EPCIC OPERATION FLOW
CONTRACTOR’s Business Development Department invites New Clients to Pre-Qualify CONTRACTOR or to solicits for the coming tender from the existing Clients.
PROCUREMENTENGINEERING CONSTRUCTION INSTALLATION COMMISSIONING
PRE BID
DPT 3DPT 3DPT 3
Business Development shall forward the Pre-Qualification request or Intent To Bid from Client to the Proposal Department.
Proposal Department shall be the coordinator for the Pre-Qualification or Bidding of new project until contract been awarded by the Client
PR
OP
OS
AL
Dept 1
Dept 2
Dept 3,,,
CONTRACTOR
CLIENT
BIDDING OF EPCIC CONTRACT
PROCUREMENTENGINEERING CONSTRUCTION INSTALLATION COMMISSIONING
PRE-QUALIFICATION
INTENT TO BID(From CLIENT)
GET APPROVALTO BID FROM BUSINES REVIEW COMMITTEE
NOTIFY SUPPORTDEPARTMENTS
ORGANIZE TENDERBRIEFING
GATHER FSP & PROJECT SPECIFIC PROCEDURE
(From all support Departments)
COLLECT ERECTIONSEQUENCE
(prepared by Engineering)
COLLECT MATERIALTAKE OFF
(prepared by Engineering)
OBTAIN QUOTATION FROM VENDOR
(assisted by Procurement)
COLLECT PROJECT SCHEDULE
(Prepared by Planning)
PREPARE PROJECT MANAGEMENT TEAM (PMT)
ORGANIZATION CHART, MANPOWER & EQUIPMENT
LOADING (Prepared by PMT &Human Resource)
FINALISE TECHNICAL PROPOSAL
& SPREEDSHEET
SUBMIT BID QUERY
BID SUBMISSION
TECHNICAL CLARIFICATION
TECHNO-COMMERCIAL(If needed)
LETTER OF AWARD (From CLIENT)
APPROVAL FOR SUBMISSION
(decided by Business Review Committee)
ASSIGN BID LEADER
ASSIGN TECHNICAL PROPOSAL ENGINEER
PROPOSAL WORK PROCESS
Note: FSP = Fabrication Standards ProcedurePMT = Project Management Team
PROCUREMENT CONSTRUCTION INSTALLATION COMMISSIONINGENGINEERING
PROVISION OF ENGINEERING
To work on the Conceptual, Front End and Detail engineering
ENGINEERING
EXECUTION OF EPCIC CONTRACT
REVIEW CLIENT’S DRAWING& SPECIFICATION
PREPARE SHOP DRAWING/ 3D MODELLING
(for Client’s approval)
PREPARE AS-BUILT DRAWING
PREPARE FINALDOCUMENTS
PREPARE ERECTION SEQUENCE
DESIGN TEMPORARY SUPPORT
(for load out/weighing operation)
CONDUCT ENGINEERINGSTUDY
PREPARE MATERIALTAKE OFF
RAISE PURCHASEREQUISITION
TECHNICALBID EVALUATION
DESIGN AND PREPAREPROJECT SPECIFIC PROCEDURE (PSP)
PROVIDE TECHNICAL SUPPORT TO PROJECT
MANAGEMENT TEAM
ENGINEERING WORK PROCESS
CONSTRUCTION INSTALLATION COMMISSIONINGPROCUREMENT
PROVISION OF PROCUREMENT
Purchasing of project materials and equipments are being centralized and organized by its Procurement Department.
In some cases, Client also purchased the tag items and delivered to CONTRACTOR within the agreed timing.
This requirement shall be specified by Client during the Bidding.
PROCUREMENTENGINEERING
EXECUTION OF EPCIC CONTRACT
PROCUREMENT WORK PROCESS
PROCUREMENT EXPEDITING LOGISTIC, MATERIAL & W’HSE
QUOTATION TABULANT/ PURCHASE ORDER
WORKSHEET
APPROVE DRAWING & DOCUMENT(s)
(approved by Project ManagementTeam, Engineering & Client)
START FABRICATION(by Vendor)
DRAFT AGREEMENT (If needed)
RELEASE ITEM (to project team)
RELEASE OF GOODS INCOMING INSPECTION
REPORT
INSPECT ITEMS AGAINST PURCHASE ORDER
DELIVER ITEM TO STORE
CUSTOM CLEARANCE ON DUTY & TAX
TRANSPORT & PERMIT AP(If needed)
CLARIFICATION MEETING (with vendor)
ISSUE PURCHASE ORDER
REGISTER ITEMIN SAP
TECHNICAL EVALUATION(conducted by Engineering)
SOURCING
PURCHASE REQUISITION (from Engineering)
INSPECTION(by our Staff or
3rd party surveyor)
PROVISION OF CONSTRUCTION
Construction work of one project is handled by specific Project Management Team (PMT).
INSTALLATION COMMISSIONINGCONSTRUCTIONPROCUREMENTENGINEERING
EXECUTION OF EPCIC CONTRACT
INSPECT MATERIAL
ON YARD COMMISSIONING
CONSTRUCTION COMPLETE
CUTTING
SHOP PRIME
MARKING
INSPECTION ON ACCURACY
RELEASE MATERIALVERIFICATION REPORT
LOAD OUT FOR DELIVERY
RELEASE MATERIAL TO PROJECT MANAGEMENT TEAM
COATING(If needed)
WELDING
INSPEC DIMENSION
PAINTING
LIFTING/ RIGGING
CHECK ERECTIONSEQUENCE
CONTINUE FABRICATION ACCORDING
TO ERECTION SEQUENCE
UP DATE FIT UP REPORTRECEIVE MATERIAL
RELEASE GOODS INCOMING INSPECTION REPORT
ASSEMBLY
INSPECT DIMENSION
RELEASE FIT UP REPORT
CONSTRUCTION WORK PROCESS
COMMISSIONINGINSTALLATIONCONSTRUCTIONPROCUREMENTENGINEERING
EXECUTION OF EPCIC CONTRACT
PROVISION OF INSTALLATION
To work on the logistic,marine fleets, installation window based on sea condition
and the permit needed for the offshore installation
Anchor Handling Towing Supply
Derrick/Lay Barge
Utility Workboat/DSV
CURRENT MARINE FLEETS
COMMISSIONINGINSTALLATIONCONSTRUCTIONPROCUREMENTENGINEERING
PROVISION OF COMMISSIONING
Commissioning Department (PMT) shall perform the testing and the pre-commissioning work onshore, hook up
and commissioning activities offshore
EXECUTION OF EPCIC CONTRACT
IDENTIFY SYSTEM/ EQUIPMENTTO BE COMMISSIONED
PREPARATION PRIORTO COMMISSIONING
SET UP TEMPORARY FACILITIES
STARTS PRE-COMMISSIONING
FINISH PRE-COMMISSIONING
SUBMIT CHECK LISTS(To be approved by Client)
PURCHASE COMMISSIONING CONSUMABLE AND SPARES
NOTIFY CLIENT FOR SPECIFIC PRE-COMMISSIONING
COMPLETE HANDOVER OF THE TERMINAL TO CLIENT
REVIEW THE CHECK LIST OFINSTALLED EQUIPMENTS
IDENTIFY COMMISSIONINGWORK SCOPE
PREPARE COMMISSIONINGPROCEDURE
(To be approved by Client)
COMMISSIONING & TESTINGON SYSTEM/ EQUIPMENT
(testing to be witnessed by Client)
HANDOVER SYSTEM TOCLIENT FOR APPROVAL
SUBMIT THE REMAININGDOCUMENTS
(If any)
COMMISSIONING WORK PROCESS