j Daily Report Summary Date: 19, Nov 2012 # Name of the Inspector /Safety Engineer Project No Name Of the Contract or Purpose of the Visit Summary Of the safety Deficiencies/ Issues 1 Kashirajyam Kammari 2 Fernando Q. Uligan PIC G 1625 BULGU Regular Inspect ion Warning signs and Barricades, Environmental, Electrical, Machine guarding and Housekeeping. PIC A 1011 JNCO RFI-051 Concrete pouring of segment wall @ Ramp3. 3 Reynaldo C. Pulgo PIC G 1507B SCC Regular Inspect ion Pressurized Gas Air Compressor, Personal Protective Equipment, Fire Hazard, Toolbox Talk, (Housekeeping Positive Observation) 4 Mohammed Jai Sujiya Khan PIC G- 1679F SAMAMA Regular Inspect ion PPE, Hollow Block Supports, Scaffolding/Fall Protection, Electrical, Safety Representative, Housekeeping, Shop Drawings Approval, RFI Procedure. Submitted By: __________________ Kashirajyam Kammari (Acting Safety Supervisor)

description

s

Transcript of eport Summary

j

Daily Report SummaryDate: 19, Nov 2012

#Name of the Inspector /Safety EngineerProject NoName Of the ContractorPurpose of the VisitSummary Of the safety Deficiencies/ Issues

1Kashirajyam Kammari

2Fernando Q. Uligan

PIC G 1625BULGURegular InspectionWarning signs and Barricades, Environmental, Electrical, Machine guarding and Housekeeping.

PIC A 1011JNCORFI-051Concrete pouring of segment wall @ Ramp3.

3 Reynaldo C. Pulgo

PIC G 1507BSCCRegular InspectionPressurized Gas Air Compressor, Personal Protective Equipment, Fire Hazard, Toolbox Talk, (Housekeeping Positive Observation)

4Mohammed Jai Sujiya Khan

PIC G-1679FSAMAMARegular InspectionPPE, Hollow Block Supports, Scaffolding/Fall Protection, Electrical, Safety Representative, Housekeeping, Shop Drawings Approval, RFI Procedure.

Submitted By: __________________

Kashirajyam Kammari

(Acting Safety Supervisor)