O.K NOT O.K
1) MECHANICALINSTALLATION
a) ChecktheSufficientfreespacearoundtheunit
b)EnsuretheDrivecabinetsareinstalledinsafedustfreeenvironmentandtheroomshouldbeenoughtohandletherequiredaircirculationforthedrives
c)
Check the frame, roof / canopy, component mounting plates, cable gland plates andside doors for any damages during transport / erection and should as per GA and IGAdrawings
d)Check the optional structure requirements such as anti-vibration pad, specialhookingarrangementsetc.ifany
e)EnsuretheLiftinganglesareremoved.
f)Checkthatthecabinetpartsarecleananddustfree.
g)Check that each shipping section was erected with correct type of joiningarrangementslikesideplates,channels,connectingbusbar(AC,DCandPE)etc.
h) Theambientoperatingconditionsareallowed
i) Theunitisproperlyfastenedtothefloorandwall
k) Thecoolingairisabletoflowfreelyandcoolingairvolumeissufficient
2)Busbars
a)Checkvisuallythatbusbarsupportinsulatorsareundamaged.
b)
Checkthatallbusbarconnections/jointsaretightened.(Notethatallboltsaretightenedwithcorrecttorquearemarkedinfactorybeforedispatch.VisualCheckingofthemarkissufficient)
c)Ensuresufficientclearancebetweenbusbarsaftererectionandensurenoforeignmaterialsonbusbars
3)Electricalcomponents
a)Checkthatthequantity,make,typeandratingofcomponentsareasperBOM.Checkvisuallythatthecomponentsarenotdamaged
b)Checkthatallthecomponentsaremarkedwithvisiblelabels.Ifanylabelmissingpleasearrangethesame
c)CheckthatallmodulesareaccordingtotheBOMwithcorrectoptioncodes
d)Checkthatanyphysicaldamagesinthemodules
e)Checkdrivemodulesaremountedproperly/insertedinsideplugconnectorssecurelyforfullcontactwithplugconnector
4)ELECTRICALINSTALLATION
a) Theinverterisgroundedproperly
b) TheAClinevoltagematchesthenominaloutputvoltageoftheinverter
c) TheACtransformerissuitableforusewiththeinverter
d) Theinsulationoftheassemblyissufficent
e) TheACpowersystemisanIT(ungrounded)system
f) TheACpowercableconnectionsatL1,L2andL3andtheirtighteningtorquesareOK
g)TheDCpowercableconnectionsatUDC+andUDC-andtheirtighteningtorquesareOK
h) Thepowercablesareroutedawayfromothercables
i)TheauxiliarypowersupplycableconnectionatQ10andtheirtighteningtorquesareOk
CUSTOMER
EQUIPMENT DETAILS
SITE
INVERTER ERECTION CHECK LIST
SR NOCHECK POINT
STATUS
k)TheexternalcontrolconnectionstotheinverterareOK(includingemergencystop,feildbusetc.)
l)Thecableconnectionsatthejunctionbox(option+K479)andtheirtighteningtorqueareOK
m) TheEMCfilter(option+E216)iscorrectlyinstalled,ifpresent
n)Therearenotools,foreignobjectsordustfromdrillinginsidethemodulesorthecabinet
o) Allshroudsandcoversareinplace
5)Cablingandwiring
a)
CheckthatField(Customerside)analogsignalcableslikePT100arewiredwithshieldedcable.Alsocheckthoseshieldsareproperlyearthedatoneend.EarthLoopshouldbeavoided
b)CheckthatallFieldcablesenoughinlengthandstressfree.ThecablesshouldbewithpropercableglandandtightenedwithGlandplate
c)
Checkthatallfiberopticcablesarenotdamaged,connectorsnottobebroken,notroutedagainstsharpedgesorbarelivepartsandbendingradiusoftheFOcablesisbiggerthan35mm.
d)Check,bygentlepullingthecables,thattheirconnectionstocomponentterminalsaretightenough
e)CheckthatshortlinksonTB’sandloopchainingaredoneaccordingtoscheme
6)EarthingandMechanicalOperatingTests
a)
Checkthatthepanelsaredualearthed.Weldingofearthbarswithpanelisnotrecommended.(PleasenotetheremaybeaseparatePowerandElectronicearthingpracticeinsomeplants)
b)Checkthefunctionalityofallswitchesbyclosingandopeningthem
c)Checkthatfusesareplacedtightlyinthemiddleofthefusesocket/fusebase.
d)Checkthatthedoorsforopenandclosewithoutrubbingornoisewhenopenandclose.
e)Checkthedoordefeatfunction.Whenfuseswitchordisconnectingswitchisclosed,thecabinetdoorcannotbeopened.
