Transcript of ERCOT Monthly Operational Overvie · • 21,190 MW wind capacity in commercial operations as of...
ERCOT Monthly Operational Overview(June 2018)
ERCOT PublicJuly 15 2018
Grid Planning amp Operations
PUBLIC
Summary ndash June 2018
Operationsbull The preliminary Settlements hourly peak demand of 69102 MW on June 27 was lower
than the day-ahead mid-term load forecast peak of 69223 MW for the same operatinghourndash The operational instantaneous peak demand was 69226 MW (telemetry)
bull Day-ahead load forecast error for June was 165bull ERCOT issued 17 notifications
ndash Two Advisories issued due to Physical Responsive Capability being below 3000 MWndash Three DAM-related Advisoriesndash One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailabilityndash Nine DC Tie-related Watchesndash Two Transmission-related Watches
Planning Activitiesbull 379 active generation interconnection requests totaling 77020 MW including 34376
MW of wind generation as of June 30 2018 Ten additional requests and an increaseof 1813 MW from May 31 2018
bull 21190 MW wind capacity in commercial operations as of July 1 2018
Per Demand and Energy Report as of 070918
3
PUBLIC
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
4
PUBLIC
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
5
PUBLIC
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
CPS1 12 Month Rolling Average = 17667
6
PUBLIC
Monthly Peak Actual Demand ndash June 2018
Preliminary for latest two months of the current year
Monthly Peak Actual Demand = 69102 MW 062718 HE 1700
7
PUBLIC
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Preliminary for latest two months of the current year
8
PUBLIC
Day-Ahead Load Forecast Performance ndash June 2018
Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead
2015MAPE
2016MAPE
2017MAPE
2018MAPE
June 2018MAPE
AverageAnnual MAPE
286 262 255 245 165
LowestMonthly MAPE
189 194 169 165LowestDailyMAPE
054Jun 1
HighestMonthly MAPE
381 386 407 366
Highest DailyMAPE
583Jun 4
9
PUBLIC
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJune 2018
10
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Grid Planning amp Operations
PUBLIC
Summary ndash June 2018
Operationsbull The preliminary Settlements hourly peak demand of 69102 MW on June 27 was lower
than the day-ahead mid-term load forecast peak of 69223 MW for the same operatinghourndash The operational instantaneous peak demand was 69226 MW (telemetry)
bull Day-ahead load forecast error for June was 165bull ERCOT issued 17 notifications
ndash Two Advisories issued due to Physical Responsive Capability being below 3000 MWndash Three DAM-related Advisoriesndash One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailabilityndash Nine DC Tie-related Watchesndash Two Transmission-related Watches
Planning Activitiesbull 379 active generation interconnection requests totaling 77020 MW including 34376
MW of wind generation as of June 30 2018 Ten additional requests and an increaseof 1813 MW from May 31 2018
bull 21190 MW wind capacity in commercial operations as of July 1 2018
Per Demand and Energy Report as of 070918
3
PUBLIC
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
4
PUBLIC
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
5
PUBLIC
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
CPS1 12 Month Rolling Average = 17667
6
PUBLIC
Monthly Peak Actual Demand ndash June 2018
Preliminary for latest two months of the current year
Monthly Peak Actual Demand = 69102 MW 062718 HE 1700
7
PUBLIC
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Preliminary for latest two months of the current year
8
PUBLIC
Day-Ahead Load Forecast Performance ndash June 2018
Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead
2015MAPE
2016MAPE
2017MAPE
2018MAPE
June 2018MAPE
AverageAnnual MAPE
286 262 255 245 165
LowestMonthly MAPE
189 194 169 165LowestDailyMAPE
054Jun 1
HighestMonthly MAPE
381 386 407 366
Highest DailyMAPE
583Jun 4
9
PUBLIC
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJune 2018
10
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Summary ndash June 2018
Operationsbull The preliminary Settlements hourly peak demand of 69102 MW on June 27 was lower
