    Somercotes Environmental Audit Report 2010 -- 1

    ENVIRONMENTAL AUDIT OF STERIGENICS

    CONDUCTED BY ADAM RUSSELL

  • 8/8/2019 Environmental Audit for Somercotes

    2/9

    Somercotes Environmental Audit Report 2010 -- 2

    Electrical

    Lighting

    In general lighting was at a very good standard, being for the most part T5 a nd DD light bulbs

    throughout the site. The only exceptions are the chamber room, and pre-conditioning room. The

    chamber room and pre-conditioning room lighting still uses inefficient tungsten light bulbs . Areas

    of the facility that have recently been refittedfeature the highest standard of ligh ting energy

    efficiency. The main office has fitted low energy LED lighting in place of the fluorescents thatcharacterise the building, whilst the reception has fitted low energy compact fluorescents. The

    kitchen facilities have fluorescent light bulbs, which do not utilise either reflectors or diffus ers. All

    light switches were well labelled and clear as to which lights they operated, although one set of

    switches near the reception entrance to main office appeared to be unlabelled. Switch it Off

    stickers and posters were also in plain view of many of the light switches throughout all sites,

    showing positive attempts to promote awareness of energy conservation.

    Although the lighting is generally efficient in terms of bulbs, their use is not. Lighting in the toilets

    is often left on constantly, as are the lights in the common room yet natural light is more than

    sufficient in the day.

    Desk lamps were available in some of the office spaces, such as the QA office. The Satistical

    Offices, Finance Office, Marketing and Publicity, Admin and the GM office al l lacked desk lighting

    or lamps.

    It is recommended that the building listing status of the lighting be investigated for the possibility

    of changing the Tungsten light bulbs to more energy efficient ones. This should be done with th e

    help and consent of both the Corporate and the Local Authority.

    Sterigenics should continue to ensure that all light switches remain labeled and are updated if

    necessary. Promoting energy conservation in relation to lighting should continue. It is suggested

    that the free awareness resources provided by the Carbon Trust are employed in this process.

    The lack of occupancy sensors for lighting is apparent throughout the building and its outlets. As

    noted, many areas of remain constantly or unnecessarily lit for extended periods of t ime, leading

    to the waste consumption of large amounts of energy. Installation of occupancy sensors could cut

    down dramatically this waste. The following areas were identified as possible locations for

    occupancy sensors:

    - All toilets

    - The shower room

    - Kitchen in the room

    - The conference room

    - Main office (after hours)

    If occupancy sensors are not an option, efforts must be made to ensure their use is monitored and

    subsequently cut back as currently they represent a large and unnecessary consumption of

    electricity.

  • 8/8/2019 Environmental Audit for Somercotes

    3/9

    Somercotes Environmental Audit Report 2010 -- 3

    More personal desk lamps for the relevant office space would also likely reduce the need for

    excessive lighting in office spaces, further cutting down energy consumption.

    Appliances

    One of the biggest improvements made over the past year was the replacement of CRT screens

    with TFT computer screens. The only CRT screens left are in the control room where there is a

    bank of computers available for use by anyone. CRT monitors can use up to 8 to 10 times more

    energy consumption that TFT and so is essential that they are phased out.

    There are, however, still several laser printers around the building, with up to one laser printer per

    three members of staff. However, it is noted that there is an active replacement scheme currently

    taking place to have fewer printers around the building, networked together to reduce the overall

    number. Photocopiers are also in the process of being replaced. Taking this into account, there is

    no immediate requirement to focus attention on printers and photocopier s.

    The main area of concern regarding appliances is the fridges, microwaves and other kitchen

    equipment in the facility. They are mostly older models and as a result are very inefficient, with no

    energy ratings. It is recommended that a program of replacement is undertaken for these

    appliances to models with A+ ratings and, at the very least, all fridges be fitted with fridge -saver

    plugs. It must also be noted that old models that are replaced must be replaced in a safe manner,

    ifnot recycled/donated.

