EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity
ESS Group, Inc.
Stacey Snow, PE, ENV SP
Environmental Consulting & Engineering for Over 20 YearsOffices in Waltham, MA and East Providence, RI
Mike FeinblattRoger Gosciminski, TURP
essgroup.com |
12345
Agenda
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 2
Introductions
EHS Compliance Update
EPA 2021 MSGP
Discussion
Resources
EPA 2021 MSGP
Presentation will be recorded
essgroup.com |
EHS Compliance Update
Compliance Calendar3/01 EPA Tier II Reporting3/01 EPA Title V Annual Certification 3/01 MassDEP Hazardous Waste & Recycling Annual Report3/02 OSHA Form 300A Electronic Reporting3/31 EPA Greenhouse Gas Report4/01 MassDEP Triennial Source Registration4/15 MassDEP Greenhouse Gas Report4/15 NHDES Air Emission Statement 4/15 Title V Annual Compliance Certification | NH5/01 MassDEP Annual Source Registration (Operating Permit)
5/30 EPA 2021 MSGP Notice of Intent and SWPPP Update6/01 MassDEP Annual Source Registration (Other Annual)7/01 EPA Toxic Release Inventory Report7/01 EPCRA TRI – Forms R & A7/01 MassDEP Toxic Use Reduction Report
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 3
Ask us for the pdf
essgroup.com |
Stormwater Program Overview• Prepare
• Eligibility• Update SWPPP• Control Measures
• Coverage• NOI
• Check-up• Inspections• Visual Assessments• Monitoring
• Follow-up• AIM• Reporting
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 4
SWPPPStormwater Pollution Prevention Plan
essgroup.com |
EPA 2021 MSGP Changes
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity
• Public Sign of Permit CoverageCurrently Included in Other NPDES Permits
• Monitoring Changes
• Corrective Action ChangesAdditional Implementation Measures (AIM)
• Consideration of Major Storm Control Measure Enhancements to Address Major Storm Events and Flooding (Such as: Elevated Storage of Materials, Temporarily Reducing Outdoor Storage, Delaying Deliveries)
5
essgroup.com |
EPA 2021 MSGP Changes - Monitoring
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity
• Indicator “Report Only” Monitoring • pH, TSS, COD
• Applies to All Sectors with no Existing Benchmarks• Quarterly Sampling for Permit Term
• PAHs• If Coal-tar sealcoat used or if Specified for Sector• Bi-annual Sampling in First and Fourth Permit years
• Updated Benchmark Values - New EPA Water Quality Criteria• Removed Manganese and Iron Benchmarks• Copper Benchmark is 5.19 ug/L (no longer hardness dependent)• Thresholds Updated for Aluminum, Selenium and Cadmium
6
essgroup.com |
EPA 2021 MSGP Changes - Monitoring
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity
• Benchmark Monitoring • Sample in First and Fourth Permit Years
• Continue Sampling if Benchmarks Exceeded
• Starts in First Full Quarter After NOI
• Impaired Waters Monitoring• Sample in First and Fourth Permit Years
• Must Sample Annually for Pollutants Detected in First and Fourth Years
7
essgroup.com |EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity
ESS Group Five-Year Compliance Calendar Template
8
1 2021 - 2022
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Indicator Monitoring (PAH)4
Benchmark MonitoringImpaired Waters Monitoring
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Indicator Monitoring (PAH)4
Benchmark MonitoringAnnual Report7
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring
2 2022 - 2023
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
Impaired Waters Monitoring6
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
Annual Report7
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
3 2023 - 2024
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
Impaired Waters Monitoring6
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
Annual Report7
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
4 2024 - 2025
Facility Inspection1Visual Assessment2Indicator Monitoring (pH, TSS, COD)3Indicator Monitoring (PAH)4Benchmark MonitoringImpaired Waters Monitoring
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Indicator Monitoring (PAH)4
Benchmark MonitoringAnnual Report7
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring
5 2025 - 2026
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
Impaired Waters Monitoring6
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
Annual Report7
Facility Inspection1
Visual Assessment2
Indicator Monitoring (pH, TSS, COD)3
Benchmark Monitoring5
Oct - Dec Jan - Mar Apr - JunYear1st
Quarter2nd 3rd 4th
Jul - Sep
essgroup.com |
• Level 1 – Annual Four-Quarter Average Over Benchmark or Sum of Less than Four Quarters Over 4X Benchmark
• Review Existing Control Measures, SWPPP and On-site Activities
• Install Additional Implementation Measures
• Sample Additional Four Quarters • Deadline 14 Days
If Infeasible, Document and Complete Within 45 Days
Additional Implementation Measures (AIM)
Level 1EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 9
essgroup.com |
• Level 2 – Repeat of Exceedance While in Level 1
• Implement Additional Stormwater Control Measures
• Sample Additional Four Quarters• Deadline 14 Days
If Infeasible, Document and Complete Within 45 Days
Additional Implementation Measures (AIM)
Level 2
Level 1EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 10
essgroup.com |
• Level 3 – Repeat of Exceedance while in Level 2
• Implement Permanent, Structural or Treatment Technologies
• Deadline 30 Days If Infeasible, Document and Complete Within 90 Days Can Request Extension from EPA
• Sample Additional Four Quarters
Additional Implementation Measures (AIM)
Level 3
Level 2
Level 1EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 11
essgroup.com |
Additional Implementation Measures (AIM)
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity
• AIM Responses Must Be Reported in Annual Report
• Exemptions Allowed for Natural Background Sources, Run-on, One-time Abnormal Event, Facility Specific Copper and Aluminum Benchmarks
• Immediate Actions Must Be Completed the Same Day, Unless Too Late in the Workday, Then It Can Be Completed the Following Workday Morning
12
essgroup.com |
AIM Preparation Plan
• Review 1st and 2nd Quarter 2021 Benchmark Monitoring Data• Evaluate Existing Treatment System Effectiveness (Influent/EffluentSampling)• Review Best Management Practices (BMPs)• Identify Source Reduction Opportunities• Identify Stormwater Management Control Options• Identify Potential Treatment Options• Review Potential AIM Exemptions
• Natural Background Pollutant Levels• Run-On• Abnormal Events• Facility Specific Risk Analysis
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 14
0
1
2
3
4
5
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
mg/l
mg/l
essgroup.com |
NOI Submittal Plan
• Consider Enhanced Measures for Major Storm Events• Update SWPPP• Submit Notice of Intent (NOI)• Post Public Copy of SWPPP• Post Public Signage
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 15
SWPPP
essgroup.com |
Discussion
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity
• Next Steps• Update SWPPP• File Notice of Intent• Evaluate Current Compliance Status• Develop Action Plan• Five-Year Compliance Calendar• Consider Sampling for Background
Levels, Treatment Efficiencies, etc.• Provide SWPPP Training
• Other Stormwater Program Issues
• Feedback
• Future Topics
16
essgroup.com |
Resources
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity
• EPA 2021 MSGPhttps://www.epa.gov/npdes/stormwater-discharges-industrial-activities-epas-2021-msgp
• ESS Compliance Calendarhttps://www.essgroup.com/resources/environmental-compliance-calendar/
• Updated EPA Industrial Stormwater Monitoring and Sampling Guide
• NetworkingLinkedIn Group
Attendance List
• Presentation
17
Thank YouEHS Roundtable Attendees For Your Participation
Stacey Snow, PE, ENV SP
Roger Gosciminski, TURP
Mike Feinblatt
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity