Enterprise Decommission Modernization

Process Asset Library Office of Information and Technology

Page 2: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization ii

Table of Contents Enterprise Decommission Modernization Process Map ........................ 1

Process: Enterprise Decommission Modernization ............................... 8 Enterprise Decommission Modernization Description and Goals ...................... 10

Description............................................................................................................... 10 Goals......................................................................................................................... 10

Enterprise Decommission Modernization RACI Information .............................. 11 Enterprise Decommission Modernization Associated Artifacts Information .... 27 Enterprise Decommission Modernization Tools and Web Sites Information ... 27 Enterprise Decommission Modernization Standards Information ..................... 28 Enterprise Decommission Modernization Process............................................... 30

Process Activity Name: EDM-01 Capture and Evaluate Decommissioning Criteria ...................................................................................................................... 30 Process Activity Name: EDM-01.01 Initiate Data Call ........................................ 30 Process Activity Name: EDM-01.02 Log into Data Capture System Tool ....... 31 Process Activity Name: EDM-01.03 Review List of Authorized Systems ....... 32 Process Activity Name: EDM-01.04 Select System for Data Entry .................. 33 Process Activity Name: EDM-01.05 Display System's Stored Criteria Values ................................................................................................................................... 34 Process Activity Name: EDM-01.06 Select/Modify Survey Answers ............... 35 Process Activity Name: EDM-01.07 Submit Survey ........................................... 36 Process Activity Name: EDM-01.08 Enter Another System? ............................ 37 Process Activity Name: EDM-01.09 Log off System Data Capture Tool ......... 37 Process Activity Name: EDM-01.10 Update Stored Survey Data ..................... 38 Process Activity Name: EDM-01.11 Score System Based on Submitted Survey....................................................................................................................... 39 Process Activity Name: EDM-01.12 Generate Candidate List .......................... 40 Process Activity Name: EDM-01.13 Review Candidate List .............................. 41 Process Activity Name: EDM-01.14 Send Notification Letters ......................... 42 Process Activity Name: EDM-01.15 Send Current Content .............................. 43 Process Activity Name: EDM-01.16 Display Decommissioning Survey View 44 Process Activity Name: EDM-02 Perform Business/Technical Assessments 45 Process Activity Name: EDM-02.01 Perform Business Case Analysis ........... 45 Process Activity Name: EDM-02.02 Modernize System? .................................. 46 Process Activity Name: EDM-02.03 Analyze System Alternatives................... 47 Process Activity Name: EDM-02.04 Confirm Selected Alternative .................. 48 Process Activity Name: EDM-02.05 Create Business Epic ............................... 49

Page 3: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization iii

Process Activity Name: EDM-02.06 Review Assessment Products with ITAM ................................................................................................................................... 50 Process Activity Name: EDM-03 Recommendation? ......................................... 51 Process Activity Name: EDM-04 Follow VIP for Upgrades ............................... 52 Process Activity Name: EDM-05 Project Management Framework ................. 53 Process Activity Name: EDM-06 OIT Intake, Analysis and Decisions ............. 54 Process Activity Name: EDM-06.01 Submit OIT Intake Request ...................... 54 Process Activity Name: EDM-06.02 Conduct Intake / Discovery ..................... 55 Process Activity Name: EDM-06.03 Complete Required Analyses .................. 56 Process Activity Name: EDM-06.04 Seek Portfolio Investment Management Board Approval ....................................................................................................... 57 Process Activity Name: EDM-06.05 Approved? ................................................. 58 Process Activity Name: EDM-06.06 Develop Required Planning Documents 59 Process Activity Name: EDM-06.07 Perform Critical Decision 1...................... 60 Process Activity Name: EDM-06.08 Critical Decision 1 Approved? ................ 61 Process Activity Name: EDM-06.09 Develop Decommissioning Plan ............. 62 Process Activity Name: EDM-06.10 Perform Critical Decision 2...................... 63 Process Activity Name: EDM-06.11 Critical Decision 2 Approved? ................ 64 Process Activity Name: EDM-07 OIT Intake Process ......................................... 65 Process Activity Name: EDM-08 Decommission Action? ................................. 66 Process Activity Name: EDM-09 Develop Migrating Functionality .................. 66 Process Activity Name: EDM-09.01 Design Migrating Solution ....................... 67 Process Activity Name: EDM-09.02 Transfer Migrating Data ........................... 68 Process Activity Name: EDM-09.03 Code Migrating Functionality .................. 69 Process Activity Name: EDM-09.04 Perform Testing......................................... 70 Process Activity Name: EDM-09.05 All Migrations Implemented? .................. 71 Process Activity Name: EDM-09.06 Update Documentation ............................ 72 Process Activity Name: EDM-09.07 Develop User Training .............................. 73 Process Activity Name: EDM-09.08 Provide User Training .............................. 74 Process Activity Name: EDM-09.09 Critical Decision 2 Approved? ................ 75 Process Activity Name: EDM-09.10 Release New Version of Updated System ................................................................................................................................... 76 Process Activity Name: EDM-10 Perform System Retirement ......................... 77 Process Activity Name: EDM-10.01 Remove User Access to Retiring System ................................................................................................................................... 77 Process Activity Name: EDM-10.02 Update Links .............................................. 78 Process Activity Name: EDM-10.03 Archive Retiring System Data ................. 79 Process Activity Name: EDM-10.04 Archive Software ....................................... 81 Process Activity Name: EDM-10.05 Dispose of Retiring System Hardware ... 82

