JNTUWORLD Code No: K0123 Set No. 1 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD IV B.Tech. II Sem., II Mid-Term Examinations, March/April – 2011 ENVIRONMENTAL IMPACT ASSESSMENT AND MANAGEMENT Objective Exam Name: ______________________________ Hall Ticket No. A Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 20. I Choose the correct alternative: 1. The authorities to be appointed under the Indian Wildlife Act are [ ] a) Director b) Chief Wildlife Warden c) Wildlife Advisor d) All the above 2. The Indian Wildlife protection Act was established in the year [ ] a) 1977 b) 1980 c)1972 d) 1967 3. Site Inspection comes under ____________ stage of environmental audit. [ ] a) Audit b) Pre-audit c)Post-Audit d) None of the above 4. Which is of the following is listed under the EPA? [ ] a) laying down procedures and safeguards for the prevention of accidents which may cause environmental pollution b) examination of materials and substances as are likely to cause environmental pollution c) carrying out and sponsoring investigations and research relating to problems of environmental pollution d)All the above 5. ________ is the environmental standard against which an organization can be assessed. [ ] a) ISO 14001 b) ISO 14002 c) ISO 14005 d) ISO 14007 6. In ____________, the Council on Environmental Policy established procedural and content guidelines for environmental impact statements. [ ] a)1980 b)1971 c)1989 d)1990 7. According to Act of Prohibition of Hunting, no person shall hunt any wild animal specified in Schedule, I, II, III and IV except as provided under section ______ and section ______. [ ] a)10 and 15 b)11 and 12 c)5 and 6 d)7 and 8 8. Under the Code of Audit Practice, appointed auditors are also required to comply with the current professional standards issued by the independent [ ] a) Auditing Practices Board b) Auditing Testing Board c) Auditing Practices Commission d) Auditing Code Institute 9. The ___________ team has unrestricted access to all activities undertaken in order to review, appraise and report on the accuracy of financial audits. [ ] a)TGM b)ACT c)IAT d)DBT 10. The destruction of the forests is occurring due to various reasons, one of the main and strongest reasons being the [ ] a) short term economic benefits b) long term economic benefits c) short term agricultural benefits d) to create more grazing land Cont……2 www.jntuworld.com www.jntuworld.com

Transcript of Environmental Impact Assessment and Management(1)

Page 1: Environmental Impact Assessment and Management(1)

JNTUWORLD

Code No: K0123 Set No. 1 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD IV B.Tech. II Sem., II Mid-Term Examinations, March/April – 2011

ENVIRONMENTAL IMPACT ASSESSMENT AND MANAGEMENT Objective Exam

Name: ______________________________ Hall Ticket No. A

Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 20. I Choose the correct alternative: 1. The authorities to be appointed under the Indian Wildlife Act are [ ]

a) Director b) Chief Wildlife Warden c) Wildlife Advisor d) All the above 2. The Indian Wildlife protection Act was established in the year [ ]

a) 1977 b) 1980 c)1972 d) 1967 3. Site Inspection comes under ____________ stage of environmental audit. [ ] a) Audit b) Pre-audit c)Post-Audit d) None of the above 4. Which is of the following is listed under the EPA? [ ]

a) laying down procedures and safeguards for the prevention of accidents which may cause environmental pollution b) examination of materials and substances as are likely to cause environmental pollution c) carrying out and sponsoring investigations and research relating to problems of environmental pollution d)All the above

5. ________ is the environmental standard against which an organization can be assessed. [ ] a) ISO 14001 b) ISO 14002 c) ISO 14005 d) ISO 14007 6. In ____________, the Council on Environmental Policy established procedural and content

guidelines for environmental impact statements. [ ] a)1980 b)1971 c)1989 d)1990

7. According to Act of Prohibition of Hunting, no person shall hunt any wild animal specified in

Schedule, I, II, III and IV except as provided under section ______ and section ______. [ ] a)10 and 15 b)11 and 12 c)5 and 6 d)7 and 8

