Erosion Practices VACDE Graves Mountain Training 8/23/2017 Amanda Pennington, P.E., DCR-DSWC Raleigh Coleman, DCR-DSWC

Transcript of Erosion Practices - Virginia Department of Conservation ...

Page 1: Erosion Practices - Virginia Department of Conservation ...

Erosion Practices

VACDE Graves Mountain Training

8/23/2017

Amanda Pennington, P.E., DCR-DSWC

Raleigh Coleman, DCR-DSWC

Page 2: Erosion Practices - Virginia Department of Conservation ...

Topics• Erosion Fundamentals

• Overview of Upland Erosion Stabilization Practices

– Grassed Waterways, Drop Structures, Critical Area Stabilization, Lined Waterways

– NOT Covered: Streambank Stabilization, Diversions, etc.

• Hydrologic and Hydraulic Calculations

• Design of Grassed Waterways

• Drop Structure & Lined Waterway Design

• Case Studies

Page 3: Erosion Practices - Virginia Department of Conservation ...

Erosion Fundamentals

Page 4: Erosion Practices - Virginia Department of Conservation ...

Erosion Fundamentals• Factors influencing erosion:

– Soil characteristics

– Vegetative Cover

– Topogrpahy

– Climate (frequency, intensity, duration of rainfall)

Page 5: Erosion Practices - Virginia Department of Conservation ...

Virginia Erosion and Sediment Control Handbook

Page 6: Erosion Practices - Virginia Department of Conservation ...

Virginia Erosion and Sediment Control Handbook

Page 7: Erosion Practices - Virginia Department of Conservation ...

Common Erosion Stabilization Practices• Grassed Waterways: NRCS CPS 412 Grassed Waterway

• Drop Structures: NRCS CPS 410 Grade Stabilization Structure

• Lined Waterways: NRCS CPS 468 Lined Waterway or Outlet

• Critical Area Stabilization: NRCS CPS 342 Critical Area Planting

Important for SWCD technicians to be able to make conservation planning decisions about which practices are appropriate.

Reminder: All engineeringpractices require EJAA for I&E, Design, and Construction.

Page 8: Erosion Practices - Virginia Department of Conservation ...

Grassed Waterways (CPS 412)• DCR Practice Spec: WP-3

• Stabilize eroded drainage swale areas in crop fields

• Maintained in grass

Page 9: Erosion Practices - Virginia Department of Conservation ...
Page 10: Erosion Practices - Virginia Department of Conservation ...
Page 11: Erosion Practices - Virginia Department of Conservation ...
Page 12: Erosion Practices - Virginia Department of Conservation ...
Page 13: Erosion Practices - Virginia Department of Conservation ...

Drop Structures (CPS 410)• DCR Practice Spec: WP-1

• Stabilize headcut areas & gullies (vs. rills)

• More engineering work and more expensive to construct than grassed waterways

Page 14: Erosion Practices - Virginia Department of Conservation ...
Page 15: Erosion Practices - Virginia Department of Conservation ...
Page 16: Erosion Practices - Virginia Department of Conservation ...
Page 17: Erosion Practices - Virginia Department of Conservation ...
Page 18: Erosion Practices - Virginia Department of Conservation ...
Page 19: Erosion Practices - Virginia Department of Conservation ...
Page 20: Erosion Practices - Virginia Department of Conservation ...

Vs.

Potential Grassed

Waterway

Potential Drop

Structure

Rills Gullies

Page 21: Erosion Practices - Virginia Department of Conservation ...

Lined Waterway or Outlet (CPS 468)• DCR Practice Spec: WP-1

• Stabilize eroding channels where grassed waterways will not be sufficient

Page 22: Erosion Practices - Virginia Department of Conservation ...

Critical Area Stabilization: CPS 342• DCR Practice Spec: SL-11

• Stabilize eroding areas

• NOT for areas where runoff concentrates (unlike grassed waterways, drop structures, lined waterways)

• Not an engineering practice

Page 23: Erosion Practices - Virginia Department of Conservation ...

Conservation Planning Considerations:

Is there an activeerosion problem creating a water quality concern?

Page 24: Erosion Practices - Virginia Department of Conservation ...

Conservation Planning Considerations

What is causingthe problem, and will the practice solve the problem?

Page 25: Erosion Practices - Virginia Department of Conservation ...