than the day-ahead mid-term load forecast peak of 69223 MW for the same operatinghourndash The operational instantaneous peak demand was 69226 MW (telemetry)
bull Day-ahead load forecast error for June was 165bull ERCOT issued 17 notifications
ndash Two Advisories issued due to Physical Responsive Capability being below 3000 MWndash Three DAM-related Advisoriesndash One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailabilityndash Nine DC Tie-related Watchesndash Two Transmission-related Watches
Planning Activitiesbull 379 active generation interconnection requests totaling 77020 MW including 34376
MW of wind generation as of June 30 2018 Ten additional requests and an increaseof 1813 MW from May 31 2018
bull 21190 MW wind capacity in commercial operations as of July 1 2018
Per Demand and Energy Report as of 070918
3
PUBLIC
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
4
PUBLIC
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
5
PUBLIC
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
CPS1 12 Month Rolling Average = 17667
6
PUBLIC
Monthly Peak Actual Demand ndash June 2018
Preliminary for latest two months of the current year
Monthly Peak Actual Demand = 69102 MW 062718 HE 1700
7
PUBLIC
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Preliminary for latest two months of the current year
8
PUBLIC
Day-Ahead Load Forecast Performance ndash June 2018
Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead
2015MAPE
2016MAPE
2017MAPE
2018MAPE
June 2018MAPE
AverageAnnual MAPE
286 262 255 245 165
LowestMonthly MAPE
189 194 169 165LowestDailyMAPE
054Jun 1
HighestMonthly MAPE
381 386 407 366
Highest DailyMAPE
583Jun 4
9
PUBLIC
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJune 2018
10
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
4
PUBLIC
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
5
PUBLIC
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
CPS1 12 Month Rolling Average = 17667
6
PUBLIC
Monthly Peak Actual Demand ndash June 2018
Preliminary for latest two months of the current year
Monthly Peak Actual Demand = 69102 MW 062718 HE 1700
7
PUBLIC
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Preliminary for latest two months of the current year
8
PUBLIC
Day-Ahead Load Forecast Performance ndash June 2018
Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead
2015MAPE
2016MAPE
2017MAPE
2018MAPE
June 2018MAPE
AverageAnnual MAPE
286 262 255 245 165
LowestMonthly MAPE
189 194 169 165LowestDailyMAPE
054Jun 1
HighestMonthly MAPE
381 386 407 366
Highest DailyMAPE
583Jun 4
9
PUBLIC
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJune 2018
10
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
5
PUBLIC
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
CPS1 12 Month Rolling Average = 17667
6
PUBLIC
Monthly Peak Actual Demand ndash June 2018
Preliminary for latest two months of the current year
Monthly Peak Actual Demand = 69102 MW 062718 HE 1700
7
PUBLIC
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Preliminary for latest two months of the current year
8
PUBLIC
Day-Ahead Load Forecast Performance ndash June 2018
Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead
2015MAPE
2016MAPE
2017MAPE
2018MAPE
June 2018MAPE
AverageAnnual MAPE
286 262 255 245 165
LowestMonthly MAPE
189 194 169 165LowestDailyMAPE
054Jun 1
HighestMonthly MAPE
381 386 407 366
Highest DailyMAPE
583Jun 4
9
PUBLIC
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJune 2018
10
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
CPS1 12 Month Rolling Average = 17667
6
PUBLIC
Monthly Peak Actual Demand ndash June 2018
Preliminary for latest two months of the current year
Monthly Peak Actual Demand = 69102 MW 062718 HE 1700
7
PUBLIC
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Preliminary for latest two months of the current year
8
PUBLIC
Day-Ahead Load Forecast Performance ndash June 2018
Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead
2015MAPE
2016MAPE
2017MAPE
2018MAPE
June 2018MAPE
AverageAnnual MAPE
286 262 255 245 165
LowestMonthly MAPE
189 194 169 165LowestDailyMAPE
054Jun 1
HighestMonthly MAPE
