Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

download Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

of 60

Transcript of Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    1/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    29

    31

    32

    33

    35

    36

    38

    39  

    CORRODED MEMBERS IN THE BOOM & JIB

    CONDITION OF TELECOPIC CYLINDERCONDITION OF SHEAVES

    CONDITION OF WEDGE SOCKET &TERMINATIONand DEAD END WIRE GRIPS ( both )

    BOOM HOIST LINE SIZE (As per manufactured)

    CONDITION OF BOOM HOIST

    CONDITION OF HOIST SLIDE PAD (OR) ROLLER

    BOOM STOP (BOOM LIMIT ANGLE INDICATOR)

    CONDITION OF WIND SHIELD AND WIPER

    HEAD LIGHT AND INDICATOR

    CONDITION OF DOOR'S AND LOCK

    CONDITION OF SEAT BELT (both side)

    CONDITION OF BOOM ELEVATION

    (IF GREASE SHOULD BE REMOVE)

    37

    34

    30

    CONDITION OF BODY

    28

    CONDITION OF METERS & GAUGES

    OPERATOR MANUAL

    WIND VELOSITY DEVICE (Anemometer)

    CONDITION OF OPERATION JOY STICK

    CONDITION OF BACKUP ALARM

    OPERATOR CABIN

    CONDITION OF HOOK BLOCK,WHIPLINE HOOK ANDCAPACITY SWL MARKING AND SAFETY LATCHS (BOTH)

    MAKE

    CAPACITY

    BOOM LENGTH

    SUB - CONTRACTOR

    EQUIPMENT PLATE NUMBER

    WIRING AND HARNESS

    INSPECTION DESCRIPTION

    CONDITION OF OPERATOR SUN ROOF AND WIPER

    CONDITION OF STEERING AND PUMP

    27

    CONDITION OF BRAKE AND CLUTCH

    CONDITION OF BOOM TELESCOPING

    FIRE EXTINGUISHERS (10 BC-Asme B30.5)

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

    INITIAL CHECK LIST FOR CRANE

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    S =satisfactory U =unsatisfactory COMMENTS

    EQUIPMENT INSPECTION LOCATION

    CONDITON OF BYPASS CONTROL (Incase of emergency)

    LOAD RATING CHART

    CONDITION OF SWING BRAKE

    PARKING BRAKE (ELECTRONIC / MANUAL)

    SIGHT / SPIRIT / TILT LEVEL (BUBBLE LEVEL)

    CONDITION OF TYRE,WHEEL FRONT AND REAR

    CONDITION OF SIDE MIRROR

    CONDITION OF HORN

    CONDITION OF WARNING LIGHTS AND DECALS

    INSPECTION DATE

    Inspection Standared From Asme B 30.5 and Manufaturer's manual

     YEAR OF MANUFATURE

    ( Load Monitoring and Indicating systems )

    CONDITION OF MOUNTED SLEWING,RING AND GEAR

    CONDITION OF RATED CAPACITY INDICATOR

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    BOOM

    CONTINUE …….

    RATED CAPACITY INDICATOR SYSTEM

    CONDITION OF BOOM AND DEFORMED ,CRACKED ,

    CONDITION OF ANTI - TWO - BLOCK DEVICE

    Page.1 to 2

    :-

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    2/60

    S.NO S U N/A COMMENTS

    40

    41

    42

    43

    44

    46

    47

    48

    49

    50

    51

    52

    54

    55

    56

    57

    58

    59

    60

    61

    62

    63

    64

    65

    66

    67

    68

    69

    70

    71

    72

    73

    74

    75

    76

    77

    78

    79

    80

    81

    82

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF OUT RIGGER SLIDING ARMS

    ,ZIM,JACK AND FLOAT

    OUT RIGGER ARMS SAFETY LOCK PIN

    CONDITION OF OUT RIGGER SLIDING ARMS CYLINDER

    HYDRAULIC HOLDING VALVE'S

    OIL LEAKS

    CONDITION OF ENGINE START

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF LIFTING CYLINDER PIN

    CONDITION OF SWING LOCK (electronic / manual)

    WIRE ROPE DRUM

    CONDITION OF OUT RIGGER LEVERS AND SIGHT / SPRITLEVEL /TILT

    CONDITION OF WIRE ROPE DRUM LINER BRAKE

    CONDITION OF HYDRAULIC OIL FLUID AND LEVEL

    CONDITION OF BOOM EXTENSON & FLY JIB - PIN

    ( Automatic stop 2 Wraps )45

    CONDITION OF WIRE ROPE DRUM & GROVE

    CONDITION OF DRUM SPOOLING AND GUIDE

    CONDITION OF BOOM HINGE PIN

    CONTINUE …….

    CONDITION OF WINCH DRUM MIRROR

    CONDITION OF AIR FILTER

    TRANS & ENG.MOUNTS

    UNDERCARRIAGE

    RELATED TO BOOM

    53

    HYDRAULIC OIL HOSES

    OUT RIGGER BEAMS

    CONDITION OF OUT RIGGER PAD

    DEFORMED ,CRACKED OR CORRODED MEMBERS IN THESTRUCHER

    CONDITION OF DISK BRAKE CHAMBER AND DRYER

    CONDITION OF STERING CYLINDER,RACK ARM AND REARAXLE ADJUSTER

    LEAKS

    WHEEL CYLINDER SUSPENSION OR LEAF ,U -bolts and Nuts

    PROPELLER SHAFT,HOUSING DIFFERENTIAL AND AXLE

    CONDITION OF HYDRAULIC SWIVEL and HOSES

    CONDITION OF CHASSIS

    ENGINE COMPONENT

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF HOIST- LIMIT SWITCH

    CONDITION OF AXLE LOCK

    CONDITION OF DRUM MOTOR (upnormal sound)

    CONDITION OF HYDRAULIC OIL HOSE'S

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF ENGINE BELT

    CONDITION OF FRONT JACK

    OIL LEAKS

    CONDITION OF ENGINE

    CONDITION OF SUSPENSION and WHEEL LOCK

    INSPECTED BY

    Page. 2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    3/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    28

    31

    32

    33

    34

    35

    36

    38

    39

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    EQUIPMENT PLATE NUMBER

    CONDITION OF SEAT BELT (both side)

     CONDITION OF TELECOPIC CYLINDER

    EQUIPMENT INSPECTION LOCATION

    Inspection Standared from Asme B30.5 and Manufacturer's Manual

    DATE OF INSPECTION

    BOOM

    LOAD RATING CHART

    CONDITION OF HOIST SLIDE PAD (OR) ROLLER

    RATED CAPACITY INDICATOR SYSTEM

    CONDITION OF SHEAVES

    30

    SELF SAFETY SPELTER (swage) BUTTON AND LOCK

    BOOM HOIST LINE SIZE (As per manufactured)

    CONDITION OF BOOM HOIST

    ( Load Monitoring and Indicating systems )BOOM STOP (BOOM LIMIT ANGLE INDICATOR)

    CONDITION OF SWING BRAKE

    CONDITION OF BODY

    CONDITION OF DOOR AND LOCK

    CONDITION OF SWING PEDAL / AUTOMATIC BRAKE

    37

    CONDITION OF HOOK BLOCK,WHIPLINE HOOK ANDCAPACITY SWL MARKING AND SAFETY LATCHS (BOTH)

    CONTINUE …….

    CONDITION OF WIND SHIELD AND WIPER

    INSPECTION DESCRIPTION

    CONDITION OF WARNING LIGHT AND DECALS

    CORRODED MEMBERS IN THE BOOM & JIB

    CONDITION OF BOOM AND DEFORMED ,CRACKED,

    OPERATOR'S MANUAL

    CONDITION OF WEDGE SOCKET &TERMINATION

    and DEAD END WIRE GRIPS ( both )

    CONDITION OF ANTI -TWO- BLOCK DEVICE

    29

    CONDITION OF STEERING AND PUMP

    CONDITION OF HORN

    CONDITION OF BOOM ELEVATION AND TELESCOPING

    CAPACITY

    BOOM LENGTH

    SUB - CONTRACTOR

    INITIAL CHECK LIST FOR CRANE

    FIRE EXTINGUISHERS (10 BC-Asme B30.5)

    PARKING BRAKE (ELECTRONIC & MANUAL)

    CONDITION OF OPERATION JOY STICK

    CONDITION OF BYPASS CONTROL (Incase of emergency)

    CONDITION OF WIRING AND HARNESS

    26

    HEAD LIGHT AND INDICATORS

    SAUDI ELASTOMERS PROJECT

    CONDITION OF BACKUP ALARM

    CONDITION OF OUT RIGGER TOUCH DISPLAY

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    MAKE

    S =satisfactory U =unsatisfactoryCOMMENTS

    CONDITION OF WINDSHIELD AND SUN ROOF WIPER

    CONDITION OF BRAKE AND CLUTCH

     YEAR OF MANUFATURE

    CONDITION OF TYRE,WHEEL FRONT AND REAR

    CONDITION OF SIDE MIRROR

    OPERATOR CABIN

    CONDITION OF METERS & GAUGES

    ROOF WINDOW WIPER AND WASHER

    27

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    (IF GREASE SHOULD BE REMOVE)

    CONDITION OF RATED CAPACITY INDICATOR

    Page.1 to 2

    :-

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    4/60

    S U N/A

    40

    41

    42

    43

    44

    45

    46

    48

    49

    50

    51

    52

    53

    54

    56

    57

    58

    59

    60

    61

    62

    65

    66

    6768

    69

    70

    71

    72

    73

    74

    75

    76

    77

    78

    79

    80

    81

    82

    83

    84

    85

    86

    87

    88

    89

    47

    CONDITION OF AIR FILTER

    S =satisfactory U =unsatisfactory

    CONDITION OF HYDRAULIC PRESSOR MOTOR HOSE OIL

    LINES

    CONDITION OF LIFTING CYLINDER PIN

    CONDITION OF HYDRAULIC SWIVEL AND HOSES

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE BELT

    INSPECTED BY

    CONDITION OF COUNTER WEIGHT LIFT MOTOR ANDSENSOR

    64

    CONDITION OF HYDRAULIC OIL FLUID & LEVEL

    CONDITION OF COUNTER WEIGHT SUPPORT PINS

    CONDITION OF WINCH DRUM MIRROR

    CONDITION OF DRUM & CLUTCH WHEEL(upnormal sound)

    CONDITION OF HYDRAULIC OIL HOSE

    CONDITION OF STERING CYLINDER AND SUPPORT RACKARM AND REAR AXLE ADJUSTER

    WHEEL SUSPENSION OR SPRING LEAF AND FITTINGS

    PROPELLER SHAFT & DIFFERENTIAL ,AXLE AND HOUSING

    CONDITION OF SWING LOCK (electronic or manual)

    CONDITION OF GYUING SYSTEM FOR TELESCOPIC

    COMMENTS

    CONDITION OF " A " FRAME & WIRE ROPE

    CONDITION OF HOIST-LIMIT SWITCH

    CONDITION OF ENGINE OIL FILTER

    OUT RIGGER ARMS SAFETY LOCK PIN

    HYDRAULIC OIL HOSE AND LEAK

    CONDITION OF OUT RIGGER PAD

    CONDITION OF CHASSIS

    LEAKS

    CONDITION OF COUNTER WEIGHT HOIST LINE

    CONDITION OF BOOM HINGE PIN

    CONDITION OF COUNTER WEIGHT SUPPORT PINS

    CONDITION OF LUFFING JIB AND RAM

    OUT RIGGER SLIDING ARMS CYLINDER

    ZIM,JACK AND FLOAT

    CONDITION OF HOLDING VALVES

    CONDITION OF OUT RIGGER CONTROL

    WIRE ROPE DRUM

    CONDITION OF LATTICE FLY JIB

    CONDITION OF TELESCOPIC CYLINDER (RAM) & PIN

    OUT RIGGER

    CONDITION OF WINCH DRUM & GROVE

    CONDITION OF HYDRAULIC OIL HOSE'S

    CONTINUE …….