Background: Hydrologic Calculations• Design of grassed waterways, drop structures, and lined

waterways requires hydrologic calculations

• We need to determine how much water the waterway or structure needs to carry

Practice Design Storm Requirement

Grassed Waterway Peak 10-yr, 24-hr

Drop Structures Depends on type, vertical drop, receiving channel depth

Lined Waterways Peak 10-yr, 24-hr

cfs = cubic feet per second = ft3/sec (This is a volume per time.)Velocity is measured in feet per second and will depend on the channel shape, slope, and roughness.

Page 26: Erosion Practices - Virginia Department of Conservation ...

Flow Rate vs. Velocity

Page 27: Erosion Practices - Virginia Department of Conservation ...

EFH-2 vs. USGS Regression AnalysisEFH-2 USGS Regression Analysis

Description Computer program based on NRCS Engineering Field Handbook Ch. 2

Spreadsheet or StreamStats web application

Inputs Drainage Area, watershed length, avg. watershed slope, curve number (based on land use and hydrologic soil group)

Location, Drainage Area

Accuracy Very good, site specific Marginal (typically no better than ±22%)

Ease of Use Fairly time-consuming Very Easy and Quick

• Summary: EFH-2 requires a little bit more work but will generally produce much more accurate results. The USGS method may provide a good starting point, but EFH-2 is generally preferred.

• The Rational Method may also be used where appropriate.

For Grassed Waterways, Drop Structures, Lined Waterways

Page 28: Erosion Practices - Virginia Department of Conservation ...

EFH-2

• Can use WinTR-55 for watersheds with more impervious or sub-watersheds

Page 29: Erosion Practices - Virginia Department of Conservation ...

EFH2 Limitations

• Watershed is accurately represented bya single runoff curve number between 40 and 98.

• Watershed area is between 1 and 2,000 acres.

• Watershed length is between 200 and 26,000 feet.

• Average watershed slope is between 0.5 and 64%.

• No valley or reservoir routing is required.

• Urban land use within the watershed does not exceed 10%.

Page 30: Erosion Practices - Virginia Department of Conservation ...

What are HSGs?

For EFH2, you will need the “Hydrologic Soil Group” of the soil types in the watershed.

Page 31: Erosion Practices - Virginia Department of Conservation ...

To find the HSG of the soils, Click the “Soil Data Explorer” Tab, then the “Soil Properties and Qualities” Tab, then “Soil Qualities and Features,” then “Hydrologic Soil Group,” then click “View Rating”

Page 32: Erosion Practices - Virginia Department of Conservation ...

Results

Add the “like” HSGs together to determine the total acreage of each HSG in the drainage area.

HSG Total Percentage

A 40.1

B 59.9

C 0

D 0

XXX

Page 33: Erosion Practices - Virginia Department of Conservation ...

EFH2 InputsInput Units Description

Drainage Area Acres Area draining to proposed practice location

Curve Number - EFH-2 has a curve number calculating tab – you input the breakdown of area by HSG and land use

Watershed Length Feet Length of longest flow path from watershed boundary to the outlet

Watershed Slope Percent Average slope of WATERSHED – NOT slope of flow path

Rainfall Information - Electronic files available by county, OR get pinpoint accurate data from NOAA PFDS

This is different from most other hydrologic methods and is the most commonly seen problem in EFH2 calculations

Page 34: Erosion Practices - Virginia Department of Conservation ...

Average Watershed Slope

OR, the soils report can also be used to estimate the average “Watershed Slope” for EFH2.

Calculate a weighted average of the slope of the soil types in the watershed.

Page 35: Erosion Practices - Virginia Department of Conservation ...

Watershed Slope(A)

Slope Range of Soil Type

(B)Avg. Slope of Soil Type

(C)Total Percentage of Area

(D)Decimal Percentage

(E)Weighted Slope

2-7% 5% 9.5 0.095 0.48

7-15% 11% 16.1 0.161 1.77

5-15% 10% 0.5 0.005 0.05

15-25% 20% 26.9 0.269 5.38

25-55% 40% 33.7 0.337 13.5

25-45% 35% 3.2 0.032 1.12

25-50% 38% 10.1 0.101 3.84

Total:(Average Slope): 26.1Column B: Average the slope range in Column A

Column C: Add together the “Percent of AOI” of all of the soil types with this slope rangeColumn D: Column C/100Column E: Multiply Columns B and D (Avg. Slope of Flow Path = 7.2%)

Page 36: Erosion Practices - Virginia Department of Conservation ...

