EPC Project Execution.pdf

206
HERVE BARON © 2015 – Hervé Baron The execution of a Complex Project… a guided tour

Transcript of EPC Project Execution.pdf

  • HERVE BARON

    2015 Herv Baron

    The execution of a Complex Project a guided tour

  • HERVE BARON

    2015 Herv Baron

    The actors

    Impossible dafficher limage.

    The COMPANY

    Client The EPC Contractor

    The suppliers

    The sub-contractors

  • HERVE BARON

    2015 Herv Baron

    Conceptual evaluation + Pre-Project

    By COMPANY

    Basic Engineering By ENGINEERING

    Project Execution by EPC CONTRACTOR

    Sanction Sanction

    The phases

  • HERVE BARON

    2015 Herv Baron

    Design Procurement Manufacturing Shipping

    Installation Construction & erection Inspection & tests Hand-over

  • HERVE BARON

    2015 Herv Baron

    The multiple sides of a Project

    Hum

    an Resources M

    anagement

    Project Control

    PROJECT

  • HERVE BARON

    2015 Herv Baron

    Engineering Sub-Contractor (India) Detail Engineering (part)

    Shipyard (Korea) Hull Engineering & Fabrication

    Shipyards (Singapore & Malaysia) Topsides Fabrication & Integration

    Home office (Paris) Project management Detail Engineering (part) Procurement

    Satellite office Detail Engineering (part)

    Fabrication yard (Nigeria): Fabrication (part)

    Offshore (Nigeria): Installation, commissioning, start-up

    The multiple sites of a Project

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering Procurement Construction

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering Procurement Construction

  • HERVE BARON

    2015 Herv Baron

    Process facilities:

    Feedstock and products flow

    Feedstock composition

    Battery limit conditions

    Equipment Spare

    Performance:

    Products specifications

    Energy efficiency, emissions

    Utilities:

    Electric power supply

    Other utilities

    Systems:

    Process control

    Fire/gas alarm

    Public address, LAN, PABX

    Infrastructure:

    Administrative and technical buildings

    Control room

    Access road

    Site fencing, gates, check point

    Design criteria:

    % of over design

    Environment data:

    Min/max temperature

    Rain/snow fall

    Wind

    Geological conditions

    Applicable codes and standards:

    International standards

    Local rules

    0 5

    10 15 20 25 30 35 40 45 50

    -85 -80 -75 -70 -65 -60 -55

    Pre

    ssu

    re (

    ba

    r)

    The facilities design basis

  • HERVE BARON

    2015 Herv Baron

    Engineering Documents for Purchase:

    bill of quantity & specification

    Documents for Construction:

    Construction drawings & specifications

    Design basis:

    - Functional requirements

    - Client specifications

    - Design codes

    Engineering in the Project

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering

    Instruments& Control

    Layout & Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering

    Instruments& Control

    Layout & Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE BARON

    2015 Herv Baron

    Process simulations

  • HERVE BARON

    2015 Herv Baron

    Heat & Material balance

    Thermodynamic calculations

    Process Flow Diagram (PFD)

  • HERVE BARON

    2015 Herv Baron

    Equipment list

  • HERVE BARON

    2015 Herv Baron

    Equipment duty

  • HERVE BARON

    2015 Herv Baron

    Process data sheet

  • HERVE BARON

    2015 Herv Baron

    Process Flow Diagram (PFD)

  • HERVE BARON

    2015 Herv Baron

    Piping & Instrumentation Diagram (P&ID)

  • HERVE BARON

    2015 Herv Baron

    Piping & Instrumentation Diagram (P&ID)

  • HERVE BARON

    2015 Herv Baron

    Process control

  • HERVE BARON

    2015 Herv Baron

    Emergency shut down

  • HERVE BARON

    2015 Herv Baron

    Emergency relief

  • HERVE BARON

    2015 Herv Baron

    Operating manual

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering

    Instruments& Control

    Layout & Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE BARON

    2015 Herv Baron

    Rotating machinery

  • HERVE BARON

    2015 Herv Baron

    Pressure vessels

  • HERVE BARON

    2015 Herv Baron

    Heat exchangers

  • HERVE BARON

    2015 Herv Baron

    Packages,

    Fired Equipment

  • HERVE BARON

    2015 Herv Baron

    Process data sheet

    Mechanical data sheet

  • HERVE BARON

    2015 Herv Baron

    Material Requisition

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering

    Instruments& Control

    Layout & Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Fire fighting

  • HERVE BARON

    2015 Herv Baron

    Passive fire protection

  • HERVE BARON

    2015 Herv Baron

    Fire & Gas detection layout

  • HERVE BARON

    2015 Herv Baron

    Environmental Impact Assessment

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering

    Instruments& Control

    Layout & Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Equipment supporting structures