    The biggest concern is the lack of timer plugs that are not in use. Several appliances are suitable

    for timer plugs, including the photo booth and vending machine on the ground floor, portable

    heaters and fans, desk lamps and on a variety of photocopiers and printers. Many of these devices

    are left on over-night for little or no reason and a lot of energy could be saved with only a small

    investment. It is recommended that these appliances be fitted with timer plugs as soon as

    possible.

    Heating

    The majority of the main heating system within the facility is severely limited and very inefficient

    as the whole system is controlled centrally. Many of the fixed radiator points are covered and

    extremely inaccessible. Until only recently the heating wasn t adjustable and evennow is

    controlled remotely from outside of the building, on a timer. Staff have consistently complained

    about the situation, but little has been done. Many areas remain too hot whereas others are too

    cold no matter the heating settin gs. Insulation is also non -existent, in either wall cavities or above

    false ceilings.

    This situation is compounded further as it has lead to the building being forced to a number of

    portable heaters and fans to compensate for the lack of effective heating. The majority of office

    space throughout the building has at least one, ifnot more, electric heaters, which they rely on for

    warmth or a fan in order to provide more suitable ventilation.

    Improvements in recent years have been made as now some rooms are controlled by thermostat,

    reducing the reliance on portable heaters. Unlike heating however, there is little in the way of

    awareness publicity on the heating settings for the few thermostats that do exist.

    Every effort should be made to keep the heaters clear. This in many cases can prove difficult due

    to the main heating system occupying the outskirts of the majority of the room, yet in some cases

    they can be cleared to allow heating to circulate better.

  • 8/8/2019 Environmental Audit for Somercotes

    4/9

    Somercotes Environmental Audit Report 2010 -- 4

    Two over-door heaters were identified one close to the shower room and one above the doors

    to reception. Both of which were not operational during the period of the audit and we were

    advised they need maintenance. These heaters should only be used when absolutely necessary as

    they are extremely energy intensive and most of the heat is lost when the doors are opened.

    The widespread use of portable heaters needs to be reduced as much as possible. If additional

    heating is required, energy effi cient, larger appliances should be used in preference over the older,

    smaller heaters, which were often found underneath peoples desks. If portable heaters areessential, then it is recommended that efforts should be made to replace the inefficient electr ic

    heaters with oil filled heaters as they retain their heat and usually have room -temperature

    thermostats. It is also recommended that timer plugs be attached to all heaters to ensure that

    they are not left on overnight.

    The same principle applies to portable fans that are widely used, particularly in the main office. It

    is recognised that these rooms get very hot, but the number of fans in use should be reduced

    where possible and monitored. These fans should also be put on timer plugs so that they are n ot

    left on.

    Overall, the heating situation within the building is extremely inefficient. It is within our long-term

    interests if efforts are made to installing modern radiators fitted with thermostatic radiator valves

    in accessible areas to decrease reliance on the current system. As a minimum, electric heater use

    needs to be reduced and replaced by oil filled appliances.

    Windows

    The building has only old single -glazed windows placed throughout, further exacerbating problems

    caused by the old and ineffective heating system.

    Previous audits have highlighted that by installing some kind of double -glazing will save 4,000 a

    year in heating costs. Along with the heating system, we as a company should be seriously looking

    into how this can be improved. If doubl e-glazing is not viable, then an alternative must be invested

    in.

    Water

    Most toilets areas have been fitted with timed percussion taps with inbuilt pressure valves. Water

    heating is also monitored to ensure it does not exclude too high levels of heating. Urinals are self -

    flushing; however the toilets themselves are older, less efficient models.

    A further key issue is the bottled water coolers in use around the building. Staff have complained

    that the drinking water available from taps in toilet areas is unsuitable for drinking and so rely on

    the bottled water as an alternative. This type of water cooler is very unsustainable and

    alternatives should be researched immediately. This can include looking into mains connected

    coolers and moving towards more ethical suppliers of bottled cooler water such as Aquaid.

    When Sterigenics looks into refits, it should also consider other water saving devices such as a

    motion sensor system that regulates lighting, extractor fans and urinal flushes. Other devices

    include spray head taps and waterless urinals, which could cut water consumption by as much as

    80%.