    CONDITION OF DRUM SPOOLING AND GUIDE

    (WINCH DRUM) HAND RAIL,PLATFORM AND LOCKS

     BOOM " Y"

    CONDITION OF BOOM EXTENSON & FLY JIB- PIN

     BOOM STOP (BOOM LIMIT ANGLE INDICATOR)

    RELATED TO BOOM

    UNDERCARRIAGE

    DEFORMED ,CRACKED OR CORRODED MEMBERS IN THESTRUCHER

    CONDITION OF DISK BRAKE AND BOOSTER

    55

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF RADIATOR AND COOLENT LEVEL

    ( Automatic brake) Remaining wire ropes2 Wraps

    INDICATING AND LEVEL AND REMOT

    CONDITION OF ENGINE

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF OUT RIGGER SLIDING ARMS

    63

    CONDITION OF ENGINE OIL LEVEL AND LEAK

    ENGINE COMPONENT

    CONDITION OF ENGINE START

    TRANS & ENG.MOUNTS

     

    Page.2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    5/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    16

    18

    19

    20

    22

    23

    24

    25

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    CONDITION OF BYPASS CONTROL(Incase of emergency)

    LATTICE BOOM AND TELECOPIC CYLINDER

    CONDITION OF HYDRAULIC OIL FLUID AND LEVEL

    S =satisfactory U =unsatisfactory

    CONDITION OF WEDGE SOCKET &TERMINATION

    CONDITION OF BOOM HOIST

    CONDITION OF BOOM HOIST MECHANISM

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    DEFORMED ,CRACKED OR CORRODED MEMBERS IN THEBOOM & JIB

    (IF GREASE SHOULD BE REMOVE)

     

    CONDITION OF GAUGES AND METERS

    14

    Inspection Standared from Asme B30.5 and Manufacturer's Manual

     INITIAL CHECK LIST FOR CRAWLER CRANE

    ROOF WINDOW WIPER AND WASHER

    OPERATOR CABIN

    INSPECTION DESCRIPTION

     YEAR OF MANUFATURE

    CONDITION OF WIND SHIELD AND WIPER

    (Rear, latice boom and wire rope drum)

    FIRE EXTINGUISHERS (10 BC-Asme B30.5)Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    CONDITION OF SHEAVES

    BOOM

    ( Load Monitoring and Indicating System )

    EQUIPMENT INSPECTION LOCATION

    LOAD RATING CHART,REPAIR AND OPERATION MANUAL

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    COMMENTS

    CONDITION OF METERS & GAUGES

    SIDE MIRROR

    CONDITION OF HORN

    CAPACITY

    26

    SELF SAFETY BUTTON SPELTER SOCKET AND LOCK

    RATED CAPACITY INDICATOR (OVER LOAD)

    CONDITION OF MOUNTED SLEWING,GEAR RING AND GEAR

    LATTICE BOOM LENGTH

    17

    15

    CONTINUE …….

    CONDITION OF DOOR AND LOCK

    HYDRAULIC OIL LEVEL

    BOOM HOIST LINE SIZE (As per manufactured)

    CONDITION OF BOOM HINGE (FOOT) PIN

    CONDITION OF ANTI - TWO - BLOCK DEVICE

    21

     BOOM STOP (BOOM LIMIT ANGLE INDICATOR)

    WIND VELOSITY DEVICE (Anemometer)

    AND DEAD END WIRE GRIPS ( both )

    EQUIPMENT NUMBER

    SAUDI ELASTOMERS PROJECT

    CONDITION OF HOOK BLOCK,WHIPLINE HOOK ANDCAPACITY SWL MARKING AND SAFETY LATCHS (BOTH)

    CONDITION OF HYDRAULIC OIL HOSE'S

    CONDITION OF WARNING LIGHT AND DECALS

    DATE OF INSPECTION

    REAR SIDE CAMERA VISIBLE

    MAKE

    RATED CAPACITY INDICATOR SYSTEM

    CONDITION OF SEAT BELT

    CONDITION OF DOOR LOCK

    BOOM HOIST

    SUB - CONTRACTOR

    CONDITIO OF 4 CAMERA VISIBLE

    OPERATOR CABIN

    CONDITION OF RATED CAPACITY INDICATOR

    Page. 1 to 2

    :-

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    6/60

    S U N/A

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    53

    54

    55

    56

    57

    58

    59

    60

    61

    62

    64

    65

    66

    67

    68

    69

    70

    71

    72

    73

    74

    75

    OIL LEAK

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF WINCH DRUM'S AND BRAKE ANDGUIDE,GROVE

    CONDITION OF RADIATOR & COOLENT LEVEL

    INSPECTED BY

    DEFORMED ,CRACKED OR CORRODED MEMBERS IN THESTRUCHER

    CONDITION OF BATERY AND TERMINAL

    S =satisfactory U =unsatisfactory

    PENDENT MAST (GANTRY)

    COMMENTS

    63

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF ENGINE BELT

    CONDITION OF ENGINE START

    CONDITION OF AIR FILTER

    TRACK SUSPENSION

    WIRE ROPE DRUM

    CONDITION OF DRUM SPOOLING AND GUIDE

    CONDITION OF WINCH DRUM MIRROR OR CAMERA

    CONDITION OF DRUM & CLUTCH WHEEL(upnormal sound)

    ROLLER FRAME

    ENGINE COMPONENT

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE

    CONDITION OF HYDRAULIC OIL HOSE

    BACK STAY PENDENT & PINS

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF LUFFING JIB

    CONDITION OF LATTICE BOOM

    CONDITION OF SUPER LIFT ATTACHMENTSand HOIST LINE

    TRACK PAD PINS

    CONDITION OF HYDRAULIC OIL FLUID & LEVEL

    CONDITION OF COUNTER WEIGHT SUPPORT PINS

    WINCHES AND BRAKE

    GUIDE / ROLLERS

    TRACK PAD BACK SPINAL DRIVE

    TRACK PAD FRONT DRIVE

    GANTRY & SHEAVES

    JIB & PINS

    FORESTAY PENDENT & PINS

    CONTINUE …….

    RELATED TO BOOMS.NO

    CONDITION OF COUNTER WEIGHT HOIST LINE

    TRANS & ENG.MOUNTS

    TRACK PAD SUPPORT PIN LOOSE BOLT & NUTS

    CONDITION OF HOIST-LIMIT SWITCH OR SENSOR

    (Automatic brake) (Remaining wire rope minimum 2 Wraps )

    Page.2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    7/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    4

    5

    6

    7

    8

    911

    12

    13

    15

    16

    17

    18

    19

    20

    21

    22

    23

    22

    23

    26

    27

    28

    29

    30

    33

    34

    36

    37

    CONDITION OF FITTINGS

    CONDITION OF HANGER END STOP

    CONDITION OF CABLE TRACK AND JOINT

    CONDITION OF SAFE GUARDS

    CONDTION OF GEARS

    INSPECTED BY

    CONDITION OF TROLLY END SWITCH

    CONDITION OF ANTI-TWO-BLOCK

    CONDITION OF WIRE ROPE

    CONDITION OF WEDGE SOCKET &TERMINATION

    CONDITION OF HOOK BLOCK,(CAPACITY OF SWL MARKING AND SAFETY LATCH )

    CONDTION OF LIMIT SWITCHES AND STOPS

    LOOSE AND BOLTS

    CONDITION OF WEB PLATE and FITTINGS

    CONDITION OF POWER SUPPLY CABLE TROLLEY

    24FIRE EXTINGUISHERS (10 BC-Asme B30.5)

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    SAFETY SWITHCHES

    25

    CONDITION OF BOOM AND DEFORMED ,CRACKED,

    CORRODED MEMBERS IN THE BOOM & JIB

    CONDITION OF STRUCTURAL MEMBER

    CONDITION OF RUNWAY STRUCTURE

    WARNING DEVICES

    SIGN AND LABELS

    ELECTRICAL COMPANENTS

    BRIDGE RAIL AND WHEELS

    TROLLEY AND RUNWAY RAIL

    MOTOR

    CONDITION OF MOTOR ( UNUSUAL SOUND)

    CONDITION OF SHEAVES

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

    INITIAL CHECK LIST FOR OVER HEAD CRANE

    MOTIVE POWER ELECTRICAL EQUIPMENT SERIAL NUMBER

    MAKE

    CAPACITY DATE OF INSPECTIONEQUIPMENT INSPECTION LOCATION

    BOOM LENGTH

    SUB - CONTRACTOR YEAR OF MANUFATURE

    Inspection Standared from Asme B30.5 and Manufacturer's Manual

    S =satisfactory U =unsatisfactoryCOMMENTS

    INSPECTION DESCRIPTION

    :-

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    8/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    2829

    30

    31

    33

    34

    35

    Inspection Standared from Asme B92.5 and Manufacturer's Manual

    CONDITION OF POWER TRACK

    EQUIPMENT NUMBER

    CONDITION OF SWING RING & BEARING

    CONDITION OF TELSCOPIC INSIDE CYLINDER

    CONDITION OF BASE BOOM AND LIFTING CYLINDER ANDPIN

    DATE OF INSPECTION

    CONDITION OF WARNING LIGHT AND ALARM

    CONDITION OF GROUND EMERGENCY LOWERINGMANUAL OPERATING SYSTEM

    CONDITION OF UPRIGHT

    CONDITION OF ARTICULATING JIB CYLINDER

    CONDITION OF ROTATOR

    CONDITION OF PLATFORM CONTROL BOX

    CONDITION OF AXLE MANUAL LEVERS

    CONDITION OF AXLE EXTENDING FRONT AND REAR

    CONTINUE ….