8. Under the Code of Audit Practice, appointed auditors are also required to comply with the current

professional standards issued by the independent [ ] a) Auditing Practices Board b) Auditing Testing Board c) Auditing Practices Commission d) Auditing Code Institute

9. The ___________ team has unrestricted access to all activities undertaken in order to review,

appraise and report on the accuracy of financial audits. [ ] a)TGM b)ACT c)IAT d)DBT

10. The destruction of the forests is occurring due to various reasons, one of the main and strongest

reasons being the [ ] a) short term economic benefits b) long term economic benefits c) short term agricultural benefits d) to create more grazing land Cont……2

www.jntuworld.com

www.jntuworld.com

Page 2: Environmental Impact Assessment and Management(1)

JNTUWORLD

Code No: K0123 :2: Set No. 1 II Fill in the blanks 11. The approach of using protocol to existing systems and operations prior to implementation of ES

and H guidelines is called as __________ analysis. 12. CND stands for _______________ 13. The period in history that has seen extensive deforestation was the ___________ period. 14. One of the main of Zoo authority is to identify the endangered species and promote _________

breeding. 15. DPF stands for _______________________. 16. IAT stands for _________________. 17. A _____________ audit is also sometimes called an activity or issues audit. 18. ___________ audits verify and make sure that an Environmental Management Strategy meets its

stated objectives. 19. When forest areas are cleared, it results in exposing the soil to the sun, making it very dry and

eventually, infertile, due to volatile nutrients such as _________ are lost. 20. Environmental impact statements are reports that outline the predicted environmental effects of a

particular action or project in which the _______________ is involved.

-oOo-

www.jntuworld.com

www.jntuworld.com

Page 3: Environmental Impact Assessment and Management(1)

JNTUWORLD

Code No: K0123 Set No. 2 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD IV B.Tech. II Sem., II Mid-Term Examinations, March/April – 2011

ENVIRONMENTAL IMPACT ASSESSMENT AND MANAGEMENT Objective Exam

Name: ______________________________ Hall Ticket No. A

Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 20. I Choose the correct alternative: 1. Which is of the following is listed under the EPA? [ ]

a) laying down procedures and safeguards for the prevention of accidents which may cause environmental pollution b) examination of materials and substances as are likely to cause environmental pollution c) carrying out and sponsoring investigations and research relating to problems of environmental pollution d)All the above

2. ________ is the environmental standard against which an organization can be assessed. [ ] a) ISO 14001 b) ISO 14002 c) ISO 14005 d) ISO 14007 3. In ____________, the Council on Environmental Policy established procedural and content

guidelines for environmental impact statements. [ ] a)1980 b)1971 c)1989 d)1990

4. According to Act of Prohibition of Hunting, no person shall hunt any wild animal specified in

Schedule, I, II, III and IV except as provided under section ______ and section ______. [ ] a)10 and 15 b)11 and 12 c)5 and 6 d)7 and 8

5. Under the Code of Audit Practice, appointed auditors are also required to comply with the current

professional standards issued by the independent [ ] a) Auditing Practices Board b) Auditing Testing Board c) Auditing Practices Commission d) Auditing Code Institute

6. The ___________ team has unrestricted access to all activities undertaken in order to review,

appraise and report on the accuracy of financial audits. [ ] a)TGM b)ACT c)IAT d)DBT

7. The destruction of the forests is occurring due to various reasons, one of the main and strongest

reasons being the [ ] a) short term economic benefits b) long term economic benefits c) short term agricultural benefits d) to create more grazing land

8. The authorities to be appointed under the Indian Wildlife Act are [ ]

a) Director b) Chief Wildlife Warden c) Wildlife Advisor d) All the above 9. The Indian Wildlife protection Act was established in the year [ ]

a) 1977 b) 1980 c)1972 d) 1967 10. Site Inspection comes under ____________ stage of environmental audit. [ ] a) Audit b) Pre-audit c)Post-Audit d) None of the above