  • HERVE BARON

    2015 Herv Baron

    Piping supporting structures (pipe-racks)

  • HERVE BARON

    2015 Herv Baron

    Structural design

  • HERVE BARON

    2015 Herv Baron

    Structural design

  • HERVE BARON

    2015 Herv Baron

    Structural drawings

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Architectural drawings

    Equipment layout drawing

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering

    Instruments& Control

    Layout & Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Layout/

    principles

  • HERVE BARON

    2015 Herv Baron

    Layout/consideration for all networks

  • HERVE BARON

    2015 Herv Baron

    General Plot Plan

  • HERVE BARON

    2015 Herv Baron

    Piping Layout drawing

  • HERVE BARON

    2015 Herv Baron

    3D modelling

  • HERVE BARON

    2015 Herv Baron

    3D model review

    3D model clash check

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Piping Design

    Design code for Process plants: ASME B31.3

    )(

    PY 2SWED * Pt+

    =

    P design pressure D (outside) diameter S stress value for material as per table in ASME B31.3 W weld joint reduction factor for long term strength of weld at elevated temperature E quality factor, from table in ASME B31.3 (1 for seamless, 0.85 for ER welded pipe, etc.) Y coefficient from table in ASME B31.3 (from 0.4 to 0.7 depending on material and temperature)

    To the above calculated thickness shall be added: - The corrosion allowance, e.g., 3 mm - The manufacturing tolerance: 12.5%

  • HERVE BARON

    2015 Herv Baron

    Thickness (mm) Number of passes

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Isometric drawing

  • HERVE BARON

    2015 Herv Baron

    Piping Pre-fabrication

  • HERVE BARON

    2015 Herv Baron

    Piping General Arrangement drawing

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Standard Pipe Support drawings

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Material Selection

  • HERVE BARON

    2015 Herv Baron

    Material Specification

  • HERVE BARON

    2015 Herv Baron

    Material Specification

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering

    Instruments& Control

    Layout & Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Instrument data sheet

  • HERVE BARON

    2015 Herv Baron Process Control System

  • HERVE BARON

    2015 Herv Baron

    System architecture drawing

  • HERVE BARON

    2015 Herv Baron

    Mechanical Equipment Control

  • HERVE BARON

    2015 Herv Baron

    PT JB

    Process line

    Marshalling

    cabinet

    Controller

    cabinet

    Instrument room Control room

    VDU

    CPU

    LAN Secondary cable

    Multi cable

    The instrumentation hardware

  • HERVE BARON

    2015 Herv Baron

    Building detail drawing/Telecom and PAGA layout

  • HERVE BARON

    2015 Herv Baron

    Cable routing drawings

    Cable list

  • HERVE BARON

    2015 Herv Baron Cable routing inside technical rooms

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering

    Instruments& Control

    Layout & Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE BARON

    2015 Herv Baron

    Electrical consumers list

  • HERVE BARON

    2015 Herv Baron

    Electrical Load Summary

  • HERVE BARON

    2015 Herv Baron

    Electrical distribution

  • HERVE BARON

    2015 Herv Baron

    General One Line Diagram

  • HERVE BARON

    2015 Herv Baron

    Generators

    Switchgear

    Transformer

    Equipment

    specification

  • HERVE BARON

    2015 Herv Baron

    Electrical equipment layout

  • HERVE BARON

    2015 Herv Baron

    Electrical Control System

  • HERVE BARON

    2015 Herv Baron

    Process design

    PFDs

    H&M balance

  • HERVE BARON

    2015 Herv Baron

    Process design

    PFDs

    H&M balance

    Rotating Pressure vessels Fired equipment Heat exchangers Packages etc.