    FIRE EXTINGUISHERS (10 BC-Asme B92.5)

    S =satisfactory U =unsatisfactory

    MAKE

    CONDITION OF SLIDER

    SWL-CAPACITY

    INSPECTION DESCRIPTION

    CONDITION OF GROUND CONTROL SYSTEM

    CONDITION OF WHEEL CYLINDERS AND SUSPENSION

    CONDITION OF SLAVE LEVEL CYLINDER

    DRIVE MOTORS - RIGHT AND LEFT FRONT

    CONDITION OF DRIVE WHEEL (FORWARD)

    BOOM LENGTH

    CONDITION OF STEER WHEEL (REVERSE)

     DRIVE MOTORS - RIGHT AND LEFT REAR

    CONDITION OF PLATFORM OPERATINGMANUAL EMERGENCY LOWERING

    EQUIPMENT INSPECTION LOCATION

    MAN BASKET (PLATFORM)

    CONTROL LABELS (BOTH SIDE)

    BASKET DOOR AND LATCH

    LANYARD AND ANCHORING POINT

    CONDITION OF FLY BOOM

    BOOM

    CONDITION OF FOOT SWITCH

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SUB - CONTRACTOR

    CONDITION OF REAR WHEEL RIGHT & LEFT CYLINDER

    CONDITION OF FRAME

    CONDITON OF BODY

     YEAR OF MANUFACTURE

    COMMENTS

    CONDITON OF STRUCTURE

    SAUDI ELASTOMERS PROJECT

    INITIAL CHECK LIST FOR MAN LIFT (ARTICULATING)

    CONDITION OF UPRIGHT LEVEL CYLINDER

    ROTARY COUPLER

    AXLE (OUT RIGGER) MANUAL EXTENDING

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    32

    CONDITION OF EXTENDABLE AXLES AND SHIM

    CONDITION OF FRONT AND REAR JACK

    :

    :

    :

    :

    :

    :

    :-

    :-

    :-

    :-

    :-

    Page.1 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    9/60

    S.NO S U N/A COMMENTS

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    53

    54

    55

    56

    CONDITION OF RADIATOR & COOLENT LEVEL

    INSPECTED BY

    ENGINE TRANSMISSION AND ENG.MOUNTS

    CONDITION OF ENGINE DRAIN OIL FILTER AND GAUGE

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    BASKET LEVEL (Indicating and Alarm / Indicating Only)

    TILTY CONTROL ( For Ground Level Make Little Tilt at the Same Time Boom UpAutomatic Operation Stop / Indicating and Alarm Will Come)

    HYDRAULIC MANIFOLD / CONTROLS VALVES / HYDRAULICSYSTEM

    CONDITION OF WIRING ELECTRICAL HARNESS

    CONDITION OF SLOPE (TILT) WARNING DEVICE

    CONDITION OF WHIPLINE DRUM MOTOR

    SAFETY SWITCHES

    OVERLOAD FROM BASKET ( if equiped) Most Morethen 30 Mtr Boom LengthAutomatic Stop. Below 30 mtr Alarm / indicating not Automatic Stop)

    SPEED CONTROL (Below 10 Digree Angle Diffrence speed Above 20 Different SpeedYou should know Operate the Man Lift Otherways you cannot find out)

    CONDITION OF HYDRAULIC RETURN FILTER AND GAUGE

    AXLE EXTENSION ( Not All ManLift Morethan 30 Mtr Boom Length WithoutExtension Automatic (10 (Degree Angle) cut )

    CONDITION OF CHASSIS

    OIL LEAK

    INSPECTION DESCRIPTION

    ENGINE COMPONENTS

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF AIR FILTER

    CONDITION OF FUEL OIL LINES

    CONDITION OF BATERY and TERMINAL

    CONTINUE ….

    CONDITION OF ENGINE AND BELT

    0

    0 0

     

    Page. 2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    10/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    39

    40

    41

    CONTINUE ….

    Inspection Standared from Ansi B92.5 and Manufacturer's Manual

    LANYARD AND ANCHORING POINT

    CONDITION OF PLATFORM OPERATING MANUALEMERGENCY LOWERING

    COMMENTSINSPECTION DESCRIPTION

    CONDITION OF FRAME

    CONDITON OF STRUCTURE

    CONDITION OF GROUND CONTROL SYSTEM

    MAKE

    CONDITION OF GROUND EMERGENCY LOWERINGMANUAL OPERATING SYSTEM

    BOOM

    DATE OF INSPECTION

    CONDITION OF SWING & BEARING

    SUB - CONTRACTOR

    BOOM LENGTH

    DRIVE MOTORS - RIGHT AND LEFT REAR

    CONDITION OF BASE BOOM AND LIFTING CYLINDER ANDPIN

    CONDITION OF SLIDER

    CONDITION OF FRONT AND REAR JACK

    FIRE EXTINGUISHERS (10 BC-Asme B92.5)

    CONDITION OF FOOT SWITCH

    MAN BASKET

    POWER EMERGENCY SHUTDOWN SWITCH

    TRAVEL JOY STICK AND HIGH ANDLOW

    CONDITION OF WARNING LIGHT AND ALARM

    CONDITION OF REAR WHEEL LEFT AND RIGHT CYLINDER

    CONDITION OF EXTENDED AXLE & NYLON ZIM

    DRIVE MOTORS - RIGHT AND LEFT FRONT

    CONDITION OF TELSCOPIC INSIDE CYLINDER

    AXLE (OUT RIGGER) EXTENDING FOR MANUAL

    CONDITION OF AXLE MANUAL LEVERS

    CONDITION OF AXLE EXTENDING FRONT AND REAR

    CONDITION OF WIRE ROPE AND ADJUSTEMENT NUTS

    CONDITION OF PLATFORM CONTROL

    CONDITION OF PLAT FORM

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    EQUIPMENT NUMBERMOTIVE POWER DIESEL ENGINE AND HYDRAULIC

     YEAR OF MANUFACTURE

    38

    CONDITION OF BASKET DOOR AND LATCH

    CONTROL STATION DECALS (BOTH SIDE)

    CONDITON OF BODY

    CONDITION OF STEER WHEEL (REVERSE)

    CONDITION OF DRIVE WHEEL (FORWARD)

    CONDITION OF FLY BOOM SECTION

    EQUIPMENT INSPECTION LOCATION

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    S =satisfactory U =unsatisfactory

    INITIAL CHECK LIST FOR MAN LIFT (TELESCOPIC)

    POWER EMERGENCY SHUTDOWN PUSH SWITCH

    CONDITION OF UPRIGHT LEVEL CYLINDER

    CONDITION OF UPRIGHT

    CONDITION OF SLAVE LEVEL CYLINDER

    CONDITION OF ARTICULATING JIB CYLINDER

    CONDITION OF ROTATOR

    CONDITION OF POWER TRACK

    CONDITION OF BOOM LENGTH

    CONDITION OF FLY BOOM RETRACT ADJUSTING NUTS ANDLOCK PLATES

    CONDITION OF OUTER SHEAVE AND CABLE RETAINERBLOCK AND SHIMS

    CAPACITY

    SAUDI ELASTOMERS PROJECT

    :-

    :-

    :-

    :-

    :-

    Page.1 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    11/60

    S.NO S U N/A COMMENTS

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    53

    54

    55

    56

    57

    58

    59

    60

    61

    62

    CONDITION OF HYDRAULIC PUMP AND HOSES

    SPEED CONTROL (Below 10 Digree Angle Diffrence speed Above 20 Different SpeedYou should know Operate the Man Lift Otherways you cannot find out)

    TILTY CONTROL ( For Ground Level Make Little Tilt at the Same Time Boom UpAutomatic Operation Stop / Indicating and Alarm Will Come)

    BASKET LEVEL SENSOR (Indicating and Alarm / Indicating Only)

    CONTINUE ….

    INSPECTION DESCRIPTION

    SAFETY SWITCHES

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF ENGINE

    CONDITION OF BATERY AND TERMINAL

    OIL LEAK

    CONDITION OF RADIATOR & COOLENT LEVEL

    TRACTION MANIPOLD (HYDRAULIC SYSTEM)

    CONDITION OF ENGINE BELT

    INSPECTED BY

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF ENGINE START

    CONDITION OF WIRING AND HARNESS

    CONDITION OF HYDRAULIC SWIVEL AND HOSES

    AXLE EXTENSION ( Not All ManLift Morethan 30 Mtr Boom Length WithoutExtension Automatic (10 (Degree Angle) cut )

    OVERLOAD FROM BASKET ( if equiped) Most Morethen 30 Mtr Boom LengthAutomatic Stop. Below 30 mtr Alarm / indicating not Automatic Stop)

    UNDER CARRIAGE AND ENGINE COMPONENTS

    CONDITION OF AIR FILTER

    TRANS & ENG.MOUNTS

    0

    0 0

    Page.2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    12/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36 LANYARD AND ANCHORING POINT

    Inspection Standared from Ansi B92.5 and Manufacturer's Manual

    POWER EMERGENCY SHUTDOWN SWITCH

    CONDITION OF EMERGENCY STOP BUTTON

    CONDITION OF OSCILLATING AXLE LIMITSWITCHES REAR AXLE (ONLY)

    CONDITION OF CONTROL STATION DECALS

    CONDITION OF GROUND EMERGENCY LOWERINGMANUAL OPERATING SYSTEM

    37

    CONTINUE ….

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    RIGHT REAR

    LEFT FRONT

    CONDITIO OF LOWER SIDE PAD CHANNEL AND PINS

    CONDITION OF GUARD RAILS AND WELDINGS

    CONDITION OF SCISSOR ARMS AND PIVOT PINS

     CONDITIO OF SCISSOR LIFT CYLINDER OIL LEVEL

    RIGHT FRONT

    LEFT REAR

    CONDITION OF STEER DRIVE WHEELS CYLINDER

    CONDITION OF PLATFORM EXTENSION (S)

    CONDITION OF PINS AND RETAINING FASTNERS

    COMMENTS

    CONDITION OF ROTTARY ANGLE SWITCH

    CONDITION OF TILT CONTROL

    SCISSOR CAGE

    FIRE EXTINGUISHERS (10 BC-Asme B92.5)

    EQUIPMENT INSPECTION LOCATION

    INSPECTION DESCRIPTION

    CONDITON OF BODY AND STRUCTURE

    DATE OF INSPECTION

    CONDITION OF JOY STICK

    CONDITION OF DOOR AND LATCH

    CONDITION OF EMERGENCY LOWERING CONTROL

    SCISSOR ARMS

     CONDITIO OF SCISSOR LIFT CYLINDER AND PINS

    CONDITION OF EMERGENCY STOP BUTTON

    CONDITION OF CONTROL SYSTEM DECALS

    EQUIPMENT NUMBER

    CONDITION OF CAGE

    CONDITION OF GROUND EMERGENCY LOWERINGMANUAL OPERATING SYSTEM

    SAUDI ELASTOMERS PROJECT

    HEIGHT

     YEAR OF MANUFACTURE

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    CONDITION OF BATTERY AND COMPARTMENT

    DRIVE MOTOR

    CONDITION OF OUT RIGGER AND INTER LOCK

    CONDITION OF HIGH SPEED CUT OUT LIMIT SWITCH

    CONDITION OF FRAME

    WARNING LIMIT SWITCHES

    MAKE

    CAPACITY

    S =satisfactory U =unsatisfactory

    GROUND CONTROL

    CONDITION OF WARNING LIGHT AND ALARM

    CONDITION OF LIMIT SWITCH (S)

    SUB - CONTRACTOR

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    CONDITION OF OUT RIGGER

    INITIAL CHECK LIST FOR SCISSOR LIFT

    :-

    :-

    :-

    :-

    :-

    Page. 1 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    13/60

    S.NO S U N/A COMMENTS

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    53

    54

    SAFETY SWITCHES

    AXLE EXTENSION ( Not All ManLift Morethan 6 Mtr (18 Mtr Height Scissor Lift)Without Extension Automatic (10 (Degree Angle) cut )

    OVERLOAD (if equiped) Most Morethen (18 Mtr Heigth Scissor Lift) Automatic Stop.Below 30 mtr Alarm / indicating not Automatic Stop)

    SPEED CONTROL ( Below 10 Mtr Diffrence speed Above 20 Mtr Heigth DifferentSpeed You should know Operate the Scissor Lift Otherways you cannot find out Same SpeedReject)

    TILTY CONTROL ( For Ground Level Make Little Tilt at the Same Time Make Height Automatic Operation Stop / Indicating and Alarm Will Come)

    INSPECTION DESCRIPTION

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF AIR FILTER

    CONDITION OF RADIATOR & COOLENT LEVEL

    TRANS & ENG.MOUNTS

    CONDITION OF ENGINE START

    CONDITION OF ENGINE

    INSPECTED BY

    ENGINE COMPONENT

    CONTINUE ….