Page 4: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization iv

Process Activity Name: EDM-10.06 Make Necessary Network Changes ........ 83 Process Activity Name: EDM-10.07 Remove Security Certificates .................. 84 Process Activity Name: EDM-11 Perform Decommissioning Closeout .......... 85 Process Activity Name: EDM-11.01 Notify Help Desk........................................ 85 Process Activity Name: EDM-11.02 Prepare Official Information for Dissemination.......................................................................................................... 86 Process Activity Name: EDM-11.03 Additional Notifications? ......................... 87 Process Activity Name: EDM-11.04 Disseminate Internal Notice .................... 88 Process Activity Name: EDM-11.05 Disseminate Public Release .................... 89 Process Activity Name: EDM-11.06 Perform Necessary Outreach .................. 90 Process Activity Name: EDM-11.07 Update System of Record Notice............ 91 Process Activity Name: EDM-11.08 Notify Architecture Team ......................... 92 Process Activity Name: EDM-11.09 Notify Open Source .................................. 93 Process Activity Name: EDM-11.10 Revise Budget to Any System Involved 94 Process Activity Name: EDM-11.11 Prepare Post-decommissioning Report 95 Process Activity Name: EDM-11.12 Send Update to RiskVision / ATO Tracker ................................................................................................................................... 96 Process Activity Name: EDM-11.13 Send Update to VASI ................................ 97 Process Activity Name: EDM-12 Track Decommissioning Projects................ 98 Process Activity Name: EDM-13 Capture Assessment Lessons Learned ...... 99

Page 5: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

The links in this process map are inactive. Please scroll to view activity data. 1

Enterprise Decommission Modernization Process Map

Page 6: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

The links in this process map are inactive. Please scroll to view activity data. 2

Page 7: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

The links in this process map are inactive. Please scroll to view activity data. 3

Page 8: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

The links in this process map are inactive. Please scroll to view activity data. 4

Page 9: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

The links in this process map are inactive. Please scroll to view activity data. 5

Page 10: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

The links in this process map are inactive. Please scroll to view activity data. 6

Page 11: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

The links in this process map are inactive. Please scroll to view activity data. 7

Page 12: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 8

Process: Enterprise Decommission Modernization Overview: The process map for Enterprise Decommission Modernization cycles through the following process and review activities:

EDM-01 Capture and Evaluate Decommissioning Criteria EDM-01.01 Initiate Data Call EDM-01.02 Log into Data Capture System Tool EDM-01.03 Review List of Authorized Systems EDM-01.04 Select System for Data Entry EDM-01.05 Display System's Stored Criteria Values EDM-01.06 Select/Modify Survey Answers EDM-01.07 Submit Survey EDM-01.08 Enter Another System? EDM-01.09 Log off System Data Capture Tool EDM-01.10 Update Stored Survey Data EDM-01.11 Score System Based on Submitted Survey EDM-01.12 Generate Candidate List EDM-01.13 Review Candidate List EDM-01.14 Send Notification Letters EDM-01.15 Send Current Content EDM-01.16 Display Decommissioning Survey View EDM-02 Perform Business/Technical Assessments EDM-02.01 Perform Business Case Analysis EDM-02.02 Modernize System? EDM-02.03 Analyze System Alternatives EDM-02.04 Confirm Selected Alternative EDM-02.05 Create Business Epic EDM-02.06 Review Assessment Products with ITAM EDM-03 Recommendation? EDM-04 Follow VIP for Upgrades EDM-05 Project Management Framework EDM-06 OIT Intake, Analysis and Decisions EDM-06.01 Submit OIT Intake Request EDM-06.02 Conduct Intake / Discovery EDM-06.03 Complete Required Analyses EDM-06.04 Seek Portfolio Investment Management Board Approval EDM-06.05 Approved? EDM-06.06 Develop Required Planning Documents EDM-06.07 Perform Critical Decision 1 EDM-06.08 Critical Decision 1 Approved? EDM-06.09 Develop Decommissioning Plan EDM-06.10 Perform Critical Decision 2 EDM-06.11 Critical Decision 2 Approved? EDM-07 OIT Intake Process EDM-08 Decommission Action? EDM-09 Develop Migrating Functionality