381 386 407 366
Highest DailyMAPE
583Jun 4
9
PUBLIC
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJune 2018
10
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Monthly Peak Actual Demand ndash June 2018
Preliminary for latest two months of the current year
Monthly Peak Actual Demand = 69102 MW 062718 HE 1700
7
PUBLIC
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Preliminary for latest two months of the current year
8
PUBLIC
Day-Ahead Load Forecast Performance ndash June 2018
Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead
2015MAPE
2016MAPE
2017MAPE
2018MAPE
June 2018MAPE
AverageAnnual MAPE
286 262 255 245 165
LowestMonthly MAPE
189 194 169 165LowestDailyMAPE
054Jun 1
HighestMonthly MAPE
381 386 407 366
Highest DailyMAPE
583Jun 4
9
PUBLIC
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJune 2018
10
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Preliminary for latest two months of the current year
8
PUBLIC
Day-Ahead Load Forecast Performance ndash June 2018
Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead
2015MAPE
2016MAPE
2017MAPE
2018MAPE
June 2018MAPE
AverageAnnual MAPE
286 262 255 245 165
LowestMonthly MAPE
189 194 169 165LowestDailyMAPE
054Jun 1
HighestMonthly MAPE
381 386 407 366
Highest DailyMAPE
583Jun 4
9
PUBLIC
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJune 2018
10
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Day-Ahead Load Forecast Performance ndash June 2018
Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead
2015MAPE
2016MAPE
2017MAPE
2018MAPE
June 2018MAPE
AverageAnnual MAPE
286 262 255 245 165
LowestMonthly MAPE
189 194 169 165LowestDailyMAPE
054Jun 1
HighestMonthly MAPE
381 386 407 366
Highest DailyMAPE
583Jun 4
9
PUBLIC
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJune 2018
10
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJune 2018
10
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Generic Transmission Constraints (GTCs) ndash June 2018
GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications
Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred
GTCsJun-17 Apr-18 May-18 Jun-18 Last 12 Months Total
DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Jul 17 ndash Jun 18)
North ndash Houston 0 1 0 1 9
Valley Import 4 0 4 0 14
Panhandle 21 25 27 23 273
Red Tap 0 0 0 0 0North Edinburg ndash
Lobo 0 0 0 0 1Nelson Sharpe ndash
Rio Hondo - 12 0 2 65
East Texas - 0 0 0 16
11
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch issued for the forced outage of the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 63
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 65
bull One Advisory issued for postponing the deadline for posting of the DAM Solution for Operating Day June 8th 2018
ndash Issued 67
bull One Advisory issued due to Physical Responsive Capability being below 3000 MWndash Issued 67
bull One Watch for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 612
bull One Watch for the forced outage of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE
ndash Issued 613
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 613
12
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Advisories and Watches ndash June 2018
bull One Watch for the forced outage of the Laredo DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 615
bull One Watch issued due to the post-contingency overload of SCHYWIN8 loss of No Trees Switch to Wink Sub 138 kV lines overloads Wink Sub 13869 kV Auto 2 due to multiple outages in Far West Texas
ndash Issued 617
bull One Watch issued due to the post-contingency overload of SHSAPB38 loss of Ward Gulf Tap to Wink Sub 138 kV lines overloads Dollar Hide to No Trees Switch 138 kV line
ndash Issued 619
bull One Watch issued due to an erroneous tag on the Eagle Pass DC-Tie and curtailment of DC-Tie exports to CENACE
ndash Issued 625
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 626
bull One Advisory issued for postponing the deadline for the posting of the DAM solution for operating day June 28 2018
ndash Issued 627
13
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Advisories and Watches ndash June 2018