    CONDITION OF FUEL OIL LINES

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    OUT RIGGER JACK ( Check Out rigger without extension Make Higth Maximum 1mtr extend after Automatic Stop Must be All Jack proper extend not extended Morethan 1 mtr)

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF ENGINE BELT

    OIL LEAK

    Page. 2 to 2

    0

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    14/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    CONDITION OF LANYARD AND ANCHORING POINT

    INSPECTION DESCRIPTION

    CONDITION OF LOWERING WARNING SYSTEM

    CONDITION OF HYDRAULIC OIL LEVEL AND LEAK

     CONDITIO OF SCISSOR LIFT CYLINDER AND PINS

    EQUIPMENT INSPECTION LOCATION

    25

    CONDITION OF SCISSOR ARMS AND PIVOT PINS

    Inspection Standared from Ansi B92.5 and Manufacturer's Manual

    CAPACITY

    CONDITION OF DOOR LATCH AND GUARD RAILS

    CONDITIO OF LOWER SIDE PAD CHANNEL AND PINS

    COMMENTS

    SAUDI ELASTOMERS PROJECT

    INITIAL CHECK LIST FOR ELECTRIC SCISSOR LIFT

    MAKE

    SCISSOR ARMS

    DRIVE MOTOR

    RIGHT FRONT

    RIGHT REAR

    LEFT FRONT

    LEFT REAR

    CONDITION OF CAGE AND ADJUSTABLE

    MOTIVE POWER ELECTRIC POWER EQUIPMENT NUMBER

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    CONDITION OF TILT CONTROL ( 3 degree alarm )

    FIRE EXTINGUISHERS (10 BC-Asme B92.5)

    INSPECTED BY

    CONDITION OF EMERGENCY STOP BUTTONS

    CONDITION OF GROUND EMERGENCY LOWERINGMANUAL OPERATING SYSTEM and CABLE

    CONDITION OF BATTERY AND COMPARTMENT

    CONDITION OF PROXIMITY SWITCHS

    CONDITION OF BRAKE RELEASE KNOB

    SUB - CONTRACTOR

    HEIGHT

    CONDITION OF OUT RIGGER

     YEAR OF MANUFACTURE

    CONDITION OF WARNING LIGHT AND ALARM

     CONDITIO OF SCISSOR LIFT CYLINDER OIL LEVEL

    CONDITION OF STEER DRIVE WHEELS CYLINDERS

    SCISSOR CAGE

    CONDITION OF POTHOLE (LIMIT) SWITCH

    CONDITION OF POWER CHARGER STATUS LED ANDCHARGER CONNECTOR

    CONDITION OF FRAME

    CONDITION OF OPERATION CONTROL AND JOY STICK

    CONDITION OF EMERGENCY STOP PUSH BUTTONS

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    CONDITION OF EMERGENCY LOWERING CONTROL

    CONDITION OF LIFT AND LOWERING SWITCH

    CONDITION OF CAGE MAXIMUM LIMIT SWITCH

    CONDITION OF CONTROL SYSTEM DECALS

    DATE OF INSPECTION

    CONDITION OF CONTROL STATION DECALS

    CONDITION OF POTHOLE GUARD

    S =satisfactory U =unsatisfactory

    FIRE EXTINGUISHERS (10 BC-Asme B92.5)

    CONDITON OF BODY

    39

    GROUND CONTROL

    CONDITION OF CONTROL LEVERS

    CONDITION OF ROTTARY ANGLE SWITCH

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    :-

    :-

    :-

    :-

    :-

    o

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    15/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    4041

    42

    43

    44

    45

    CONDITION OF WIRING AND HARNESS

    CONDITION OF HYDRAULIC LIFTING CYLINDER

    WARNING LIGHT

    COMMENTS

    HYDRAULIC CYLINDER

    BACKUP ALARM

    CONDITION OF CHASSIS AND CRACK

    WHEEL SUSPENSION LEAF SPRINGS AND HOUSING

    CONDITION OF AIR BRAKE CHAMBER AND SPRINGS

    EQUIPMENT INSPECTION LOCATION

    CONDITION OF OUT RIGGER AND BOOM CONTROL LOCKLEVER

    TYRE AND WHEEL FRONT

    HYDRAULIC CYLINDER HOLDING VALVE

    TYRE AND WHEEL REAR

    CONDITION OF AIR HOSE

    CONTINUE….

    CONDITION OF HYDRAULIC HOSE

    CONDITION OF STERING AND BOX

    CONDITION OF PARKING BRAKE

    WIRING AND HARNESS

    EQUIPMENT PLATE NUMBER

    MAKE

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    BOOM LENGTH

    SUB - CONTRACTOR

    S =satisfactory U =unsatisfactory

    CONDITION OF HOOK AND CAPACITY SWL MARKING AND

    SAFETY LATCHS

    CONDITION OF BOOM AND TELECOPIC CYLINDER

    CONDITION OF PTO SHAFT GEAR BOX

    CONDITION OF BUBBLE LEVEL

    CONDITION OF BOOM FITTINGS

    CONDITION OF STABILIZER ZIM AND PAD

    CONDITION OF CONTROL LEVER'S , REMOT SYSTEM

    CONDITION OF DRIVER DOOR AND LOCK

    CONDITION OF AIR DRYER AND AIR TANK

    LEAKS

    CONDITION OF AIR SUSPENSION

    CONDITION OF SEAT BELT

    CONDITION OF EMERGENCY BRAKE

    HYDRAULIC OIL LEVEL

    INITIAL CHECK LIST FOR BOOM TRUCK (CRANE)

    INSPECTION DESCRIPTION

    BOOM COMPENENT

    CAPACITY

    SIDEMIRROR

    DATE OF INSPECTION

    CONDITION OF WIRE ROPE DRUM AND WRAPS

    CONDITION OF WIRE ROPE SUPPORTING ROLLERS

    CONDITION OF ANTI 2 BLOCK

    PROPELLER SHAFT & DIFFERENTIAL AND AXLE

    FUEL TANK

    CONDITION OF BODY

    Inspection Standared from Asme B30.22 and Manufaturer's Manual

     YEAR OF MANUFATURE

    CONDITION OF SHEAVES

    CONDITION OF STABILIZER AND BEAM

    UNDERCARRIAGE

    CONDITION OF BRAKE AND CLUTCH

    HEAD LIGHT AND INDICATOR

    WIND SHIELD AND WIPER BLADE

    CONDITION OF SWING RING AND LOOSE AND BOLTS

    CONDITION OF SWING GEAR (BRAKE)

    :

    :

    :

    :

    :

    :

    Page. 1 to 2

    :-

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    16/60

    S.NO S U N/A COMMENTS

    46

    47

    48

    49

    50

    51

    52

    53

    54

    55

    56

    57

    58

    59

    CONDITION OF AIR FILTER

    CONDITION OF ENGINE

    CONDITION OF FUEL OIL LINES

    INSPECTION DESCRIPTION

    ENGINE COMPONENTS

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF REAR DOOR

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF ENGINE BELT

    TRANS & ENG.MOUNTS

    CONDITION OF RADIATOR & COOLENT LEVEL

    OIL LEAK

    REAR SIDE

    CONDITION OF BATERY AND TERMINAL

    60FIRE EXTINGUISHERS (10 BC-Asme B30.22)

    INSPECTED BY

    CONDITION OF ENGINE OIL FILTER

    CONTINUE….

    CONDITION OF REAR DOOR LOCK LEVER

    CONDITION OF ENGINE START

    Page. 2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    17/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    33

    34

    35

    36

    37

    38

    39

    40

    41

    42

    43

    CONDITION OF HYDRAULIC SUSPENSION

    CONDITION OF HYDRAULIC LOCK INSTALATION

    TRANS & ENG.MOUNTS

    CONDITION OF AIR FILTER

    CONDITION OF UNIVERSAL-JOINT DRIVE (BOTH)

    CONDITION OF ENGINE BELT

    RIPPER

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    S =satisfactory U =unsatisfactory

    CONDITION OF FRAMES,CROSSBAR and WELDED

    INSPECTED BY

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF BATERY AND TERMINAL

    CRACKS and WELDED

    SAUDI ELASTOMERS PROJECT

    CONDITION OF ENGINE OIL LEVEL and OIL LEAKS

    ENGINE COMPONENTS

    DATE OF INSPECTIONEQUIPMENT INSPECTION LOCATION

    SUB - CONTRACTOR

     YEAR OF MANUFATURE

    COMMENTS

    ELECTRICAL WIRING AND HARNESS

    CONDITION OF ENGINE & SAFE GUARDS

    LEFT and RIGHT TILT FRAME & CYLINDER

    CONDITION OF ENGINE START(SELF MOTOR SOLENOID SWITCH)

    INSPECTION DESCRIPTION

    CONDITION OF ARTICULATING HITCH AND MOUNTS

    CONDITION OF REAR AND FRONT AXLE

    CONDITION OF BUCKET AND PINS

    CONDITION OF GAUGES

    BUCKET LINKAGE

    CONDITION OF SEAT BELT

    CONDITION OF TRACTION FRAME CYLINDER

    CONDITION OF PIVOT PINS

    CONDITION OF SEAT BELT

    CONDITION OF FUEL OIL LINES

    CONDITION OF RIPPER SHANK AND HOLDER

    HYDRAULIC HOSE'S

    Inspection Standared from Manufaturer's Manual

    S.NO

    CONDITION OF CHASSIS

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC EQUIPMENT NUMBER

    TRANSMISSIONANDFLUIDS

    INITIAL CHECK LIST FOR MOTOR GRADER

    WARNING LIGHT

    CONDITION OF PARKING BRAKE

    HYDRAULIC OIL LEVEL

    17

    MAKE

    CAPACITY

    WINDSHIELD,WIPER and HORN

    SIDE AND REAR MIRROR

    HEAD LIGHTANDINDICATOR'S

    OPERATION CONTROL LEVER (OR) JOYSTICK

    HYDRAULIC CONTROL VALVE

    CONDITON OF FRAME

    OPERTATOR MANUAL

    FIRE EXTINGUISHERS (10 BC)

    CONDITION OF RADIATOR & COOLENT LEVEL

    LOOSE BOLTS,MOUNTS

    MOULDBOARDCONDITION OF MOULDBOARD AND BRACKETS

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    18/60

    SERIAL #

    MODEL #

    EQUIPMENT INSPECTION LOCATION

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    OIL LEAK

    BUCKET

    CONDITION OF REAR AND FRONT AXLE

    CONDITION OF PIVOT PINS

    CONDITON OF FRAME

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    (SELF MOTOR SOLONOIDE SWITCH)

    TRANSMISSION AND FLUIDS

    HYDRAULIC CONTROL & HOLDING VALVE

    HYDRAULIC OIL LEVEL

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF ENGINE BELT

    ENGINE COMPONENTS

    CRACKS & WARPAGE

    LOOSE BOLTS,MOUNTS

    S =satisfactory U =unsatisfactory

    CONDITION OF ENGINE

    CONDITION OF FUEL OIL LINES

    RIPPER

    CONDITION OF RIPPER SHANK AND HOLDER

    CONDITION OF LIFT CYLINDER

    MAKE

    BUCKET LINKAGE

    ELECTRICAL WIRING AND HARNESS

    GUIDE ROLLERS

    CONDITION OF TRACK SUPPORT FRAME

    ROLLER FRAME

    TRACK

    CONDITION OF CHASSIS

    36

    CONDITON OF LIFT CYLINDERS

    CONDITION OF CHASSIS

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    TRANS & ENG.MOUNTS

    CONDITION OF GAUGES & HOSES

    INSPECTED BY

    TRACK PAD PINS

    COMMENTS

    Inspection Standared from Manufaturer's Manual

    S.NO

    CAPACITY

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

    INITIAL CHECK LIST FOR BULLDOZER

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    DATE OF INSPECTION

    SUB - CONTRACTOR

     YEAR OF MANUFACTURE

    TRACK PAD MASTER PIN

    HEAD LIGHTANDINDICATOR'S

    OPERTATOR MANUAL

    CONDITION OF PARKING BRAKE

    CONDITION OF SEAT BELT

    FIRE EXTINGUISHERS (10 BC)