Curve Number Calculation

Considerations:-The 2-yr storm is most likely to happen during summer months (thunderstorm), so it may be conservative to consider the highest runoff-producing land cover conditions expected during summer.

-If cropland, consider early July when straw is baled, or April/May for full tillage corn

-If pasture, consider the “summer slump” of cool-season forages

-Think about management tendencies of the landowner.-If you know of imminent land development, go ahead and factor it in to your calculation.

Page 37: Erosion Practices - Virginia Department of Conservation ...

Rainfall Information• More accurate (site-specific) precipitation data

can be obtained from NOAA at: http://hdsc.nws.noaa.gov/hdsc/pfds/index.html

• Enter the lat. & long. for the site and it will give you the rainfall amounts for different storm events

• Can be entered manually into EFH2

Page 38: Erosion Practices - Virginia Department of Conservation ...

ExampleWaterway

Q10 = 174cfs

Page 39: Erosion Practices - Virginia Department of Conservation ...

Avoid concentrating runoff on unprotected fill• Try to achieve final grades by cut

Ensure outlet is stable• May require outlet protection, stilling basin, level spreader, etc.

Once runoff is concentrated, it is difficultto un-concentrate

Ensure elevations within design do not conflict

Overarching Engineering Concepts

• Profile vs. Cross-Sections

• Convergence Point of Multiple Conveyances

Ensure inlet can accept all runoff

Page 40: Erosion Practices - Virginia Department of Conservation ...

For all lined outlets and waterways, it is CRITICAL that the armored area is low enough to accept the runoff!

Page 41: Erosion Practices - Virginia Department of Conservation ...
Page 42: Erosion Practices - Virginia Department of Conservation ...
Page 43: Erosion Practices - Virginia Department of Conservation ...

Design of Grassed Waterways

Page 44: Erosion Practices - Virginia Department of Conservation ...
Page 45: Erosion Practices - Virginia Department of Conservation ...

Grassed Waterway

Types

Page 46: Erosion Practices - Virginia Department of Conservation ...
Page 47: Erosion Practices - Virginia Department of Conservation ...

Steps in the Design of a Waterway

Page 48: Erosion Practices - Virginia Department of Conservation ...

Step 1: Plan the optimum location of the waterway centerline

• Optimum location usually easily determined during site investigation

• Can also often be seen on aerial photographs (especially aerials taken over winter)

Page 49: Erosion Practices - Virginia Department of Conservation ...
Page 50: Erosion Practices - Virginia Department of Conservation ...
Page 51: Erosion Practices - Virginia Department of Conservation ...

Step 2: Select design points along the waterway where grades, drainage

areas, and/or type of lining change significantly.

Page 52: Erosion Practices - Virginia Department of Conservation ...

Step 3: Determine the watershed area for the points in step 2 and for the

outlet.

• For this site, where should watersheds be analyzed?

• Analyze for each portion of the waterways.

Page 53: Erosion Practices - Virginia Department of Conservation ...
Page 54: Erosion Practices - Virginia Department of Conservation ...
Page 55: Erosion Practices - Virginia Department of Conservation ...
Page 56: Erosion Practices - Virginia Department of Conservation ...

Step 4: Compute the peak runoff produced by the design storm.

• Design storm for Grassed Waterway is 10-yr, 24-hr

• Analyze for each portion of the waterways.

Page 57: Erosion Practices - Virginia Department of Conservation ...

Step 4: Compute the peak runoff produced by the design storm.

• Design storm for Grassed Waterway is 10-yr, 24-hr

• Analyze for each portion of the waterways.

782ft.

Page 58: Erosion Practices - Virginia Department of Conservation ...

• All soils are HSG B– 3.6ac. row crops

– 0.25ac. woods

Page 59: Erosion Practices - Virginia Department of Conservation ...
Page 60: Erosion Practices - Virginia Department of Conservation ...

Design Flow = Q10 = 12cfs

Q

Page 61: Erosion Practices - Virginia Department of Conservation ...

Step 5: Determine the slope of each reach of the channel from the

topographic map, profiles, or cross sections.

Determine slope of waterway:

Slope(%) = ∆Elevation∆Distance

0+00, 349’

3+51, 326’

∆Elevation = 349’ – 326’ = 23’

∆Distance = 3+51 – 0+00 = 351’

X 100

Slope(%) = ∆Elevation=23’∆Distance=351’

X 100

Slope(%) = 6.6%

Page 62: Erosion Practices - Virginia Department of Conservation ...