7) Start-UpPreparation
a)Makesurethatthepanelissafetoconnectvoltage
b)Keep all switches and breakers of the panel in OFF position and do the necessaryshortlinksifrequired
c)Ensure that nobody is working on the unit or circuits that are associated to the paneltobetestlikeinterpanels,shippingsection,motoretc.
d)Keepallcabinetdoorsinclosebeforepowerup
e)Ensureauxiliaryvoltagesavailableforbackchargingandcontroltesting
f) StatusofGridvoltageavailabilityandreadinessforenergising
g) Statusofpanelearthingandearthpits
h) StatusofDCpowerconnectionsreadiness
ConsultantEngineer
ClientEngineer
Acceptance Date
ContractorEngineer
O.K NOTO.K
1) AVAILABILITYOFDOCUMENTATION
a) ErectiondrawingsincludingOGA
b) Erection/MaintenanceManual
c) Transportpackinglist
2) RECEIPTOFTRANSFORMER
a) Externallyinspecteddamage(ifany)
b) Gaspressureonreceipt(Whereapplicable)
c) Oillevel(incaseofoilfilledtransformer)
d) Unitcorrectlypositioned
3) RECEIPTOFACCESSORIES
a) Allmaterialsstoredcorrectly
b) PackingCasesinspected,damageifany
c) Marshallingboxinspected,damageifany
d) Controlpanels(RTCC)inspecteddamageifany
e) MaterialsreceivedcorrespondedtoAdvisenote
f) Anyshortages/wrongsupply
g) Materialscomplywithshippingspecification
h) Remark(ifany)
4) ERECTION
a) Transportrollersmounted
b) Conservatormounted
c)Buchholzrelayandoilsurgerelaymounted(arrowmarkedshouldbetowardsconservator)
d) Breathermountedanddulycharged
e) HVBushingsmounted
f) LVBushingmounted
Sr.No. CheckPoint Status
TRANSFORMERERECTIONCHECKLIST
Customer:-
EquipmentDetails:-
Site:-
g) TertiaryBushingmounted(ifapplicable)
h) HVneutralBushingmounted
i) LVNeutralBushingmounted
j) Bushinginstalledatcorrectangles
k) Diaphragmchecked
l) MOLGmounted
m) Radiatormounted
n) Fansmounted
o) PressureReliefvalvesmounted
p) Alignmentofallpipework
q) OLTCConservatormounted
r) HeatExchangersassembledwithpipework
s) Toppingupoftransformeroil
t) Leakageobservedafter24hrs.(ifany)
u) RatingDiagramandidentificationplatefitted
v) Controlpanel(RTCC)aligned
w) Controlpanel(OLTC)aligned
4) OILFILLING
a) Allbushingoillevel
b) Tapchangerselectoroillevel
c) Diverterswitchoillevel
d) Auxiliaryunitoillevel
e) Radiator,Headersoilfilled
f) Transformer/OLTCConservatoroiltight
g) Completetransformeroiltight
h) Allairreleaseplugvented
i) Valvesinserviceposition
j) Alldrain/filtervalvesblanked
5) MULTICORECABLE
a) Alltrayworkadequatelysecured
b) Allcablesadequatelytied/clippedbacktotray
c) Cablesglanedcorrectly
6) BREATHERS
a) Transformersilicagelbreathersatisfactory
b) Tapchangersilicagelbreathersatisfactory
c) Drybreathercorrectlyinstalled
7) FANS
a) Fansrotatefreely&quickly
b) Pumpsinstalledforcorrect
c) Flowindicationvisible
8) CONTROLPANELS
a) Cabletermination&Glanning
9) Cleaningandtouchupofpainting
ConsultantEngineer
ClientEngineer
DateAcceptance
ContractorEngineer
O.K NOTO.K
1)SCBAssembly/Installation
a) MountingStructure'sverticality,alignment,GIcoating
b) CastingofmountingstructureandpilecapaboveG.L
c) ClerancebetweenbottomofSMBandG.L.
d) Overallvisualaspect(damages,Scratches)
e) BoxFixationandassembly
d) SCBallocation(IDVsallocation)
f) Cleaningoftheinteriorofthepanelbox
g) Labelling/NumerationofSCBasperdrawing
2)Equipment
a) InputNHIFusestatus(InputFuses)
b) SurgeArrestorFlag
c) DCswitchoperational
3)ElectricalConnections
a) GroundconnectivitytoGIstrip,cableandconnections
b) DCoutput,cableandconnections
c) Stringinput,cableandconnections
d) Glandtighting
e) Protectionagainstdirectcontact
f) Allconnectiontightness
g) CableLabelling(Inputs,Outputs,Auxiliary,communicationcables)
4)Documentation
a) SCB'sSLD&StringLayout