A partnership of the Virginia Department of Transportation and the University of Virginia since 1948 ERS Route 5 Chickahominy Bridge March 4, 2009 Celik Ozyildirim, Ph.D., P.E. Principal Research Scientist

Transcript of ERS Route 5 Chickahominy Bridge - Virginia Department of ...ERS Route 5 Chickahominy Bridge March 4,...

A partnership of the Virginia Department of Transportationand the University of Virginia since 1948

ERSRoute 5 Chickahominy Bridge

March 4, 2009Celik Ozyildirim, Ph.D., P.E. Principal Research Scientist

03/04/2009

Outline

• ERS• Pilot Projects• Chickahominy Bridge

– Trial batches– Control charts

03/04/2009

ERS - Goals

• To have long lasting concrete structures• Provide innovation• Ensure consistent uniform concrete• Pay based on the quality of concrete

03/04/2009

ERS

Includes• Prequalification

QC Plan by the Contractor applicable to preconstruction and during construction

• Mix design approval• Acceptance

03/04/2009

Differences in Specifications

PWLMinimumBasis of Pay

Contractor andVDOT

VDOTTesting

Performance Measures

PrescriptiveMix Design

ERSCurrentItem

03/04/2009

First Phase Pilot Projects

Salem: Route 11 over the New River and Norfolk Southern Railroad tracks near Radford University

Culpeper: Route 28 near Manassas

03/04/2009

Salem

03/04/2009

Salem Mix Proportions

0.45w/cm

1755Coarse aggregate

1101Fine aggregate

159Slag

159Fly ash Class F

318Cement Type I/II

Amount (lb/yd3)Material

03/04/2009

Salem Strength and Permeability

72391Permeability

3055016Strength

Std DevAverage (psi)

N=31

03/04/2009

Culpeper

03/04/2009

Second Phase Pilot Projects

• Structures in different districts• Route 624• Route 95• Chincoteague Bridge• Route 5 Chickahominy bridge

03/04/2009

Route 624 over Cat Point Creek

03/04/2009

Route 624 over Cat Point Creek

In the same mixture• Crushed stone and gravel.• Water reducer and retarding admixture

03/04/2009

Route 95 Widening Project

Curing Box with continuous recording

03/04/2009

Chincoteague Bridge Bascule Footing

03/04/2009

Chincoteague Bridge

• In A3 Mass Concrete minimum cementitious material content is 588 lb/yd3

• In this project used 539 lb/cy3 of cementitious material content with 30% Class F fly ash

03/04/2009

Rte 5 over Chickahominy

03/04/2009

Rte 5 over Chickahominy

Quality coarse aggregate did not meet #57

03/04/2009

Rte 5 over Chickahominy

Combined Aggregate Gradation: #57+#78+Sand

0

5

10

15

20

25

30

1 1/2 1 3/4 1/2 3/8 #4 #8 #16

#30

#50

#100

#200 Pan

Sieve Size

Perc

ent R

etai

ned

03/04/2009

Rte 5 over Chickahominy

Three trial batches with different cementitious material and w/cm

03/04/2009

Rte 5 over Chickahominy

Three trial batches with different cementitious material and w/cm

Coarse aggregate does not meet #57; however, combined aggregate is considered.

03/04/2009

Control Charts Fresh Concrete

Slump Results

01234567

1 2 3 4 5 6 7 8 9 10 11 12 13 14Test Number

Inch

es

Air Content

0

2

4

6

8

1 2 3 4 5 6 7 8 9 10 11 12 13 14Test Number

Air

Con

tent

Unit Weight

134

136138

140142

144

1 2 3 4 5 6 7 8 9 10 11 12 13 14Test Number

Uni

t Wei

ght

Temperature

0

20

40

60

80

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14Test Number

Tem

pera

ture

03/04/2009

Control ChartsHardened Concrete

Compressive Strength (Avg)

0100020003000400050006000

1 2 3 4 5 6 7 8 9 10 11 12 13 14Test Number

psi (

Ave

rage

)

Coulombs (Avg)

200300400500600700800900

1000

1 2 3 4 5 6 7 8 9 10 11 12 13 14Test Number

Cou

lom

be (A

vg)

Compressive Strength Moving Average (psi)

41004200430044004500460047004800

1 2 3 4 5 6 7 8 9 10 11 12 1Test Number

psi (

Ave

rage

)

Coulombs Moving Average

200300400500600700800900

1000

1 2 3 4 5 6 7 8 9 10 11 12Test Number

Cou

lom

be (A

vg)

A partnership of the Virginia Department of Transportationand the University of Virginia since 1948

THANK YOUMarch 4, 2009Celik Ozyildirim, Ph.D., P.E. Principal Research Scientist