Page 13: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 9

EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality EDM-09.04 Perform Testing EDM-09.05 All Migrations Implemented? EDM-09.06 Update Documentation EDM-09.07 Develop User Training EDM-09.08 Provide User Training EDM-09.09 Critical Decision 2 Approved? EDM-09.10 Release New Version of Updated System EDM-10 Perform System Retirement EDM-10.01 Remove User Access to Retiring System EDM-10.02 Update Links EDM-10.03 Archive Retiring System Data EDM-10.04 Archive Software EDM-10.05 Dispose of Retiring System Hardware EDM-10.06 Make Necessary Network Changes EDM-10.07 Remove Security Certificates EDM-11 Perform Decommissioning Closeout EDM-11.01 Notify Help Desk EDM-11.02 Prepare Official Information for Dissemination EDM-11.03 Additional Notifications? EDM-11.04 Disseminate Internal Notice EDM-11.05 Disseminate Public Release EDM-11.06 Perform Necessary Outreach EDM-11.07 Update System of Record Notice EDM-11.08 Notify Architecture Team EDM-11.09 Notify Open Source EDM-11.10 Revise Budget to Any System Involved EDM-11.11 Prepare Post-decommissioning Report EDM-11.12 Send Update to RiskVision / ATO Tracker EDM-11.13 Send Update to VASI EDM-12 Track Decommissioning Projects EDM-13 Capture Assessment Lessons Learned

Page 14: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 10

Enterprise Decommission Modernization Description and Goals Description The Enterprise Decommission Modernization Process is the deliberate and systematic decommissioning of existing solutions with appropriate consideration of data archiving and security, migration of data or functionality to new solution(s), and incorporation of lessons learned over the solution’s life cycle. Decommissioning and Modernization may be linked to other high-level policy documents and High Level Designs (HLD). The Legacy System Modernization/Retire activities are planned and executed with input from all known and dependent Business & Technical stakeholders including the system owner, solution development team, operations and maintenance, records management, legal counsel, security, enterprise architecture, and interfacing systems in keeping with the Veteran-focused Integration Process (VIP) policy. it provides a sustainable and actionable sequencing plan which decommissions outmoded technology, recaptures resources, and re-programs freed resources towards priority business needs that is integrated into the lifecycle management of VA’s IT systems.

Goals - Create and sustain a more affordable technology footprint

- Realize operational performance improvements in business and technical systems

- Migrate, effectively, to another solution or archived in accordance with applicable records management regulations and policies

- Reduce VA infrastructure costs

- Mitigate current operational risks

Page 15: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 11

Enterprise Decommission Modernization RACI Information The following describes the RACI information for this process:

EDM-01.01 Initiate Data Call Responsible Role: Legacy System Modernization Team

Accountable Role: Program Manager

Consulted Role: None Listed

Informed Role: Business Team; IT Account Manager; Project Manager

EDM-01.02 Log into Data Capture System Tool Responsible Role: System Team

Accountable Role: Portfolio Director

Consulted Role: Program Manager

Informed Role: Legacy System Modernization Team

EDM-01.03 Review List of Authorized Systems Responsible Role: Data Capture System Tool

Accountable Role: Legacy System Modernization Team

Consulted Role: None Listed

Informed Role: None Listed

EDM-01.04 Select System for Data Entry Responsible Role: Data Capture System Tool

Accountable Role: Portfolio Director

Consulted Role: Program Manager

Informed Role: None Listed

EDM-01.05 Display System's Stored Criteria Values Responsible Role: Data Capture System Tool

Page 16: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 12

Accountable Role: Legacy System Modernization Team

Consulted Role: None Listed

Informed Role: None Listed

EDM-01.06 Select/Modify Survey Answers Responsible Role: System Team

Accountable Role: Portfolio Director

Consulted Role: Program Manager

Informed Role: None Listed

EDM-01.07 Submit Survey Responsible Role: System Team

Accountable Role: Portfolio Director

Consulted Role: Program Manager

Informed Role: None Listed

EDM-01.08 Enter Another System? Responsible Role: System Owner

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-01.09 Log off System Data Capture Tool Responsible Role: System Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-01.10 Update Stored Survey Data

Page 17: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 13

Responsible Role: Data Capture System Tool

Accountable Role: Legacy System Modernization Team

Consulted Role: None Listed

Informed Role: None Listed

EDM-01.11 Score System Based on Submitted Survey Responsible Role: Data Capture System Tool

Accountable Role: Legacy System Modernization Team

Consulted Role: None Listed

Informed Role: None Listed

EDM-01.12 Generate Candidate List Responsible Role: Data Capture System Tool

Accountable Role: Legacy System Modernization Team

Consulted Role: None Listed

Informed Role: None Listed

EDM-01.13 Review Candidate List Responsible Role: Legacy System Modernization Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: Business Team; IT Account Manager; Portfolio Director; Program Manager; System Team

EDM-01.14 Send Notification Letters Responsible Role: Legacy System Modernization Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: Business Team; IT Account Manager; Portfolio Director; Program Manager; System Team

Page 18: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 14

EDM-01.15 Send Current Content Responsible Role: VA System Inventory Tool

Accountable Role: Legacy System Modernization Team

Consulted Role: Business Owner; Portfolio Director

Informed Role: Program Manager

EDM-01.16 Display Decommissioning Survey View Responsible Role: VA System Inventory Tool

