TABLE OF CONTENTS
INTRODUCTION TASK AND OBJECTIVE BASELINE DESIGN SEASONS AREA AND LOAD ALLOCATION HVAC SYSTEMS CASE STUDIES
TASK AND OBJECTIVE TASK : To design and provide an optimised energy model for a
hospital of floor size 250,000 square feet with the below specifications.
Basement level-1 Number of floors-3 Location: Oklahoma city, Oklahoma
OBJECTIVE : To modify and analyse the simulated results of the baseline design. Modifications were done for the building structure (H & U), heating systems, cooling systems, daylight control and renewable energy systems.
BASELINE DESIGNs Shape ‘H’ & Shape ‘U’
Construction Materials, Doors, Windows specifications were selected based Building Development Program envelope by the U.S. Department of Energy.
No Daylight control
&
5%
50%
5%
10%
10%
5%
10%5%
Lobby, Waiting Area Medical and Clinical CenterRestrooms CorridorLaboratory, Medical Mechanical/ Electrical RoomOffice, Private All other(Parking)
Zones and Area Shape ‘H’, 9 zones
Shape ‘U’, & zones
Area Allocation
Location& Seasons
Comparison between H & U
Shape Electric consumption
Gas Consumption