Page 1: Environmental Monitoring From a State Perspective 13... · State Decommissioning Timeline 6o year to complete . State Perspective on Kewaunee Decommissioning Timeline KPS 2013 2017

Environmental Monitoring From a

State Perspective

Page 2: Environmental Monitoring From a State Perspective 13... · State Decommissioning Timeline 6o year to complete . State Perspective on Kewaunee Decommissioning Timeline KPS 2013 2017

Purpose of the Environmental Monitoring

Program

• Establish long term Base-line isotopic back-ground

• Demonstrate Compliance

• Maintain public confidence

• Monitoring Started prior to electrical generation

• Monitoring area • Within 10 miles (16.1km) of a nuclear power plant

Page 3: Environmental Monitoring From a State Perspective 13... · State Decommissioning Timeline 6o year to complete . State Perspective on Kewaunee Decommissioning Timeline KPS 2013 2017

Decommissioning

Operation Decommissioning Land

Reuse

Shutdown

SAFSTOR Fuel Decontamination Dismantling

Transfer to

Dry Cask

Land

Reuse

NRC Decommissioning Timeline

Operation

Shutdown Fuel

Transfer to

Dry Cask

Decontamination

and/or Active

Dismantling - Demolition

SAFSTOR

No Active

Decommissioning

ISFSI

Land

Reuse

State Decommissioning Timeline

6o year to complete

Page 4: Environmental Monitoring From a State Perspective 13... · State Decommissioning Timeline 6o year to complete . State Perspective on Kewaunee Decommissioning Timeline KPS 2013 2017

State Perspective on Kewaunee Decommissioning Timeline

KPS

2013 2017

Operation

Shutdown Fuel

Transfer to

Dry Cask

Decommissioning

Decontamination

and/or Active

Dismantling - Demolition

SAFSTOR

No Active

Decommissioning

ISFSI

Land

Reuse

Operation Decommissioning Land

Reuse

Shutdown

SAFSTOR Fuel Decontamination Dismantling

Transfer to

Dry Cask

Land

Reuse

NRC Decommissioning Timeline

Page 5: Environmental Monitoring From a State Perspective 13... · State Decommissioning Timeline 6o year to complete . State Perspective on Kewaunee Decommissioning Timeline KPS 2013 2017

Type of Samples Collected at KPS

Kewaunee Power Station

Sample Type Number of Samples

Collected

air particulate 156 / 0

Iodine cartridge 78 / 0

Precipitation 24 / 0

TLD 64 / 32

surface water 20 / 2

shoreline sediment 3 / 3

vegetation 9 / 8

soil 9 / 8

well water 5 / 4

Total: 368 / 57

SAFSTOR (No Active Decommissioning)

Samples during power production / SAFSTOR

Page 6: Environmental Monitoring From a State Perspective 13... · State Decommissioning Timeline 6o year to complete . State Perspective on Kewaunee Decommissioning Timeline KPS 2013 2017

State Perspective on LaCrosse Decommissioning Timeline

1987 2012

2005 - 2007

1991 2016

LaCrosse Boiling Water Reactor (LACBWR)

2019

Operation

Shutdown Fuel

Transfer

Dry

Cask

Decommissioning

Decontamination

and/or Active

Dismantling -

Demolition

SAFSTOR

No Active

Decommissioning

ISFSI

Land

Reuse

Decommissioning (DECON)

Decontamination

and Active

Dismantling

2012 - 2014

Operation Decommissioning Land

Reuse

Shutdown

SAFSTOR Fuel Decontamination Dismantling

Transfer to

Dry Cask

Land

Reuse

NRC Decommissioning Timeline

Page 7: Environmental Monitoring From a State Perspective 13... · State Decommissioning Timeline 6o year to complete . State Perspective on Kewaunee Decommissioning Timeline KPS 2013 2017

Type of Samples Collected at LACBWR

LaCrosse Boiling Water Reactor

Sample Type Number of Samples

Collected

air particulate 0 / 52

Iodine cartridge 0 / 0

TLD 16 / 16

surface water 1 / 1

bottom sediment 3 / 3

vegetation 2 / 2

soil 2 / 2

well water 2 / 4

Extra Tritium (Bloom) 0 / 5

Total: 26 / 85

Active Decommissioning

SAFSTOR / Active Decommissioning

Page 8: Environmental Monitoring From a State Perspective 13... · State Decommissioning Timeline 6o year to complete . State Perspective on Kewaunee Decommissioning Timeline KPS 2013 2017

Lessons Learned

• Sample Collection Parallel Decommissioning Activity

• Find a way to preserve records (time capsule)

• Maintain contacts with appropriate state and federal agencies.

• Ensure that you’re on call list for prompt notification

• Know the waste route

• Document

Page 9: Environmental Monitoring From a State Perspective 13... · State Decommissioning Timeline 6o year to complete . State Perspective on Kewaunee Decommissioning Timeline KPS 2013 2017

LaCrosse Boiling Water

Reactor

Decommissioning &

Demolition Time-lapse