Accountable Role: Legacy System Modernization Team

Consulted Role: Business Owner; Portfolio Director

Informed Role: Program Manager

EDM-02.01 Perform Business Case Analysis Responsible Role: Business Team

Accountable Role: System Owner

Consulted Role: None Listed

Informed Role: Legacy System Modernization Team; Portfolio Director; Program Manager; Project Manager; IT Account Manager; Solution Delivery Technical Reviewer

EDM-02.02 Modernize System? Responsible Role: Business Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-02.03 Analyze System Alternatives Responsible Role: Technical Team

Accountable Role: Portfolio Director

Page 19: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 15

Consulted Role: Business Team; Program Manager

Informed Role: Legacy System Modernization Team

EDM-02.04 Confirm Selected Alternative Responsible Role: Business Team

Accountable Role: Portfolio Director

Consulted Role: Program Manager; System Team

Informed Role: Legacy System Modernization Team

EDM-02.05 Create Business Epic Responsible Role: Business Team

Accountable Role: Portfolio Director

Consulted Role: Program Manager

Informed Role: Legacy System Modernization Team

EDM-02.06 Review Assessment Products with ITAM Responsible Role: Business Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-03 Recommendation? Responsible Role: System Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-04 Follow VIP for Upgrades Responsible Role: System Team

Page 20: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 16

Accountable Role: Portfolio Director

Consulted Role: Business Team; Program Manager

Informed Role: Acquisition Specialist; Legacy System Modernization Team; Receiving Organization

EDM-05 Project Management Framework Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: None Listed

Informed Role: Stakeholders

EDM-06.01 Submit OIT Intake Request Responsible Role: Business Owner

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-06.02 Conduct Intake / Discovery Responsible Role: Demand Management

Accountable Role: Acquisition Integrated Product Team

Consulted Role: None Listed

Informed Role: None Listed

EDM-06.03 Complete Required Analyses Responsible Role: Technical Team

Accountable Role: Portfolio Director

Consulted Role: Business Team

Informed Role: Acquisition Specialist; Legacy System Modernization Team; Program Manager; Receiving Organization

Page 21: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 17

EDM-06.04 Seek Portfolio Investment Management Board Approval Responsible Role: Technical Team

Accountable Role: Portfolio Director

Consulted Role: Legacy System Modernization Team

Informed Role: Acquisition Specialist; Business Team; Demand Management Team; Intake and Analysis Team; IT Account Manager; Program Manager; Release Agent

EDM-06.05 Approved? Responsible Role: Technical Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-06.06 Develop Required Planning Documents Responsible Role: Technical Team

Accountable Role: Portfolio Director

Consulted Role: Business Owner; Product Owner; Demand Management Team; Program Manager; Release Agent

Informed Role: Legacy System Modernization Team; Users; Information Security Officer; Acquisition Specialist; POLARIS Agent

EDM-06.07 Perform Critical Decision 1 Responsible Role: Technical Team

Accountable Role: Portfolio Director

Consulted Role: Intake and Analysis Team; Program Manager; System Team

Informed Role: Acquisition Specialist; Contracting Officer; Information Security Officer; IT Account Manager; Receiving Organization; Release Agent

EDM-06.08 Critical Decision 1 Approved? Responsible Role: Technical Team

Page 22: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 18

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-06.09 Develop Decommissioning Plan Responsible Role: Technical Team

Accountable Role: Portfolio Director

Consulted Role: Intake and Analysis Team; Release Agent; System Team

Informed Role: Acquisition Specialist; Information Security Officer

EDM-06.10 Perform Critical Decision 2 Responsible Role: Technical Team

Accountable Role: Portfolio Director

Consulted Role: Intake and Analysis Team; Program Manager; System Team

Informed Role: Acquisition Specialist; Contracting Officer; Information Security Officer; IT Account Manager; Receiving Organization; Release Agent

EDM-06.11 Critical Decision 2 Approved? Responsible Role: Technical Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-07 OIT Intake Process Responsible Role: System Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

Page 23: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 19

EDM-08 Decommission Action? Responsible Role: System Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-09.01 Design Migrating Solution Responsible Role: System Implementation Team

Accountable Role: Portfolio Director

Consulted Role: Contracting Officer; Information Security Officer; Program Manager; Receiving Organization; Release Agent; System Team

Informed Role: Acquisition Specialist; Intake and Analysis Team; IT Account Manager

EDM-09.02 Transfer Migrating Data Responsible Role: System Implementation Team

Accountable Role: Portfolio Director

Consulted Role: Contracting Officer; Information Security Officer; Receiving Organization; Release Agent

Informed Role: Acquisition Specialist; Intake and Analysis Team; IT Account Manager

EDM-09.03 Code Migrating Functionality Responsible Role: System Implementation Team

Accountable Role: Portfolio Director

Consulted Role: Contracting Officer; Information Security Officer; Project Manager; Receiving Organization; System Team

Informed Role: Acquisition Specialist; Intake and Analysis Team; IT Account Manager

EDM-09.04 Perform Testing Responsible Role: System Implementation Team

Accountable Role: Portfolio Director

Page 24: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 20

Consulted Role: Contracting Officer; Information Security Officer; Program Manager; Receiving Organization; Release Agent; System Team

