ERCOT Monthly Operational
Overview (August 2013)
ERCOT Public
September 15, 2013
![Page 2: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/2.jpg)
2
Grid Operations & Planning
![Page 3: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/3.jpg)
ERCOT Public 3
• Operations
– The peak demand of 67,180 MW on August 7th was less than the mid-term
forecast peak of 67,225 MW but greater than the August 2012 actual peak
demand of 66,509 MW. The instantaneous load on August 7th was 67,314 MW.
– Day-ahead load forecast error for August was 2.07%
– ERCOT issued two Advisories. • Two separate advisories for extreme hot weather expected in the North Central and South Central
weather zones (8/7,8/8).
– No Watches were issued
– ERCOT issued an Emergency Notice due to SCED failure (8/16 03:10)
– No Energy Emergency Alert (EEA) events
• Planning Activities
– 162 active generation interconnection requests totaling over 41,400 MW,
including 20,900 MW of wind generation as of August 31, 2013. One less
request and 1,400 less total MW from July 31, 2013
– 10,570 MW wind capacity in commercial operation August 31, 2013; no change
from July 31, 2013
Summary – August 2013
![Page 4: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/4.jpg)
ERCOT Public 4
Daily Peak Demand: Hourly Average Actual vs.
Forecast, Wind Day-Ahead COPs & On-line Capacity at Peak – August 2013
![Page 5: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/5.jpg)
ERCOT Public 5
0
500
1000
1500
2000
2500
3000
3500
4000
4500
8/1
8/2
8/3
8/4
8/5
8/6
8/7
8/8
8/9
8/10
8/11
8/12
8/13
8/14
8/15
8/16
8/17
8/18
8/19
8/20
8/21
8/22
8/23
8/24
8/25
8/26
8/27
8/28
8/29
8/30
8/31
MW
Daily Averaged Aggregated Wind Output Estimated Wind Curtailment Daily Averaged Day-Ahead COP HSL
Actual Wind Output plus Curtailments vs. Wind Day-Ahead COPs for All
Hours – August 2013
Note: QSEs must use the AWST 50% probability of exceedance forecast as the HSL in their COPs
% of Hours when Estimated Uncurtailed Wind Output
>= COP HSLs (Target = 50%)
44%
![Page 6: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/6.jpg)
ERCOT Public 6
ERCOT’s CPS1 Monthly Performance – August 2013
CPS1 12 Month Rolling Average = 166.86%
![Page 7: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/7.jpg)
ERCOT Public 7
Monthly Peak Actual Demand – August 2013
![Page 8: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/8.jpg)
ERCOT Public 8
Monthly Minimum Actual Demand – August 2013
![Page 9: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/9.jpg)
ERCOT Public 9
Day-Ahead Load Forecast Performance – August 2013
Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF)
Run at 14:00 Day Ahead
2010
MAPE
2011
MAPE
2012
MAPE
2013
MAPE
Aug 2013
MAPE
Average
Annual
MAPE 2.83 2.83 3.02 2.78
2.07
Lowest
Monthly
MAPE 2.24 1.63 2.51 2.07
Lowest
Daily
MAPE
0.55 August - 7
Highest
Monthly
MAPE 3.79 3.55 3.49 3.50
Highest
Daily
MAPE
4.16 August – 24
![Page 10: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/10.jpg)
ERCOT Public 10
Reliability Unit Commitment (RUC) Capacity by Weather Zone – August
2013
![Page 11: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/11.jpg)
ERCOT Public 11
Generic Transmission Limits (GTLs) – August 2013
GTL: A transmission flow limit more constraining than a Transmission Element’s normal limit
established to constrain flow between geographic areas of the ERCOT Transmission System that is
used to enforce stability and voltage constraints that cannot be modeled directly in ERCOT’s
transmission security analysis applications.
Note: This table lists how many times a constraint has been activated to avoid exceeding a GTL limit, it does
not imply an exceedance of the GTL occurred.