    SIDE AND REAR MIRROR

    10

    INSPECTION DESCRIPTION

    WARNING LIGHT

    TRACK PAD MOTOR & OIL LEVEL

    EQUIPMENT NUMBER

    HORN

    TRACK PAD BACK SPINAL DRIVE AND TEETH

    CONDITION OF AIR FILTER

    CONDITION OF ENGINE START

    CONDITION OF ENGINE OIL LEVEL

    OPERATION CONTROL LEVER (OR) JOYSTICK

    LOOSE BOLTS,MOUNTS

    CRACKS and WELDED

    CONDITION OF ENGINE OIL FILTER

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    19/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41

    CONDITION OF ENGINE OIL LEVEL & OIL LEAKS

    EQUIPMENT INSPECTION LOCATION

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC EQUIPMENT NUMBER

    HYDRAULIC HOSE'S

    POWER TRACK PAD MOTOR & OIL LEVEL

    TRACK PAD PINS

    CONDITION OF SLEWING MOTOR AND OIL LEVEL

    ENGINE COMPONENTS

    CONDITION OF SEAT BELT

    BOOM LIFTING HYDRAULIC CYLINDER

    HEAD LIGHT AND INDICATOR'S

    CAPACITY

    S =satisfactory U =unsatisfactoryCOMMENTS

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    INSPECTED BY

    CONDITION OF MOUNTED SLEWING, RING AND GEAR

    MAKE

    WARNING LIGHT

     YEAR OF MANUFATURE

    BUCKET LINKAGE ,PIVOT PINS AND HYDRAULIC CYLINDER

    POWER TRACK PAD BACK SPINAL DRIVE AND SPROKETS

    OPERTATOR MANUAL

    Inspection Standared from Manufaturer's Manual

    BUCKET ADAPTOR

    INITIAL CHECK LIST FOR EXCAVATOR

    LOOSE BOLTS,MOUNTS

    INSPECTION DESCRIPTION

    CONDITION OF STICK and HYDRAULIC CYLINDER

    CONDITION OF BUCKET AND PINS

    UNDER SIDE AND TRACK PAD

    HYDRAULIC OIL LEVEL

    CONDITION OF HYDRAULIC PUMP STOP MANUAL

    HORN

     DATE OF INSPECTION

    SAUDI ELASTOMERS PROJECT

    MONITOR PANEL

    SUB - CONTRACTOR

    SIDE AND REAR MIRROR

    TRACK & PAD

    TRANS & ENG.MOUNTS

    POWER TRACK GUIDE / ROLLERS

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    23

    CONDITION OF FUEL OIL LINES

    ELECTRICAL WIRING AND HARNESS

    POWER TRACK FRONT IDLER

    HYDRAULIC CONTROL VALVE

    CONDITION OF CHASSIS

    CRACKS & WARP

    OPERATION CONTROL (JOY STICK) and DECALS

    FIRE EXTINGUISHERS (10 BC)

    CONDITION OF BATERY AND TERMINAL

    TRANSMISSION AND FLUIDS

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF ENGINE & START

    CONDITION OF ENGINE BELT

    CONDITION OF AIR FILTER

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    20/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    1112

    13

    14

    15

    16

    17

    18

    19

    20

    21

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41 OIL LEAK

    42

    43

    CONDITION OF AIR FILTER

    INSPECTION DESCRIPTION

    CONDITION OF ENGINE

    MAKE

    COMMENTS

    EQUIPMENT NUMBER

    HORN

    FIRE EXTINGUISHERS (10 BC)

    OPERATION CONTROL (JOY STICK) and DECALS

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF ENGINE BELT

    CONDITION OF STICK

    TRACK PAD BACK SPINAL DRIVE AND TEETH

    TRACK PAD CHAINS

    INSPECTED BY

    CONDITION OF ENGINE START

    CONDITION OF ENGINE OIL FILTER

    BUCKET ADAPTOR AND TEETH

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    ELECTRICAL WIRING AND HARNESS

    ROLLER FRAME

    CONDITION OF SEAT BELT

    WARNING LIGHT

    LOOSE BOLTS,MOUNTS

    UNDER SIDE ANDTRACK PAD

    HYDRAULIC CONTROL VALVE

    HYDRAULIC OIL LEVEL

    HYDRAULIC HOSE'S

    RUBBER TRACK ADJUSTABLE CYLINDER

    CONDITION OF FUEL OIL LINES

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    CONDITION OF ENGINE OIL LEVEL

    BUCKET LINKAGE

    ENGINE COMPONENTS

    CONDITION OF CHASSIS

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    CAPACITY

    CONDITION OF LEVELING LEVER AND CYLINDER

    CONDITION OF STICK ROTTOR AND LEFT AND RIGHT SIDECYLINDER 160 DIGREE

    CONDITION OF AUXILATOR HIGH & LOW LEVER CONTROL

    CONDITION OF PARKING BRAKE MANUAL

    Inspection Standared from Manufaturer's Manual

    TRANSMISSION AND FLUIDS

    SUB - CONTRACTOR

     YEAR OF MANUFATURE

    STICK LIFTING CYLINDER'S

    SAUDI ELASTOMERS PROJECT

    S =satisfactory U =unsatisfactory

    INITIAL CHECK LIST FOR MINI EXCAVATOR

    EQUIPMENT INSPECTION LOCATION DATE OF INSPECTION

    SITE

    22

    RUBBER TRACK & PAD

    CONDITION OF BUCKET AND PINS

    TRACK PAD PINS

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    TRANS & ENG.MOUNTS

    OPERTATOR MANUAL

    CRACKS & WARP

    CONDITION OF BATERY AND TERMINAL

    TRACK PAD MOTOR & OIL LEVEL

    GUIDE ROLLERS

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    21/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    INITIAL CHECK LIST FOR WHEEL LOADER OR PAYLOADER

    STEERING CYLINDER

     DATE OF INSPECTION

    SIDE AND REAR MIRROR

    CAPACITY

    CONDITION OF BOOM

    BUCKET BELL CRANKS

    BUCKET CENTER SUPPORT FRAME

    LIFTING CYLINDER

    SAUDI ELASTOMERS PROJECT

    CONDITION OF HYDRAULIC PUMP

    HYDRAULIC OIL LEVEL

    BECON ALARM

    CONDITION OF SEAT BELT

    S =satisfactory U =unsatisfactory

    BUCKET ADAPTOR AND LINKAGE PIVOT PINS

    CONDITION OF PARKING BRAKE

    CONDITION OF BRAKE AND CLUTCH

    EXHAUST SYSTEM

    PROPELLER SHAFT CENTER SUPPORT BEARING

    CONDITION OF CHASSIS

    FIRE EXTINGUISHERS (10 BC)

    LEAKS

    EQUIPMENT PLATE NUMBER

    TYRE AND WHEEL FRONT

    PROPELLER SHAFT & DIFFERENTIAL AND AXLE

    FRONT END PIVOT PIN

    CONTINUE ….

    LOOSE BOLT AND NUTS

    BUCKET CYLINDER

    BUCKET LIFT & DOWN SUPPORT FRAME

    UNDERCARRIAGE

    SUB - CONTRACTOR

     YEAR OF MANUFATURE

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    INSPECTION DESCRIPTION

    EQUIPMENT INSPECTION LOCATION

    BUCKET

    CONDTION OF STEERING & HORN

    MONITOR PANEL

    CONDITION OF TILT AND LIFT CYLINDERS AND PINS

    HEAD LIGHT AND INDICATOR'S

    FUEL TANK

    MAKE

    WARNING LIGHT AND DECALS

    OPERATION JOYSTICK

    WIND SHIELD AND WIPER

    TYRE AND WHEEL REAR

    Inspection Standared from Manufaturer's Manual

    CONDITION OF HYDRAULIC OIL HOSES

    COMMENTS

    RIGHT AND LEFT STEERING STOPER CONTROL

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    17

    Page.1 to 2

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    22/60

    S.NO S U N/A COMMENTS

    36

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF FUEL OIL LINES

    ENGINE COMPONENTS

    OIL LEAK

    CONDITION OF ENGINE

    CONTINUE ….

    37CONDITION OF ENGINE START

    (SELF MOTOR SOLONOIDE SWITCH)

    TRANS & ENG.MOUNTS

    CONDITION OF ENGINE BELT

    CONDITION OF ENGINE OIL FILTER

    INSPECTED BY

    CONDITION OF AIR FILTER

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF ENGINE OIL LEVEL

    INSPECTION DESCRIPTION

    Page.2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    23/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    SUB - CONTRACTOR

    CONDITION OF BRAKE AND PARKING BRAKE

    PROPELLER SHAFT & DIFFERENTIAL AND AXLE

    CONDITION OF SUPER STRUCTURE

    UNDERCARRIAGE

    INITIAL CHECK LIST FOR BACKHOE

    CONDITION OF CHASSIS

    BUCKET CYLINDER

    FUEL TANK

    BUCKET ADAPTOR

    REAR BOOM SUPPORT FRAME AND STRUCTURE

    EQUIPMENT INSPECTION LOCATION

    Inspection Standared from Manufaturer's Manual

    S.NO

     YEAR OF MANUFATURE

    HEAD LIGHTANDINDICATOR'S

    TYRE AND WHEEL REAR

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    EXHAUST SYSTEM

    22

    INSPECTION DESCRIPTION

    STEERING CYLINDER

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    DATE OF INSPECTION

    HORN

    REAR BOOM MANUAL LOCK

    SAUDI ELASTOMERS PROJECT

    MAKE

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    LOOSE BOLT AND NUTS

    PROPELLER SHAFT CENTER SUPPORT BEARING

    COMMENTS

    EQUIPMENT PLATE NUMBER

    CAPACITY

    CENTER TURNING POINT

    TYRE AND WHEEL FRONT

    S =satisfactory U =unsatisfactory

    CONDITION OF BUCKET AND PIN

    SIDE AND REAR MIRROR

    CONTINUE …

    CONDITION OF HOLDING VALVE

    CONDITION OF HYDRAULIC HOSE's

    WARNING LIGHT

    BECON ALARM

    OPERATION JOYSTICK

    BUCKET UP & DOWN SUPPORT FRAME

    LEAKS

    REAR SLIDE FRAME

    AUXILIARY SYSTEM

    BUCKET LINKAGE AND PIN'S

    HYDRAULIC OIL LEVEL

    LIFTING CYLINDER

    CONDITION OF SEAT BELT

    FIRE EXTINGUISHERS (10 BC)

