Erection of Statues

4
109 GOVERNMENT OF ANDHRA PRADESH ABSTRACT Statues – Installation/Erection of Statues/Monuments in Major District Roads/Rural Roads in A.P. State – Guidelines prescribed – Orders – Issued. TRANSPORT, ROADS & BUILDINGS (R.I) DEPARTMENT G.O.Ms.No.55 Dated : 8 th April, 2003. Read the following:- From the CE(R&B) Roads, Hyderabad’ Lr.no.1762/TA.12/AE.6/2001, Dt.27.9.2001. ORDER: In the reference read above, the Chief Engineer(R&B) Roads has requested Government to issue guidelines on erection of Statues on roads in Andhra Pradesh State. 2. Government, after careful examination of the proposal, hereby issue the following guidelines for installation/erection of statues/monuments. 1. No new statues should be permitted for erection on any R&B Roads henceforth by the R&B Department. Existing statues that are located on traffic islands and not obstructing view of the drivers/traffic may continue and the statues causing inconvenience to the public accidents etc. shall be removed and kept in safer places with the permission from the concerned authorities. Maintenance shall however be done by the concerned Agencies/ Organisations/ Departments. Each Executive Engineer shall maintain a list of statues in his jurisdiction and take up with the concerned agency and formalize the responsibility of maintenance. 2. In regard to statues already approved for Hyderabad city, such statue erection works should be completed within a period of one month from the date of issue of this G.O. and henceforth no permission should be given by the Collector or concerned authorities as the case may be for erection of new status without the approval of Government (R&B Department). 3. For statues that have already been erected without proper permission, the concerned Collector should review the structure with the concerned Statue erection organisations and such statues should be removed or located with the permission of the Collector or concerned authorities as the case may be following the guidelines wherever necessary. Such organisations should be penalized for an amount of Rs.10,000/- in case of erection without prior permission of the Collector/concerned authorities as the case may be. They should also bear the cost of relocation/removal of statues etc.

description

Erection of Statues in Major District Roads and Rural Roads Certain guide lines

Transcript of Erection of Statues

Page 1: Erection of Statues

109

GOVERNMENT OF ANDHRA PRADESH

ABSTRACT

Statues – Installation/Erection of Statues/Monuments in Major District Roads/Rural Roads in

A.P. State – Guidelines prescribed – Orders – Issued.

TRANSPORT, ROADS & BUILDINGS (R.I) DEPARTMENT

G.O.Ms.No.55 Dated : 8th April, 2003.

Read the following:-

From the CE(R&B) Roads, Hyderabad’ Lr.no.1762/TA.12/AE.6/2001,

Dt.27.9.2001. ORDER:

In the reference read above, the Chief Engineer(R&B) Roads has requested

Government to issue guidelines on erection of Statues on roads in Andhra Pradesh State.

2. Government, after careful examination of the proposal, hereby issue the following

guidelines for installation/erection of statues/monuments.

1. No new statues should be permitted for erection on any R&B Roads henceforth by

the R&B Department. Existing statues that are located on traffic islands and not

obstructing view of the drivers/traffic may continue and the statues causing

inconvenience to the public accidents etc. shall be removed and kept in safer

places with the permission from the concerned authorities. Maintenance shall

however be done by the concerned Agencies/ Organisations/ Departments. Each

Executive Engineer shall maintain a list of statues in his jurisdiction and take up

with the concerned agency and formalize the responsibility of maintenance.

2. In regard to statues already approved for Hyderabad city, such statue erection

works should be completed within a period of one month from the date of issue of

this G.O. and henceforth no permission should be given by the Collector or

concerned authorities as the case may be for erection of new status without the

approval of Government (R&B Department).

3. For statues that have already been erected without proper permission, the

concerned Collector should review the structure with the concerned Statue

erection organisations and such statues should be removed or located with the

permission of the Collector or concerned authorities as the case may be following

the guidelines wherever necessary. Such organisations should be penalized for an

amount of Rs.10,000/- in case of erection without prior permission of the

Collector/concerned authorities as the case may be. They should also bear the cost

of relocation/removal of statues etc.

Page 2: Erection of Statues

110

4. If statues/monuments are unavoidable on roads, they should be located only on

large traffic islands, Public gardens, parks, premises of Government buildings,

town halls or places of public importance. In case, any approval of Government is

required, recommendation by a Statue Committee headed by the District Collector

and comprising Superintendent of Police, Superintending Engineers(R&B),

Chairman/CEO, Local Municipal Body, Superintending Engineers(PR),

Superintending Engineer (AP Transco) and the concerned Executive

Engineer(R&B) is mandatory. This Committee, which may also draft if necessary

representatives of other Departments, should examine all aspects before making

any recommendation including possibility of proposed statues obstructing the flow

of traffic, future expansion of roads & the design of the roads, the water supply

and sewerage pipe lines, electrical and telephone wires and cables as well as the

local situation. The size of the statue/ monument, metal used & the design should

also be considered and a site plan shall be prepared and approved by Committee

before forwarding to the Government.

