed in reverse
þÿ�1� � þÿ�1� �
1. Year plates of the general dimensions shown shall be constructed on all
þÿ�c�o�n�c�r�e�t�e� �d�o�e�s� �n�o�t� �e�x�c�e�e�d� �o
3. There will be no separate measurement or payment made for year plates
the upper sloped portion of the barrier approximately 5’- 6’’ from the end of
at each end of the bridge on opposite sides.
the bridge, or as designated by the Engineer. There shall be one year plate
endblocks, the year plate shall be centered vertically on the curb face approximately
bridges with ‘‘Jersey’’ shaped barrier endblocks, the year plate shall be centered on
six (6) inches from the end of the bridge, or as designated by the Engineer. On
b. On bridges with six (6) inch curbs or ‘‘Jersey’’ shaped barriers with no
End Brid
ge
End Bridge
Year Plate
Year Plate
End Bridge
Year Plate
JERSEY BARRIER TYPE B CURBJERSEY BARRIER
( With Endblock )
inches below the top of the upstream parapet wall and centered laterally on the
upstream face. On precast box culverts the year plate shall be centered laterally
with this location, the year plate shall be centered in an adjacent barrel.
on the upstream face of the top slab. Where an extended interior wall interferes
þÿ�a�.� � � � � �O�n� �c�a�s�t�-�i�n�-�p�l�a�c�e� �b�o�x� �c�u�l�v�e�r�t�s� �t�h�e� �y�e�a
5’- 6’’
Year Plate See Note 2 (c)
Year Plate See Note 2 (c)
6’’
Year Plate See Note 2 (c)
6’’
c. When the plans specify that both the original date of construction and the date of
reconstruction are to be shown, one date shall be placed as listed above and the
bridge on opposite sides.
other located adjacent to it. Both year plates shall be shown at each end of the
2. Year plates shall be located on structure (s) as follows:
þÿ�2� �
on box culverts and bridges. All costs for this work shall be incidental to
March 31, 2000
Published Date: 4th Qtr. 2008 Published Date: 4th Qtr. 2008
33