GTLs Aug 12
Days GTLs
Jun 13
Days GTLs
Jul 13
Days GTLs
Aug 13
Days GTLs
Last 12
Months
Total Days (Aug12 – Aug13)
North – Houston 0 0 0 0 0
West – North 3 4 0 0 81
Valley Import 0 0 0
0
0
![Page 12: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/12.jpg)
ERCOT Public 12
• Advisories issued for Physical Responsive Capability (PRC) below 3000 MW. – None
• Advisories issued for extreme hot weather expected in the North Central and South Central weather zones
– Issued two days (08/07; 08/07)
• Advisories issued for geomagnetic disturbance storm of K-7 or higher. – None
• Watches issued for Physical Responsive Capability (PRC) below 2500 MW. – None
• Transmission Watches – None
• Emergency Notice – ERCOT issued an emergency notice due to SCED execution failure 8/16 03:10
• Energy Emergency Alerts – None
Advisories and Watches – August 2013
![Page 13: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/13.jpg)
ERCOT Public 13
Significant Events – August 2013
• No significant events to report
![Page 14: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/14.jpg)
ERCOT Public 14
Lake Levels Update – September 1, 2013
Surface Water & (MW)
*Level @ Full
Conservation
Pool
*Level on
Jan 1, 2011
*Level on
Oct 7, 2011
*Level on
Sep 1, 2013
Lake Texana (56) 44.50 41.00 32.81 40.22
Bardwell Lake (312) 421.00 420.71 416.23 416.38
Lake Colorado City (407) 2,070.20 2057.33 2052.4 2050.64
Lake Ray Hubbard (916) 435.50 432.37 429.22 429.80
Lake Granbury (983) 693.00 691.90 686.27 685.33
Lake Houston (1016) 41.73 42.10 36.76 41.40
Twin Oaks Reservoir (1616) 400 398.87 398.27 400.12
Lake Limestone (1689) 363 359.03 354 356.14
Martin Lake (2425) 306 300.48 295.06 301.70
* In Feet above Mean Sea Level
![Page 15: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/15.jpg)
ERCOT Public 15
• ERCOT is currently tracking 162 active generation interconnection requests
totaling over 41,400 MW. This includes over 20,900 MW of wind generation.
• ERCOT is currently reviewing proposed transmission improvements with a
total cost of $750 Million
• Transmission Projects endorsed in 2013 total $349.8 Million
• All projects (in engineering, routing, licensing and construction) total
approximately $8.82 Billion.
• Transmission Projects energized in 2013 total about $1.29 Billion.
Planning Summary – August 2013
![Page 16: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/16.jpg)
ERCOT Public 16
County Location of Installed Generation with Interconnection Requests (all
fuels) – August 2013
![Page 17: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/17.jpg)
ERCOT Public 17
County Location of Wind Generation – August 2013
![Page 18: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/18.jpg)
ERCOT Public 18
Wind Generation – August 2013
![Page 19: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/19.jpg)
ERCOT Public 19
Generation Interconnection Activity by Fuel – August 2013
![Page 20: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/20.jpg)
ERCOT Public 20
Generation Interconnection Activity by Project Phase – August 2013
![Page 21: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/21.jpg)
21
Market Operations
![Page 22: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/22.jpg)
ERCOT Public 22
Day-Ahead Schedule (Hourly Average) – August 2013
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
MW
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
DAM Net Flow
Liquidity and activity is normal in Day-Ahead Market
DAM_Net_Flow = Combined market transmission flow of Energy purchased/sold in
Day-Ahead Market plus Point-to-Point Obligations and
NOIE CRR Options carried forward to real-time.
![Page 23: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/23.jpg)
ERCOT Public 23
Day-Ahead Electricity And Ancillary Service Hourly Average Prices –
August 2013
0
10
20
30
40
50
60
70
80
90
100
110
120
Pri
ce
($
/MW
h)
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
Ancillary Service price reflect the opportunity cost of energy
High prices for Regulation Up, Responsive Reserve, and
Non-Spinning Reserve during hours 16 to 18 were due to the
co-optimization of higher Energy/Ancillary Service
offers and higher Energy bids for those hours.