Informed Role: Acquisition Specialist; Intake and Analysis Team; IT Account Manager

EDM-09.05 All Migrations Implemented? Responsible Role: System Implementation Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: None Listed

EDM-09.06 Update Documentation Responsible Role: System Implementation Team

Accountable Role: Portfolio Director

Consulted Role: Contracting Officer; Information Security Officer; Project Manager; Receiving Organization; Release Agent

Informed Role: Acquisition Specialist; Intake and Analysis Team; IT Account Manager

EDM-09.07 Develop User Training Responsible Role: System Implementation Team

Accountable Role: Portfolio Director

Consulted Role: Contracting Officer; Information Security Officer; Receiving Organization; Release Agent; System Implementation Team

Informed Role: Acquisition Specialist; Intake and Analysis Team; IT Account Manager

EDM-09.08 Provide User Training Responsible Role: System Implementation Team

Accountable Role: Portfolio Director

Consulted Role: Contracting Officer; Information Security Officer; Program Manager; Receiving Organization; Release Agent; System Implementation Team

Informed Role: Acquisition Specialist; Intake and Analysis Team; IT Account Manager

Page 25: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 21

EDM-09.09 Critical Decision 2 Approved? Responsible Role: System Implementation Team

Accountable Role: Portfolio Director

Consulted Role: Contracting Officer; Information Security Officer; Program Manager; Receiving Organization; Release Agent; System Implementation Team

Informed Role: Acquisition Specialist; IT Account Manager; Intake and Analysis Team

EDM-09.10 Release New Version of Updated System Responsible Role: System Implementation Team

Accountable Role: Portfolio Director

Consulted Role: None Listed

Informed Role: Contracting Officer; Information Security Officer; Program Manager; Receiving Organization; Release Agent; System Team

EDM-10.01 Remove User Access to Retiring System Responsible Role: System Retirement Team

Accountable Role: Information Security Officer

Consulted Role: IT Account Manager; System Team

Informed Role: Acquisition Specialist; Intake and Analysis Team; Program Manager; Release Agent

EDM-10.02 Update Links Responsible Role: System Retirement Team

Accountable Role: Information Security Officer

Consulted Role: IT Account Manager

Informed Role: Acquisition Specialist; Intake and Analysis Team; Program Manager; Release Agent

EDM-10.03 Archive Retiring System Data Responsible Role: System Retirement Team

Page 26: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 22

Accountable Role: Information Security Officer

Consulted Role: None Listed

Informed Role: Acquisition Specialist; Intake and Analysis Team; Portfolio Director

EDM-10.04 Archive Software Responsible Role: System Retirement Team

Accountable Role: Program Manager

Consulted Role: System Team

Informed Role: Acquisition Specialist; Information Security Officer; Intake and Analysis Team; Portfolio Director

EDM-10.05 Dispose of Retiring System Hardware Responsible Role: System Retirement Team

Accountable Role: Program Manager

Consulted Role: System Team

Informed Role: Acquisition Specialist; Information Security Officer; Intake and Analysis Team

EDM-10.06 Make Necessary Network Changes Responsible Role: System Retirement Team

Accountable Role: Information Security Officer

Consulted Role: IT Account Manager; System Team

Informed Role: Acquisition Specialist; Intake and Analysis Team; Program Manager; Release Agent

EDM-10.07 Remove Security Certificates Responsible Role: System Retirement Team

Accountable Role: Information Security Officer

Consulted Role: System Team

Informed Role: Acquisition Specialist; Intake and Analysis Team; Release Agent

Page 27: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 23

EDM-11.01 Notify Help Desk Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: None Listed

Informed Role: Acquisition Specialist; Business Team; Intake and Analysis Team; Portfolio Director

EDM-11.02 Prepare Official Information for Dissemination Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: None Listed

Informed Role: None Listed

EDM-11.03 Additional Notifications? Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: None Listed

Informed Role: None Listed

EDM-11.04 Disseminate Internal Notice Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: None Listed

Informed Role: Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team

EDM-11.05 Disseminate Public Release Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: None Listed

Page 28: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 24

Informed Role: Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

EDM-11.06 Perform Necessary Outreach Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: None Listed

Informed Role: Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

EDM-11.07 Update System of Record Notice Responsible Role: System Team

Accountable Role: Records Steward

Consulted Role: None Listed

Informed Role: Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team

EDM-11.08 Notify Architecture Team Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: None Listed

Informed Role: Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

EDM-11.09 Notify Open Source Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: None Listed

Informed Role: Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

Page 29: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 25

EDM-11.10 Revise Budget to Any System Involved Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: Acquisition Specialist

Informed Role: Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

EDM-11.11 Prepare Post-decommissioning Report Responsible Role: System Team

Accountable Role: Program Manager

Consulted Role: None Listed

Informed Role: Acquisition Specialist; Business Team; Intake and Analysis Team; Information Security Officer; IT Account Manager; Legacy System Modernization Team