Cont……2

www.jntuworld.com

www.jntuworld.com

Page 4: Environmental Impact Assessment and Management(1)

JNTUWORLD

Code No: K0123 :2: Set No. 2 II Fill in the blanks 11. One of the main of Zoo authority is to identify the endangered species and promote _________

breeding. 12. DPF stands for _______________________. 13. IAT stands for _________________. 14. A _____________ audit is also sometimes called an activity or issues audit. 15. ___________ audits verify and make sure that an Environmental Management Strategy meets its

stated objectives. 16. When forest areas are cleared, it results in exposing the soil to the sun, making it very dry and

eventually, infertile, due to volatile nutrients such as _________ are lost. 17. Environmental impact statements are reports that outline the predicted environmental effects of a

particular action or project in which the _______________ is involved. 18. The approach of using protocol to existing systems and operations prior to implementation of ES

and H guidelines is called as __________ analysis. 19. CND stands for _______________ 20. The period in history that has seen extensive deforestation was the ___________ period.

-oOo-

www.jntuworld.com

www.jntuworld.com

Page 5: Environmental Impact Assessment and Management(1)

JNTUWORLD

Code No: K0123 Set No. 3 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD IV B.Tech. II Sem., II Mid-Term Examinations, March/April – 2011

ENVIRONMENTAL IMPACT ASSESSMENT AND MANAGEMENT Objective Exam

Name: ______________________________ Hall Ticket No. A

Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 20. I Choose the correct alternative: 1. In ____________, the Council on Environmental Policy established procedural and content

guidelines for environmental impact statements. [ ] a)1980 b)1971 c)1989 d)1990

2. According to Act of Prohibition of Hunting, no person shall hunt any wild animal specified in

Schedule, I, II, III and IV except as provided under section ______ and section ______. [ ] a)10 and 15 b)11 and 12 c)5 and 6 d)7 and 8

3. Under the Code of Audit Practice, appointed auditors are also required to comply with the current

professional standards issued by the independent [ ] a) Auditing Practices Board b) Auditing Testing Board c) Auditing Practices Commission d) Auditing Code Institute

4. The ___________ team has unrestricted access to all activities undertaken in order to review,

appraise and report on the accuracy of financial audits. [ ] a)TGM b)ACT c)IAT d)DBT

5. The destruction of the forests is occurring due to various reasons, one of the main and strongest

reasons being the [ ] a) short term economic benefits b) long term economic benefits c) short term agricultural benefits d) to create more grazing land

6. The authorities to be appointed under the Indian Wildlife Act are [ ]

a) Director b) Chief Wildlife Warden c) Wildlife Advisor d) All the above 7. The Indian Wildlife protection Act was established in the year [ ]

a) 1977 b) 1980 c)1972 d) 1967 8. Site Inspection comes under ____________ stage of environmental audit. [ ] a) Audit b) Pre-audit c)Post-Audit d) None of the above 9. Which is of the following is listed under the EPA? [ ]

a) laying down procedures and safeguards for the prevention of accidents which may cause environmental pollution b) examination of materials and substances as are likely to cause environmental pollution c) carrying out and sponsoring investigations and research relating to problems of environmental pollution d)All the above

10. ________ is the environmental standard against which an organization can be assessed. [ ] a) ISO 14001 b) ISO 14002 c) ISO 14005 d) ISO 14007

Cont……2

www.jntuworld.com

www.jntuworld.com

Page 6: Environmental Impact Assessment and Management(1)

JNTUWORLD

Code No: K0123 :2: Set No. 3 II Fill in the blanks 11. IAT stands for _________________. 12. A _____________ audit is also sometimes called an activity or issues audit. 13. ___________ audits verify and make sure that an Environmental Management Strategy meets its

stated objectives. 14. When forest areas are cleared, it results in exposing the soil to the sun, making it very dry and

eventually, infertile, due to volatile nutrients such as _________ are lost. 15. Environmental impact statements are reports that outline the predicted environmental effects of a

particular action or project in which the _______________ is involved. 16. The approach of using protocol to existing systems and operations prior to implementation of ES

and H guidelines is called as __________ analysis. 17. CND stands for _______________ 18. The period in history that has seen extensive deforestation was the ___________ period. 19. One of the main of Zoo authority is to identify the endangered species and promote _________

breeding. 20. DPF stands for _______________________.

