Page 1: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Esri Best Practices: How to Run An AGILE GIS

ProjectJennifer Prather (esri), Betsy Leis (esri), and Joe Minus (NGA)

Page 2: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Who’s familiar with Agile?

Page 3: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

https://www.youtube.com/watch?v=Wac3aGn5twc

• Watch the video

• Think about:

- What went wrong?

- What would you do differently?

Page 4: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

How to Start…

Discuss similar

industriesAssess

workflows

Prioritize

workflows

Create a plan

Conduct

kickoff meeting

56

Choose

a life cycle

Launching your Location Platform Guide:

www.esri.com/LaunchGuide

5

Page 5: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

The Agile Approach

Page 6: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Emerging Application Development | 1960’s – 1990’s

Requirements

Design

Implementation

Testing

Maintenance

`

`

`

`

• “I want something else”

1 + years6 months1.5 years1 year

`

Change Management

Process

Contract Amendment

Page 7: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Agile Manifesto

Individuals and interactions over processes and tools

Working software over comprehensive documentation

Customer collaboration over contract negotiation

Responding to change over following a plan

Page 8: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Agile | Terminology

User Story Epic

Velocity

Burndown Chart

AGILESprint\Iteration

Page 9: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Scope,

Technology,

Contract

When would you use Agile?

Waterfall

• Clear requirements

• Fixed deliverables

• Single application

Staged Delivery

• Several applications

• Prototypes expected

Agile

• Flexible scope, deliverables

• One or several applications

Capacity,

Capabilities,

Environment

Size,

Duration

• Small size, short duration project

• Limited capacity, resources, and environment

• Frequent turnover on project team

• Medium or large size, mid to long duration

• Capacity, resources, and environment to support multiple releases

• Customer EXPECTS collaboration

• Stable, experienced project team

• Any size or duration project

Page 10: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Proposing Agile

Page 11: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Big Picture

System

ArchitectureDatabase

DesignWidget 1 Widget 2

Application

Hardening

21

Story Points

34 34 45 21

EpicsStory point is a arbitrary measure used by Scrum

teams. This is used to measure the effort required to

implement a story. In simple terms its a number that

tells the team how hard the story is. Hard could be

related to complexity, Unknowns and effort. In most

cases a story point range is1,2,3,5,8,13,21,34,45

Page 12: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

21 34 34 45 21

168 272 272 360 168

Story Points

Hours

Page 13: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Activity Scrum

Master

Product

Owner

Developer Analyst System

Admin

Total

System

Architecture168

Geodatabase

Design272

Widget 1 272

Widget 2 360

Application

Hardening168

Pricing Sheet

16 16 0 16 120

24 24 0 184 40

24 24 176 48 0

20 20 240 80 0

40 16 84 24 4

Page 14: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Work Breakdown Structure

System

ArchitectureDatabase

DesignWidget 1 Widget 2

Application

Hardening

Project

1.1 User Story

1.2 User Story

2.1 User Story

2.2 User Story

2.3 User Story

3.1 User Story

3.2 User Story

3.3 User Story

3.4 User Story

4.1 User Story

4.2 User Story

4.3 User Story

4.4 User Story

4.5 User Story

5.1 User Story

5.2 User Story

Page 15: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Managing Agile

Page 16: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Scrum Sprint Cycle

Product Backlog Sprint Planning Sprint Backlog

Potentially Shippable

Product Increment

2 - 4 Week

Sprint

Product

Owner

Scrum

Master

The team

Retrospective

Daily Scrum

Stakeholders

Page 17: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

KanBan Approach (Still Agile, just not Scrum)

• No defined iterations

• No defined roles

• Direct communication with customer

• Limit your work-in-progress

• Visualize your work

• Ever-changing backlog with on-the-fly prioritization

Page 18: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Let’s talk about people

• People have personalities

• Personalities can be tricky

Page 19: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Collecting Requirements

Page 20: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

User stories facilitate a conversation with the team and with the users…

ProductOwner

ScrumMaster

The teamStakeholders

Page 21: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

ndependent. Reduced dependencies = easier to plan

egotiable. Details added via collaboration

aluable. Provides value to the customer

stimate-able. Too big or too vague = not estimate-able

mall. Can be done in less than a week

estable. Good acceptance criteria

A good user story uses the “INVEST” model:

I

N

V

E

S

T

Page 22: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Build for Value

Standish Group Study Reported at XP2002 by Jim Johnson, Chairman

Requirements evolve over time

Page 23: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Product Backlog

Page 24: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Wish List

Page 25: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Sprint Backlog

Page 26: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Sprint Backlog

Page 27: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

4h

Sprint Backlog

3 days8h

2 days1h

2h

4h 8h

Page 28: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

How do we know when we are done?Confirmation…the acceptance test

Page 29: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

How do we know when we are done?Confirmation…the acceptance test

• Given I have enabled

offline access on my map

• When I click on the map to

create a feature

• Then the feature will be

stored locally until I

sync with connectivity.

Page 30: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

How do we know when we are done?Couple of things to note…

• Define acceptance just in time…don’t waste too much time

• Part of the conversation process

• Acceptance consistency (given…when…expect) is helpful, but not necessary

Page 31: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Definition of Done

Examples of practices that might be included in the definition of “done:”

• Acceptance criteria met

• Code is reviewed by another development team member

• Test cases are written

• Unit tests and UI automation tasks are written

• Feature is tested for accessibility

We don’t do strict…

treehouse

http://blog.teamtreehouse.com/when-is-a-user-story-done-acceptance-criteria-definition-done

Page 32: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Example – Enterprise Geocoding ServicesDecomposing work into manageable pieces

Provide Single Line capabilities

Logic adheres to the following order building point, street centerline,

zip code

As an employee I need locators to be built on my Agency

Data.