    Waste

    Sterigenics controls the waste management contract, which is currently being negotiated and so is

    not available at the time of writing. However, as to date there is no breakdown kept by

  • 8/8/2019 Environmental Audit for Somercotes

    5/9

    Somercotes Environmental Audit Report 2010 -- 5

    Sterigenicsabout how much is sent to landfill o r to recycling. Sample data has been taken, but is

    insufficient in terms of a consistent and accurate measure of waste used by Sterigenics.

    Recycling

    In general, recycling is very good within Sterigenics. Only recycled paper is used by Sterigenics,

    including photocopying and printing. The canteen recycle all paper, plastic, glass, aluminum and

    safely store and recycle cooking oil, with separate recycle points outside of the canteen areas

    being investigated. The main office has a recycling box in place to take most forms of waste. In alloffice spaces, there are centrally placed recycling boxes for paper waste. Recycling points are also

    available for printer cartridges in the main office. Wooden pallets are stored and sent back to be

    reused.

    However, there are still some improvements which could be made. There is minimal envelope

    recycling, even though stickers have been provided, although most envelopes are put in the paper

    recycling receptacles anyways. There is very little recycling in the QA office and Business Support

    office. Organic waste is still not recycled anywhere within Sterigenics, nor locally or commercially

    within the kitchen areas. Staff have also brought up that there is little internal recycling outside of

    paper waste within the office spaces and that more could be done locally to encourage staff to

    recycle.

    Efforts should be made to set up organic waste disposal. All would be needed is a small number of

    organic bins which would then taken to a local composting site. With the t wo franchises taken

    over the kitchen areas in both bars, they will need to be worked with to come up with a system to

    dispose of their own commercial waste. Though they are ultimately responsible for it, Sterigenics

    should make efforts to support them. Pri nter cartridge and mobile recycling points should be

    publicised and made more accessible to staff, with publicity visible in reception, canteen and the

    main office. Staff should also be encouraged to recycle more envelopes and recycle points made

    available throughout the facility.

  • 8/8/2019 Environmental Audit for Somercotes

    6/9

    Somercotes Environmental Audit Report 2010 -- 6

    Other Sterigenics Initiatives

    Plants

    There are lots of plants around the facility, in both the office spaces and the canteen, all of which

    are maintained by an external company.

    Awareness posters

    There are several awareness posters around Sterigenics in office spaces and canteen areas.

    However, some specific areas are lacking and should be identified and rectified. This includes next

    to thermostats and recycling points.

  • 8/8/2019 Environmental Audit for Somercotes

    7/9

    Somercotes Environmental Audit Report 2010 -- 7

    Overview

    Sterigenics has several strong areas of environmental care. Almost all the lighting throughout the

    main building and all the outlets is energy efficient, with only a few exceptions. New capital

    purchases are all geared towards greater energy efficiency and phasing out older, less efficient

    models. Almost all waste that can be recycled is sorted and done so in all areas, from offices and

    communal areas.

    However, Sterigenics has a lot of room for improvement. Currently, the inefficient heating system

    combined with no insulation, single glazing and a large array of portable electric heaters is clearly

    a massive waste of energy. Following from this, Sterigenics needs to take responsibility for

    monitoring and recording its consumption and output of all utilities and waste. If Sterigenics

    wants to make realistic targets and then be able to stick to them, they must work closely with the

    staff to ensure this does happen. If the current metering system is not sufficient, then Sterigenics

    must campaign for adequate metering.

    Policy and procedure is also lacking to back up the work that many staff are already carrying out.

    The current Environmental policy is not up to date and is contradicted by other policies, there is

    currently little in the way of formal procedure and no -one is responsible for making sure

    Sterigenics is abiding by environmental legislation. Sterigenics needs to update its policy and put

    in place procedure on all levels such as procurement and transport to give greater environmental

    consistency to its daily operations.

  • 8/8/2019 Environmental Audit for Somercotes

    8/9

    Somercotes Environmental Audit Report 2010 -- 8

    Recommendations

    Below are the recommendations of the audit, detailing an action plan that Sterigenics can try and

    stick to for the coming years in order to improve its environmental performance a nd reduce

    running costs. If Sterigenics is serious about its commitment to continuous self improvement, it

    should pursue these targets as soon as financially possible and continue to look to further improve

    its environmental impact.