    Process data sheet

    Equipment specification

  • HERVE BARON

    2015 Herv Baron

    Process design

    PFDs

    H&M balance

    P&IDs

  • HERVE BARON

    2015 Herv Baron

    Process design

    PFDs

    H&M balance

    Rotating Pressure vessels Fired equipment Heat exchangers Packages etc.

    P&IDs

    Piping

    Instrumentation

    Layout

    Civil

    Electrical

    Process data sheet

    Equipment specification

    Vendor drawings

  • HERVE BARON

    2015 Herv Baron

    Engineering work sequence

    Extract from the book: The Oil & Gas Engineering Guide, Herv Baron, Editions Technip, 2015, page 209

  • HERVE BARON

    2015 Herv Baron

    Typical 3 year EPC Project Engineering schedule

    PR = Process, EQ = Equipment, PL = Plant Layout, PI = Piping, I&C = Instrumentation & Control, EL = ELectrcial, HSE = Safety & Environment, CIV = Civil

    Extract from the book: The Oil & Gas Engineering Guide, Herv Baron, Editions Technip, 2015, page 211

  • HERVE BARON

    2015 Herv Baron

    Process design

    PFDs

    H&M balance

    Rotating Pressure vessels Fired equipment Heat exchangers Packages etc.

    P&IDs

    Piping

    Instrumentation

    Layout

    Civil

    Electrical

    Process data sheet

    Equipment specification

    Vendor drawings

  • HERVE BARON

    2015 Herv Baron

    Vendor Instrumentation &

    Control

    Electrical

    Layout

    Civil

    Piping Process

  • HERVE BARON

    2015 Herv Baron

    Vendor Instrumentation & Control

    Electrical

    Layout

    Civil

    P&ID

    Functional analysis

    C&E

    Terminals dwgs

    Power consumption

    General Arrangement

    Foundation drawing and loads, including auxiliaries!

    Piping Purchaser Mechanical connection list and dwg

    Process

    Utility consumption

    Battery limit conditions

    Engineering / Vendor interfaces

  • HERVE BARON

    2015 Herv Baron

    A unique synthesis for the busy Project professional 270 pages 300 illustrations

    Interested and wanting to know more on Engineering?

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide 2nd edition

    Order direct from the publisher:

    http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering Procurement Construction

  • HERVE BARON

    2015 Herv Baron

    Procurement

  • HERVE BARON

    2015 Herv Baron

    Inquiry (Call for Tender)

