ENTRY GATE K.B. ROAD BATTERY LIMIT OF STP CONTRACT · from sas pumps centrifuge house 51.5...
Transcript of ENTRY GATE K.B. ROAD BATTERY LIMIT OF STP CONTRACT · from sas pumps centrifuge house 51.5...
WALKWAY
PROPOSED BL 46.00 M
LVL 50.25 M
RAILING
PROPOSED
COMPOUNDL WALL
FSL 49.50 M
6.00
TEMPORARY STEEL
SHEET PILE
WIRE FENCING
0.250
1.00
BEEL WATER
EGL 47.00 M
FGL 50.00 M (APPX)
BATTERY LIMIT
B
O
R
S
O
L
A
B
E
E
L
INLET
K.B
. RO
AD
2
6
.5
2.6
X
X
STEEL SHEET PILE
COMPOUND WALL
BATTERY LIMIT
RETAINING WALL
B
O
R
S
O
L
A
B
E
E
L
B
O
R
S
O
L
A
B
E
E
L
C
H
.
1
7
3
M
C
H
.
0
0
M
C
H
.
3
0
0
M
C
H
.
4
0
0
M
C
H
.
5
0
0
M
C
H
.
6
0
0
M
C
H
.
7
0
0
M
C
H
.
8
0
0
M
C
H
.
1
2
5
5
M
C
H
.
1
2
5
M
C
H
.
1
5
0
M
C
H
.
2
1
0
M
C
H
.
9
0
0
M
C
H
.
1
0
0
0
M
C
H
.
1
1
0
0
M
C
H
.
1
2
0
0
M
ENTRY GATE
03
12
BATTERY LIMIT OF STP
CONTRACT
I
N
L
E
T
O
U
T
L
E
T
R
O
A
D
X
X
S
T
E
E
L
S
H
E
E
T
P
I
L
E
C
O
M
P
O
U
N
D
W
A
L
L
APPD
I&C
DATE
CIVIL
DRN
ELEC
DO NOT SCALE
DATE
DATE (R0 ISSUE)
ISSUE
SCALE: 1:1000
CHD:
DRN:
:
:
DATE
FILE NAME
CLIENT
:PROJECT
APPROVED
NO
DWG
CLEARED
ISSUE
SIGNATURE
CLEARED
CIVIL
DEPT
MECH
ELEC
I&C
FOR R0 ISSUE ONLY
REVISIONS
CONSULTING ENGINEERS LIMITED
MUMBAI
TCE FORM NO. 042 R5
FILE NAME: F-041-Rev-R5.dwg
SIZ
E-A
2
GUWAHATI SMART CITY LIMITED
PROPOSED 15 MLD STP AT BORSOLA BEEL
GUWAHATI SMART CITY LIMITED
BATTERY LIMIT OF CONTRACT
15 MLD STP AT BORSOLA BEEL
TENDER PURPOSE ONLY
ALL THE LEVELS AND DIMENSIONS ARE INDICATIVE.
DETAIL & DESIGN DRAWINGS SHOULD BE PREPARED
BY THE CONTRACTOR AFTER PERFORMING NECESSARY INVESTIGATION.
BATTERY LIMIT OF STP CONTRACT
P0
KEY PLAN
SECTION X-X
(SCALE 1 :100)
STEEL SHEET PILE
BATTERY LIMIT
LEGENDS
BORSOLA BEEL
500 MM Ø PILE
@20 M DEPTH
@1 M C/C
RL 45.75
RL 50.25
RAILING-R2
(AS PER DETAIL)
RAILING-R1
(AS PER DETAIL)
RETAINING WALL OF HEIGHT 4.5 M AND ROAD
RTL (+) 50.00 m
INTERNAL ROAD
SECTION P-P
CONSULTING ENGINEERS LIMITED
MUMBAI
GUWAHATI SMART CITY LIMITED
LAYOUT OF PROPOSED 15 MLD STP AND
CROSS SECTION OF RETAINING WALL AND ROAD
AT BORSOLA BEEL
TENDER PURPOSE ONLY
ALL THE LEVELS AND DIMENSIONS ARE INDICATIVE.
DETAIL & DESIGN DRAWINGS SHOULD BE PREPARED
BY THE CONTRACTOR AFTER PERFORMING NECESSARY INVESTIGATION.