bull One Advisory issued for timeline deviation of the Day Ahead Market delaying the start of DRUC
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 627
bull One Watch issued due to the post-contingency overload of SPOLPHA8 loss of Polk Avenue ndash North Pharr 138 kV overloads North McAllen ndash West McAllen 138 kV and curtailment of DC-Tie exports to CENACE
ndash Issued 628
bull One Advisory issued due to ERCOTrsquos Voltage Security Assessment Tool RTCA unavailability
ndash Issued 629
14
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Lake Levels Update ndash July 1 2018
15
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Planning Summary ndash June 2018
bull ERCOT is currently tracking 379 active generation interconnection requests totaling 77020 MW This includes 34376 MW of wind generation
bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million
bull Transmission Projects endorsed in 2018 total $3935 million
bull All projects (in engineering routing licensing and construction) total approximately $761 billion (as of June 1 2018)
bull Transmission Projects energized in 2018 total about $122 billion (as of June 1 2018)
16
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Mapping of Counties to ERCOT Zones ndash June 2018
17
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
18
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
19
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
20
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Wind Generation ndash June 2018
21
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Solar Generation ndash June 2018
22
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Generation Interconnection Activity by Fuel ndash June 2018
23
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Generation Interconnection Activity by Project Phase ndash June 2018
24
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Market Operations
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Day-Ahead Schedule (Hourly Average) ndash June 2018
26
0
10000
20000
30000
40000
50000
60000
70000
80000
MW
Hour Ending
Scheduled Energy Only Offer
Scheduled Three-part Offer
DAM Energy Purchase
RT System Load
Liquidity and activity are normal in the Day-Ahead Market
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) -June 2018
27
0
20
40
60
80
100
120Ja
n
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May Ju
l
Sep
Nov Jan
Mar
May
2013 2014 2015 2016 2017 2018
The dotted lines represent the bounds for major outliers
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
DAM and RTM Price Convergence ndash June 2018
28
-20
-15
-10
-5
0
5
10
15
20Ja
nM
arM
ay Jul
Sep
Nov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May Ju
lSe
pN
ov Jan
Mar
May
2013 2014 2015 2016 2017 2018
Aver
age
DAM
-R
TM S
PP ($
MW
h)
The dotted lines represent the bounds for major outliers
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJune 2018
29
0
10
20
30
40
50
60
70
80
90
100
Pric
e ($
MW
h)
Hour Ending
Regulation Up
Regulation Down
Responsive Reserve
Non Spinning Reserve
DAM Power Balance Price(System Lambda)
Ancillary Service prices reflect the opportunity cost of energy
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
30
0
20
40
60
80
100
120
140
160
Pric
e ($
MW
h)
Hour Ending
RTSPP - LZ West
RTSPP - LZ North
RTSPP - LZ South
RTSPP - LZ Houston
DASPP - LZ West
DASPP - LZ North
DASPP - LZ South
DASPP - LZ Houston
Prices reflect relative transmission congestion and system scarcity
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
31
0
20
40
60
80
100
120
Pric
e ($
MW
h)
Hour Ending
RTSPP - Hub AverageDASPP - Hub Average
Energy prices reflect the risk premium between Day-Ahead amp Real-Time
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
DRUC Monthly Summary (Hourly Average) ndash June 2018
32
0
15000
30000
45000
60000
75000
90000
MW
h
Hour Ending
Self Scheduled Capacity
Self Scheduled Ancillary Service Limit
Load Forecast
DRUC Recommended Capacity
30 executions (0 missed)0 published after 16008 minutes average execution time0 Resources committed
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
33
$00
$02
$04
$06
$08
$10
0
200
400
600
800
1000
1200
1400
RTO