    Page.1 to 2

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    24/60

    S U N/A COMMENTS

    35

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    CONTINUE …

    ENGINE COMPONENTS

    INSPECTION DESCRIPTION

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE BELT

    CONDITION OF ENGINE START

    CONDITION OF ENGINE

    CONDITION OF BATERY AND TERMINAL

    INSPECTED BY

    OIL LEAK

    CONDITION OF AIR FILTER

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF ENGINE OIL LEVEL

    TRANS & ENG.MOUNTS

    Page.2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    25/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    HORN

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    CONDITION OF ENGINE BELT

    UNDERCARRIAGE

    Inspection Standared from Manufaturer's Manual

    TYRE AND WHEEL FRONT

    CONDITION OF BATERY AND TERMINAL

    SUB - CONTRACTOR

    OIL LEAK

    DATE OF INSPECTION

    OPERATION JOYSTICK

    CONDITION OF SEAT BELT AND RESTRICTION GUARD ORSEAT BAR

    17

    TYRE AND WHEEL REAR

    CONDITION OF RADIATOR & COOLENT LEVEL

    INSPECTED BY

    S.NO

    EXHAUST SYSTEM

    HYDRAULIC DRIVE MOTOR

    CONDITION OF BUCKET

    CONDITION OF GRAB HANDLE

    HYDRAULIC CYLINDER'S

    CONDITION OF CHASSIS

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC EQUIPMENT NUMBER

    BUCKET LINKAGE

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF ENGINE

    FUEL TANK

    CAPACITYEQUIPMENT INSPECTION LOCATION

    SIDE AND REAR MIRROR

    WARNING LIGHT AND BECON ALARM

    CONDITION OF ENGINE START

    MAKE

    SITE

    CONDITION OF FUEL OIL LINES

    FIRE EXTINGUISHERS (10 BC)

    CONDITION OF HYDRAULIC HOSES

    HYDRAULIC OIL LEVEL

    CONDITION OF LIFTING CYLINDER

    HEAD LIGHT AND INDICATOR'S

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    CONDITION OF LIFT ARM

    SAUDI ELASTOMERS PROJECT

    INITIAL CHECK LIST FOR SKID STEER LOADER

     YEAR OF MANUFATURE

    INSPECTION DESCRIPTIONS =satisfactory U =unsatisfactory

    COMMENTS

    CONDITION OF ENGINE OIL FILTER

    ENGINE COMPONENTS

    TRANS & ENG.MOUNTS

    CONDITION OF AIR FILTER

    HYDRAULIC HOSE

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    26/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    910

    11

    12

    13

    14

    15

    16

    17

    18

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    FUEL TANK

    S =satisfactory U =unsatisfactoryCOMMENTS

    SIDE AND REAR MIRROR

    ENGINE COMPONENTS

    UNDERCARRIAGE

    CONDITION OF CHASSIS

    MAKE

    TRANS & ENG.MOUNTS

    CONDITION OF AIR FILTER

    HYDRAULIC DRIVE MOTOR AND HOSES

    SAUDI ELASTOMERS PROJECT

     YEAR OF MANUFATURE

    CAPACITY

    HYDRAULIC CYLINDER'S

    EXHAUST SYSTEM

    CONDITION OF FUEL OIL LINES

    S.NO

    CONDITION OF ENGINE OIL FILTER

    OIL LEAK

    CONDITION OF ENGINE

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF GRAB HANDLE

    CONDITION OF HYDRAULIC AND STOP

    HYDRAULIC OIL LEVEL

    HYDRAULIC HOSEBUCKET LINKAGE

    CONDITION OF SEAT BELT AND RESTRICTION GUARD ORSEAT BAR

    DATE OF INSPECTION

    EQUIPMENT INSPECTION LOCATIONSUB - CONTRACTOR

    INITIAL CHECK LIST FOR SKID STEER COMPACT TRACK LOADER

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF ENGINE REAR DOOR AND LOCK

    CONDITION OF ENGINE START

    INSPECTED BY

    CONDITION OF LIFT ARM

    HORN

    WARNING LIGHTS AND BECON ALARM

    OPERATION JOYSTICK

    LIFTING CYLINDER

    19

    CONDITION OF BUCKET

    HEAD LIGHTANDINDICATOR'S

    INSPECTION DESCRIPTION

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    FIRE EXTINGUISHERS (10 BC)

    CONDITION OF ROLLER SUSPENSION

    CONDITION OF RUBBER TRACK

    CONDITION OF STEEL ROLLER

    CONDITION OF PARKING BRAKE

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC EQUIPMENT NUMBER

    Inspection Standared from Manufaturer's Manual

    CONDITION OF ENGINE BELT

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    27/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    1011

    12

    13

    14

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37 OIL LEAK

    38

    39

    REVERSE ALARM

    MAST CYLINDER

    WARNING LIGHT

    INITIAL CHECK LIST FOR TELESCOPIC HANDLER (FORK LIFT)

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC EQUIPMENT NUMBER

    MAKE

    EQUIPMENT INSPECTION LOCATION

    CONDITION OF SEAT BELT

    FIRE EXTINGUISHERS (10 BC)

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF ENGINE START

    FORKS & SUPPORT PIN

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    LEAKS

    STEPS,HANDRAIL

    STABILIZER ARMS,CYLINDERS,PADS

    CAPACITY DATE OF INSPECTION

    SUB - CONTRACTOR

     YEAR OF MANUFACTURE

    INSPECTION DESCRIPTIONS =satisfactory U =unsatisfactory

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

    COMMENTS

    TYRE AND WHEEL FRONT

    TYRE AND WHEEL REAR

    SIDE AND REAR MIRROR

    HORN

    15

    GAUGES

    HEAD LIGHT AND INDICATOR

    CONDITION OF BRAKE AND PARKING BRAKE

    NO

    Inspection Standared From ANSI - ITSDF- B56.6 and Manufaturer's Manual

    CONDITION OF STERING AND BOX

    CYLINDERS AND HOSES

    TELEHANDLER

     UNDERCARRIAGE

    FUEL TANK

    ENGINE COMPONENTS

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE BELT

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF BOOM

    CONDITION OF ENGINE

    CONDTION OF CHASSIS

    CONDITION OF DISK BRAKE

    BODY MOUNTING

    HYDRAULIC CYLINDER

    TURNING CYLINDER

    EXHAUST SYSTEM

    PROPELLER SHAFT & DIFFERENTIAL

    INSPECTED BY

    TRANS & ENG.MOUNTS

    CONDITION OF AIR FILTER

    CONDITION OF ENGINE OIL LEVEL

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    28/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35 OIL LEAK

    36

    37

    S.NO

    CONDITION OF ENGINE START

    CONDITION OF ENGINE OIL FILTER

    PROPELLER SHAFT & DIFFERENTIAL

    ENGINE COMPONENTS

    EQUIPMENT PLATE NUMBER

    GAUGES

    CYLINDERSANDHOSES

    INSPECTED BY

    CONDITION OF FUEL OIL LINES

    TRIPLEX CHAIN

    MAKE

     YEAR OF MANUFACTURE

    CAPACITY -----

    SIDE AND REAR MIRROR

    HORN

    WARNING LIGHT

    INSPECTION DESCRIPTION

    CONDITION OF SEAT BELT

    MAST CYLINDER

    FORKS & SUPPORT PIN

    HYDRAULIC CYLINDER

    TURNING CYLINDER

    EXHAUST SYSTEM

    INITIAL CHECK LIST FOR FORK LIFT

    EQUIPMENT INSPECTION LOCATION

    FUEL TANK

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

    LEAKS

    Inspection Standared From ANSI - ITSDF- B56.6 and Manufaturer's Manual

    16

     UNDERCARRIAGE

    DATE OF INSPECTION

    SUB - CONTRACTOR

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    TYRE AND WHEEL REAR

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    TYRE AND WHEEL FRONT

    COMMENTS

    FIRE EXTINGUISHERS (10 BC-ANSI - ITSDF- B56.6 )

    REVERSE ALARM AND LEVER

    CONDITION OF STERING AND BOX

    CONDITION OF BRAKE AND PARKING BRAKE

    HEAD LIGHT AND INDICATOR

    S =satisfactory U =unsatisfactory

    CONDITION OF DISK BRAKE

    BODY MOUNTING

    CONDITION OF ENGINE BELT

    CONDITION OF AIR FILTER

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF ENGINE OIL LEVEL

    TRANS & ENG.MOUNTS

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF ENGINE

    CONDTION OF CHASSIS

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    29/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4 HORN

    5

    6 WARNING LIGHT

    7

    8

    9

    10 BECON ALARM

    11

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    3031

    32

    33

    34

    35

    36

    37 OIL LEAK

    38

    39

    FIRE EXTINGUISHERS (10 BC)

    CONDITION OF BRAKE AND CLUTCH

    CONDTION OF STEERING

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC

    Inspection Standared From Manufaturer's Manual

    S.NO

    TRANS & ENG.MOUNTS

    12

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

    CONDITION OF ENGINE BELT

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF ENGINE START

    INITIAL CHECK LIST FOR ROLLER COMPACTOR

    COMMENTS

    EQUIPMENT NUMBER

    S =satisfactory U =unsatisfactory

    CAPACITY

    CONDITION OF CHASSIS

    CONDITION OF LEFT & RIGHT ROLLER CYLINDERS

    CONDITION OF HYDRAULIC AND HOSES

    CONDITION OF AIR FILTER

    CONDITION OF ENGINE

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF BATERY AND TERMINAL

    HYDRAULIC OIL LEVEL

    SIDE AND REAR MIRROR

    TYRE AND WHEEL REAR

    INSPECTION DESCRIPTION

    WIND SHIELD AND WIPER

    OPERATION JOYSTICK

    CONDITION OF SEAT BELT

    WARNING LIGHT

     DATE OF INSPECTION

    SUB - CONTRACTOR

    CONDION OF REAR WHEEL & TYRE

    EXHAUST SYSTEM

    CONDITION OF HYDRAULIC PUMP

    CONDITION OF PARKING BRAKE

    ROLLER

    EQUIPMENT INSPECTION LOCATION

    MAKE

     YEAR OF MANUFATURE

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE OIL LEVEL

    INSPECTED BY

    LOOSE BOLT AND NUTS

    CONDITION OF ROLLER AND SUPPORT LINK

    WHEEL AND AXLE

    CODITION OF HYDRAULIC DISK BRAKE AND HOSES

    STEERING CYLINDER

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    UNDERCARRIAGE

    ENGINE COMPONENTS

    FUEL TANK

    LEAKS

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    30/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    10

    11

    12

    13

    14

    15

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    2829

    30

    31

    32

    33

    34

    35

    WIND SHIELD AND WIPER BLADE

    CONDITION OF WIRING AND HARNESS

    S.NO INSPECTION DESCRIPTION

    CONDITION OF STOPPER

    SIDE MIRROR

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    CONDITION OF TRUCK SPROKTS

    LEAKS

    CONDITION OF WHEEL DRUM ,AIR BRAKE CHAMBER ANDRETURN SPRINGS

    CONTINUE …

    HYDRAULIC LIFTING CYLINDER

    HORN

    WARNING LIGHT

    HEAD LIGHTANDINDICATOR

    UNDERCARRIAGE

    HYDRAULIC OIL LEVEL

    HYDRAULIC CYLINDER

    WHEEL SUSPENSION LEAF

    REVERSE ALARM

    CONDITION OF STERING AND BOX

    CONDITION OF BRAKE AND CLUTCH AND PARKING BRAKE

    AS PER MANUFATURER TRUCK LIMIT SAFETY ROPE

    TRUCK REAR DOOR AND LEVER

    TRUCK SAFETY LOCK PIN

    FIRE EXTINGUISHERS (10 BC)

