EPSC Module 3 Unit 3
Transcript of EPSC Module 3 Unit 3
![Page 1: EPSC Module 3 Unit 3](https://reader036.fdocuments.in/reader036/viewer/2022071816/55abcac81a28ab4b3f8b4746/html5/thumbnails/1.jpg)
UNIT 3
Module 3
![Page 2: EPSC Module 3 Unit 3](https://reader036.fdocuments.in/reader036/viewer/2022071816/55abcac81a28ab4b3f8b4746/html5/thumbnails/2.jpg)
“Green” - What is it?
Green Infrastructure / Low Impact Development
• Not traditional storm water management – rapid conveyance of water via storm sewers to surface waters
• Green Infrastructure- practices designed & constructed for infiltration of water into ground water table.– retains and promotes rainfall infiltration
– mimics natural infiltration
![Page 3: EPSC Module 3 Unit 3](https://reader036.fdocuments.in/reader036/viewer/2022071816/55abcac81a28ab4b3f8b4746/html5/thumbnails/3.jpg)
Design ConsiderationsWhat we are learning
• Protecting the green practice while normal construction is progressing?
– Phasing BMP’s
• Delineating green areas (signage, fencing, etc.)
• Prevent construction traffic from compacting area
– Installing green practice when appropriate
• Allowing plant material to establish
– Protection up to 100yr storm
![Page 4: EPSC Module 3 Unit 3](https://reader036.fdocuments.in/reader036/viewer/2022071816/55abcac81a28ab4b3f8b4746/html5/thumbnails/4.jpg)
Compaction Infiltration
Avoiding traditional construction
methods (Compaction)
Keeping large equipment outside
of infiltration area, more labor
intensive.
![Page 5: EPSC Module 3 Unit 3](https://reader036.fdocuments.in/reader036/viewer/2022071816/55abcac81a28ab4b3f8b4746/html5/thumbnails/5.jpg)
Phasing: When to Install?Follow Plans
![Page 6: EPSC Module 3 Unit 3](https://reader036.fdocuments.in/reader036/viewer/2022071816/55abcac81a28ab4b3f8b4746/html5/thumbnails/6.jpg)
Protect the Investment
• Ensuring controls are in place and maintained to prevent sediment from green practice until stabilization is achieved.– Sediment prohibits infiltration
![Page 7: EPSC Module 3 Unit 3](https://reader036.fdocuments.in/reader036/viewer/2022071816/55abcac81a28ab4b3f8b4746/html5/thumbnails/7.jpg)
Protect the Investment
• Maintaining controls to keep sediment out of infiltration area.
![Page 8: EPSC Module 3 Unit 3](https://reader036.fdocuments.in/reader036/viewer/2022071816/55abcac81a28ab4b3f8b4746/html5/thumbnails/8.jpg)
Subcontractor Communication
• Educate / Train subs.
• Allowing pollutants/ sediment into green practice will prohibit infiltration and result in reconstructing green practice.
![Page 9: EPSC Module 3 Unit 3](https://reader036.fdocuments.in/reader036/viewer/2022071816/55abcac81a28ab4b3f8b4746/html5/thumbnails/9.jpg)
End of Module 3