RD
PA ($
MW
h)
MW
h
Hour Ending
720 executions (0 missed)6 minutes average execution time5 Resources committed through HRUC or by a Verbal Dispatch Instruction3 Resources decommited through HRUC or by a Verbal Dispatch Instruction
The dotted line indicates the average RTORDPA
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
NonndashSpinning Reserve Service Deployment ndash June 2018
34
Deployment Start Time
Deployment End Time
Deployment Duration (Hours)
Max Deployment(MW) Reason
NA
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
CRR Price Convergence ndash June 2018
0
50
100
150
200
250
Mill
ions
$
Cost Value
Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market
35
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Daily Average System Lambda and ORDC Price Adders ndash June 2018
0
40
80
120
160
200
240
$M
Wh
Day of Month
RTOFFPA
RTORPA
SystemLambda
36
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
ERS Procurement for June 2018 ndash September 2018
TP1 TP2 TP3 TP4 TP5 TP6
Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138
Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394
Weather-Sensitive ERS-10 MW 0 0 0 0 0 0
Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0
Total MW Procured 897426 947555 857703 777625 911852 808532
Clearing Price $201 $185 $2108 $2177 $199 $225
Time Period Time Period Hours
Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays
Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays
Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays
Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays
Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours
37
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Reliability Services ndash June 2018
Reliability Unit Commitment (RUC) $ in Millions
RUC Make-Whole Payments $000
RUC Clawback Charges $000
RUC Commitment Settlement $000
RUC Capacity Short Charges $000
RUC Make-Whole Uplift $000
RUC Commitment Cost Allocation $000
RUC Decommitment Payments $000
Total RUC Allocation to Load $000
In June 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $236M in May 2018bull A credit of $016M in June 2017
38
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Ancillary and Other Services ndash June 2018
Ancillary and Other Services $ in Millions
Regulation Up Service $160
Regulation Down Service $055
Responsive Reserve Service $1287
Non-Spinning Reserve Service $440
Black Start Service $060
Voltage Services - Reactive Power $000
Voltage Services - Lost Opportunity $000
Total Charges Allocated to Load $2001
In June 2018 Ancillary and Other Services was a charge of $2001M compared to bull A charge of $4808M in May 2018bull A charge of $1840M in June 2017
39
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
In June 2018 Real-Time Ancillary Service Imbalance was a charge to load of $147K compared to bull A charge of $3734K in May 2018bull A charge of $592K in June 2017
Real-Time Ancillary Service Imbalance $ in Thousands
Real-Time AS Imbalance ($147)
Real-Time Reliability Deployment AS Imbalance $000
Total RTASI Amount Allocated to Load $147
40
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Energy Settlement ndash June 2018
41
Day-Ahead Market Energy Settlement $ in Millions
Energy Purchases $76400
Point to Point Obligation Purchases $15513
Energy Sales ($73592)
Day-Ahead Congestion Rent $18322
Day-Ahead Market Make-Whole Payments ($001)
Real-Time Market Energy Settlement $ in Millions
Energy Imbalance at a Resource Node ($58156)
Energy Imbalance at a Load Zone $113393
Energy Imbalance at a Hub ($40006)
Net Real-Time Energy Imbalance $15231
Real Time Congestion from Self Schedules $014
Block Load Transfers and DC Ties ($1021)
Total Impact to Revenue Neutrality $14225
Load-Allocated Emergency Energy Payments ($012)
Load-Allocated Base Point Deviation Charges $031
Day-Ahead Market energy settlement activity decreased from last month and increased from June 2017
Real-Time Market energy settlement activity increased from last month and increased from June 2017
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Congestion Revenue Rights (CRR) ndash June 2018
$ in Millions