    CONDITION OF DRIVER DOOR AND LOCK

    16

    CONDITION OF AIR TANK'S

    CONDITION OF AIR HOSE

    CONDITION OF HYDRAULIC HOSE

    CONDITION OF CHASSIS

    (AIR COMPRESSED FOR AIR BRAKE) AIR DRYER

    CONDITION OF EMERGENCY BRAKE

    SILENCER AND SMOKE

    SUB - CONTRACTOR

    HYDRAULIC CYLINDER HOLDING VALVE

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

    INITIAL CHECK LIST FOR DUMP TRUCK

    TYREANDWHEEL FRONT

    CONDITION OF SEAT BELT

    TRUCK

    MAKE

    S =satisfactory U =unsatisfactory

    DATE OF INSPECTION

     YEAR OF MANUFATURE

    MOTIVE POWER DIESEL ENGINE AND HYDRAULIC EQUIPMENT PLATE NUMBER

    CAPACITYEQUIPMENT INSPECTION LOCATION

    COMMENTS

    PROPELLER SHAFT & DIFFERENTIAL AND AXLE

    TYREANDWHEEL REAR

    :

    Page.1 to 2

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    31/60

    S U N/A COMMENTS

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    48

    49

    ENGINE COMPONENTS

    CONDITION OF AIR FILTER

    CONTINUE …

    TRANS & ENG.MOUNTS

    CONDITION OF ENGINE START

    CONDITION OF ENGINE

    CONDITION OF REAR DOOR

    CONDITION OF REAR DOOR LOCK LEVER

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE BELT

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF RADIATOR & COOLENT LEVEL

    INSPECTED BY

    OIL LEAK

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF ENGINE OIL FILTER

    REAR SIDE

    INSPECTION DESCRIPTION

     

    Page. 2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    32/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    26

    27

    28

    29

    30

    31

    32

    33

    34

    UNDERCARRIAGE

    FIRE EXTINGUISHERS (10 BC)

    TYREANDWHEEL FRONT

    TRAILER SIDE LIGHT

    WIPER BLADE

    TRAILER PLATFORM

    CAPACITY

    SUB - CONTRACTOR

    MOTIVE POWER DIESEL POWER

    INSPECTION DESCRIPTION

    EXHAUST SYSTEM

    EQUIPMENT INSPECTION LOCATION

    S =satisfactory U =unsatisfactory

    SAUDI ELASTOMERS PROJECT

    INITIAL CHECK LIST FOR TRAILER

    EMERGENCY BRAKE

    CONDITION OF BRAKE AND CLUTCH AND PARKING BRAKE

    BECON LIGHT

    COMMENTS

    HORN

    SIDEANDREAR MIRROR

    CONDITION OF AIR DRYER AND AIR TANK

    FUEL TANK

    AIR BRAKE HOSE COUPLING

    LASING BELT and AUTOMATIC TRUCK RATCHET (GRIP)

    WHEEL DRUM & BRAKE CHAMBER , SLACK ADJUSTER ANDRETURN SPRINGS

    DATE OF INSPECTION

    CONDITION OF LEAF OR AIR SUSPENSION

    S.NO

    HEAD LIGHTANDINDICATOR

    WIND SHIELD

    STERING

    REVERSE ALARM

    TRAILER PARKING SUPPORT LEGS

    CONDITION OF WHEEL HITCH,HANDLE LOCK and SPRINGS

    WARNING LIGHT

    ELECTRICAL WIRING AND HARNESS

    DRIVER CABIN DOOR

    CONDITION OF AIR SYSTEM

    LOOSE BOLTS,MOUNTS

    LEAKS ANDCRACK

    PROPELLER SHAFT & DIFFERENTIAL

     YEAR OF MANUFATURE

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    CONDITION OF AIR SUSPENSION

    VEHICLE PLATE NUMBER

    CONDITION OF SEAT BELT

    25

    MAKE

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    TYREANDWHEEL REAR

    ENGINE STOP FLOAT SWITCH

    CONTINUE … Page.1 to 2

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    33/60

    S U N/A COMMENTS

    35

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46 OIL LEAK

    47

    48

    CONDITION OF ENGINE

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF ENGINE START

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF SILENCER ANDSMOKE

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONTINUE …

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF ENGINE BELT

    INSPECTED BY

    ENGINE COMPONENTS

    INSPECTION DESCRIPTION

    CONDITION OF AIR FILTER

    TRANS & ENG.MOUNTS

    CONDITION OF CHASSIS

     

    Page. 2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    34/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    1011

    12

    13

    14

    15

    17

    1819

    20

    21

    22

    23

    24

    25

    26

    27

    2829

    30

    31

    32

    33

    34 OIL LEAK

    35

    36

    HORN

    CONDITION OF STERING AND BOX

    CONDITION OF ENGINE BELT

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE OIL LEVEL

    INSPECTED BY

    CONDITION OF ENGINE START

    CONDITION OF CHASSIS

    ENGINE COMPONENTS

    CONDITION OF BATERY AND TERMINAL

    FUEL TANKLEAKS

    TRANS & ENG.MOUNTS

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF ENGINE

    SAUDI ELASTOMERS PROJECT

    TRUCK

    TRUCK AND REAR DOOR

    CONDITION OF DOOR

    CONDITION OF WHEEL DRUM AND BRAKE LINER

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

     YEAR OF MANUFATURE

    CONDITION OF RADIATOR & COOLENT LEVEL

    16

    CONDITION OF SEAT BELT

    CONDITION OF SUSPENSION LEAF

    WIND SHIELD

    SIDEMIRROR

    TYRE AND WHEEL REAR

    FIRE EXTINGUISHERS (6 BC)

    UNDERCARRIAGE

    INSPECTION DESCRIPTION

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    CONDITION OF WIPER BLADE

    EQUIPMENT INSPECTION LOCATIONCAPACITY

    PROPELLER SHAFT & DIFFERENTIAL AND AXLE

    REVERSE ALARM

    WARNING LIGHTS

    TYRE AND WHEEL FRONT

    S.NO

    COMMENTS

    INITIAL CHECK LIST FOR TRUCK

    MOTIVE POWER DIESEL POWER

    CONDITION OF CLUTCH

    CONDITION OF BRAKE

    HEAD LIGHT AND INDICATOR

    S =satisfactory U =unsatisfactory

    SUB - CONTRACTOR

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF AIR FILTER

     DATE OF INSPECTION

    EXHAUST SYSTEM

    EQUIPMENT PLATE NUMBER

    MAKE

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    35/60

    SERIAL #

    MODEL # ------------

    S U N/A COMMENTS

    1

    2

    3

    4

    5

    6

    7

    8

    10

    11

    12

    13

    14

    15

    17

    18

    20

    21

    23

    24

    25

    26

    27

    28

    29

    30

    31

    16

    INSPECTION DESCRIPTIONS.NO

    FUEL TANK

    CONDITION OF SUSPENSION LEAF

    CONDITION OF WIPER BLADE

    CONDITION OF WATER PUMP

    CONDITION OF RECAIL STARTER ASSEMBLY

    EXHAUST SYSTEM

    (PULL CORD AND SAFE GUARD)

    PROPELLER SHAFT , DIFFERENTIAL AND AXLE

    SAFE GUARD

    PUMP BEAD

    22

    CONTINUE …

    CONDITION OF TANKER LADER

    WATER PUMP

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    HEAD LIGHT AND INDICATORS

    WIND SHIELD

    CONDITION OF CLUTCH

    CONDITION OF BRAKE AND PARKING BRAKE

    REVERSE ALARM

    CONDITION OF CHASSIS

    UNDERCARRIAGE

    LEAKS

    LEAKS

    TANK SIGNAGE ( BOTH SIDE ENGLISH AND ARABIC)

    SIDEMIRROR

     YEAR OF MANUFATURE

    EQUIPMENT INSPECTION LOCATION

    CAPACITY DATE OF INSPECTION

    SUB CONTRACTOR

    CONDITION OF BALL VALVE

    TYREANDWHEEL REAR

    CONDITION OF STERING AND BOX

    SITE

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    FIRE EXTINGUISHERS (6 BC)

    CONDITION OF SEAT BELT

    CONDITION OF DOOR

    INITIAL CHECK LIST FOR WATER TANKER

    TANK

    CONDITION OF FRAME

    SAUDI ELASTOMERS PROJECT

    EQUIPMENT PLATE NUMBER

    MAKE

    MOTIVE POWER DIESEL POWER

    TYREANDWHEEL FRONT

    WARNING LIGHT

     ( POTABLE WATER TANKER , CAPACITY 18000 LTR)19

    S =satisfactory U =unsatisfactory

    HORN

    Page. 1 to 2

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    36/60

    S U N/A COMMENTS

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41 OIL LEAK

    42

    43

    INSPECTION DESCRIPTION

    CONDITION OF ENGINE BELT

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    ENGINE COMPONENTS

    CONDITION OF ENGINE

    CONDITION OF AIR FILTER

    TRANS & ENG.MOUNTS

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF ENGINE START

    CONTINUE …

    CONDITION OF BATERY AND TERMINAL

    INSPECTED BY

     

    Page.2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    37/60

    SERIAL #

    MODEL # ----------

    S U N/A COMMENTS

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    26

    27

    29

    30

    31

    32

    33

    34

    SUB CONTRACTOR

    BECON LIGHT

    HORN

    STERING

    DIESEL LEAKAGE

    DISPENSING PUMP NOZZLE

    BALL VALVE

    HEAD LIGHT AND INDICATORS

    MOTIVE POWER DIESEL POWER EQUIPMENT PLATE NUMBER

    WIND SHIELD

    BRAKE AND CLUTCH AND PARKING BRAKE

    DIESEL GENERATOR

    (PULL CORD AND SAFE GUARD)

    FIRE EXTINGUISHERS (10 - BC)

    DIESEL GENERATOR

    FUEL TANK

    LEAKS

    CONTINUE …

    AIR COOLER

    LADER

    HOSE

    GROUNDING

    PUMP BEAD

    Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    METERS

    DRIVER CAPIN DOOR & LOCK

    WARNING LIGHT's

    DIESEL TANK

    SIGNAGE (CAPACITY,DIESEL,NO SMOKING)

    TANK

    CONDITION OF SEAT BELT

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    REVERSE ALARM

    SAUDI ELASTOMERS PROJECT

    INITIAL CHECK LIST FOR DIESEL TANKER

    CAPACITY DATE OF INSPECTION

    EQUIPMENT INSPECTION LOCATION

     YEAR OF MANUFACTURE

    25CONDITION OF RECAIL STARTER ASSEMBLY

     S.NO INSPECTION DESCRIPTIONS =satisfactory U =unsatisfactory

    SIDE & REAR MIRROR

    MAKE

    WIPER BLADE & MOTOR

    TYREANDWHEEL REAR

    TYREANDWHEEL FRONT

    28

     UNDERCARRIAGE

    EXHAUST SYSTEM

    WHEEL SUSPENSION LEAF

    CONDITION OF CHASSIS

    TRANS AND ENG. MOUNDS

    Page.1 to 2

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    38/60

    S U N/A

    35

    36

    37

    38

    39

    40

    41

    42

    43

    44 OIL LEAK

    45

    46

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF ENGINE BELT

    CONDITION OF FUEL OIL LINES

    INSPECTION DESCRIPTION

    INSPECTED BY

    CONTINUE …

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF AIR FILTER

    ENGINE COMPONENTS

    CONDITION OF ENGINE

    CONDITION OF ENGINE START

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    TRANS & ENG.MOUNTS

    Page.2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    39/60

    SERIAL #

    MODEL #

    S.NO S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    13

    15

    16

    17

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    Inspection Standared From Asme B 30.3 and Manufaturer's manual