What if the slope of your waterway varies?• Use highest measured slope for stability

calculation– Make sure the channel won’t erode where water is moving the fastest

• Use lowest measured slope for capacity calculation

– Make sure the channel won’t overtop where water is moving the slowest

Page 63: Erosion Practices - Virginia Department of Conservation ...

Step 6: Select the appropriate channel cross-section and the type of

channel lining(s) to be used. Advantages Disadvantages

-Mimics natural shape of most drainage swales-“Most common & generally the most satisfactory”

-Sometimes difficult to install true parabolic shape

-Easy shape to form in field-Steep side slopes can make it difficult for equipment to cross (can be an advantage if you don’t want equipment to cross it)

-Steep side slopes can make it difficult for equipment to cross-If bottom is not perfectly level, flow concentrates on one side

-May be easy to install for contractors who install a lot of road ditches

-Low flows concentrate at bottom of “V” and cause erosion-Sharp “V” can make it difficult for equipment to cross

Page 64: Erosion Practices - Virginia Department of Conservation ...

• Check with producer: – What type of grading equipment is available for use?

– What type of equipment and implements will he need to cross the waterway with?• NOTE: CPS 412 says to “Avoid using waterways as turn-rows during tillage and cultivation operations” and

“Avoid crossing with heavy equipment when wet”

• Look at your surveyed cross-sections: which type of channel can be installed most efficiently?

• Can try several channel types as you move through the calculations to see which would require the smallest footprint

– Less expense to install (benefit to State and producer)

– Less land taken out of production (benefit to producer)

Step 6: Select the appropriate channel cross-section and the type of

channel lining(s) to be used.

Page 65: Erosion Practices - Virginia Department of Conservation ...

• Stability Making sure the channel will not ERODE

Step 7: Design the channel for stability, typically based on the sparsest

and shortest vegetation expected.

Step 8: Adjust the depth to obtain adequate capacity based on the

densest and longest vegetation expected.

• Capacity Making sure the channel will not OVERTOP

Page 66: Erosion Practices - Virginia Department of Conservation ...

Calculate capacity when channel looks like this (thick grass reduces capacity):

Page 67: Erosion Practices - Virginia Department of Conservation ...

Calculate velocity when channel looks like this (thin grass increases velocity):

Page 68: Erosion Practices - Virginia Department of Conservation ...

Steps 7 & 8

Page 69: Erosion Practices - Virginia Department of Conservation ...
Page 70: Erosion Practices - Virginia Department of Conservation ...

CF = 0.75

Page 71: Erosion Practices - Virginia Department of Conservation ...
Page 72: Erosion Practices - Virginia Department of Conservation ...

Determine slope of waterway:

Slope(%) = ∆Elevation∆Distance

Slope(%) = 6.6%

D

CF =0.75

Page 73: Erosion Practices - Virginia Department of Conservation ...

P6.6%

D

CF =0.75

Page 74: Erosion Practices - Virginia Department of Conservation ...

P6.6%

D

B

• Now we have enough information to use the charts in Appendix C of EFH7

Finally…CF =0.75

Page 75: Erosion Practices - Virginia Department of Conservation ...

P6.6%

D

B

• Channel Type:

• Cover Factor:

• Allowable Soil Stress:

• __-__ Design:

• Side Slope (for trapezoids)

Find the table that matches ALL of these parameters.

In our example, it can be found on page 7D-5

The tables are organized according to input parameters:

Parabolic

0.75

0.02

B-D

(n/a)

Page 76: Erosion Practices - Virginia Department of Conservation ...

Q=12cfs

S=6.6%

Page 77: Erosion Practices - Virginia Department of Conservation ...

Luckily… ParabolicChannel.xlsx

Page 78: Erosion Practices - Virginia Department of Conservation ...

Can also check TrapezoidalChannel.xlsx

Page 79: Erosion Practices - Virginia Department of Conservation ...
Page 80: Erosion Practices - Virginia Department of Conservation ...

Quantities for Seed Establishment• CPS 412 references CPS 342 Critical Area Planting

Page 81: Erosion Practices - Virginia Department of Conservation ...

NRCS Plant Establishment Guide

Page 82: Erosion Practices - Virginia Department of Conservation ...

• Seeding quantity recommendations from Permanent Seeding Spec from Virginia Erosion and Sediment Control Handbook:

Page 83: Erosion Practices - Virginia Department of Conservation ...

