Est Drain SC-Colony Godavarru 1
-
Upload
kandepigopi -
Category
Documents
-
view
219 -
download
0
Transcript of Est Drain SC-Colony Godavarru 1
-
8/13/2019 Est Drain SC-Colony Godavarru 1
1/14
Mandal : Duggirala
Estimate Cost Rs. #REF! Lakhs
Grant :-
Construction of side drains to internal roads in SC
colony of Godavarru village of Duggirala Mandal.
Estimate
Name of the work
-
8/13/2019 Est Drain SC-Colony Godavarru 1
2/14
Nominal mix 1:3:6 with 40mm HBG metal for Bed Concrete 0.10m depth is
proposed.
PCC M15 Concrete mix for Drain Wall is proposed to a length of 843.00 mts on
both sides of the road is proposed.
,
0.5%,PS Charges @ 0.3%, labour cess @ 1%, etc are shown in the detailed estimate.
The above estimate is prepared with current S.S.R of 2012-2013. The work will be
executed as per the APDSS.
Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1
Sand filling 200mm th for shoe wall fondation is proposed.
Specification report to accompany the detailed estimate for the work
Construction of side drains to internal roads in SC colony of Godavarru village of
Duggirala Mandal.
Est.Rs. 23.00 Lakhs.
The above work was proposed under indiramma Infrastructure funds.Hence detailed estimate is prepared with the following provisions.
-
8/13/2019 Est Drain SC-Colony Godavarru 1
3/14
Est.Rs. 23.00 Lakhs.
No
s
L
(m)
B
(m)
D
(m)
1 2 3 4 5 6 8 9 10
1
Main road 1 x 2 185.00 0.80 0.45 133.20 Cum
Cross roads 7 x 2 40.00 0.80 0.45 201.60 Cum
--- Do-- 7 x 2 54.00 0.80 0.45 272.16 Cum
606.96 Cum 128.82 1Cum 78189
2
Main road 1 x 2 185.00 0.80 0.15 44.40 Cum
Cross roads 7 x 2 40.00 0.80 0.15 67.20 Cum
--- Do-- 7 x 2 54.00 0.80 0.15 90.72 Cum
202.32 Cum 479.85 1Cum 97083
3
P.C.C grade M 10
Main road 1 x 2 185.00 0.80 0.10 29.60 Cum
Cross roads 7 x 2 40.00 0.80 0.10 44.80 Cum
--- Do-- 7 x 2 54.00 0.80 0.10 60.48 Cum
134.88 Cum 3465.68 1 Cum 467450
Filling Sand in foundation trenches as per drawing and technical
specification Clause 305.3.9 MORD & 304 MORTH
Providing concrete for plain concrete in open foundations using 40 mm
nominal size Graded hard stone aggregate, mechanically mixed, placed in
foundation and compacted by vibration including curing for 14 days
complete as per drawings and technical specifications Clause 802, 803,1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. for Bed Concrete
Plain cement concrete in substructure complete as per drawings and
Name of the work :Construction of side drains to internal roads in SC colony of Godavarru
village of Duggirala Mandal.
7
Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH
ESTIMATE DETAILED AND ABSTRACT
SL
No.Description of Item
Measurements
Quantity Rate PerAmount
(Rs.)
-
8/13/2019 Est Drain SC-Colony Godavarru 1
4/14
1 2 3 4 5 6 8 9 107
6 Add Vat Tax @ 5% 100692.00
7 10069.00
8 Seignorage charges 50216.00
9 PS Charges @ 3% 60415.00
10 Labour Cess at 1% 20138.00
11 44633
Total Rs 2300000
Provision for Q.C.Charges @0.50%
Unforseen items if any
-
8/13/2019 Est Drain SC-Colony Godavarru 1
5/14
-
8/13/2019 Est Drain SC-Colony Godavarru 1
6/14
0
-
8/13/2019 Est Drain SC-Colony Godavarru 1
7/14
23.00 Lakhs
Index-
codeDescription Unit Quantity Rate Rs. Amount Rs.
2 3 4 5 6
1 Excavation for Structures
(I) Ordinary soil
(A) Manual Means
(i) Upto 3 m depth
Unit = cumTaking output = 10 cum
a) Labour
Mazdoor (Unskilled) day 3.64 250.00 910.00
Add 20% MAA on Labour
. Add seignorage charges cum 10.00 22.00 220.00
Cost for 10 cum = a+b+c 1130.00
158.20
Rate per cum = (a+b+c)/10 1288.20
128.82 1Cum
2
Sand filling Sand
Unit = cum
Add contractor profit and over head charges at 14%
Earthwork excavation in B.C soils for structures as per
drawing and technical specifications Clause 305.1 including
setting out, construction of shoring and bracing, removal of
stumps and other deleterious material and disposal upto a lead
of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH
Note : Classifications of Earth Work Specification are as
per 302.2.1(a) of MORD and 301.2.1 of MORT&H
R-FNDN-2
Filling in foundation trenches with sand as per drawing and
technical specification Clause 305.3.9 MORD & 304 MORTH
DETAILED DATAS
Grant: Est.Cost:Rs
S. No
1
Construction of side drains to internal roads in SC colony of Godavarru
village of Duggirala Mandal.Name of the work :
RBR-FNDN-1
-
8/13/2019 Est Drain SC-Colony Godavarru 1
8/14
(a) Material
Cement t 0.22 4500.00 990.00
Coarse sand cum 0.45 434.12 195.35
40mm HBG Metal cum 0.90 1313.78 1182.40
Water kl 1.20 0.00 0.00
(b) LabourMason (1st Class) day 0.10 350.00 35.00
Mazdoor (Unskilled) day 1.39 280.00 389.20
Add 20% MAA on Labour
(c) Machinery
Mechanical concrete mixer
0.4/0.28 cum capacity f itted with
water measuring device and
preferably also with load cell.
