Transcript of Equipment Selection Program Print Out! Then Follow it!!
![Page 1: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/1.jpg)
Equipment Selection Program
Print Out! Then Follow it!!
![Page 2: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/2.jpg)
1. Load New Project
2. Select the region
3. Mode Selection (C/O, H/P)
4. File name to save
![Page 3: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/3.jpg)
1. Unit Selection
2. Input ValuesFloor, Room, Dimension, Loads/sq.m
![Page 4: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/4.jpg)
1. “Building” is the highest position -> Floor -> Room2. Want to revise room data, dispose the cursor on the “Building” and click the right mouse button
2. Zoom Out
3. Zoom In 3. Full Screen
![Page 5: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/5.jpg)
1. Geometric diagram
2. Text Input
3. Dummy
4. Y-joint
5. Drain joint 6. Distribution Kit
7. Drainage Hole
8. Up/Down Floor
9. Refrigerant Piping
10. Drainage Piping
12. Parts List
11. Orientation
13. Equipment List
14. Screen Save
![Page 6: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/6.jpg)
1. At first, select the equipment then its background color turns yellow.
2. Click the left mouse button on the right side screen
![Page 7: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/7.jpg)
1. Double-click on the symbol of Equipment
2. Add or Erase the options, capacity, mode
3. Modified options are recorded in DB file
and they keep the same information.
![Page 8: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/8.jpg)
1. Drop all the equipments & Y-joint2. First, select a indoor unit (or outdoor unit) then drag the line to a edge of Y-joint symbol. Then pipe size and Y-joint size will appear.3. As for a beginner, make sure to enlarge the symbol which only senses the edge points. When the connection is done properly, the size will occur.
![Page 9: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/9.jpg)
1. The symbols of Y-joint and drainage joint have the same
properties. (rotate, resize, object connection)
![Page 10: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/10.jpg)
1. Drainage piping is the same as refrigerant piping.
2. When piping more than 2 indoor units, drainage joint
should be equipped.
![Page 11: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/11.jpg)
1. Symbol to connect the pipe between the floors.2. The symbols are linked internally.3. When removing any of symbols at a certain floor, make sure that the symbol linked to the other floor becomes unidentified.
![Page 12: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/12.jpg)
![Page 13: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/13.jpg)
1. After finishing all connections, generate the list of equipment.
![Page 14: Equipment Selection Program Print Out! Then Follow it!!](https://reader035.fdocuments.in/reader035/viewer/2022062401/5a4d1b927f8b9ab0599c1969/html5/thumbnails/14.jpg)
1. Equipment list can be saved in EXCEL mode.2. To change the screen, select the window
menu.