Esdep Lecture Note [Wg15a]

18
Previous | Next | Contents ESDEP WG 15A STRUCTURAL SYSTEMS: OFFSHORE OBJECTIVE/SCOPE To elaborate on structural steel concepts for integrated decks, module support frames, and modules. To show principles and methods of construction (from yard to offshore site). PRE-REQUISITES Lectures 1A & 1B: Steel Construction Lecture 2.4: Steel Grades and Qualities Lecture 2.5: Selection of Steel Quality Lectures 3.1: General Fabrication of Steel Structures Lecture 6.3: Elastic Instability Modes Lecture 7.6: Built-up Columns Lectures 8.4: Plate Girder Behaviour and Design Lecture 11.2: Welded Connections Lecture 12.2: Advanced Introduction to Fatigue Lecture 15A: Offshore Structures SUMMARY Structural systems for each type of topside structure are introduced, i.e. truss, portal frame, box girder, and stressed skin. Some special topics of design are addressed and the different construction phases are presented in more detail, i.e.: fabrication 1. weighing 2. load out 3. sea transport 4. offshore installation especially deckmating 5. module installation 6. hook-up 7. commissioning. 8. A brief discussion on inspection and repair and on platform removal concludes this lecture. 1. INTRODUCTION This lecture deals with the structural design of jacket-based offshore deck structures, following the introduction in Lecture 15A.10. Heavy decks, over 10.000 tons, are provided with a module support frame onto which a number of modules are placed, see Lecture 15A.1, Figs. 4 and 5. Smaller decks, such as those located in the southern North Sea, are nowadays installed complete with all equipment in one lift to minimize offshore hook-up. Most of this lecture refers to this type of integrated deck as described in Lecture 15A.10. The selection of the concept for the structural deck is made in close cooperation with the other disciplines. ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.ht m 1 of 18 9/2/2014 9:03 PM

Transcript of Esdep Lecture Note [Wg15a]

Page 1: Esdep Lecture Note [Wg15a]

Previous | Next | Contents

ESDEP WG 15A

STRUCTURAL SYSTEMS: OFFSHORE

OBJECTIVE/SCOPE

To elaborate on structural steel concepts for integrated decks, module support frames, and modules. To show principles and methods ofconstruction (from yard to offshore site).

PRE-REQUISITES

Lectures 1A & 1B: Steel Construction

Lecture 2.4: Steel Grades and Qualities

Lecture 2.5: Selection of Steel Quality

Lectures 3.1: General Fabrication of Steel Structures

Lecture 6.3: Elastic Instability Modes

Lecture 7.6: Built-up Columns

Lectures 8.4: Plate Girder Behaviour and Design

Lecture 11.2: Welded Connections

Lecture 12.2: Advanced Introduction to Fatigue

Lecture 15A: Offshore Structures

SUMMARY

Structural systems for each type of topside structure are introduced, i.e. truss, portal frame, box girder, and stressed skin.

Some special topics of design are addressed and the different construction phases are presented in more detail, i.e.:

fabrication1.weighing2.load out3.sea transport4.offshore installation especially deckmating5.module installation6.hook-up7.commissioning.8.

A brief discussion on inspection and repair and on platform removal concludes this lecture.

1. INTRODUCTION

This lecture deals with the structural design of jacket-based offshore deck structures, following the introduction in Lecture 15A.10.

Heavy decks, over 10.000 tons, are provided with a module support frame onto which a number of modules are placed, see Lecture 15A.1,Figs. 4 and 5. Smaller decks, such as those located in the southern North Sea, are nowadays installed complete with all equipment in one liftto minimize offshore hook-up. Most of this lecture refers to this type of integrated deck as described in Lecture 15A.10.

The selection of the concept for the structural deck is made in close cooperation with the other disciplines.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

1 of 18 9/2/2014 9:03 PM

Page 2: Esdep Lecture Note [Wg15a]

For the design of the deck structure, the in-place condition has to be considered, together with the various previous stages such asfabrication, load-out, transport and installation.

A structural system for a deck structure comprises several of the following elements:

Floors (steel plate or grating) }

Deck stringer (H beams, bulbs or troughs) } Discussed in

Horizontal bracing } Lecture 15A.10

Deck beams

}

Primary girders }

Vertical trusses or bracing } Discussed in

Deck legs } this lecture

2. MAIN STRUCTURE DESIGN

2.1 Introduction

Some major topics in topside structural design are reviewed below.