5. The concerned organisation who wants to install/ erect the Statue/monuments

should procure land on payment of compensation to the concerned land owners/

concerned department as the case may be.

6. The concerned organisation/department should complete the erection works of

statues/monuments within a period of three months from the date of issue of

permission by the Collector or concerned authorities as the case may be.

7. In case, if any organisation fails to complete the erection of statue within the

stipulated period of three months from the date of receipt of permission, such

organisation should seek renewal of permission for a further period of three

months and if they fail to seek renewal, it will be construed that permission issued

will be deemed to have been cancelled.

8. Maintenance of the Statues/monuments, cost of erection, clearance of essential

services i.e. shifting/realigning etc, of electrical/telecom wires, drainage lines etc.

on the proposed site of erection of statue/monument on R&B road must be borne

by the sponsoring agency/department and in no circumstances will be borne by the

R&B department.

9. The organisation will have no claim on land, on which it is permitted to install the

statue/monument and the ownership of the land will continue to vest with the

Department.

10. After the approval from the Government is obtained, the sponsoring organisation./

department must also obtain the clearance of the municipal corporations/

municipalities/Urban Development Authorities/Panchayats/R&B department/

Electricity authorities/ Water/drainage authorities concerned wherever necessary

before actual execution.

11. The Agency/organisation/department responsible for maintenance of statue/

monument on R&B roads must be clearly spelt out and the concurrence of the

organisation obtained at the time of taking up the project. The organisation

responsible for maintaining the landscape of the area should also be clearly

specified.

Page 3: Erection of Statues

111

12. If any damage is caused to the erected statue/monument, it should be replaced

with a new statue/monument or repairs should be taken up within a period of one

month and completed and all the expenditure should be borne by the concerned

installation organisation, otherwise, the organisation may be penalized by the

concerned authorities for an amount of Rs.10,000/- for each month of delay.

13. The permission for erection of statues should be given only in exceptional cases.

Erection of statues at Road junctions or busy traffic points should not be

permitted.

14. The organisations seeking permission to erect statues should clearly indicate the

dates on which any function is likely to be organised in a year. The type of

function to be organized should not obstruct the traffic in any manner and period

of such functions, when permitted, should be very brief (not more than ten to

fifteen minutes)

15. Statues of persons with criminal record should not be permitted.

16. Statues that are likely to appeal to narrow sectarian ideologies, or likely to cause

disaffection amongst people or extol violence/hatred should not be permitted at

public places.

17. These guidelines are applicable for all R&B roads and the Right of way and also

the lands abutting to R&B roads.

18. An undertaking must be taken from the organisation that they will abide by the

decision taken by R&B Department from time to time in regard to

installation/erection of Statue/Monument.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)

J.RAMBABU

SPECIAL CHIEF SECRETARY TO GOVERNMENT To

The Engineer-in-Chief(R&B), Admn., Hyderabad.

The Chief Engineer (R&B) Roads, Hyderabad.

The Chief Engineer(R&B) National Highways, Hyderabad.

The Managing Director, Road Development Corporation, Hyderabad.

Copy to:

The MA & UD Department.

The P.R & R.D. Department/The Revenue Department.

The Energy Department/The Home Department

All District Collectors

The Director General of Police, Hyderabad.

All Superintendent of Police in the State.

The Commissioner, Municipal Corporation of Hyderabad, Hyderabad.

The Engineer-in-Chief, Panchayat Raj Department, Hyderabad.

The Commissioner, Panchayat Raj Department, Hyderabad.

The Commissioner, Hyderabad Metro Water Service & Sewerage Board, Hyderabad.

The Commissioner, Rural Water Supply, Hyderabad.

The Commissioner, Information & Public Relations, Hyderabad.

Joint Secretary to Chief Minister

P.S. to Minister (R&B)

P.S. to Chief Secretary

P.S. to Spl. C.S./P.A. to Joint Secretary (R) TR&B Dept.,

All Roads Section.

SF/SC

//FORWARDED BY ORDER//

SECTION OFFICER

Page 4: Erection of Statues

108

Office of the Chief Engineer (R&B)

Roads, Errummanzil, Hyderabad.

Memo No.40412/TA.12/AE/97 Dated 7-5-2003.

Sub:- R&B Department – Statues – Installation Erection of statues/

Monuments in M.D.R./ Rural Roads in A.P. State Guidelines

prescribed – communicated – Regarding.

Ref:- 1) G.O.Ms.No.55, Transport (R&B) Department, Govt. of A.P.,

dated 8.4.2003.

*****

A copy of the reference cited, is herewith communicated to all the Superintending

Engineer(R&B) dealing with the State (R&B) Roads for information and necessary action.

Encl.: Reference cited above.

Sd/-

For Chief Engineer(R&B)(Roads)

To

All the Superintending Engineers(R&B) dealing the state (R&B) Roads.