    EQUIPMENT INSPECTION LOCATION

    SUB CONTRACTOR YEAR OF MANUFATURE

    11CONDITION OF OPERATION CONTROL(SUCH AS TROLLY ,SWING,HOOK UP and DOWN all 3rd GEAR SPEED,SWING MAXIMUM 2TIME ROTATION 360 digree AFTER AUTO CUT)

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

     INITIAL CHECK LIST FOR TOWER CRANE

    MOTIVE POWER ELECTRIC POWER EQUIPMENT NUMBER

    MAKE

    CAPACITY DATE OF INSPECTION

    LATTICE BOOM LENGTH

    OPERATOR CABIN

    SIDE MIRROR

    CONDITION OF HORN

    CONDITION OF WARNING LIGHTS AND DECALS

    CONDITION OF WIND SHIELD AND WIPER

    CONDITION OF DOOR AND LOCK

    CONDITION OF ANTI-COLLISION SENSOR and SWING GEAR

    CONDITION OF SEAT BELT

    CONDITION OF DOOR LOCK

    OPERATION MANUALS

    S =satisfactory U =unsatisfactoryCOMMENTS

    OPERATIOR CABIN

    BOOM

    CONDITION OF LATTICE BOOM

    TIP SHEAVE

    BOOM HOIST

    CONDITION OF LOWER LOAD BLOCK

    HYDRAULIC OIL LEVEL

    WIND VELOSITY DEVICE (Anemometer) AND INDICATING

    CONDITION OF WEDGE SOCKET &TERMINATION andWIRE GRIPS ( Both )

    12CONDITION OF PUSH CONTROL SWITCH(Temporary load hold and auto on,horn)

    CONDITION OF GAUGES AND METERS

    14RATED CAPACITY INDICATOR SYSTEM

    ( Load Monitoring and Indicating SYSTEMs )

    CONDITION OF EMERGENCY STOP

    CONDITION OF PLAT FORM

    CONDITION OF OPERATOR REST PLATFORM

    18FIRE EXTINGUISHERS (10 BC-Asme B30.3)Class B - Flammable liquids including kerosene, oils, petrol, paints, diesel, etc.Class C - Electrical fires

    BOOM HOIST LINE SIZE (As per manufactured)

    CONDITION OF TROLLY TRAVEL END LIMIT SWITCH

    CONDITION OF LIMIT - HOOK BLOCK DEVICE

    CONDITION OF BOOM HOIST MECHANISM

    CONDITION OF MOUNTED SLEWING,RING AND GEAR

    CONDITION OF WINCH DRUM'S AND BRAKE ANDGUIDE,GROVE

    CONDTION OF FREE SWING LOCK

    CONDITION OF HYDRAULIC OIL HOSE'S

    CONDITION OF HYDRAULIC OIL FLUID AND LEVEL

    CONDITION OF COUNTER WEIGHT

    CONTINUE …

    CONDITION OF RATED CAPACITY INDICATOR

    :-

    :-

    :-

    :-

    :-

    Page.1 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    40/60

    S U N/A COMMENTS

    37

    38

    39

    40

    41

    42

    43

    CONTINUE …

    RELATED TO BOOM

    TOWER

    CONDITION OF BASE PLAT FORM

    CONDITION OF TOWER (MAST)

    CONDITION OF TOWER REST PLATFORM(EVERY 6 MTR) and FITTINGS

    CONDITION OF LOOSE ANCHOR BOLT & NUTS

    CONDITION OF TOWER BASE BALLAST WEIGHT

    CONDITION OF CONCRATE FOOTING (BASE)

    CONDITION OF GROUND EARTLINK (TPI CERTIFIED)

    INSPECTED BY

    Page.2 to 2

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    41/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    Inspection Standared from Manufaturer's Manual

    INSPECTION DESCRIPTIONS =satisfactory U =unsatisfactory

    COMMENTSS.NO

    CONDITION OF ENGINE OIL LEVEL

    OIL LEAK

    CONDITION OF AIR FILTER

    TRANS & ENG.MOUNTS

    CONDITION OF EARTY ROD AND CLAMP

    INSPECTED BY

    BYPASS IN PANEL OR BATTERY CONNECTIONS

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

     INITIAL CHECK LIST FOR POWER GENERATOR

    MOTIVE POWER DIESEL POWER EQUIPMENT ASSET NUMBER

    MAKE

    CAPACITY DATE OF INSPECTIONEQUIPMENT INSPECTION LOCATION

    SUB CONTRACTOR

     YEAR OF MANUFACTURE 

    CONDITION OF FRAMEANDBODY

    CONDITION OF PANEL SAFE GUARDS

    CONDITION OF OUT PUT ON,OFF SWITCH

    CONDITION OF DISPLAY PANEL AND INDICATIONS

    CONDITION OF AUTO START AND SHUTDOWN

    CONDITION OF PANEL BOARD

    CONDITION OF GAUGES

    CONDITION OF METERANDSWITCHES AND DECALS

    EXHAUST SYSTEM

    EMERGENCY STOP

    CONDITION OF OUT PUT SOCKET

    CONDITION OF ELECTRICAL WIRING AND HARNESS

    PLACE IN DRIP TRAY

    SIGN BOARDS - NO SMOKING,CAUTION ANDENERGIZED,WEAR AIR PLUG,UNAUTHORISED PERSON NOTALLOWED,CONTACT PERSON NUMBER AND BARRICADE

    CONDITION OF FIRE EXTINGUISHER

    ENGINE COMPONENTS

    CONDITION OF ENGINE

    CONDITION OF ENGINE START

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF ENGINE BELT

    CONDITION OF FUEL OIL LINES

    CONDITION OF VOLTAGE EARTH LEAKAGE CIRCUITBRAKER (ELCB)

    :-:-

    :-:-

    :-:-

    :-:-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    42/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    S.NO

    Inspection Standared from Manufaturer's Manual

    CONDITION OF ENGINE ON-OFF SWITCH (IF EQUIPPED)

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

     INITIAL CHECK LIST FOR PORTABLE GENERATOR

    MOTIVE POWER DIESEL POWER EQUIPMENT NUMBER

    MAKE

    CAPACITY DATE OF INSPECTIONEQUIPMENT INSPECTION LOCATION

    SUB CONTRACTOR

     YEAR OF MANUFACTURESITE

    (PULL CORD AND SAFE GUARD)12

    CONDITION OF ON AND OFF AND CHOKE LEVER

    CONDITION OF ELECTRICAL OUT PUT CONNECTION FROMPANEL BOARD WITH GFCI

    CONDITION OF RECAIL STARTER ASSEMBLY

    CONDITION OF OUT PUT SOCKET

    CONDITION OF ELECTRICAL WIRING AND HARNESS

    PLACE IN DRIP TRAY

    CONDITION OF FIRE EXTINGUISHER

    ENGINE COMPONENTS

    CONDITION OF ENGINE

    INSPECTION DESCRIPTIONS =satisfactory U =unsatisfactory

    COMMENTS

    CONDITION OF FRAME AND BODY

    CONDITION OF PANEL SAFE GUARDS

    CONDITION OF OUT PUT ON OF SWITCH

    CONDITION OF PANEL BOARD

    CONDITION OF METER AND SWITCHES,DECALS ANDLABELS

    EXHAUST SYSTEM

    BYPASS IN PANEL OR BATTERY CONNECTIONS

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE OIL LEVEL

    INSPECTED BY

    CONDITION OF ENGINE OIL FILTER

    CONDITION OF BATERY AND TERMINAL

    TRANS & ENG.MOUNTS

    CONDITION OF ENGINE START

    CONDITION OF AIR FILTER

    OIL LEAK

    :-

    :-

    :-

    :-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    43/60

    SERIAL #

    MODEL #

    S.NO

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9 BYPASS IN PANEL OR BATTERY CONNECTIONS

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25 OIL LEAK

    26

    27

    28

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    MAKE

    CAPACITY -------------- DATE OF INSPECTIONEQUIPMENT INSPECTION LOCATION

    SUB - CONTRACTOR

    SAUDI ELASTOMERS PROJECT

     INITIAL CHECK LIST FOR WELDING MACHINE

    MOTIVE POWER DIESEL POWER EQUIPMENT ASSET NUMBER

     YEAR OF MANUFACTURE

    CONDITION OF FRAME AND BODY

    CONDITION OF TYRE AND SIZE

    CONDITION OF PANEL SAFE GUARDS

    CONDITION OF OUT PUT ON OF SWITCH

    CONDITION OF PANEL BOARD

    CONDITION OF GAUGES

    CONDITION OF METER, SWITCHES,DECALS AND LABELS

    CONDITION OF OUT PUT SOCKET

    CONDITION OF ELECTRICAL OUT PUT CONNECTION FROMPANEL BOARD WITH GFCI

    CONDITION OF ELECTRICAL AND HARNESS

    CONDITION OF CABLE AND ELCTRODE HOLDER OR CLAMP

    INSPECTION DESCRIPTIONS =satisfactory U =unsatisfactory

    COMMENTS

    Inspection Standared from Manufaturer's Manual

    PLACE IN DRIP TRAY

    CONDITION OF FIRE EXTINGUISHER

    ENGINE COMPONENTS

    CONDITION OF ENGINE

    CONDITION OF ENGINE START

    CONDITION OF ENGINE OIL FILTER

    EXHAUST SYSTEM

    CONDITION OF BATERY AND TERMINAL

    CONDITION OF SMOKE AND EXHAUST SYSTEM

    CONDITION OF RADIATOR & COOLENT LEVEL

    CONDITION OF DYNAMO BELT ( FOR CHARGING)

    CONDITION OF FUEL OIL LINES

    CONDITION OF ENGINE OIL LEVEL

    CONDITION OF AIR FILTER

    TRANS & ENG.MOUNTS

    CONDITION OF EARTY ROD AND CLAMP

    INSPECTED BY

    :-:-

    :-:-

    :-:-

    :-:-

  • 8/17/2019 Equipment-Initial and Monthly Checklist-updated 21st Jun 2015

    44/60

    SERIAL #

    MODEL #

    S U N/A

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    Inspection Standared from Manufaturer's Manual

    S.NO

     YEAR OF MANUFACTURE

    AL-JUBAIL CHEMICAL COMPANY (KEMYA)

    SAUDI ELASTOMERS PROJECT

     INITIAL CHECK LIST FOR TOWER LIGHT

    MOTIVE POWER DIESEL POWER EQUIPMENT ASSET NUMBER

    MAKE

    CAPACITY DATE OF INSPECTIONEQUIPMENT INSPECTION LOCATION

    SUB - CONTRACTOR

    CONDITION OF DYNAMO BELT

    INSPECTION DESCRIPTIONS =satisfactory U =unsatisfactory

    COMMENTS

    CONDITION OF FRAMEANDBODY

    CONDITION OF TYRE

    CONDITION OF PANEL SAFE GUARDS

    CONDITION OF OUT PUT LIGHT ON OF SWITCHES

    CONDITION OF PANEL BOARD

    CONDITION OF GAUGES

    CONDITION OF METER,SWITCHES,DECALS AND LABELS

    CONDITION OF OUT PUT SOCKET

    CONDITION OF ELECTRICAL OUT PUT C