EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

17
EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity ESS Group, Inc. Stacey Snow, PE, ENV SP Environmental Consulting & Engineering for Over 20 Years Offices in Waltham, MA and East Providence, RI Mike Feinblatt Roger Gosciminski, TURP

Transcript of EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

Page 1: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity

ESS Group, Inc.

Stacey Snow, PE, ENV SP

Environmental Consulting & Engineering for Over 20 YearsOffices in Waltham, MA and East Providence, RI

Mike FeinblattRoger Gosciminski, TURP

Page 2: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

12345

Agenda

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 2

Introductions

EHS Compliance Update

EPA 2021 MSGP

Discussion

Resources

EPA 2021 MSGP

Presentation will be recorded

Page 3: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

EHS Compliance Update

Compliance Calendar3/01 EPA Tier II Reporting3/01 EPA Title V Annual Certification 3/01 MassDEP Hazardous Waste & Recycling Annual Report3/02 OSHA Form 300A Electronic Reporting3/31 EPA Greenhouse Gas Report4/01 MassDEP Triennial Source Registration4/15 MassDEP Greenhouse Gas Report4/15 NHDES Air Emission Statement 4/15 Title V Annual Compliance Certification | NH5/01 MassDEP Annual Source Registration (Operating Permit)

5/30 EPA 2021 MSGP Notice of Intent and SWPPP Update6/01 MassDEP Annual Source Registration (Other Annual)7/01 EPA Toxic Release Inventory Report7/01 EPCRA TRI – Forms R & A7/01 MassDEP Toxic Use Reduction Report

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 3

Ask us for the pdf

Page 4: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

Stormwater Program Overview• Prepare

• Eligibility• Update SWPPP• Control Measures

• Coverage• NOI

• Check-up• Inspections• Visual Assessments• Monitoring

• Follow-up• AIM• Reporting

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 4

SWPPPStormwater Pollution Prevention Plan

Page 5: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

EPA 2021 MSGP Changes

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity

• Public Sign of Permit CoverageCurrently Included in Other NPDES Permits

• Monitoring Changes

• Corrective Action ChangesAdditional Implementation Measures (AIM)

• Consideration of Major Storm Control Measure Enhancements to Address Major Storm Events and Flooding (Such as: Elevated Storage of Materials, Temporarily Reducing Outdoor Storage, Delaying Deliveries)

5

Page 6: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

EPA 2021 MSGP Changes - Monitoring

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity

• Indicator “Report Only” Monitoring • pH, TSS, COD

• Applies to All Sectors with no Existing Benchmarks• Quarterly Sampling for Permit Term

• PAHs• If Coal-tar sealcoat used or if Specified for Sector• Bi-annual Sampling in First and Fourth Permit years

• Updated Benchmark Values - New EPA Water Quality Criteria• Removed Manganese and Iron Benchmarks• Copper Benchmark is 5.19 ug/L (no longer hardness dependent)• Thresholds Updated for Aluminum, Selenium and Cadmium

6

Page 7: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

EPA 2021 MSGP Changes - Monitoring

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity

• Benchmark Monitoring • Sample in First and Fourth Permit Years

• Continue Sampling if Benchmarks Exceeded

• Starts in First Full Quarter After NOI

• Impaired Waters Monitoring• Sample in First and Fourth Permit Years

• Must Sample Annually for Pollutants Detected in First and Fourth Years

7

Page 8: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity

ESS Group Five-Year Compliance Calendar Template

8

1 2021 - 2022

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Indicator Monitoring (PAH)4

Benchmark MonitoringImpaired Waters Monitoring

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Indicator Monitoring (PAH)4

Benchmark MonitoringAnnual Report7

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring

2 2022 - 2023

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

Impaired Waters Monitoring6

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

Annual Report7

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

3 2023 - 2024

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

Impaired Waters Monitoring6

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

Annual Report7

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

4 2024 - 2025

Facility Inspection1Visual Assessment2Indicator Monitoring (pH, TSS, COD)3Indicator Monitoring (PAH)4Benchmark MonitoringImpaired Waters Monitoring