2.2 Main Structure-Portal Frame Design

A portal frame design has been used in recent major projects in the Dutch sector such as Amoco P15, Placid K12 [5] and Penzoil L8.

The main girder/column joint, as shown in Figure 1, is very important in determining the height. It is most practical to position thelongitudinal and transverse main girder flanges at the same elevation.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

2 of 18 9/2/2014 9:03 PM

Page 3: Esdep Lecture Note [Wg15a]

Haunching of the transverse main girder , which is more lightly loaded-in-plane, however is not an option as these girders become highlyloaded during transport.

The severe restraint of welding a tubular in a diaphragm requires the selection of TTP steel for the column section.

Due to the high importance of the diaphragm plates in the overall integrity of the structure and the welding constraints on the web plates inbetween, TTP-steel is chosen also for the diaphragm.

Another option is to weld the girders directly onto the unstiffened can section of the column. The assessment of ultimate resistance as well asfatigue strength has been the subject of recent research (see Lecture 15A.12).

Further improvement of the theoretical and experimental background is required. For lighter loaded truss structures, this non-stiffened typeof joint has been used successfully.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

3 of 18 9/2/2014 9:03 PM

Page 4: Esdep Lecture Note [Wg15a]

A third solution is to weld the girders directly to the can section of the column, which is internally stiffened by rings. Its most severedisadvantage is the difficulty of inspecting the column interior.

The disadvantage of both direct girder-column joints is that the girder sizing is governed by the very high moments at the column/beamtransition point.

Cast steel nodes form an alternative to the welded designs.

Member selection for portal frame structures with increasing section moduli usually includes:

300 mm wide rolled beam.400 mm wide rolled beam.450 mm /460 mm wide rolled beam.castellated beams fabricated from rolled beams, giving a height 1,5 times the original beam height.built-up girders fabricated from rolled beam T-sections with a web plate welded-in-between.plate girder.

The plate girder of course provides the greatest flexibility for design, material selection and procurement, though its cost per tonne isapproximately twice that of a rolled beam.

2.3 Main Structure-Truss Design

Most offshore structures of moderate size have been provided with a truss-type structure. Typically such trusses consist of rolled beams aschords and tubulars as diagonals.

Truss design requires several choices which affect the structural efficiency and have impact on other disciplines:

number and configuration of bracesfalling or rising bracesintermediate load carrying of chordspresence of external moments on jointsbraces: tubulars or H-rolled sectionschords: rolled section or plate girderstruss joints: locally reinforced chord or prefabricated node section.

Figure 2 shows different arrangements of braces (basically N or W-type) obtained by variation of the number of nodes. It should be kept inmind that all diagonals and verticals form obstructions for piping and cable routings of all kinds.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

4 of 18 9/2/2014 9:03 PM

Page 5: Esdep Lecture Note [Wg15a]

For the transverse trusses, transparency is even more important, especially near the well area. The number of members required shouldtherefore be reduced to a minimum.

Providing a W-truss with light verticals should be evaluated against choosing a heavier chord section.

If a joint, e.g. at the top deck, is subject to severe moments due to lifting, ventstack, or crane pedestal for example, much of the bracing stresswould result from unintended bending. Generally the deck leg restraint creates a similar problem in the lower deck. An evaluation shouldyield a preferred location therefore for the node of the end brace.

The truss deflects under its vertical load which leads to restraint of the chord in the column and to bending of the chord. Both effects canquite severely effect the efficiency. The chord section should be kept compact therefore and not given too much height.

Tubulars (circular, square or rectangular) or rolled sections can be chosen for the braces.

The choice depends primarily on the loads and the chord width. A chord width of 300mm can accommodate a 10 in. brace only. Thus a widerchord flange is preferred.

2.4 Main Structure-Stressed Skin Design

A third major structural option is the stressed skin concept, where full height plate walls take the function of the truss or the frame.

Modules for living quarters are frequently built to this concept. Other types of modules have not been built with stressed skin since theobstruction they cause during construction is severe.

For smaller stressed skin modules, trapezoid corrugated plate can be used to provide a wall in a frame of square hollow sections.

For bigger modules, flat plate stiffened with through-stiffeners is used for the walls.

The detailed design can only be made with a clear plan for assembling the module which shows the panels that must be prefabricated.