EDM-11.12 Send Update to RiskVision / ATO Tracker Responsible Role: System Team

Accountable Role: Product Manager

Consulted Role: None Listed

Informed Role: Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

EDM-11.13 Send Update to VASI Responsible Role: System Team

Accountable Role: Project Manager

Consulted Role: None Listed

Informed Role: Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

EDM-12 Track Decommissioning Projects Responsible Role: Legacy System Modernization Team

Page 30: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 26

Accountable Role: Legacy System Modernization Team

Consulted Role: None Listed

Informed Role: Program Manager; Portfolio Director; IT Account Manager; Intake and Analysis Team; Receiving Organization; Release Agent; Contracting Officer; Information Security Officer; System Team; Acquisition Specialist; Business Team

EDM-13 Capture Assessment Lessons Learned Responsible Role: Legacy System Modernization Team

Accountable Role: Legacy System Modernization Team

Consulted Role: Acquisition Specialist; Business Team; Intake and Analysis Team; IT Account Manager; Portfolio Director; Program Manager; Receiving Organization; Release Agent; System Team

Informed Role: None Listed

Page 31: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 27

Enterprise Decommission Modernization Associated Artifacts Information Associated Artifacts information (including hyperlinks) for this process includes:

Analysis of Alternatives Template

Business Case Technical Analysis (BCTA)

Business Epic Template

Candidate List

Communications Plan Template

Configuration Management Plan Template

Critical Decision 1 Template

Critical Decision 2 Template

Data Update Request Template

Decommission Score Card Sample With Risk Criteria

Deployment, Installation, Rollback, Back-out Guide Template

Disposition of User Accounts & Security Certificates Report

Document Drafting Handbook - Update System of Records Notice

Lessons Learned Report Template

OIT File Plan Template

Post Decommission Operations Report

Project Management Plan (PMP) Template

Required Artifacts

System Context Diagram

Test Case Test Scripts

Test Evaluation Template

Test Results

VA Form 0751-Information Technology Sanitization Certificate Template

VA Systems Inventory

VIPR Intake Request

Enterprise Decommission Modernization Tools and Web Sites Information The Tools and Web Sites associated with this process (including hyperlinks) include:

Data Capture System Tool

Page 32: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 28

EPMD Legacy Systems Modernization Portal

POLARIS Enterprise Release Calendar

POLARIS Enterprise Release Calendar (PERC) Process

Polaris Landing Page

Product Documentation (DOC) Process

Project Initiation (PRI) Process

Project Planning (PRP) Process

Rational Quality Manager (Quality Management)

Rational Requirements DOORS Next Generation

Rational Team Concert (Change/Configuration Management)

Records Management Process

VA Systems Inventory

VIP Dashboard

VIPR Tool

Enterprise Decommission Modernization Standards Information Standards associated with this process (including hyperlinks) include:

41 U.S.C. 2101 - Restrictions on Obtaining and Disclosing Certain Information

Change Control Process Guide

Enterprise Design Patterns

Enterprise Testing Service Testing Guide

Legacy Systems Business Case Decommissioning Assessment Criteria

MP-6 Electronic Media Sanitization SOP

Portfolio Investment Management Board Charter

Software Configuration Management Plan Standard

VA Directive 6004, Configuration, Change, and Release Management Programs

VA Directive 6300, Records and Information Management

VA Directive 6404, VA Systems Inventory

VA Directive 6500, Managing Information Security Risk: VA Information Security Program

VA Directive 6518, Enterprise Information Management

VA Directive 6551, Enterprise Design Patterns

VA EA Enterprise Technical Architecture (ETA) Compliance Criteria

Page 33: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 29

VA EA Vision and Strategy

VA Enterprise Design Patterns: 2. Enterprise Architecture 2.2. End-to-End Application Performance Management (APM)

VA Enterprise Design Patterns: Data-as-a-Service (DaaS)

VA Enterprise Target Application Architecture

VA Handbook 6300.1, Records Management Procedures

VA Handbook 6300.4: Procedures for Processing Requests for Records Subject to the Privacy Act

VA Handbook 6300.5 Procedures for Establishing and Maintaining Privacy Act Systems of Record

VA Handbook 6500, Risk Management Framework for VA Information Systems - Tier 3: VA Information Security Program

VA Handbook 6500.1, Electronic Media Sanitization

Veteran Focused Integration Process (VIP) Guide

Veteran-focused Integration Process (VIP) Release Process Guide

Veteran-focused Integration Process Request (VIPR) Submission Instruction

Page 34: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 30

Enterprise Decommission Modernization Process Process Activity Name: EDM-01 Capture and Evaluate Decommissioning Criteria Previous Activities Process Begins

Next Activities EDM-01.01 Initiate Data Call

Description The Capture and Evaluate Decommissioning Criteria sub-process describes the assessment activities led by the Legacy System Modernization team to gather select data values for each information technology system at the Department of Veteran Affairs and review those criteria values to identify candidates for retirement or integration into other systems. The Capture and Evaluate Decommissioning Criteria sub-process cycles through the following dependent activities:

- Initiate Data Call

- Log into Data Capture System Tool

- Display List of Authorized Systems - Select System for Data Entry

- Display System's Stored Criteria Values

- Select/Modify Survey Answers

- Submit Survey

- Enter Another System?