![Page 24: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/24.jpg)
ERCOT Public 24
Day-Ahead Vs Real-Time Load Zone SPP (Hourly Average) – August 2013
0
20
40
60
80
100
120
140
160
180P
ric
e (
$/M
Wh
)
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
Higher Real-Time prices in Load Zone West were mainly due to
outages and low wind in the west area
Higher Day-Ahead prices in late afternoon and evening reflect
hedging activities against exposure to Real-Time prices
![Page 25: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/25.jpg)
ERCOT Public 25
Day-Ahead Vs Real-Time Hub Average SPP (Hourly Average) – August 2013
0
20
40
60
80
100
120P
ric
e (
$/M
Wh
)
RTSPP - Hub Average
DASPP - Hub AverageEnergy prices reflect the risk premium between Day-Ahead & Real-Time
![Page 26: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/26.jpg)
ERCOT Public 26
DRUC Monthly Summary (Hourly Average) – August 2013
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000M
Wh
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
31 executions (none missed)
None published after 1600
8 minutes average execution time
No Resource Commitments
![Page 27: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/27.jpg)
ERCOT Public 27
HRUC Monthly Summary – August 2013
0
0
0
1
1
1
1M
Wh
744 executions (none missed)
8 minute average execution time
No Resource commitments
Colors Indicate Individual Resources
![Page 28: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/28.jpg)
ERCOT Public 28
Non-Spinning Reserve Service Deployment – August 2013
Deployment Start Time Deployment End
Time
Deployment
Duration (Hours)
Max Deployment
(MW) Reason
None
![Page 29: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/29.jpg)
ERCOT Public 29
CRR Price Convergence – August 2013
0
10
20
30
40
50
60
70
80M
illio
ns
$
Cost
Value
Congestion Revenue Right cost in auction convergence with
payment in Day-Ahead Market and Real Time Market
Congestion Revenue Right cost in auction convergence with
payment in Day-Ahead Market and Real Time Market
![Page 30: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/30.jpg)
ERCOT Public 30
ERS Procurement for June 2013 – September 2013
10-Minute ERS
BH1 BH2 BH3 NBH
MW Procured 472.125 351.550 345.500 384.875
Average Price Per MW per Hour1 $10.21 $12.07 $12.60 $10.13
Note: Four Generators procured with an average of 11.7 MW across all 4 time periods 30-Minute ERS Pilot
MW Procured 126.970 87.645 76.190 100.940
Clearing Price2 $11.00 $12.00 $14.00 $11.00
BH1 - Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays BH2 - Business Hours 2 HE 1400 through 1600, Monday thru Friday except ERCOT Holidays BH3 - Business Hours 3 HE 1700 through 2000, Monday thru Friday except ERCOT Holidays NBH - Non-Business Hours All other hours
Weather Sensitive ERS Pilot
BH2 BH3 WEH
MW Procured 2.60 2.60 2.60
Clearing Price2 $50.00 $50.00 $50.00
BH2 - Business Hours 2 HE 1400 through 1600, Monday thru Friday except ERCOT Holidays BH3 - Business Hours 3 HE 1700 through 2000, Monday thru Friday except ERCOT Holidays WEH- WeekEnd & Holidays HE 1400-2000, Saturday, Sundays & Holidays
1 Procured on a Pay-As-Offer basis 2 Procured using a Clearing Price Mechanism
![Page 31: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/31.jpg)
ERCOT Public 31
Market Enhancements to Address IMM Recommendations –
August 2013
Enhancement Further Information
Adequate scarcity pricing in
SCED using Operating
Reserve Demand Curve:
Hogan solution
• ERCOT is scheduled to provide a draft NPRR and corresponding Other Binding
Document (OBD) that would implement Hogan B+ as described in the white
paper
• The target date for the submittal to the PUC is 9/19/2013 (3 weeks from
the 8/29/2013 Open Meeting)
• Key parameters will be left as variables
Potential solutions to prevent
price reversals due to
deployment of existing load
resources
• NPRR 508 – Setting of Real-Time LMPs during EEA ERS/Load Resource
Deployment
• At the 6-6-13 TAC meeting, the NPRR failed to get sufficient votes for approval
(14 yes/13 no/2 abstain)
• NPRR 508 has a status of “rejected”
• TAC produced a report for July Board of Director meeting on pricing during
Reserve Deployments
“Over-mitigation” in SCED
• NPRR 520 – Real-Time Mitigation Rules and Creation of a Real-Time Constraint
Competitiveness was approved by BOD on 3-19-13
• The NPRR was partially (MMS functionality) implemented on 6-12-13
• The last remaining part of the NPRR which provides additional informational
telemetry to QSEs was implemented on 7-31-13
![Page 32: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/32.jpg)
ERCOT Public 32
Reliability Services – August 2013
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments ($0.00)
RUC Clawback Charges $0.00
RUC Commitment Settlement ($0.00)
RUC Capacity Short Charges $0.00
RUC Make-Whole Uplift $0.00
RUC Commitment Cost Allocation $0.00
RUC Decommitment Payments $0.00
RUC Cost continues to trend low.