2.5 Non-Load Bearing Walls

Blast or fire walls are provided in offshore platforms. Due to their function full welding to the main structure is often unavoidable, see Figure3a.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

5 of 18 9/2/2014 9:03 PM

Page 6: Esdep Lecture Note [Wg15a]

Special attention is required concerning:

the capability of the walls to comply with the deformation of the main structure during load-out, sea transport, lifting and in-service.the strength of welds to the main structure being stronger than the plate to avoid rupture and potential crack initiation of the mainstructure.

One solution is to provide a flexible detail, see Figure 3b and 3c, with stiffeners falling short.

2.6 Crane Pedestals

Crane pedestal, are discussed briefly below.

It is structurally economical to put the crane pedestal on top of a main column. For a truss type the main structure will be close to theplatform periphery so a moderate length of crane boom is sufficient.

For a portal frame type with columns closer to the outer periphery, the pedestal requires a special column in order to avoid using a crane withlarge boom length. Figure 4 depicts such a solution.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

6 of 18 9/2/2014 9:03 PM

Page 7: Esdep Lecture Note [Wg15a]

The functions of the main structure with respect to the crane pedestal are:

to provide torsional support preferable at top deck levelto provide lateral restraint at top deck levelto provide lateral restraint at the lower end of the pedestalto provide vertical support, preferably at the lower end of the pedestal.

Bending restraint by deck beams and/or main structure girders is not required and should be reduced where possible. Torsion caused byslewing of the crane should preferably be resisted by the floor plate, the stiffest element.

It has become practice to include the tapered top section of the pedestal in the supply package of the crane. The top section contains thelarge flange for the slewing bearing.

Fatigue due to crane operations is a design criterion and requires careful detailing of the pedestal and the adjoining structure.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

7 of 18 9/2/2014 9:03 PM

Page 8: Esdep Lecture Note [Wg15a]

3. ANALYSIS OF DECK STRUCTURES

3.1 Introduction

Although the analysis of deck structures is a standard task, several aspects require special attention:

Plate girder designStrength of jointsStrength of the floor plateLifting pointsModelling of floor platesSupport of modules.

3.2 Plate Girder Design

Design of plate girders requires selection of many dimensional variables and of approaches for assessing load-carrying resistance. Lectures8.4 deal in more detail with plate girder design.

Web buckling due to bending, normal force and shear restricts the slenderness of the web which is expressed as the height of the web (h)divided by the web thickness (t).

API-RP2A [2] refers to the AISC manual [3] which gives the figures below for material with yield-stress of 355 MPa:

Allowable bending stress 0,66 Fy 0,60 Fy

Ratio web height h to thickness t 90 138

Ratio flange width b to thickness t 18 27

Instead of the above approach, more recent research, [3] and [6], allows use of the post-buckling strength. The depth/thickness limits givenabove do not then apply.

3.3 Strength of Joints

The most important joints in a topside steel structure are:

the ring stiffened joint between rolled beams or plate girders with a circular column.the non-stiffened joint between rolled beams or plate girders with a circular column.the tubular brace joint to single web beams.the non-overlapped tubular joint.

These joints are discussed in Lecture 15A.12.

3.4 Lifting Points

The effect of lifting points on deck design is considerable. For example the local forces that act on the lifting points (Figure 5) have to betransmitted safely through to the deck structure.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

8 of 18 9/2/2014 9:03 PM

Page 9: Esdep Lecture Note [Wg15a]

There are two types of lifting points, trunnions and padeye, Figure 6.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

9 of 18 9/2/2014 9:03 PM

Page 10: Esdep Lecture Note [Wg15a]

Trunnions, though favourable from other points of view, see Section 4, can generate considerable offset of the sling force with respect to thetopdeck system points. Significant bending is generated which is transferred to the topdeck girders to the extent that they contribute to jointstiffness. It is most efficient to leave these bending moments in the column, by providing stiff columns.

Padeyes generally provide a good opportunity to minimize or eliminate offset, as far as they can be situated on top of the column. Therequirement of recessed padeyes (recessed padeyes are those which are positioned between the top and bottom flange elevation) or thepresence of other structures on the top deck can lead to very eccentric positioning and resulting heavy moments. For this reason the liftingconcept must be developed in the concept phase of the structural development.

API-RP2A [1] requires larger load factors to be used for members direct-loaded by padeyes or trunnions.