Annual Auction ($3603)
Monthly Auction ($1374)
Total Auction Revenue ($4977)
Day-Ahead CRR Settlements ($19051)
Day-Ahead CRR Short-Charges $1652
Day-Ahead CRR Short-Charges Refunded ($1652)
Day-Ahead CRR Short-Charges Net $000
Total CRR Funding ($19051)
Day-Ahead Point-to-Point Obligations $15513
Real-Time Point-to-Point Obligations ($17271)
Net Point-to-Point Obligations ($1758)
Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund
Point to Point Obligations settled with a net credit of $1758M compared to a net credit of $3322M last month
42
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
CRR Balancing Account Fund ndash June 2018
CRR Balancing Account $ in Millions
Monthly Day-Ahead Congestion Rent $18322
Monthly Day-Ahead CRR Settlements ($19051)
Monthly Day-Ahead CRR Short -Charges $1652
CRR Balancing Account Credit Total $923
Beginning Fund Balance for the Month $1000
CRR Balancing Account Credit Total $923
Day-Ahead CRR Short-Charges Refunded ($1652)
CRR PTP Option Award Charges $004
Load-Allocated CRR Amount $000
Total Fund Amount $275
43
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Revenue Neutrality ndash June 2018
Revenue Neutrality $ in Millions
Real-Time Energy Imbalance $15231
Real-Time Point to Point Obligation ($17271)
Real-Time Congestion from Self-Schedules $014
DC Tie amp Block Load Transfer ($1021)
Allocation to Load $3046
In June 2018 the Revenue Neutrality charge to load was $3046M compared to bull A charge of $1840M in May 2018bull A charge of $1036M in June 2017
44
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Net Allocation to Load ndash June 2018
Market-Based Allocation $ in Millions
Reliability Unit Commitment $000
Ancillary and Other Services $2001
Real-Time Ancillary Service Imbalance $015
Emergency Energy $012
Base Point Deviation ($031)
CRR Auction Revenue ($4977)
CRR Balancing Account $000
Real-Time Revenue Neutrality $3046
Reliability Must Run $000
Monthly Block Load Transfer $000
Total $067
Fee AllocationERCOT Administrative Fee $2085
Net Allocated to Load $2152
In June 2018 the Net Allocation to load was a charge of $2152M compared to bull A charge of $1507M in May 2018bull A credit of $1322M in June 2017
45
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Advanced Meter Settlement Impacts ndash June 2018
June 2018 At month end settling 71M ESIIDs using Advanced Meter data
June 2018 989 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)
46
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJune 2018
47
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
48
Transaction Type June 2018 June 2017 June 2018 June 2017
Switches 547983 533241 109653 108784
Acquisition 0 0 0 0
Move - Ins 1396915 1315793 257125 257759
Move - Outs 684760 675706 125861 133582
Continuous Service Agreements (CSA) 355727 227489 62083 43745
Mass Transitions 9033 0 0 0
Total 2994418 2752229 554722 543870
Year-To-Date Transactions Received
Board Presentation Input
Trans Volumes by Month_New
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Retail Transactions Summary
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
Grand total
814_01 - Switch
Received
109653
96828
81291
95159
76119
88933
60560
77860
78096
79502
84134
84059
108784
130828
71769
67845
66875
87140
66556
56202
64452
67323
86656
82923
86376
75323
70300
76235
68057
63954
61486
52887
65276
70342
81674
91211
102661
86229
81255
79997
73394
72885
71072
67080
110465
175164
89677
99568
101490
111077
91983
93887
71130
86953
69691
55957
166882
82415
93194
102562
103756
116086
78919
68950
64329
67116
1321827
Difference from previous month
12825
15537
(13868)
19040
(12814)
28373
(17300)
(236)
(1406)
(4632)
75
(24725)
(22044)
59059
3924
970
(20265)
20584
10354
(8250)
(2871)
(19333)
3733
(3453)
11053
5023
(5935)
8178
4103
2468
8599
(12389)
(5066)
(11332)
(9537)
(11450)
16432
4974
1258
6603
509
1813
3992
(43385)
(64699)
85487
(9891)
(1922)
(9587)
19094
(1904)
22757
(15823)
17262
13734
(110925)
84467
(10779)
(9368)
(1194)
(12330)
37167
9969
4621
(2787)
814_16 - Move - Ins
Received
257125
244431
225380
224289
215281
230409
238340
207921
236397
244511
258046
252360
257759
237611
197865
217962
201984