hour 0.40 417.40 166.96
Water tanker 6 kl capacity hour 0.13 624.00 81.12
Rate per cum = a+b+c+d+e+f 3040.04
425.61
Sundries 0.03
3465.68 1Cum
4 5) I) i
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC
Mixer (MORD)
Unit = cum
(a) Material
Cement t 0.275 4500.00 1237.50
Add contractor profit and over head charges at 14%
Plain cement concrete in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH
Note : Water for concrete :A provision for cost of water may be
added at 1.2 kl / 1 cum (including curing purpose) keeping the site
Coarse Aggregate : Single grade nominal size can also be used
instead of graded metal, keeping the site conditions in view
RBR-SBST-5
-
8/13/2019 Est Drain SC-Colony Godavarru 1
9/14
Rate per cum = a+b+c+d+e+f 3637.90
509.31
Sundries 0.06
4147.27 1Cum
5 5 Sub Analysis:
Cement Mortar (1 : 5)
Unit : 1cum
A. MATERIALS:
Cement kg. 288.0 4.50 1296.00
Sand (including 5% wastage) cum 1.05 434.12 455.83
B. MACHINERY
- Nil - -
C. LABOUR:
Man mazdoor for mixing mortar day 0.20 280.00 56.00
Grand Total 1807.83
6 3)c)
Unit = 10 sqm
Taking output = 10 sqm(a) Material
Cement mortar 1:5 (Rate as in
item 11.5 II )
cum 0.144 1807.83 260.33
(b) Labour
Mate day -
Mason 1st Class day 0.500 350.00 175.00
Mazdoor (Unskilled) day 0.540 280.00 151.20
Rate per 10 sqm = (a+b+c+d) 586.53
82.11
668.64
66.86 1Sqm
Add contractor profit and over head charges at 14%
Add contractor profit and over head charges at 14%
RBR-SBST-3
Plastering with cement mortar (1:5), 12 mm thickness as
per technical specification 1300 & 2200 MORTH
RBR-FNDN-5
-
8/13/2019 Est Drain SC-Colony Godavarru 1
10/14
-
8/13/2019 Est Drain SC-Colony Godavarru 1
11/14
0
-
8/13/2019 Est Drain SC-Colony Godavarru 1
12/14
Name of the work : Construction of side drains to internal roads in SC colony of Godavarru village of Duggirala Mandal.
23.00 Lakhs.
1 2 3 4 5 6 7 8 9 12 13 14 15 16 17
1 Sand for Concrete krishnariver 3 385.00 0.00 0.00 385.00 56.00 0.00 -6.88 49.12 434.12 ./cum
2 Coarse Sand for filling krishnariver 3 285.00 0.00 0.00 285.00 56.00 0.00 -6.88 49.12 334.12 ./cum
3 Gravel Vejendala 37 98.00 0.00 0.00 98.00 450.00 0.00 -55.26 394.74 492.74 ./cum
4Aggregates 40 mm
nominal size SS5Lam 50 588.00 70.00 147.00 805.00 580.00 0.00 -71.22 508.78 1313.78 ./cum
5Aggregates 20 mm
nominal size SS5Lam 50 984.00 70.00 246.00 1300.00 580.00 0.00 -71.22 508.78 1808.78 ./cum
6Aggregates 12 mm
nominal size SS5Lam 50 780.00 70.00 195.00 1045.00 580.00 0.00 -71.22 508.78 1553.78 ./cum
7 Cement Tenali 25 4600.00 0.00 0.00 5700.00 0.00 0.00 0.00 0.00 5700.00 ./Mt
8300 dia. RCC NP2 class
Plain ended pipesTenali 25 348.00 0.00 0.00 348.00 2 2.60 0.00 0.00 22.60 370.60 ./1Rm
Initial
Charges
AddBlasting
charges
Machine
crushing
charges@
25%
Netbasiccost
Units
Est.Cost:
Conveyance Cost
Add
Conveyance
ChargesName of
Quarry
Lead in
KM
DeductCP&
OH(12.28%)
Material Basic Cost
Est.Cost Rs..
LEAD STATEMENT
2. Certified that the metal is obtained by blasting.
loading
chargesSl.
No
Certificates :
1. Certified that the above leads are shortest and correct to the best of my knowledge and belief.
Discription of Item
NetConveyanc
e
Charges
AddSeigniorag
e
Charges
Total Cost
-
8/13/2019 Est Drain SC-Colony Godavarru 1
13/14
-
8/13/2019 Est Drain SC-Colony Godavarru 1
14/14
Sl No Unit Qty Metal Sand Earth Work
1 1Cum 606.96 0.00 0.00 606.96
2 PCC M10 mix(1:3:6) for Bed Concrete 1Cum 134.88 121.39 60.70 0.00
3 1Cum 202.32 0.00 202.32 0.00
PCC M15 mix For Drain Wall 1Cum 310.22 279.20 139.60 0.00
4 10Sqm 1264.50 0.00 18.21 0.00
400.59 420.82 606.96
50.00 40.00 22.00
20029.50 16832.95 13353.12
50215.57 or 50216.00
SEIGNORAGE CHARGES
Name of Work : - Construction of CC Drains at Karrevari Bazar,SC Colony,Gudiwada(V) of Tenali(M)
Description of Item
Eart Work
Filling with Sand
Plastering CM (1:5) 12mm thick