-oOo-

www.jntuworld.com

www.jntuworld.com

Page 7: Environmental Impact Assessment and Management(1)

JNTUWORLD

Code No: K0123 Set No. 4 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD IV B.Tech. II Sem., II Mid-Term Examinations, March/April – 2011

ENVIRONMENTAL IMPACT ASSESSMENT AND MANAGEMENT Objective Exam

Name: ______________________________ Hall Ticket No. A

Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 20. I Choose the correct alternative: 1. Under the Code of Audit Practice, appointed auditors are also required to comply with the current

professional standards issued by the independent [ ] a) Auditing Practices Board b) Auditing Testing Board c) Auditing Practices Commission d) Auditing Code Institute

2. The ___________ team has unrestricted access to all activities undertaken in order to review,

appraise and report on the accuracy of financial audits. [ ] a)TGM b)ACT c)IAT d)DBT

3. The destruction of the forests is occurring due to various reasons, one of the main and strongest

reasons being the [ ] a) short term economic benefits b) long term economic benefits c) short term agricultural benefits d) to create more grazing land

4. The authorities to be appointed under the Indian Wildlife Act are [ ]

a) Director b) Chief Wildlife Warden c) Wildlife Advisor d) All the above 5. The Indian Wildlife protection Act was established in the year [ ]

a) 1977 b) 1980 c)1972 d) 1967 6. Site Inspection comes under ____________ stage of environmental audit. [ ] a) Audit b) Pre-audit c)Post-Audit d) None of the above 7. Which is of the following is listed under the EPA? [ ]

a) laying down procedures and safeguards for the prevention of accidents which may cause environmental pollution b) examination of materials and substances as are likely to cause environmental pollution c) carrying out and sponsoring investigations and research relating to problems of environmental pollution d)All the above

8. ________ is the environmental standard against which an organization can be assessed. [ ] a) ISO 14001 b) ISO 14002 c) ISO 14005 d) ISO 14007 9. In ____________, the Council on Environmental Policy established procedural and content

guidelines for environmental impact statements. [ ] a)1980 b)1971 c)1989 d)1990

10. According to Act of Prohibition of Hunting, no person shall hunt any wild animal specified in

Schedule, I, II, III and IV except as provided under section ______ and section ______. [ ] a)10 and 15 b)11 and 12 c)5 and 6 d)7 and 8 Cont……2

www.jntuworld.com

www.jntuworld.com

Page 8: Environmental Impact Assessment and Management(1)

JNTUWORLD

Code No: K0123 :2: Set No. 4 II Fill in the blanks 11. ___________ audits verify and make sure that an Environmental Management Strategy meets its

stated objectives. 12. When forest areas are cleared, it results in exposing the soil to the sun, making it very dry and

eventually, infertile, due to volatile nutrients such as _________ are lost. 13. Environmental impact statements are reports that outline the predicted environmental effects of a

particular action or project in which the _______________ is involved. 14. The approach of using protocol to existing systems and operations prior to implementation of ES

and H guidelines is called as __________ analysis. 15. CND stands for _______________ 16. The period in history that has seen extensive deforestation was the ___________ period. 17. One of the main of Zoo authority is to identify the endangered species and promote _________

breeding. 18. DPF stands for _______________________. 19. IAT stands for _________________. 20. A _____________ audit is also sometimes called an activity or issues audit.

-oOo-