ERCOT RMR Basics
Ino GonzálezSupervisor, S&B Market Analysis
Topic Outline
I. Why ERCOT deploys RMR units
II. How ERCOT Contracts RMR Units
III. Eligible RMR Costs
IV. Non-Eligible RMR Costs
V. Settlement of RMR Units
VI. Deployment of RMR Units in the Adjustment Period
VII. Next steps
Slide 2
Need for RMR Units
I. Why ERCOT deploys RMR units• To solve local reliability constraints• To provide voltage support• To acquire additional system capacity under special
conditions (possibly using a currently undefined type of Load Resource- LR)
Slide 3
RMR Contract Basis
II. How ERCOT Contracts RMR Units• ERCOT performs analysis of needs for system
capacity, or • Resource submits Notice of Suspension Form• ERCOT request RMR owner to submit estimated costs
to run the units• ERCOT evaluates costs and reliability needs and
makes final procurement assessment
Slide 4
RMR Contract Basis
III. Eligible RMR Costs (Per protocol 3.14.1.10 Eligible Cost)
Labor and services Materials and supplies Maintenance Fuel Property Taxes All variable costs
Slide 5
RMR Contract Basis (con.)
IV. Non-Eligible RMR Costs (Per protocol 3.14.1.10 Eligible Cost)
Depreciation expenses Return on Equity Fixed property taxes Income taxes of property owner Labor costs not associated with RMR operation Any costs the RMR owner would have incurred even
if the unit had been mothballed or shutdown
Slide 6
RMR settlement Basis
V. Settlement of RMR Units • Initial Settlement
Capacity payment ($/h) based on eligible costs plus 10%
Energy Payment (based on estimated fuel)
• True-up Settlement Capacity payment ($/h) based on actual costs plus
10% Energy Payment (based on actual fuel)
Slide 7
Deployment of RMR Units in the Adjustment Period
VI. Deployment of RMR units in the Adjustment Period ERCOT discovers need for RMR units in the Adjustment period
If RMR unit needed for capacity service, submit an OS SCED deploys RMR based on EOC and system need at SWC
Slide 8
Loads Providing RMR-Like Services
VII. Next StepsNeed to:
Define the type of capacity (RMR-Like) service an LR
o types of loads
o allow aggregation or not
o minimum MW levels Develop RMR-Like contracting procedures Establish deployment guidelines Specific payment and settlement rules and M&V
Slide 9