202612
196236
201714
220958
231999
268781
241844
247481
214383
199804
218245
212474
193716
189862
181098
215908
229405
248124
263233
247089
208166
207932
215950
197765
198025
193973
178624
226283
231418
243482
251957
233679
223201
258649
214724
208160
207059
172981
178671
233469
216550
255967
249114
220397
216982
204412
197200
191955
194507
3162148
Difference from previous month
12694
19051
1091
9008
(15128)
(7931)
30419
(28476)
(8114)
(13535)
5686
(5399)
20148
39746
(20097)
15978
(628)
6376
(5478)
(19244)
(11041)
(36782)
26937
(5637)
33098
14579
(18441)
5771
18758
3854
8764
(34810)
(13497)
(18719)
(15109)
16144
38923
234
(8018)
18185
(260)
4052
15349
(47659)
(5135)
(12064)
(8475)
18278
10478
(35448)
43925
6564
1101
34078
(5690)
(54798)
16919
(39417)
6853
28717
3415
12570
7212
5245
(2552)
814_24 - MVO and MVO to CSA
Received
125861
124403
113795
108753
100127
111821
144987
100830
116519
129103
128104
127073
133582
127218
102055
111459
100285
101107
96289
100578
109493
114094
133170
122932
129025
118022
103789
109278
103747
96628
99552
96214
109578
117949
123894
133905
133855
114675
108275
108859
94864
98233
97901
89578
111857
115918
121662
131607
126785
119107
107956
107266
99428
104273
93385
93977
115469
115524
129594
135196
121446
120049
111598
106467
102429
104399
1660500
814_10 - DTP Mass Acquisition
Received
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_10 - DTP Mass Transition
Received
- 0
9033
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
639
- 0
- 0
4975
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
814_18 - CSA AdditionDeletes
Received
62083
99016
55581
46720
42587
49740
47725
31726
52888
41597
40616
55770
43745
52139
26702
21791
39082
44030
38884
39856
31786
33061
42622
48489
64178
50499
59475
59400
48536
42179
40351
34796
34420
54677
35078
49489
59611
39384
44247
44577
35386
40420
54831
43550
45039
44268
40405
57954
64408
65032
80184
70310
41156
34811
46680
50347
71847
48606
52585
50867
62747
59763
34925
40977
40389
41227
747237
Total
554722
573711
476047
474921
434114
480903
491612
418337
483900
494713
510900
519262
543870
547796
398391
419057
408226
434889
397965
398350
426689
446477
531229
496188
527060
458227
433368
463158
432814
396477
391251
364995
425182
472373
488770
537838
543216
448454
441709
449383
401409
409563
417777
378832
493644
566768
495865
541086
526362
523392
538772
486187
419874
433096
382737
378952
587667
463095
531340
537739
508346
512880
429854
413594
399102
407249
6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date
Transactions Received
Transaction Type
June 2018
June 2017
June 2018
June 2017
Switches
547983
533241
109653
108784
Acquisition
0
0
0
0
Move - Ins
1396915
1315793
257125
257759
Move - Outs
684760
675706
125861
133582
Continuous Service Agreements (CSA)
355727
227489
62083
43745
Mass Transitions
9033
0
0
0
Total
2994418
2752229
554722
543870
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
PUBLIC
Retail Transaction Volumes ndash Summary ndash June 2018
SwitchesAcquisitions Move-Ins
Move-Outs Mass Transition
49
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
Projects Report
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline
Phase FinishApproved
Phase FinishScheduled
Go-Live DateScheduled
Phase Finish
183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral
12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs
NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions
662018 6272018 6272018 TBD 6272018 0 0
Schedule Health Budget Health
20000000$ 2018 Portfolio
Spending Estimate
Projects In FlightOn Hold (Count = 96) 23455478$
Projects Not Yet Started (Count = 14) 1033777$
Projects Completed (Count = 35) 684997$
(5174252)$
TOTAL 20000000$
Project Number Projects in Initiation Phase (Count = 3)
288-01 EDI Map and Translator Replacement287-01 Security Constrained Unit Commitment (SCUC)134-02 Privileged Account Management (PAM) Phase 2
Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99
Spending Reductions Required to Maintain Capital Budget
2018 Project Funding
Footnotes1 - One or more phases took longer than expected resulting in additional time required
