. Version 1: August 2010 1
Application for authorisation in terms of the National Environmental
Management Act, 1998 (Act No. 107 of 1998), as amended and the
Environmental Impact Assessment Regulations, 2010
PROJECT TITLE
Environmental Impact Assessment for the remediation and upgrading of Delmas Coal’s Discard Dump and Pollution Control Dams. Kindly note that: 1. This application form is current as of 2 August 2010. It is the responsibility of the applicant to ascertain whether
subsequent versions of the form have been published or produced by the competent authority. 2. The application must be typed within the spaces provided in the form. The sizes of the spaces provided are not
necessarily indicative of the amount of information to be provided. Spaces are provided in tabular format and will extend automatically when each space is filled with typing.
3. Where applicable black out the boxes that are not applicable in the form. 4. Incomplete applications may be returned to the applicant for revision. 5. The use of the phrase “not applicable” in the form must be done with circumspection. Should it be done in respect of
material information required by the competent authority for assessing the application, it may result in the rejection of the application as provided for in the Regulations.
6. This form must be submitted to the Department at the postal address of the relevant DISTRICT OFFICE given below or by delivery thereof to the relevant DISTRICT OFFICE. Should the application form not be submitted at the relevant district office, it will not be considered.
7. No faxed or e-mailed applications will be accepted.
8. If the applicant is not the owner or person in control of the land on which the activity is to be undertaken, the written notice of the proposed activity as referred to in Regulation 15, as well as proof of serving such notice on the owner or person in control of the land, must be attached to this form. Should the application form not be accompanied by such notice, it will be rejected.
9. If permission has been granted in terms of Regulation 20(3) to apply S&EIR instead of basic assessment to the application, or if permission has been granted in terms of 20(4) to apply basic assessment instead of S&EIR to the application, a copy of such authorisation must be attached to this application form.
10. Unless protected by law, all information filled in on this application will become public information on receipt by the competent authority. Any interested and affected party should be provided with the information contained in this application on request, during any stage of the application process.
(For official use only)
File Reference Number:
NEAS Reference Number:
Date Received:
Responsible Official:
. Version 1: August 2010 2
DEPARTMENTAL DETAILS
HEAD OFFICE (18 Jones Street, Nelpruit)
EHLANZENI DISTRICT (50 Murray Street, Nelspruit)
NKANGALA DISTRICT (Pavilion Centre, Cnr Botha & Northey Streets, Witbank)
GERT SIBANDE DISTRICT (13 De Jager Street, Ermelo)
Attention: Directorate: Environmental Impact Management Private Bag X 11215 Nelspruit, 1200 Queries should be directed to the Directorate: Environmental Impact Management at: Tel: (013) 759 4000 Fax (013) 759 4165
Attention: Directorate: Environmental Impact Management Private Bag X 11215 Nelspruit, 1200 Queries should be directed to the Directorate: Environmental Impact Management at: Tel: 0824068831 Fax: Email: [email protected]
Attention: Directorate: Environmental Impact Management P. O. Box 7255 Witbank, 1035 Queries should be directed to the Directorate: Environmental Impact Management at: Tel: 0136902595/6901358/0766441707 Fax: Email:[email protected]
Attention: Directorate: Environmental Impact Management P. O. Box 2777 Ermelo, 2351 Queries should be directed to the Directorate: Environmental Impact Management at: Tel: 0178192828/9 0178114815 0798419582 Fax: E mail:[email protected]
Applications to be sent direct to district office
SITE IDENTIFICATION AND LINKAGE
Please indicate all the Surveyor-general 21 digit site (erf/farm/portion) reference numbers for all sites (including portions of sites) that are part of the application.
T 0 I R 0 0 0 0 0 0 0 0 0 2 6 5 0 0 0 1 6
T 0 I R 0 0 0 0 0 0 0 0 0 2 6 5 0 0 0 2 5
T 0 I R 0 0 0 0 0 0 0 0 0 2 6 5 0 0 0 2 9
(if there are more than 6, please attach a list with the rest of the numbers) (These numbers will be used to link various different applications, authorisations, permits etc. that may be connected to a specific site)
. Version 1: August 2010 3
PROJECT TITLE
Environmental Impact Assessment for the remediation and upgrading of Delmas Coal’s Discard Dump and Pollution Control Dams.
The entire project will entail the following (full detail of the project can also be appended):
Delmas Coal, a subsidiary of Kuyasa Mining, intends to undertake the possible remediation and upgrading of its existing discard dump and pollution control dams.
1. BACKGROUND INFORMATION
Project applicant: Delmas Coal (Pty) Ltd (Delmas Coal is a wholly owned subsidiary of Kuyasa Mining (Pty) Ltd
Trading name (if any): Delmas Coal
Contact person: Mr Mpumelelo Saliwa
Physical address: Hawerklip Farm, Delmas 2210
Postal address: Private Bag X0002, Delmas
Postal code: 2210 Cell: +27 71 681 0661
Telephone: +27 13 665 7000 Fax: +27 13 665 7016
E-mail: [email protected]
Environmental Assessment Practitioner:
Jones & Wagener (Pty) Ltd
Contact person: Marius van Zyl
Postal address: PO Box 1434 Rivonia
Postal code: 2128 Cell: 082 880 1250
Telephone: 011 519 0200 Fax: 011 519 0201
E-mail: [email protected]
Qualifications & relevant experience
BSc (Hons): Biochemistry & Environmental Management. 27 years’ experience in environmental management
Professional affiliation(s) (if any) SACNASP No 400171/87
Landowner: Delmas Coal (Pty) Ltd
Contact person: Mr Mpumelelo Saliwa
Postal address: Private Bag X0002, Delmas
Postal code: 2210 Cell: +27 71 681 0661
Telephone: +27 13 665 7000 Fax: +27 13 665 7016
E-mail: [email protected]
In instances where there is more than one landowner, please attach a list of landowners with their contact details to this application.