3.5 Modelling of Floor Plates

There are two points of major interest:

representation of the floorplate in the structural modeltrue elevation

There are several ways to model the plate. The most direct is to choose a computer-program which allows selection of plate elements. A

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

10 of 18 9/2/2014 9:03 PM

Page 11: Esdep Lecture Note [Wg15a]

second option is to define representative members which model the plate stiffness by diagonals.

The deck plate is often positioned in the model at the elevation of the centre line, i.e. the mid height of the main structure girders, in order tosave nodes in the model. It should however be recognised that this "error" of elevation, amounting to 0,5 - 1m, can affect the results. Aseparate evaluation should then be performed on the effect to this deliberate "error" at least at some critical points.

3.6 Support of Modules

Modules and deck structures interact structurally. API-RP2A [1] requires that modules are modelled as elastic structures for the analysis ofthe supporting deck. In the 1970's major difficulties arose in the decks for concrete gravity structures, because modules were represented as aset of loads for the different load cases, acting at the support points, and neglecting structural interaction. The basic phenomenon of thisinteraction is that the distribution of the support reactions of the module is quite unequal and varies with the load case. Dimensional controlof the module as well as the support, with corrective measures, further provide control over the module - deck interaction. Some modules,such as living quarter modules, gas compressor and injection modules, are often placed on anti-vibration pads in order to isolate them fromvibrations.

4. CONSTRUCTION

4.1 Introduction

In Lecture 15A.1 the principal aspects of construction of offshore structures and their major equipment was introduced.

For topsides more specific aspects are discussed below.

4.2 Fabrication

4.2.1 Operations

The design should allow efficient prefabrication of major sections. Prefabrication will avoid congestion in one working area and it speeds upthe whole construction process.

Prefabrication and assembly shall properly incorporate the aspects of installation of major and smaller mechanical equipment, as well asoutfitting with piping, electrical and instrument cables and lines. It should be recognized that major mechanical and electrical equipment isoften not available at the start of assembly and must be brought in during fabrication.

4.2.2 Design aspects

Since the overhead space is well covered by extensive piping routes as well as cable trays during construction, "late" structural work shouldpreferably not be positioned overhead in that underfloor area.

Fabrication of offshore steel structures is principally assembly by welding.

The prefabrication concept and joint detailing should maximize welding productivity with many horizontal welds preferably made usingSMAW technology.

Support to the topside during construction should be well controlled to avoid settlement and to keep within construction tolerances.

Special consideration should be given to the selection of materials suitable for the fabrication. Where thick-walled elements are involvedrequiring Post Weld Heat Treatment (PWHT), the design should position such welding and the PWHT in the prefabrication phase.

4.3 Weight Engineering

The topside must be kept under strict weight control, as explained in Lecture 15A.10. To that end the topside is usually weighed prior to loadout. The basic design of a weighing system usually consists of a set of hydraulic jacks with electrical load cells on top, installed between thetopside and the shop floor. The accuracy of such systems is typically 0,5-1%.

Accuracy is necessary in order to check the actual position of the centre of gravity. Knowledge of the position is vital for the installation.

The system for support of the topside should be similar to the anticipated method of load out.

4.4 Load Out

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

11 of 18 9/2/2014 9:03 PM

Page 12: Esdep Lecture Note [Wg15a]

4.4.1 Operations

The load out usually combines two operations:

moving the topside from the fabrication hall to the nearby quay.moving the topside from the quay onto the barge.

The short journey on land can be complicated when the track is not flat or curves have to be taken.

The most preferred option for load out is therefore to use a platform trailer with individual suspended wheels, see Figure 7 and Slide 1.

Slide 1 : General arrangement of a load out through skidding

The trailer drives from the quay over a rocker flap resting on the quay and the barge and then slowly onto the barge. The barge is kept inright trim by ballast pumping.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

12 of 18 9/2/2014 9:03 PM

Page 13: Esdep Lecture Note [Wg15a]

When it reached the right position, the topside is set down on the beam grid of the sea fastening.

4.4.2 Design aspects load out

When using platform trailers the lower deck should be designed to meet three basic load-out requirements:

the bottom flange plates of the transverse beams should all be in one plane.the distance of transverse beams should not exceed approximately 7 m.

the lower deck should be able to take an upward reaction typically in the range of 50-60 kN/m2 of ground area.