RECIEVING
FINE SCREEN
CHAMBER
SLUDGE
DEWATERING
DRIED SLUDGE FOR DISPOSAL
GSF
TWT
FOR DISPOSAL
POLYELECTROLYTE
BLOWERS
LEGEND :
SEWAGE
SLUDGE
SUPERNATANT/CENTRATE/FILTRATE
SLUDGE/FILTRATE PUMP HOUSE
DEGRITTING SYSTEM
(WITH OIL AND
BLOWERS
BACKWASH TO
SHT
TREATED WATER TANKTWT
SLUDGE HOLDING TANKSHT
STILLING CHAMBER
TREATED SEWAGE
FFP
FFT
CLEAR WATER TANKCWT
OIL FOR DISPOSAL
SCREENED MATERIAL
FOR DISPOSAL
PRIMARY TREATMENT
SECONDARY TREATMENT TERTIARY TREATMENT
GREASE CHAMBER)
GRIT FOR DISPOSAL
PUMPING
STATION
COARSE
CHAMBER
SCREEN
CHAMBER
SEWAGE
CENTRATE
TO STILLING CHAMBER
FILTER FEED PUMPFFP
SBTU
AT
CCT
CHAMBER
STILLING
INCOMING
SEWER
SECONDARY BIOLOGICAL TREATMENT UNIT SBTU
FILTER FEED TANKFFT
GRAVITY SAND FILTERGSF
CHLORINE CONTACT TANKCCT
CHLORINE DOSING
AIREATION TANKAT
DO NOT SCALE
DATE
DATE (R0 ISSUE)
ISSUE
SCALE: NTS
CHD:
DRN:
:
:
DATE
FILE NAME
CLIENT
:PROJECT
APPROVED
NO
DWG
SIGNATURE
CLEARED
CIVIL
DEPT
MECH
ELEC
I&C
FOR R0 ISSUE ONLY
CONSULTING ENGINEERS LIMITED
MUMBAI
GUWAHATI SMART CITY LIMITED
BORSOLA BEEL 15 MLD STP
GUWAHATI SMART CITY LIMITED
PROCESS FLOW DIAGRAM OF
PROPOSED 15 MLD STP AT BORSOLA BEEL
TENDER PURPOSE ONLY
ALL THE LEVELS AND DIMENSIONS ARE INDICATIVE.
DETAIL & DESIGN DRAWINGS SHOULD BE PREPARED
BY THE CONTRACTOR AFTER PERFORMING NECESSARY INVESTIGATION.
P0
STILLINGCHAMBER
FINE SCREEN GRIT CHAMBER
TWL.56.4TWL.56.3 TWL.55.95
TWL.55.9
TWL.55.60
FGL.50.25
55.4 TWL.55.3
TWL. 51.6
TOC. 49.50
54.9
RAS SAS
55.1
BWL. 52.9
TWL.55.50
SPLITTER BOX
TWL.56.00
CHLORINATION TANKTOC. 48.9
TO SLUDGE SUMP
TWL. 53.85
46.8346.53
49.05
46.83
46.05
FGL.50.25
TOC.42.13
46.53INCOMING SEWER 46.05WATER BODY
FSL 49.50
THICKENED SLUDGE SUMP
51.0
49.0
56.0
60.5
FGL.50.25
TO STILLING CHAMBER
FROM SAS PUMPS
CENTRIFUGE HOUSE
51.5
DEWETERTED SLUDGE TO DISPOSAL
FGL.50.25
52.5
49.00
THICKENER
TOSLUDGE
TANK
54.5
51.0IL. 50.4
IL. 49.9SLUDGE SUMP
49.9
45.9
BACK WASH SUMP
RECEIVING CHAMBERCOARSE SCREEN
CHAMBER
TERMINAL SEWAGE PUMPING STATION
50.8
THICKENERFEED PUMP
FEED PUMP
SEWAGE TRANSFER PUMP
BACK WASHWATER TRANSFER PUMP
FILTER FEED PUMP
THICKENED SLUDGE TRANSFER PUMP
54.9
TWL.55.55
54.40
TWL. 51.1TWL. 50.9
59.60
TWL. 51.30TWL. 51.35
TWL. 50.96
RGSF
TWL. 53.85
50.8
49.7
50.55
55.55
54.60
46.35
FGL.50.25
SECONDARYBIOLOGICALTREATMENTUNIT
FROM CHLORINATIONSYSTEM
DEW
ETER
TED
SLU
DG
E
CENTRIFUGE
CENTRATE TO STILLING CHAMBER
CENTRIFUGE
LEGEND :
PUMP
TOP WATER LEVELTWL
FINISHED GROUND LEVELFGL
BOTTOM WATER LEVELBWL
INVERT LEVELIL
TOP OF CONCRETETOC
RAPID GRAVITY SAND FILTERRGSF
RETURN ACTIVATED SLUDGERAS
SURPLUS ACTIVATED SLUDGE SAS
FULL SERVICE LEVELFSL
DO NOT SCALE
DATE
DATE (R0 ISSUE)
ISSUE
SCALE: 1:125
CHD:
DRN:
:
:
DATE
FILE NAME
CLIENT
:PROJECT
APPROVED
NO
DWG
SIGNATURE
CLEARED
CIVIL
DEPT
MECH
ELEC
I&C
FOR R0 ISSUE ONLY
CONSULTING ENGINEERS LIMITED
MUMBAI
GUWAHATI SMART CITY LIMITED
BOROSOLA BEEL 15 MLD STP
GUWAHATI SMART CITY LIMITED
TCE.10477A-EV-2032-FD-2107
HYDRAULIC FLOW DIAGRAM OF
15 MLD STP AT BORSOLABEEL
TENDER PURPOSE ONLY
ALL THE LEVELS AND DIMENSIONS ARE INDICATIVE.