- Log Off Data Capture System Tool

- Update Stored Survey Data

- Score System Based on Submitted Survey

- Generate Candidate List

- Review Candidate List

- Send Notification Letters

- Send Current Content

- Display Decommissioning Survey View

Process Activity Name: EDM-01.01 Initiate Data Call Previous Activities EDM-01 Capture and Evaluate Decommissioning Criteria

Page 35: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 31

Next Activities EDM-01.02 Log into Data Capture System Tool

Description The Initiate Data Call activity, performed by the Legacy System Modernization Team, starts the criteria collection effort by requesting system owners complete a short survey, updating previous values contained in the Data Capture System Tool if any exist.

Input Data Capture System Tool System Report

VA System Inventory System Report

Output Data Update Request

Associated Artifacts Data Update Request Template

Responsible Role Legacy System Modernization Team

Accountable Role Program Manager

Consulted Role None Listed

Informed Role Business Team; IT Account Manager; Project Manager

Tools and Websites Data Capture System Tool

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.02 Log into Data Capture System Tool Previous Activities EDM-01.01 Initiate Data Call

Next Activities EDM-01.03 Review List of Authorized Systems

Page 36: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 32

Description The System Team performs the Log into Data Capture System Tool by visiting the web link provided by the Legacy System Modernization Team in the Initiate Data Call process.

Input Data Call Request

Output Authorized Systems Listing

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Portfolio Director

Consulted Role Program Manager

Informed Role Legacy System Modernization Team

Tools and Websites VA Systems Inventory

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.03 Review List of Authorized Systems Previous Activities EDM-01.02 Log into Data Capture System Tool

Or

EDM-01.08 Enter Another System?

Next Activities EDM-01.04 Select System for Data Entry

Description The Data Capture System performs the Display List of Authorized Systems process after validating the identity of the user.

Page 37: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 33

Input Current VASI Content

Output Listing of Authorized Systems

Associated Artifacts None Listed

Responsible Role Data Capture System Tool

Accountable Role Legacy System Modernization Team

Consulted Role None Listed

Informed Role None Listed

Tools and Websites Data Capture System Tool

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.04 Select System for Data Entry Previous Activities EDM-01.03 Review List of Authorized Systems

Next Activities EDM-01.05 Display System's Stored Criteria Values

Description The System Team user reviews the presented list of systems for which the user has authorization and chooses the one for which the user will enter criteria values.

Input Listing of Authorized Systems

Output Selected System Access

Page 38: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 34

Associated Artifacts None Listed

Responsible Role Data Capture System Tool

Accountable Role Portfolio Director

Consulted Role Program Manager

Informed Role None Listed

Tools and Websites Data Capture System Tool

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.05 Display System's Stored Criteria Values Previous Activities EDM-01.04 Select System for Data Entry

Next Activities EDM-01.06 Select/Modify Survey Answers

Description Upon user selection of a specific system, the Data Capture System Tool displays any existing values for the survey criteria.

Input Selected System to Update

Output Displayed Stored Criteria Values

Associated Artifacts None Listed

Page 39: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 35

Responsible Role Data Capture System Tool

Accountable Role Legacy System Modernization Team

Consulted Role None Listed

Informed Role None Listed

Tools and Websites Data Capture System Tool

Standards None Listed

More Info None Listed

Process Activity Name: EDM-01.06 Select/Modify Survey Answers Previous Activities EDM-01.05 Display System's Stored Criteria Values

Next Activities EDM-01.07 Submit Survey

Description The System Team chooses the correct values for each criteria item for the selected system, modifying existing values, if necessary.

Input Displayed System Stored Criteria

Output Updated System's Stored Criteria

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Portfolio Director

Page 40: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 36

Consulted Role Program Manager

Informed Role None Listed

Tools and Websites Data Capture System Tool

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.07 Submit Survey Previous Activities EDM-01.06 Select/Modify Survey Answers

Next Activities EDM-01.08 Enter Another System?

Description Once the System Team completes and saves the criteria survey for the selected system, the Data Capture System Tool automatically submits the survey results for assessment.

Input Displayed System Stored Values

Output New System Data

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Portfolio Director

Consulted Role Program Manager

Informed Role None Listed

Page 41: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 37

Tools and Websites Data Capture System Tool

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.08 Enter Another System? Previous Activities EDM-01.07 Submit Survey

Next Activities If "No":

EDM-01.09 Log off System Data Capture Tool

Or

If "Yes":

EDM-01.03 Review List of Authorized Systems

Description The System Team determines if there are additional systems to update (Yes) or not (No).

Responsible Role System Owner

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Process Activity Name: EDM-01.09 Log off System Data Capture Tool Previous Activities EDM-01.08 Enter Another System?

Next Activities EDM-01.10 Update Stored Survey Data

Description The System Team logs off the Data Capture System Tool once all authorized systems have been updated.