A uniform distribution of loads is assumed for platform trailers. Skid systems which are not provided with a proper load sharing system willlead to a non-uniform load distribution.

Design for load-out requires coordination with sea fastening design.

4.5 Sea Transport and Sea Fastening

4.5.1 Operations

Sea transport is a very critical operation, especially for topsides (see Slide 2).

Slide 2 : Seafastening of 105MN Brent C topside

After completion of the load out and full fastening to the barge, the barge is ballasted to its target draft and cleared for the transport.

The barge is towed by one or two tugs to the offshore location. There the barge is positioned close alongside the crane vessel.

Prior to lifting, the sea fastening is cut free.

Planning the sea transport contains several steps:

identification of critical clearances, e.g. (harbour depth, width of bridges or locks, etc inshore)barge selection (a.o. stability, dynamic behaviour, location of bulkends).evaluation of sea route (weather, length of tow).assessment of barge motions in sea state.development of a sea fastening concept.assessment of deck/module integrity.assessment of barge integrity.

There is also the option with some crane vessels to transport the top side on board. Usually an extra take over is required as the draft of thecrane vessel exceeds the depth at the fabricator's quay. The advantage however is that sea fastening requires less effort. Furthermore, theoffshore operation is simpler and quicker, as the most critical and weather sensitive operation - lift off the barge- is avoided.

4.5.2 Design aspects of sea transport and sea fastening

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

13 of 18 9/2/2014 9:03 PM

Page 14: Esdep Lecture Note [Wg15a]

Several elements of the structure are dominated by the load condition during transport, see Lecture 15A.1.

All equipment in or on the topside is also subject to heavy loads, e.g. control panels, generator skids, platform crane, during transport.

Internal bracing of a topside for transport is not favoured since it creates obstacles and risk of damage or fire to cables, instruments, pipingand equipment during subsequent removal. External bracing is also not without problems. The width of the topside requires an extra widebarge. It is difficult to find "strong" points on the topside exterior. The basic concept is therefore to fix the topside to the barge by its columnsonly.

The designer should be aware that the bending stiffness of the topside often exceeds that of the barge. Considerable "composite" action canresult when the barge deflects in heavy head-on seas.

It is very important for any sea fastening concept to consider aspects of de-seafastening, i.e. cutting free, prior to lift off, and the need toremain safe in a moderate sea state.

De-seafastening should not require any handling by cranes. Braces cut loose at one end should therefore remain stable and safe while fixed atone end only.

Design of the sea fastening should not require any welding in the column joint, since the topside would not then be ready for immediate setdown onto the jacket.

When the tow is more than one or two days long, fatigue may have to be considered on critical nodes.

4.6 Installation

4.6.1 Operations

Installation on the substructure can be:

deck mating with a deep submerged floating GBS (Slide 3)lifting onto an already installed jacket (Slide 4).

Slide 3 : Deckmating of the 500MN Gullfaks-C topside

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

14 of 18 9/2/2014 9:03 PM

Page 15: Esdep Lecture Note [Wg15a]

Slide 4 : Installation of 60MN K12-BP topside by floating crane

Deck mating is a floating operation in a sheltered location, e.g. a Norwegian fjord or Scottish loch. Deck mating requires that the deck istemporarily supported with the final supports free. This requirement creates a very awkward load situation for the deck structure.

Lifting is the usual installation method for jacket-based topsides. During development of a platform concept, the lift strategy should bedefined as part of the overall construction strategy. The lifting capacity of crane vessels is defined by hook-load and reach.

The required reach is determined mainly by the width of the topside and/or the transport barge.

The major steps are:

review of the weight report.assessment of "critical" elevations.assessment of feasible crane vessels.development of a lift concept.preliminary sizing of slings, shackles, trunnions, etc.concept design of guides and bumpers.analysis of deck or module structure for lift condition.

4.6.2 Design aspects of installation by lifting

The lift concept consists of several elements:

the single or dual crane liftthe sling configurationchoice of topside pick-up pointsthe necessity (or not) for spreader bars or even spreader framesthe single, double or paired slingsthe choice of padeyes, or trunnions.

Crane vessels were listed in Lecture 15A.1. Slings are available up to over 400mm nominal diameter with safe working loads of 20-25 MN.