DETAIL & DESIGN DRAWINGS SHOULD BE PREPARED
BY THE CONTRACTOR AFTER PERFORMING NECESSARY INVESTIGATION.
P0
PGPG
CAUSTIC SOLUTION
INLET
AIR
BLOWER
PG
PG
CHAMBER
SLTILLING
RAS PUMP SAS PUMP
RAS PUMP SAS PUMP
M M M
M
M M M
M
M M M
M
TO STILLING
CHAMBER
FOR DECANTERSVFD
VFD
LT
PI
MK.NO.
DO
VARIABLE FREQUENCY DRIVE
VARIABLE FREQUENCY DRIVE
DISSOLVED OXYGEN METER
LEVEL TRANSMITTER
PRESSURE GAUGES
DESCRIPTION
FOR BLOWERS
BOURDON TYPE
REMARK
IMMERSION TYPE
INSTRUMENT LIST
DELS DECANTER LEVEL SENSOR
MERCURY FLOAT
DEPSDECANTER POSITION SENSOR
PRESSURE GAUGESPI DIAPHRAGM TYPE
FLOW TRANSMITTERFT
LEVEL SWITCHLS
LT LEVEL TRANSMITTER
ULTRASONIC TYPE
ULTRASONIC TYPE
CAPACITANCE TYPE
HYDROSTATIC TYPE
DLTLEVEL TRANSMITTER
DIFFERENTIAL
ULTRASONIC TYPE
SWITCH
MAGNETIC LIMIT
SWITCH
DIFFERENTIAL
DESCRIPTION
CHLORINATION TANK OUTLET
INCOMING SEWER
B
A
MK.NO. PRESSURE
ATMOSPHERIC
ATMOSPHERIC
REMARK
TERMINATION POINT
RCC CHANNEL
AIR LINE
SAS LINE
INSTRUMENT SIGNAL
DRAIN LINE
RAS LINE
NEEDLE VALVE
NON-RETURN VALVE
BUTTERFLY VALVE
BALL VALVE
GATE
BUTTERFLY VALVE
MOTORISED
DRIVE
VARIABLE FREQUENCY
MOTORIZED
KNIFE GATE VALVE
MOTORISED GATE
CHANNEL MOUNTED
SOFT STARTER
MOTOR
AIR BLOWER
SILENCER
FILTER
NOTES:
DO NOT SCALE
DATE
DATE (R0 ISSUE)
ISSUE
SCALE: 1:2000
CHD:
DRN:
:
:
DATE
FILE NAME
CLIENT
:PROJECT
APPROVED
NO
DWG
SIGNATURE
CLEARED
CIVIL
DEPT
MECH
ELEC
I&C
FOR R0 ISSUE ONLY
CONSULTING ENGINEERS LIMITED
MUMBAI
GUWAHATI SMART CITY LIMITED
BORSOLA BEEL 15 MLD STP
GUWAHATI SMART CITY LIMITED
P & I DIAGRAM OF
15 MLD STP AT BORSOLA BEEL
TENDER PURPOSE ONLY
ALL THE LEVELS AND DIMENSIONS ARE INDICATIVE.
DETAIL & DESIGN DRAWINGS SHOULD BE PREPARED
BY THE CONTRACTOR AFTER PERFORMING NECESSARY INVESTIGATION.
P0