    Short listing

    Bid analysis

    Clarifications

    Negotiations

    Purchase Order

    Expediting

    Inspection

    Delivery

    Warranty Period

    Procurement / Steps

  • HERVE BARON

    2015 Herv Baron

    Procurement / Supplier selection criteria

    Technical Compliance

    Price

    Qualification of supplier

    Schedule

    Load of workshop

    References

    References with final Client

    Financial situation

    Annual turn-over

    Internal feed-back

  • HERVE BARON

    2015 Herv Baron

    Procurement

  • HERVE BARON

    2015 Herv Baron

    Expediting

  • HERVE BARON

    2015 Herv Baron

    Expediting

  • HERVE BARON

    2015 Herv Baron

    Inspection

  • HERVE BARON

    2015 Herv Baron

    Inspection

  • HERVE BARON

    2015 Herv Baron

    Shipping

  • HERVE BARON

    2015 Herv Baron

    Shipping

  • HERVE BARON

    2015 Herv Baron

    Shipping

  • HERVE BARON

    2015 Herv Baron

    Project

    Engineering Procurement Construction

  • HERVE BARON

    2015 Herv Baron

    Earthworks

  • HERVE BARON

    2015 Herv Baron

    Pipeline

  • HERVE BARON

    2015 Herv Baron

    Pipeline

  • HERVE BARON

    2015 Herv Baron

    Roads

  • HERVE BARON

    2015 Herv Baron

    Buildings

  • HERVE BARON

    2015 Herv Baron

    Admixtures

    Sand

    Aggregate

    Cement

    Civil Works

  • HERVE BARON

    2015 Herv Baron

    Civil Works

  • HERVE BARON

    2015 Herv Baron

    Civil Works

  • HERVE BARON

    2015 Herv Baron

    Civil Works

  • HERVE BARON

    2015 Herv Baron

    Civil Works

  • HERVE BARON

    2015 Herv Baron

    Civil Works

  • HERVE BARON

    2015 Herv Baron

    Pre-fabrication

  • HERVE BARON

    2015 Herv Baron

    Erection

  • HERVE BARON

    2015 Herv Baron

    Underground networks

  • HERVE BARON

    2015 Herv Baron

    Plant erection

  • HERVE BARON

    2015 Herv Baron

    Steel structure erection

  • HERVE BARON

    2015 Herv Baron

    Equipment installation

  • HERVE BARON

    2015 Herv Baron

    Equipment installation

  • HERVE BARON

    2015 Herv Baron

    Piping Pre-fabrication

  • HERVE BARON

    2015 Herv Baron

    Piping erection

  • HERVE BARON

    2015 Herv Baron

    Piping erection

  • HERVE BARON

    2015 Herv Baron

    Field Instrumentation Installation

  • HERVE BARON

    2015 Herv Baron

    Electrical equipment connection

  • HERVE BARON

    2015 Herv Baron

    Cable pulling

  • HERVE BARON

    2015 Herv Baron

    Arrangement of Technical rooms

  • HERVE BARON

    2015 Herv Baron

    Cable connections

  • HERVE BARON

    2015 Herv Baron

    Other Systems Field Equipment Installation

  • HERVE BARON

    2015 Herv Baron

    Control room consoles installation

  • HERVE BARON

    2015 Herv Baron

    Testing

  • HERVE BARON

    2015 Herv Baron

    Sub-System

    Junction Box

    Instrument Loop

    Instrument Cable

    Mech Equip

    Document Folder

    Handover System

    Elect Equip Circuit

    Instrument Tag

    Commissioning

  • HERVE BARON

    2015 Herv Baron

    The multiple sides of a Project

    Hum

    an Resources M

    anagement

    Project Control

    PROJECT

  • HERVE BARON

    2015 Herv Baron

    Project Organisation

    Project Manager

    Engineering Manager

    Project Engineers

    Discipline Engineers

    Process

    Civil

    Instrumentation

    Electrical

    Equipment

    Procurement Manager

    Purchasers Expediters Inspectors

    Site Manager

    Construction Manager

    Construction Superintendent

    Construction supervisor

    Construction superintendent

    Construction supervisor

    Project Control Manager

    Contract Manager

    Scheduling Manager Cost Control

  • HERVE BARON

    2015 Herv Baron

    Project procedures

  • HERVE BARON

    2015 Herv Baron

    Project temporary facilities

  • HERVE BARON

    2015 Herv Baron

    Project temporary facilities

  • HERVE BARON

    2015 Herv Baron

    Project temporary facilities

  • HERVE BARON

    2015 Herv Baron

    Project temporary facilities

  • HERVE BARON

    2015 Herv Baron

    Project temporary facilities

  • HERVE BARON

    2015 Herv Baron

    Construction Procedures

  • HERVE BARON

    2015 Herv Baron

  • HERVE BARON

    2015 Herv Baron

    Quality Control

  • HERVE BARON

    2015 Herv Baron

    Slump

    Sampling Temperature

    Quality Control

  • HERVE BARON

    2015 Herv Baron

    Quality Control

  • HERVE BARON

    2015 Herv Baron

    Cost Control

  • HERVE BARON

    2015 Herv Baron

    Insurance

  • HERVE BARON

    2015 Herv Baron

    Contracts

    P.O.

    Sub

    P.O.

    P.O.

    Main Contract

    Purchase Orders

    Sub-Contracts

    EPC

    Sub

  • HERVE BARON

    2015 Herv Baron

    Contracts

    Main Contract

    EPC

    Terms and Conditions

    Price

    Schedule

    Performance guarantees

    Technical basis

    Specifications, codes & stds

  • HERVE BARON

    2015 Herv Baron

    Contracts

    E P C

  • HERVE BARON

    2015 Herv Baron

    Contracts

    + x%

  • HERVE BARON

    2015 Herv Baron

    Construction contracts

    Civil

  • HERVE BARON

    2015 Herv Baron

    Construction contracts

    Mechanical

  • HERVE BARON

    2015 Herv Baron

    Construction contracts

    E&I

  • HERVE BARON

    2015 Herv Baron

    Construction contracts

    General Contractor

  • HERVE BARON

    2015 Herv Baron

    Contracts Terms and Conditions

    Main Contract

    EPC

    Obligations of the 2 parties

    Limit of liability

    Penalties in case of bad performance

    Conflict resolution

  • HERVE BARON

    2015 Herv Baron

    Quality Assurance (QA)