2 - One or more phases required more labor than expected resulting in additional funding andor time required
3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project
51
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number Projects in Execution Phase (Count = 38) Phase Start Baseline Go-
Live DateApproved Go-
Live DateScheduled
Go-Live DateScheduled
Phase Finish
NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs
NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs
NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs
NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups
592018 892018 892018 892018 952018 0 17
NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 -1SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 1222018 TBD TBD 0 NA See 181-01
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018Project Number Projects On Hold (Count = 4) Forecast
Project Number Expedited Projects Completed (Count = 16)
Budget HealthSchedule Health
Budget HealthSchedule Health
54
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Slide Number 50
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
ERCOT Portfolio Stoplight Report ndash June 2018
PUBLIC
ERCOT Portfolio Stoplight Report ndash June 2018
Project Number 2018 Projects Not Yet Started (Count = 14) Forecast
Start Date
SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation Jun-2018RRGRR015 Additional Guidance for Transformer and Station Data Jul-2018RRGRR016 Additional Guidance for Solar Data Jul-2018NPRR842 Study Area Load Information Jul-2018SCR794 Update SCED Limit Calculation Aug-2018
TBD Additional Branch Limit for Relays Aug-2018NPRR817 Create a Panhandle Hub Oct-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR858 Provide Complete Current Operating Plan (COP) Data Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018
SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators
Oct-2018
TBD 2018 OS Enhancements Oct-2018ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018
55
Slide Number 1
Slide Number 2
Summary ndash June 2018
Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash June 2018
Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash June 2018
ERCOTrsquos CPS1 Monthly Performance ndash June 2018
Monthly Peak Actual Demand ndash June 2018
Monthly Minimum Actual 15-Minute Demand ndash June 2018
Day-Ahead Load Forecast Performance ndash June 2018
Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash June 2018
Generic Transmission Constraints (GTCs) ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Advisories and Watches ndash June 2018
Lake Levels Update ndash July 1 2018
Planning Summary ndash June 2018
Mapping of Counties to ERCOT Zones ndash June 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Cumulative MW Capacity of Interconnection Requests by Zone ndashJune 2018
Wind Generation ndash June 2018
Solar Generation ndash June 2018
Generation Interconnection Activity by Fuel ndash June 2018
Generation Interconnection Activity by Project Phase ndash June 2018
Slide Number 25
Day-Ahead Schedule (Hourly Average) ndash June 2018
Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) - June 2018
DAM and RTM Price Convergence ndash June 2018
Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash June 2018
Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash June 2018
DRUC Monthly Summary (Hourly Average) ndash June 2018
HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash June 2018
NonndashSpinning Reserve Service Deployment ndash June 2018
CRR Price Convergence ndash June 2018
Daily Average System Lambda and ORDC Price Adders ndash June 2018
ERS Procurement for June 2018 ndash September 2018
Reliability Services ndash June 2018
Ancillary and Other Services ndash June 2018
Real-Time Ancillary Service Imbalance (ORDC) ndash June 2018
Energy Settlement ndash June 2018
Congestion Revenue Rights (CRR) ndash June 2018
CRR Balancing Account Fund ndash June 2018
Revenue Neutrality ndash June 2018
Net Allocation to Load ndash June 2018
Advanced Meter Settlement Impacts ndash June 2018
ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018
Retail Transaction Volumes ndash Summary ndash June 2018