ES-D&M,DEP-C1-0-7
-
Upload
saad-bin-sadaqat -
Category
Documents
-
view
213 -
download
0
description
Transcript of ES-D&M,DEP-C1-0-7
TITLE:
ADJUDICATION BOARD (DESIGN & MAKE PROJECTS)MARKING SCHEME FOR UGC/MESMC & WESMC
Procedure No. ES/D&M,DEP/C1/0/7Issue No. 1 Date 05 Mar 03Revision No. DatePage No. 1 of 1Prepared By: DESAuthorized By: Commandant
Project Title:Project Memers: Board Members: Dean (Chairman)
Project Advisor / SupervisorOne Faculty Member
TOPIC PROJECT ACTIVITY TOTAL MARKS
MARKS AWARDED
THE DESIGN Is the design solution compatible with the Requirements? 10
MANUFACTURE Have the components been manufactured as per design drawings?
Has the Group conducted in a professional manner during the manufacture phase?
Has manufacture been undertaken solely by the Group with minimal outside assistance?
20
TEST Does the finished product comply with the Test specifications?
Has the finished article achieved the requirements of the SoR?
10
QUALITY Does the finished item comply with the design documentation issued post DAB?
10
CONFIGURATION CONTROL
Has the design documentation been updated to reflect changes that may have been introduced during manufacture and testing phases?
10
REPORT Format. (i.a.w JSP101)?Spelling?Clear and constructed in a logical & systematic manner?
10
PRESENTATION ContentManner of delivery Visual aids & demonstrationResponse to questions.
30
(a) Adjudication Board. Marks 100(b) Design Assessment Board Marks 50(c) Concept Design and Review Board Marks 50
(a) + (b) + (c) Final weighted Marks 200Weighting Factor for MESMC 1.5
Final Weighted Marks for MESMC 300
Name: _______________________ Signature: ______________