  • HERVE BARON

    2015 Herv Baron

    Quality Assurance (QA)

  • HERVE BARON

    2015 Herv Baron

    Quality Assurance (QA)

  • HERVE BARON

    2015 Herv Baron

    Quality Assurance (QA)

  • HERVE BARON

    2015 Herv Baron

    Discipline code

    A Instrumentation & Control

    C Civil engineering

    E Electrical

    G Project general documents

    J Mechanical

    K Safety

    M Piping & Layout

    P Processes

    S Steel Structures

    V Vessels Heat exchangers

    W Materials Welding

    Document code

    1 Installation drawings

    2 Detail drawings

    3 Diagrams

    4 Lists Bill of Quantities

    5 Isometrics

    6 Calculation notes

    7 Specifications

    8 Data sheets

    9 Requisitions

    Document Control

  • HERVE BARON

    2015 Herv Baron

    Document Control

  • HERVE BARON

    2015 Herv Baron

    Document Control

    Engineering

    Documents submitted to client

    Client

    Approval/

    Comments

    Vendors

    Documents submission Comments

  • HERVE BARON

    2015 Herv Baron

    Intranet / Internet

    Intranet / Internet

    Breakdown structures

    Projects

    Interfaces

    Reports

    Satellite Engineering

    Center

    Center 1 Sr. Mgmt Center 2 Sr.

    Mgmt

    Construction Site

    Electronic Document Management System

    Engineering documents

    Vendor documents

    Correspondence etc.

    Electronic Document Management System

  • HERVE BARON

    2015 Herv Baron

    Interface Management

  • HERVE BARON

    2015 Herv Baron

    7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36PLANT START-UPPIPING PRE-FABRICATION & INSTALLATION X X X X X X X X X XPIPING MATERIAL & DRAWINGS AT SITEPIPING MATERIAL MANUFACTURING & SHIPPING X X X X X XPURCHASE OF PIPING MATERIALTECHNICAL & COMMERCIAL CLARIFICATIONS X XCALL FOR TENDER FOR PIPING MATERIALPREPARE PIPING MATERIAL TAKE-OFF XPIPING ROUTING STUDIES X X XPIPING & INSTRUMENTATION DIAGRAMS (PIDs)

    PROJECT SCHEDULEMONTH

    1

    1

    2 3

    3

    4 5

    2

    4 5

    5

    Scheduling

  • HERVE BARON

    2015 Herv Baron

    Critical path of an Oil & Gas Project

    Extract from the book: The Oil & Gas Engineering Guide, Herv Baron, Editions Technip, 2015, page 225

  • HERVE BARON

    2015 Herv Baron

    Progress Monitoring How would you measure progress?

  • HERVE BARON

    2015 Herv Baron

    Progress Monitoring

  • HERVE BARON

    2015 Herv Baron

    Progress Monitoring

  • HERVE BARON

    2015 Herv Baron

    Progress Monitoring

  • HERVE BARON

    2015 Herv Baron

    15 years ago: 2D

    Today: 3D

    Tomorrow: 3D & data

    IT

  • HERVE BARON

    2015 Herv Baron

    IT

  • HERVE BARON

    2015 Herv Baron

    Safety

  • HERVE BARON

    2015 Herv Baron

    Safety

    Guard Rail System with ToeBoards

    Cross Bracing

    Planking

    Runner

    Bearer

    Longitudinal Brace

    Post

    Sill

  • HERVE BARON

    2015 Herv Baron

    Safety

  • HERVE BARON

    2015 Herv Baron

    Human resources / career path

    3-5 yrs

    5 yrs

    Graduate Engineer, 25 years old

    5-7 yrs

    40-45 yrs old Project Manager

    Engineering Manager/ Deputy Project Manager

    Project Engineer

    Process Engineer

    Note: the career pattern shown here is a very fast track one to the PM position... One would enjoy oneself just as well taking more time!

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide 2nd edition

    Do you want to know more... Much more?