    Short Term/Low Cost

    y The few remaining tungsten light bulbs and f lorescent tubes need to be replaced with up

    to date energy efficient ones, including any necessary deflectors to further decrease costs.

    Desk lamps should also be made available to all office spaces to reduce use of the full room

    lighting.

    y New printers and photocopiers to all office spaces should be networked for use

    immediately to begin the gradual phasing out of laser jet printers.

    y Sterigenics need to ensure monitoring of all utilities is undertaken. Someone within

    Sterigenics should be delegated to ensure they are recorded and analsyed in the future forthe purpose of setting new targets and tracking their progress.

    y Timer plugs should be invested in as a cheap and easy solution to cutting energy

    consumption and applied to electrical appliances where appl icable throughout the facility

    and its outlets. Fridge plugs for the few domestic fridges can again reduce consumption.

    Installing instant hot water boilers in the relevant office/kitchen spaces will replace kettles

    and coffee making machines and further cut down energy use.

    y A local organic waste collection scheme can be set up in the office spaces and common

    areas for use in composting.

    y Moving away from the bottled water coolers to mains supplied drinking water ifpreferable, saving Sterigenics money and reducing its carbon foot print. If this is not

    applicable, then investing in an ethical supplier such as Aquaid may help offset this.

    y Make sure all light and equipment switches, especially banks of more than six, are all

    located, on display and adequately labeled as to their use.

    y Monitoring the amount of traveling done in terms of business miles when reclaiming

    expenses and mode of transport for the purpose of setting targets and reducing.

    y Finding at least one member of staff who is willing to voluntee r for the role of

    environmental champion who would help to implement these changes.

    y Implementing internal recycling within the office spaces.

    Medium Term/Medium Cost

    y Create an up to date environmental policy, combining all relevant past policy, complete

    with targets and action points to mandate Sterigenics to push for.

  • 8/8/2019 Environmental Audit for Somercotes

    9/9

    Somercotes Environmental Audit Report 2010 -- 9

    y The installation of occupancy sensors in the less used areas of Sterigenics, such as the

    toilets and stairwells, as opposed to the leaving them constantly on which seems to the

    norm.

    y Larger, more efficient heaters need to be placed in office spaces to replace the inefficient

    electric portable heaters. If this is not possible, as a minimum short -term solution they

    should be replaced with more efficient oil models.

    y The two over door heaters should also be phased out as they are a great waste of energy.

    As a bare minimum there use should be carefully monitored and only used at critical

    junctions in the year.

    y A procurement policy is put into place to act as guidelines for all future purchases within

    Sterigenics. This would apply to not just day -to-day purchases but also to all future refits.

    This would help ensure that environmental considerations are always taken into account

    and should ensure that older inefficient models will be gradually replaced with newer

    efficient ones. Again, someone would need to be given responsibility to ensure this is

    carried through.

    Long Term/High Cost

    y Currently, Sterigenics has its own sub transformer running at 240V. This is an un -necessary

    amount and can be reduced down to 216V. Though this will take a substantial cost to put

    in place, it will reduce energy consumption on all items that run off the mains and will cut

    energy consumption dramatically, with little or no consequence to the appliances.

    y A full and comprehensive review of the facility with the view of refurbishment. This

    includes; looking into double-glazing, or an alternative equivalent, insulation, both cavity

    and ceilings, adequate draft excluders and a total review of the heating system in place

    with a more flexible and efficient building wide system.

    y Move towards sustainable generation of our utilities. These include and are not exclusivetoo; wind turbines, solar panels, rain water collection, rocket composter, geothermal heat

    collection. These projects are already under way in other businesses up and down the

    country and are possible when institutions are serious about environmental issues. As

    above, these may have large start up costs, but will reduce energy consumption and waste

    and in the long term will pay for themselves.

    Conclusion

    It is clear from the audit and its recommendations that Sterigenics have a lot to gain by forming

    closer links to work towards making a greener and more environmentally friendly company. Staff

    and management coordinating and working together will produce the best re sults, not just within

    the facility, but in raising awareness and helping push the environmental agenda beyond the

    Somercotes facility.