A basic element in all elevations is the inevitable tolerance in sling length which leads to an unequal distribution of sling forces (typically25%-75%) in a four sling lift. The unequal sling forces lead to significant stresses in the module (see Figure 8).

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

15 of 18 9/2/2014 9:03 PM

Page 16: Esdep Lecture Note [Wg15a]

The use of spreader bars leads to a fully balanced lift without distorting the module. However the spreader bar is quite expensive and usuallyleads to a requirement for a higher hook elevation.

The use of a spreader frame should only be considered in exceptional cases and does not prevent module distortion. The padeye/shackleoption is limited by the safe working load (maximum 10MN) of the biggest shackle. The trunnion can accommodate higher loads.

4.7 Hook up

Hook up is the completion of all joints and connections after installation.

For economic reasons, the overall construction strategy should keep hook up work to a minimum. Critical hook up work is the work requiredimmediately to secure the object in order to survive the next storm.

4.8 Commissioning

Commissioning is not relevant to the structural design.

4.9 Inspection Maintenance and Repair (IMR)

These activities are a major source of operational expenditure, OPEX, as introduced in Lecture 15A.1.

Some requirements are:

inspection of the primary structure is a statutory, fully planned activity.inspection is only possible when proper access to the area or joint is provided.gaining access is costly and requires space to be left behind equipment.minimum provisions, e.g. small clamps under the deck, greatly speeds up scaffolding.crack growth through fatigue is slow. A crack is usually detectable before one quarter of its life is passed.dirt accumulation promotes corrosion damage.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

16 of 18 9/2/2014 9:03 PM

Page 17: Esdep Lecture Note [Wg15a]

maximum use should be made of the results of inspection. Evaluation should lead to modification of the inspection programme whereappropriate.

4.10 Removal

Removal requirements are different from country to country. In some depths of water full removal is required in some countries from themudline upward. Elsewhere only the structure 75 m or more above the mudline must be removed.

Extensive engineering of removal is required to achieve a safe and effective operation. In the Gulf of Mexico removed structures are dumpedin the form of reefs. It is very difficult and inefficient at present to include conceptual removal engineering in the design phase. When re-useof the facility is planned, then removal engineering should be developed early in the design.

5. CONCLUDING SUMMARY

Structural systems for each type of topside structure were introduced, i.e. truss, portal, box girder, and stressed skin systems.In the section on design some topics were addressed in more detail.In the section on construction the different phases were presented in more detail, i.e.

i. fabricationii. weighingiii. load outiv. sea transportv. offshore installation especially deckmatingvi. module installationvii. hook-upviii. commissioning

A brief discussion on inspection and repair and on platform removal concluded the lecture.

6. REFERENCES

[1] API-RP2A: Recommended practice for planning, designing and constructing fixed platforms.

American Petroleum Institute, 18th ed., 1989.

The structural offshore code, governs the majority of platforms.

[2] AISC: Allowable stress design manual (ASD).

9th ed., American Institute of Steel Construction, 1989.

Widely used structural code for topsides.

[3] API-Bulletin 2V: Bulletin on design of flat plate structures.

American Petroleum Institute, 1st ed., 1987.

Valuable specialist addendum to API-RP2A.

[4] API-Bulletin 2U: Bulletin on stability design of cylindrical shells.

American Petroleum Institute, 1st ed., 1987.

Valuable specialist addendum to API-RP2A.

[5] D.v.d. Zee & A.G.J. Berkelder: Placid K12BP biggest Dutch production platform.

IRO Journal, nr. 38, 1987, pp 3-9.

Presents a recent example for a portal framed topside.

[6] R. Narayanan: Plated structures/Stability and Strength.

Applied Science Publishers, London, 1983.

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

17 of 18 9/2/2014 9:03 PM

Page 18: Esdep Lecture Note [Wg15a]

Good designers guide to plated structures design.

[7] ANON: Gullfaks C platform deckmating.

Ocean Industry, April 1989, pp 24.

Good description of the actual mating of deck to GBS.

[8] A.G.J. Berkelder: Seafastening 105 MN Brent C deck.

Bouwen met Staal, nr.24 1979.

Presentation of seafastening design for GBS topside.

Previous | Next | Contents

ESDEP LECTURE NOTE [WG15A] http://www.fgg.uni-lj.si/~/pmoze/ESDEP/master/wg15a/l1100.htm

18 of 18 9/2/2014 9:03 PM