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

    Discipline presentation: activities and deliverables

  • 2015 Herv Baron

    HERVE BARON

    The work of each

    Engineering discipline is described

  • 2015 Herv Baron

    HERVE BARON

    Design activities are explained, e.g., Plant

    Equipment layout

  • 2015 Herv Baron

    HERVE BARON

    Complex activities, such as

    QRA, are explained through a practical

    example.

  • 2015 Herv Baron

    HERVE BARON

    A sample of all common Engineering documents is

    included

  • 2015 Herv Baron

    HERVE BARON

    Difference between

    Engineering and Shop drawings

  • 2015 Herv Baron

    HERVE BARON

    Understand the main

    technical aspects, e.g., DCS vs ESD

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

    The overall process

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide 2nd edition

    Order direct from the publisher:

    http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html

    Slide Number 1 The actorsSlide Number 3Slide Number 4 The multiple sides of a Project The multiple sites of a ProjectSlide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34Slide Number 35Slide Number 36Slide Number 37Slide Number 38Slide Number 39Slide Number 40Slide Number 41Slide Number 42Slide Number 43Slide Number 44Slide Number 45Slide Number 46Slide Number 47Slide Number 48Slide Number 49Slide Number 50Slide Number 51Slide Number 52Slide Number 53Slide Number 54Slide Number 55Slide Number 56Slide Number 57Slide Number 58Slide Number 59Slide Number 60Slide Number 61Slide Number 62Slide Number 63Slide Number 64Slide Number 65Slide Number 66Slide Number 67Slide Number 68Slide Number 69Slide Number 70Slide Number 71Slide Number 72Slide Number 73Slide Number 74Slide Number 75Slide Number 76Slide Number 77Slide Number 78Slide Number 79Slide Number 80Slide Number 81Slide Number 82Slide Number 83Slide Number 84Slide Number 85Slide Number 86Slide Number 87Slide Number 88Slide Number 89Slide Number 90Slide Number 91Slide Number 92Slide Number 93Slide Number 94Slide Number 95Slide Number 96Slide Number 97Slide Number 98Slide Number 99Slide Number 100Slide Number 101Slide Number 102Slide Number 103The Oil & Gas Engineering Guide2nd editionSlide Number 105ProcurementProcurement / StepsProcurement / Supplier selection criteriaProcurementExpeditingExpeditingInspectionInspectionSlide Number 114Slide Number 115 ShippingSlide Number 117Slide Number 118Slide Number 119Slide Number 120Slide Number 121Slide Number 122Slide Number 123Slide Number 124Slide Number 125Slide Number 126Slide Number 127Slide Number 128Slide Number 129Slide Number 130Slide Number 131Slide Number 132Slide Number 133Slide Number 134Slide Number 135Slide Number 136Slide Number 137Slide Number 138Slide Number 139Slide Number 140Slide Number 141Slide Number 142Slide Number 143Slide Number 144Slide Number 145Slide Number 146Commissioning The multiple sides of a Project Project OrganisationProject proceduresSlide Number 151Slide Number 152Slide Number 153Slide Number 154Slide Number 155Slide Number 156Slide Number 157Slide Number 158Slide Number 159Slide Number 160Cost ControlSlide Number 162ContractsContractsContractsContractsConstruction contractsConstruction contractsConstruction contractsConstruction contractsContractsTerms and ConditionsQuality Assurance (QA)Quality Assurance (QA) Quality Assurance (QA)Quality Assurance (QA)Document ControlDocument ControlDocument Control Electronic Document Management System Interface ManagementSlide Number 181Slide Number 182 Progress Monitoring Progress Monitoring Progress Monitoring Progress Monitoring IT IT Safety Safety Safety Human resources / career pathThe Oil & Gas Engineering Guide2nd editionThe Oil & Gas Engineering Guide - 2nd editionThe Oil & Gas Engineering Guide - 2nd editionSlide Number 196Slide Number 197Slide Number 198Slide Number 199Slide Number 200Slide Number 201The Oil & Gas Engineering Guide - 2nd editionThe Oil & Gas Engineering Guide - 2nd editionThe Oil & Gas Engineering Guide - 2nd editionThe Oil & Gas Engineering Guide - 2nd editionThe Oil & Gas Engineering Guide2nd edition