Integrate reference data for building and

street centerlines

As an employee I need an authoritative geocoding service.

API documentation

As an employee I need a cascading set

of locators.

As a business owner I need a geocoding service available to

3rd party applications.

99.99% SLA

REST service

Provide Enterprise Geocoding Services

Feature level Epic

User Stories

Acceptance Criteria

Provide Reverse capabilities

Provide Batch capabilities

Page 33: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

• Change control of requirements

• Capturing notes/conversations

What if my customer changes their mind?

Prioritized

Changes (Unapproved)

Prioritized

Changes (Approved)

Prioritized

Product Backlog

Updated Prioritized

Product Backlog

Change 1

Change 2

Change 3

Change 2

User Story 1

User Story 2

User Story 3

User Story 1

User Story 2

User Story 3

Change 2

Page 34: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Watch out for the ‘Gotchas’Things to avoid

• Avoid long lists of acceptance criteria on a single

user story

• Prepare for conflicting requirements

• Avoid requirements that are ambiguous

• Avoid requirements that describe HOW

• Requirements must have a “reason”

• Avoid moving forward on development until after the

customer has reviewed the design

• Don’t forget to prioritize

Page 35: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

How to Esri Manage this

Agile Cycle?

Page 36: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Using Agile in a Professional Services ProjectM

eth

od

Waterfall

Agile

Time

Page 37: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Meth

od

Waterfall

Agile

Time

Using Agile in a Consulting Project

Page 38: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Meth

od

Waterfall

Agile

Time

Using Agile in a Consulting Project

Page 39: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Meth

od

Waterfall

Agile

Time

Using Agile in a Consulting Project

Page 40: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Meth

od

Waterfall

Agile

Time

Using Agile in a Consulting Project

Page 41: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Meth

od

Waterfall

Agile

Time

Final Release

Using Agile in a Consulting Project

Page 42: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Managing Resources

Your Project

Plan A Plan B

Sprint

50%

75%100%

75%

50%

100%

100%

50%

Plan ZSprint

50%

75%100%

75%

50%

100%

100%

50%

50%

50%

50%

50%

50%

Page 43: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Keys to Successful Projects!

Communication

Utilize Available Tools…

Trusted Partnerships

Transparency

Page 44: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Tools

Page 45: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Waffle.io

Microsoft Team Foundation Server (TFS)

Requirement Management ToolsLicensed and Open Source

JIRA

Compare

Page 46: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

There is a lot of info out there to help

http://assets.cdnma.com/13314/assets/Website

Downloads/2016-Seilevel-RequirementsTool-Evauation-

Report-FINAL.pdf

http://project-management.zone/system/jira,pivotal-

tracker,team-foundation-server,trello

https://businessanalystlearnings.com/technology-

matters/2017/7/4/a-list-of-free-requirements-management-

rm-software

Page 47: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Requirements and Stakeholders

THE most important part of a project

• Solid requirements gathering leads to successful projects

• Consider solution, COTS capabilities before collecting additional

requirements

• Involve the right people in the process

• Pick a methodology that fits your project

• Focus on the level of detail that is appropriate

• Important to prioritize and allocate

• Invest plenty of time to secure customer approval

Page 48: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Case Study

Page 49: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Case Study - Large Scale

Product Backlog

Sprint Planning

Sprint Backlog

Potentially Shippable

Product Increment

2 Week

Sprint

Scrum of Scrum

Master

The team

Retrospective

Daily Scrum

Stakeholders

Tech LeadProject Manager

Customer’s PM

Project Manager

Daily Scrum

Daily Scrum

Sprint Planning

The team

Sprint Planning

The team

Scrum

MasterProduct

Owner

Scrum

MasterProduct

Owner

Scrum

Master

Product

Owner

Sprint Backlog

Sprint Backlog

Scrum of Scrums

~5 developers

1 tester

~7 developers

1 tester

~8 developers

1 tester

Contract Type $$ Value

FFP-LOE $20M

Customer Customer Customer Tech LeadTech Lead Tech Lead

Page 50: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Case Study – Large Scale

• Why Agile?

- Project was contractually required to follow the SAFe Agile Methodology.

- Requirements were vague and customer recognized the benefit in iterative

development to achieve the best results.

• Key Challenges / Lessons Learned

- Deployment into the customer’s footprint occurs at the end of the Release.

- Large project team to manage.

- Each Scrum Team was responsible for individual features.

- Dependencies existed between scrum teams.

- Stakeholders (customers) were only present during Stakeholder Reviews and

were not active participants during the release planning events.

- Disconnected environment meant that the customer could not test the features

until the end of a release.

- Bi-weekly demonstrations to “sell off” features and to show progress.

Page 51: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Questions

Page 52: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Print Your Certificate of Attendance

Print Stations Located in 150 Concourse Lobby

Tuesday12:30 pm – 6:30 pm

Expo

Hall B

5:15 pm – 6:30 pm

Expo Social

Hall B

Wednesday10:45 am – 5:15 pm

Expo

Hall B

6:30 pm – 9:30 pm

Networking Reception

Smithsonian National Museum

of Natural History

Page 53: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database

Download the Esri

Events app and find your event

Select the session

you attended

Scroll down to

“Survey”

Log in to access the

survey

Complete the survey

and select “Submit”

Please Share Your Feedback in the App

Page 54: Esri Best Practices: How to Run an AGILE GIS Project€¦ · Esri Best Practices: How to Run An AGILE GIS Project ... 40 16 84 24 4. Work Breakdown Structure System Architecture Database