District Municipality in whose jurisdiction the proposed activity will fall (Delete which is not applicable):
Ehlanzeni Nkangala Gert Sibande
Local authority in whose jurisdiction the proposed activity will fall:
Victor Khanye Local Municipality
Nearest town: Delmas
Contact person: Ms Palesa Maredi
Postal address: P.O. Box 6, Delmas
Postal code: 2210 Cell:
Telephone: 013 665 6021 Fax: 013 665 2913
E-mail: [email protected]
. Version 1: August 2010 4
In instances where there is more than one local authority involved, please attach a list of local authorities with their contact details to this application.
Property description/physical address:
Portions 16, 25 and 29 of the Farm Haverklip 265 IR, Mpumalanga
(Farm name, portion, registration division etc.) Where a large number of properties are involved (e.g. linear activities), please attach a full list to this application.
Current land-use zoning: Agricultural
In instances where there is more than one current land-use zoning, please attach a list of current land use zonings that also indicate which portions each use pertains to, to this application.
Locality map:
A locality map must be attached to this document. The scale of the locality map must be relevant to the size of the development (at least 1:50 000. For linear activities of more than 25 kilometres, a smaller scale e.g. 1:250 000 can be used). The scale must be indicated on the map. The map must indicate the following:
an accurate indication of the project site position as well as the positions of the alternative sites, if any;
road access from all major roads in the area;
road names or numbers of all major roads as well as the roads that provide access to the site(s);
all roads within a 1km radius of the site or alternative sites; and
a north arrow;
a legend; and
locality GPS co-ordinates (Indicate the position of the activity using the latitude and longitude of the centre point of the site for each alternative site. The co-ordinates should be in degrees and decimal minutes. The minutes should have at least three decimals to ensure adequate accuracy. The projection that must be used in all cases is the WGS84 spheroid in a national or local projection).
Please see Appendix A
2. ACTIVITIES APPLIED FOR TO BE AUTHORISED
For an application for authorisation that involves more than one listed or specified activity that, together, make up one development proposal, all the listed activities pertaining to this application must be indicated. Indicate the number and date of the relevant notice:
Activity No (s) (in terms of the relevant notice) :
Describe each listed activity as per the detailed project description (and not as per wording of the relevant Government Notice)1:
No. 545 of 18 June 2010
Activity No: 5
The existing discard dump and pollution control dams of Delmas Coal is to be remediated and upgraded. The remediated and upgraded discard dump and pollution control dam(s) require a Section 21(g) water use licence for the disposal of waste in terms of the provisions of the National Water Act. As Section 21(g) controls the release of pollution and effluent, Activity 5 of GNR 545 is triggered.
Activity No: 19 The highest level of the pollution control dam wall may be equal or in excess of 5 metres when measured on the down slope side after being upgraded/reconstructed.
No. 544 of 18 June 2010
Activity No: 11 The reconstruction of the pollution control dam and the pump station may be closer than 32 metres from a wetland, which is part of a watercourse. Some new canals for the conveyance of impacted mine water may also be constructed closer than 32 metres from a wetland.
Activity No: 18 During the rehabilitation of the existing pollution control dams
and the possible reconstruction of one of them, more than 5 cubic metres of soil may be excavated or deposited within a wetland, which is part of a watercourse.
1 Please note that this description should not be a repetition of the listed activity as contained in the relevant
Government Notice, but should be a brief description of activities to be undertaken as per the project
description
. Version 1: August 2010 5
Activity No: 22 During rehabilitation and upgrading of the existing discard dump and pollution control dams, construction roads wider than 8 metres may be required to ensure earthmoving equipment manoeuvrability.
Activity No: 39 Existing surface water canals may have to be expanded during the rehabilitation and upgrading of the discard dump and pollution control dams. This may occur closer than 32 metres from a watercourse.
Activity No: 47 During the upgrade of the discard dump and pollution control dams, the width of existing roads in the area may have to be increased by more than 6 metres to accommodate earthmoving equipment.
Activity No: 55 Following an assessment of the existing dams, which may have a dam wall height of 5 metres or more, it may be decided to increase the height of one of the existing dams by more than 2.5 metres.
No 546 of 18 June 2010
Activity No: 14 For the reconstruction of the pollution control dam an area of more than 5 hectares, containing indigenous vegetation, may have to be cleared. A construction camp and lay-down area may also be required.
Please note that any authorisation that may result from this application will only cover activities specifically applied for.
3. TYPE OF APPLICATION
3.1 Application for Basic Assessment
Is this an application for conducting a basic assessment (as defined in the Regulations)? YES NO
Please indicate when the basic assessment report will be submitted:
N/A
3.2 Application for Scoping and Environmental Impact Assessment (S&EIR)
Is this an application for Scoping and EIR (as defined in the Regulations)? YES NO
Please indicate when the Scoping Report (including the Plan of Study for EIA) will be submitted:
MARCH 2014
. Version 1: August 2010 8
APPENDIX A
LOCALITY MAP OF DELMAS COAL
R50
Dam 2
Wilg
e R
iver
ControlPollution
Dam 1 ControlPollution
Access RoadDelmas Coal
OfficesMine
Figure 1
Job No: D910-04
LOCALITY PLAN
Delmas Coal