Erosion Control Matting:

From EFH7:

From CPS 412:

Vegetation much thicker where matting was used

Page 84: Erosion Practices - Virginia Department of Conservation ...
Page 85: Erosion Practices - Virginia Department of Conservation ...
Page 86: Erosion Practices - Virginia Department of Conservation ...

Construction

Page 87: Erosion Practices - Virginia Department of Conservation ...

• Potential Herbicide Problems:– Drift into the waterways when spraying along the edges

– Contract sprayers who aren’t familiar with the field may spray the entire field (including waterways) – especially when killing cover crops

Page 88: Erosion Practices - Virginia Department of Conservation ...

Herbicide Drift: Effect on Waterway

Reduced waterway capacity

Page 89: Erosion Practices - Virginia Department of Conservation ...

Problem in Continuous Full-Till:

Page 90: Erosion Practices - Virginia Department of Conservation ...

From CPS 412:

Page 91: Erosion Practices - Virginia Department of Conservation ...
Page 92: Erosion Practices - Virginia Department of Conservation ...

Diversions can be installed as an O&M practice to

redirect flows into the waterway if this problem arises:

Page 93: Erosion Practices - Virginia Department of Conservation ...
Page 94: Erosion Practices - Virginia Department of Conservation ...
Page 95: Erosion Practices - Virginia Department of Conservation ...
Page 96: Erosion Practices - Virginia Department of Conservation ...
Page 97: Erosion Practices - Virginia Department of Conservation ...
Page 98: Erosion Practices - Virginia Department of Conservation ...

Lined Waterway Design

Page 99: Erosion Practices - Virginia Department of Conservation ...

Lined Waterway Design• CPS 468 is one of the better standards for providing calculation guidance

Page 100: Erosion Practices - Virginia Department of Conservation ...
Page 101: Erosion Practices - Virginia Department of Conservation ...

The Stream Crossing Worksheet can be used to analyze velocities and capacities of channels.

Page 102: Erosion Practices - Virginia Department of Conservation ...

Drop Structure Design

Page 103: Erosion Practices - Virginia Department of Conservation ...

Design Tools

Page 104: Erosion Practices - Virginia Department of Conservation ...
Page 105: Erosion Practices - Virginia Department of Conservation ...

Drop Structures-when to use them

Page 106: Erosion Practices - Virginia Department of Conservation ...
Page 107: Erosion Practices - Virginia Department of Conservation ...
Page 108: Erosion Practices - Virginia Department of Conservation ...
Page 109: Erosion Practices - Virginia Department of Conservation ...
Page 110: Erosion Practices - Virginia Department of Conservation ...
Page 111: Erosion Practices - Virginia Department of Conservation ...
Page 112: Erosion Practices - Virginia Department of Conservation ...
Page 113: Erosion Practices - Virginia Department of Conservation ...
Page 114: Erosion Practices - Virginia Department of Conservation ...
Page 115: Erosion Practices - Virginia Department of Conservation ...
Page 116: Erosion Practices - Virginia Department of Conservation ...
Page 117: Erosion Practices - Virginia Department of Conservation ...
Page 118: Erosion Practices - Virginia Department of Conservation ...
Page 119: Erosion Practices - Virginia Department of Conservation ...
Page 120: Erosion Practices - Virginia Department of Conservation ...
Page 121: Erosion Practices - Virginia Department of Conservation ...
Page 122: Erosion Practices - Virginia Department of Conservation ...
Page 123: Erosion Practices - Virginia Department of Conservation ...
Page 124: Erosion Practices - Virginia Department of Conservation ...
Page 125: Erosion Practices - Virginia Department of Conservation ...
Page 126: Erosion Practices - Virginia Department of Conservation ...
Page 127: Erosion Practices - Virginia Department of Conservation ...
Page 128: Erosion Practices - Virginia Department of Conservation ...

Case Study #1: Drop Structure vs. Lined Waterway

• Three eroded channels

• Caused by barnyard runoff and cattle

• Fine sandy loam soils

Channel 1

Channel 2

Channel 3

Page 129: Erosion Practices - Virginia Department of Conservation ...

Case Study #1: Drop Structure vs. Lined Waterway

Channels 1 & 3Channel 2

Page 130: Erosion Practices - Virginia Department of Conservation ...