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Indicator Monitoring (PAH)4

Benchmark MonitoringAnnual Report7

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring

5 2025 - 2026

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

Impaired Waters Monitoring6

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

Annual Report7

Facility Inspection1

Visual Assessment2

Indicator Monitoring (pH, TSS, COD)3

Benchmark Monitoring5

Oct - Dec Jan - Mar Apr - JunYear1st

Quarter2nd 3rd 4th

Jul - Sep

Page 9: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

• Level 1 – Annual Four-Quarter Average Over Benchmark or Sum of Less than Four Quarters Over 4X Benchmark

• Review Existing Control Measures, SWPPP and On-site Activities

• Install Additional Implementation Measures

• Sample Additional Four Quarters • Deadline 14 Days

If Infeasible, Document and Complete Within 45 Days

Additional Implementation Measures (AIM)

Level 1EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 9

Page 10: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

• Level 2 – Repeat of Exceedance While in Level 1

• Implement Additional Stormwater Control Measures

• Sample Additional Four Quarters• Deadline 14 Days

If Infeasible, Document and Complete Within 45 Days

Additional Implementation Measures (AIM)

Level 2

Level 1EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 10

Page 11: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

• Level 3 – Repeat of Exceedance while in Level 2

• Implement Permanent, Structural or Treatment Technologies

• Deadline 30 Days If Infeasible, Document and Complete Within 90 Days Can Request Extension from EPA

• Sample Additional Four Quarters

Additional Implementation Measures (AIM)

Level 3

Level 2

Level 1EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 11

Page 12: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

Additional Implementation Measures (AIM)

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity

• AIM Responses Must Be Reported in Annual Report

• Exemptions Allowed for Natural Background Sources, Run-on, One-time Abnormal Event, Facility Specific Copper and Aluminum Benchmarks

• Immediate Actions Must Be Completed the Same Day, Unless Too Late in the Workday, Then It Can Be Completed the Following Workday Morning

12

Page 13: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

AIM Preparation Plan

• Review 1st and 2nd Quarter 2021 Benchmark Monitoring Data• Evaluate Existing Treatment System Effectiveness (Influent/EffluentSampling)• Review Best Management Practices (BMPs)• Identify Source Reduction Opportunities• Identify Stormwater Management Control Options• Identify Potential Treatment Options• Review Potential AIM Exemptions

• Natural Background Pollutant Levels• Run-On• Abnormal Events• Facility Specific Risk Analysis

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 14

0

1

2

3

4

5

1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

mg/l

mg/l

Page 14: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

NOI Submittal Plan

• Consider Enhanced Measures for Major Storm Events• Update SWPPP• Submit Notice of Intent (NOI)• Post Public Copy of SWPPP• Post Public Signage

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity 15

SWPPP

Page 15: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

Discussion

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity

• Next Steps• Update SWPPP• File Notice of Intent• Evaluate Current Compliance Status• Develop Action Plan• Five-Year Compliance Calendar• Consider Sampling for Background

Levels, Treatment Efficiencies, etc.• Provide SWPPP Training

• Other Stormwater Program Issues

• Feedback

• Future Topics

16

Page 16: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

essgroup.com |

Resources

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity

• EPA 2021 MSGPhttps://www.epa.gov/npdes/stormwater-discharges-industrial-activities-epas-2021-msgp

• ESS Compliance Calendarhttps://www.essgroup.com/resources/environmental-compliance-calendar/

• Updated EPA Industrial Stormwater Monitoring and Sampling Guide

• NetworkingLinkedIn Group

Attendance List

• Presentation

17

Page 17: EPA 2021 NPDES Multi-Sector General Permit (MSGP) for ...

Thank YouEHS Roundtable Attendees For Your Participation

Stacey Snow, PE, ENV SP

Roger Gosciminski, TURP

Mike Feinblatt

EPA 2021 NPDES Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activity