Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and...
Transcript of Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and...
![Page 1: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/1.jpg)
July Construction Stormwater Quality Workshop July 16–19, 2018
Erosion and Sediment
Control
Liz Fifer - Kiewit
![Page 2: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/2.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
2
• Know the difference between erosion and sediment controls
• Recognize the different types of erosion and sediment controls
• Identify examples of good and bad sediment and erosion control applications
Objectives
![Page 3: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/3.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Installation Requirements
• Install your stormwater controls before you start clearing and grubbing work at the site.
• Follow manufacturers’ specifications for proprietary products (e.g., erosion control blankets, turf reinforcement mats, soil binders, hydro-mulch, etc.)
3
![Page 4: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/4.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Construction Phasing Before work begins:
• Prepare SWPPP
• Whenever possible, schedule work to minimize areas of bare soil
4
![Page 5: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/5.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
5
Coordination with MS4
Ensure you know all the requirements of the MS4 you are working in
• DOH requirements
![Page 6: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/6.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Maintenance Requirements
• Operate and maintain your controls to prevent erosion and sediment runoff from the site
• Repair your controls immediately after discovering the problem (by the end of the work day for minor problems, and within 7 days for major issues or new BMPs)
6
![Page 7: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/7.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Perimeter Controls
• Install sediment controls (e.g., silt fence, sediment barrier) along the site perimeter that receives runoff from disturbed areas
• Remove sediment once it reaches __?__ above ground height behind silt fence or sediment barrier
7
![Page 8: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/8.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Silt Fences Greatly misunderstood, frequently abused
8
![Page 9: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/9.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Poor Silt Fence Locations
• Up and down slopes
• In drainage channels
• In creeks or streams
9
![Page 10: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/10.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Minimize Sediment Track-Out
• Restrict designated entrance/exit points
• Install rock exit pad with geotextile under-liner
• Install a grizzly/rattle plate in combo with rock trackout
• Add a wheel washer if necessary to keep exits clear of track-out mud
• Remove sediment from paved roads by the end of each day (or more frequently if permits require)
• Do not hose or sweep sediment into storm drains or ditches!
10
![Page 11: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/11.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
11
1.
4.
2.
3.
![Page 12: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/12.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Preserve Topsoil
• Preserve native topsoil whenever feasible
oUse on site to ensure good vegetative cover
oStockpile topsoil during initial grading/excavation
• Minimize soil compaction
oWhere final vegetative stabilization has occurred, restrict vehicle and
equipment use
o In areas to be vegetated, use soil conditioning techniques that will
support vegetated growth.
12
![Page 13: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/13.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Control Discharges From Stockpiles
• Locate temporary soil stockpiles outside of surface water buffers and away from ditches and channels
• Protect from contact with stormwater, including from run-on, with silt fencing, fiber rolls, etc.
• If possible, provide cover or appropriate temporary stabilization
13
![Page 14: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/14.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
14
![Page 15: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/15.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
15
![Page 16: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/16.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Minimize Dust
• Use water or other dust suppression techniques when needed
• For periods of long, hot, dry weather: consider soil binders
• Check manufacturer’s claims and application requirements
16
![Page 17: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/17.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Blankets and Mats (Rolled Erosion Control Products)
17
• Excellent for slope and channel protection
• Use blankets for slopes flatter than 3:1 and ditches flatter than 20:1
• Use mats for slopes greater than 3:1 and ditches steeper than 20:1
![Page 18: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/18.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
18
• Blanket installation
![Page 19: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/19.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
19
![Page 20: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/20.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
20
![Page 21: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/21.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Protect Storm Drain Inlets
• Install inlet protection measures (e.g., rock berm collars, fabric filters, sand or rock bags)
• Remove deposited sediment by the end of the work day
21
What is wrong in these two pictures?
![Page 22: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/22.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Outlet Protection
22
3.
1.
3.
2.
![Page 23: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/23.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Ditch Liner Materials
• Steep or high flow channels (> 20%)oUse concrete or riprap
• Moderately steep channels (~ 10%)oUse riprap or turf mats & seeding
• Slightly sloping channels (~5%)oUse turf mats or blankets & seeding
• Mostly flat channels (~2%)oUse seeding with blankets
23
Seed ditches immediately after
constructionTriple the seeding
rate
![Page 24: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/24.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
• Constructed in channels to reduce runoff velocity and trap sediment
• Bottom of upper silt check is at the same elevation as the top of downstream check
Ditch Check Dams
![Page 25: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/25.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
Sediment Traps and Basins
• Designed & placed to pool runoff so sediment can settle out
• Installed before grading/fill work begins!
25
![Page 26: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/26.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
26
Dewatering Practices
• Direct water removed from excavations and trenches to sediment controls
• Sediment controls include sediment basins, bag filters, or other sediment removal device
• Follow manufacturer’s specifications
2 BMP minimum for dewatering
![Page 27: Erosion and Sediment Control Liz Fifer - Kiewit · 2018-07-18 · Liz Fifer - Kiewit. City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops 2 • Know](https://reader033.fdocuments.in/reader033/viewer/2022050520/5fa3a7632f24a776c355a1eb/html5/thumbnails/27.jpg)
City and County of Honolulu July 2018 | Construction Stormwater Quality Workshops
27