There were no RUC Costs in August 2013, compared to:
• A charge of $0.02 in July 2013
• A charge of $0.00 in August 2012
![Page 33: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/33.jpg)
ERCOT Public 33
Ancillary Services – August 2013
Capacity Services $ in Millions
Regulation Up Service $3.65
Regulation Down Service $0.81
Responsive Reserve Service $19.7
Non-Spinning Reserve Service $5.56
Black Start Service $0.52
Voltage Services - Reactive Power $0.0
Voltage Services - Lost Opportunity $0.0
Total Capacity Service $30.20
Capacity Services costs were up from last month and are less than
August 2012.
August 2013 cost was $30.20M, compared to:
• A charge of $20.13M in July 2013
• A charge of $47.33M in August 2012
![Page 34: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/34.jpg)
ERCOT Public 34
Energy Settlement – August 2013
Day-Ahead and Real-Time energy settlement
increased from last month.
Day-Ahead Market settlements are less than
August 2012 and Real-Time Market
settlements are higher.
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $710.26
Point to Point Obligation Purchases $45.86
RMR Day-Ahead Revenue $0.00
Energy Sales ($697.72)
Day-Ahead Congestion Rent $58.40
Day-Ahead Market Make-Whole Payments ($0.05)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($696.59)
Energy Imbalance at a Load Zone $1,005.51
Energy Imbalance at a Hub ($264.27)
Real Time Congestion from Self Schedules $0.37
Block Load Transfers and DC Ties ($12.61)
Impact to Revenue Neutrality $32.41
Emergency Energy Payments ($0.27)
Base Point Deviation Charges $0.38
Real-Time Metered Generation (MWh in millions) 35.27
![Page 35: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/35.jpg)
ERCOT Public 35
Congestion Revenue Rights (CRR) – August 2013
Auction Disbursements $ in Millions
Annual Auction ($32.43)
Monthly Auction ($10.25)
Total Auction Revenue ($42.69)
Day-Ahead CRR Settlement ($54.02)
Day-Ahead CRR Short-Charges $1.07
Day-Ahead CRR Short-Charges Refunded ($1.07)
Real-Time CRR Settlement ($0.00)
Real-Time CRR Short-Charges $0.00
Real-Time CRR Short-Charges Refunded ($0.00)
Total CRR Proceeds ($54.02)
Day-Ahead Point to Point Obligations
Settlement $45.86
Real-Time Point to Point Obligation
Settlement ($36.24)
Net Point to Point Obligation Settlement $9.61
Congestion Revenue Rights were fully funded
and excess funds were available for
distribution to load.
Distribution of Balancing Account funds to load
for August 2013 was $4.42 M, compared to:
• $3.24M in July 2013
• $24.13M in August 2012
Point to Point Obligations settled with a net
charge of $9.61M compared to a net gain of
$8.56M last month.
![Page 36: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/36.jpg)
ERCOT Public 36
Revenue Neutrality – August 2013
Revenue Neutrality Settlement $ in Millions
Real-Time Point to Point Obligation Settlement ($36.24)
Real-Time Point to Point Options and Options with Refund Settlement ($0.00)
Real-Time Energy Imbalance Settlement $44.66
Real-Time Congestion from Self-Schedules Settlement $0.37
DC Tie & Block Load Transfer Settlement ($12.61)
Charge to Load $3.82
Revenue Neutrality charges to load decreased
compared to last month and to August 2012.