Case Study #1: Drop Structure vs. Lined Waterway

Channels 1 & 3Channel 2

Profile: Profile:

Cross-Section Cross-Section

Page 131: Erosion Practices - Virginia Department of Conservation ...
Page 132: Erosion Practices - Virginia Department of Conservation ...
Page 133: Erosion Practices - Virginia Department of Conservation ...
Page 134: Erosion Practices - Virginia Department of Conservation ...
Page 135: Erosion Practices - Virginia Department of Conservation ...
Page 136: Erosion Practices - Virginia Department of Conservation ...
Page 137: Erosion Practices - Virginia Department of Conservation ...
Page 138: Erosion Practices - Virginia Department of Conservation ...
Page 139: Erosion Practices - Virginia Department of Conservation ...
Page 140: Erosion Practices - Virginia Department of Conservation ...
Page 141: Erosion Practices - Virginia Department of Conservation ...
Page 142: Erosion Practices - Virginia Department of Conservation ...
Page 143: Erosion Practices - Virginia Department of Conservation ...
Page 144: Erosion Practices - Virginia Department of Conservation ...
Page 145: Erosion Practices - Virginia Department of Conservation ...
Page 146: Erosion Practices - Virginia Department of Conservation ...
Page 147: Erosion Practices - Virginia Department of Conservation ...
Page 148: Erosion Practices - Virginia Department of Conservation ...
Page 149: Erosion Practices - Virginia Department of Conservation ...

2+82

415’

After drawing the planned slope line, need to make the center-line elevation equal for each of the planned cross-sections to avoid conflicting elevations.

Page 150: Erosion Practices - Virginia Department of Conservation ...
Page 151: Erosion Practices - Virginia Department of Conservation ...
Page 152: Erosion Practices - Virginia Department of Conservation ...
Page 153: Erosion Practices - Virginia Department of Conservation ...
Page 154: Erosion Practices - Virginia Department of Conservation ...
Page 155: Erosion Practices - Virginia Department of Conservation ...
Page 156: Erosion Practices - Virginia Department of Conservation ...

Case Study #2: Coastal Plain Drop Structure

• Major eroding gully

• 5’ wide at bottom, 5-10’ deep

• Direct discharge into Pamunkey River

• Soils: fine sandy loam, K=0.37 to 0.43

• NRCS-designed, District-funded

• New Kent County, LC Davis & Sons Farm

Page 157: Erosion Practices - Virginia Department of Conservation ...
Page 158: Erosion Practices - Virginia Department of Conservation ...
Page 159: Erosion Practices - Virginia Department of Conservation ...

Berm

Outlet

Inlet

Page 160: Erosion Practices - Virginia Department of Conservation ...

Fill material in gully

Riprap-lined channel to

protect fill from erosion

Page 161: Erosion Practices - Virginia Department of Conservation ...
Page 162: Erosion Practices - Virginia Department of Conservation ...
Page 163: Erosion Practices - Virginia Department of Conservation ...
Page 164: Erosion Practices - Virginia Department of Conservation ...
Page 165: Erosion Practices - Virginia Department of Conservation ...
Page 166: Erosion Practices - Virginia Department of Conservation ...
Page 167: Erosion Practices - Virginia Department of Conservation ...
Page 168: Erosion Practices - Virginia Department of Conservation ...
Page 169: Erosion Practices - Virginia Department of Conservation ...
Page 170: Erosion Practices - Virginia Department of Conservation ...
Page 171: Erosion Practices - Virginia Department of Conservation ...

Case Study #3: Drop Structure / Lined Waterway

• Huge headcut area

• Farm road and steep hill above limited available space

• Huge pile of field stone available

Page 172: Erosion Practices - Virginia Department of Conservation ...
Page 173: Erosion Practices - Virginia Department of Conservation ...

Not as simple as dumping a bunch of stone in the gully!

Page 174: Erosion Practices - Virginia Department of Conservation ...
Page 175: Erosion Practices - Virginia Department of Conservation ...

For all lined outlets and waterways, it is CRITICAL that the armored area is low enough to accept the runoff!

Page 176: Erosion Practices - Virginia Department of Conservation ...
Page 177: Erosion Practices - Virginia Department of Conservation ...
Page 178: Erosion Practices - Virginia Department of Conservation ...
Page 179: Erosion Practices - Virginia Department of Conservation ...
Page 180: Erosion Practices - Virginia Department of Conservation ...
Page 181: Erosion Practices - Virginia Department of Conservation ...

Contact Information

Raleigh ColemanAg BMP Engineering [email protected]

Amanda Pennington, P.E.District Engineering Services [email protected]