August 2013 was a charge of $3.82M,
compared to:
• $ 5.00M charge in July 2013
• $10.11M charge in August 2012
![Page 37: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/37.jpg)
ERCOT Public 37
Net Uplift to Load – August 2013
Net uplift to Load increased significantly from last
month and decreased from August of 2012
August 2013 was a charge of $1.67M, compared
to:
• A credit of $ 8.33M in July 2013
• A charge of $18.55M in August 2012
Market-Based Uplifts $ in Millions
CRR Auction Revenue Disbursement Settlement ($42.69)
Balancing Account Proceeds Settlement ($4.42)
Net Reliability Unit Commitment Settlement $0.00
Ancillary Services Settlement $30.20
Reliability Must Run Services Settlement $0.0
Reliability Must Run for Capacity $0.0
Real-Time Revenue Neutrality Settlement $3.82
Emergency Energy Settlement $0.27
Base Point Deviation Settlement ($0.38)
Total ($13.21)
Fee Uplifts
ERCOT Administrative Fee Settlement $14.89
Net Uplift Charge to Load $1.67
![Page 38: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/38.jpg)
ERCOT Public 38
Advanced Meter Settlement Impacts – August 2013
August 2013: At month
end, settling 6.4M ESIIDs
using Advanced Meter
data.
August 2013: 97.2% of the
load in ERCOT is settled with
15-min interval data (AMS,
Competitive IDR, and NOIE
IDR).
![Page 39: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/39.jpg)
ERCOT Public 39
ERCOT Wide Load Volumes by Meter Type – INITIAL Settlement –
August 2013
![Page 40: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/40.jpg)
ERCOT Public 40
Retail Transaction Volumes – Summary – August 2013
Year-To-Date Transactions Completed
Transaction Type August 2013 August 2012 August 2013 August 2012
Switches 637,432 677,807 91,240 89,052
Acquisition 134 0 0 0
Move - Ins 1,602,271 1,523,022 259,489 232,716
Move - Outs 778,222 750,930 119,193 114,124
Continuous Service Agreements (CSA) 346,514 504,027 46,558 188,159
Mass Transitions 0 5,518 0 0
Total 3,364,573 3,461,304 516,480 624,051
Total since June 1, 2001 53,256,099
![Page 41: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/41.jpg)
ERCOT Public 41
Retail Transaction Volumes – Summary – August 2013 Switches/Acquisitions
Move-Ins
Move-Outs Mass Transition
0
1,000
2,000
3,000
4,000
5,000
6,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2013 2012
![Page 42: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/42.jpg)
ERCOT Public 42
Retail Performance Measures – Switch – August 2013 1st Quarter 2nd Quarter
3rd Quarter 4th Quarter
![Page 43: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/43.jpg)
ERCOT Public 43
1st Quarter 2nd Quarter
3rd Quarter 4th Quarter
Retail Performance Measures (Same Day Move-In) – August 2013
![Page 44: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/44.jpg)
ERCOT Public 44
1st Quarter 2nd Quarter
3rd Quarter 4th Quarter
Retail Performance Measures (Standard Move-In) – August 2013
![Page 45: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/45.jpg)
45
Projects Report
![Page 46: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/46.jpg)
ERCOT Public 46
ERCOT Portfolio Stoplight Report (as of 9/12/2013)
![Page 47: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/47.jpg)
ERCOT Public 47
ERCOT Portfolio Stoplight Report (as of 9/12/2013)
![Page 48: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/48.jpg)
ERCOT Public 48
ERCOT Portfolio Stoplight Report (as of 9/12/2013)
![Page 49: ERCOT Monthly Operational Overview (August 2013) · 2014. 6. 23. · ERCOT Public 14 Lake Levels Update – September 1, 2013 Surface Water & (MW) *Level @ Full Conservation Pool](https://reader035.fdocuments.in/reader035/viewer/2022062507/5fe63a09fee3af2095118760/html5/thumbnails/49.jpg)
ERCOT Public 49
ERCOT Portfolio Stoplight Report (as of 9/12/2013)