Page 42: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 38

Input Updated Systems Criteria for Authorized Systems

Output Closed System Data Capture Tool

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Tools and Websites Data Capture System Tool

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.10 Update Stored Survey Data Previous Activities EDM-01.09 Log off System Data Capture Tool

Next Activities EDM-01.11 Score System Based on Submitted Survey

Description The Data Capture System Tool determines the assessment score for a system by applying the numeric values for the user selected values and combining those numeric values for a total assessment score.

Input New System Data

Page 43: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 39

Output Updated System Data

Associated Artifacts Decommission Score Card Sample With Risk Criteria

Responsible Role Data Capture System Tool

Accountable Role Legacy System Modernization Team

Consulted Role None Listed

Informed Role None Listed

Tools and Websites None Listed

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.11 Score System Based on Submitted Survey Previous Activities EDM-01.10 Update Stored Survey Data

Next Activities EDM-01.12 Generate Candidate List

Description The Data Capture System Tool computes the assessment score for a system by applying the numeric values for the user selected values and combining those numeric values for a total assessment score.

Input Updated System Data

Output Updated System Score

Page 44: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 40

Associated Artifacts None Listed

Responsible Role Data Capture System Tool

Accountable Role Legacy System Modernization Team

Consulted Role None Listed

Informed Role None Listed

Tools and Websites Data Capture System Tool

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.12 Generate Candidate List Previous Activities EDM-01.11 Score System Based on Submitted Survey

Next Activities EDM-01.13 Review Candidate List

Description Based on the assessment values received, the Data Capture System Tool identifies those systems with scores in the lowest range as possible candidates for decommissioning.

Input Scored System Criteria Values

Output Candidate List

Associated Artifacts Candidate List

Responsible Role Data Capture System Tool

Page 45: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 41

Accountable Role Legacy System Modernization Team

Consulted Role None Listed

Informed Role None Listed

Tools and Websites Data Capture System Tool

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.13 Review Candidate List Previous Activities EDM-01.12 Generate Candidate List

Next Activities EDM-01.14 Send Notification Letters

Description The Legacy System Modernization Team analyzes the Data Capture System Tool generated Candidate List to confirm that each system on the list belongs on the list.

Input Candidate List

Output Approved Candidate List

Associated Artifacts Candidate List

Responsible Role Legacy System Modernization Team

Accountable Role Portfolio Director

Consulted Role None Listed

Page 46: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 42

Informed Role Business Team; IT Account Manager; Portfolio Director; Program Manager; System Team

Tools and Websites Data Capture System Tool

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.14 Send Notification Letters Previous Activities EDM-01.13 Review Candidate List

Next Activities EDM-01.15 Send Current Content

Description The Legacy System Modernization Team sends Notification Letters to the associated Portfolio Director and System Owner for those systems identified as decommissioning candidates.

Input Approved Candidate List

Output Candidate Notification Letters

Associated Artifacts None Listed

Responsible Role Legacy System Modernization Team

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role Business Team; IT Account Manager; Portfolio Director; Program Manager; System Team

Tools and Websites Data Capture System Tool

Page 47: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 43

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

More Info None Listed

Process Activity Name: EDM-01.15 Send Current Content Previous Activities EDM-01.14 Send Notification Letters

Next Activities EDM-01.16 Display Decommissioning Survey View

Description The Send Current Contents activity, performed by the VA System Inventory (VASI) Tool, involves updating contents in the Data Capture System Tool with the most current information stored in the VASI Tool.  The VASI Tool provides the data and the Data Capture System Tool updates the actual data store changes.

Input VA System Inventory Data Updates

Output Current VASI Content

Associated Artifacts VA Systems Inventory

Responsible Role VA System Inventory Tool

Accountable Role Legacy System Modernization Team

Consulted Role Business Owner; Portfolio Director

Informed Role Program Manager

Tools and Websites VA Systems Inventory

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

Page 48: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 44

More Info None Listed

Process Activity Name: EDM-01.16 Display Decommissioning Survey View Previous Activities EDM-01.15 Send Current Content

Next Activities EDM-02 Perform Business/Technical Assessments

Description The Display Decommissioning Survey View is a VA System Inventory (VASI) activity where the VASI tool, when requested by an authorized user, displays the values associated with the decommissioning survey.

Input System Data Capture Tool Updates

Output Decommissioning Survey View

Associated Artifacts None Listed

Responsible Role VA System Inventory Tool

Accountable Role Legacy System Modernization Team

Consulted Role Business Owner; Portfolio Director

Informed Role Program Manager

Tools and Websites VA Systems Inventory

Standards VA Directive 6404, VA Systems Inventory

More Info None Listed

Page 49: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 45

Process Activity Name: EDM-02 Perform Business/Technical Assessments Previous Activities EDM-01.16 Display Decommissioning Survey View

Next Activities EDM-02.01 Perform Business Case Analysis

Description The Perform Business/Technical Assessments sub-process, performed by the Business Team, evaluates a specific system for the potential benefits of and alternatives for decommissioning that system. The Perform Business/Technical Assessments sub-process cycles through the following dependent activities:

- Perform Business Case Analysis

- Modernize System?

- Analyze System Alternatives

- Confirm Selected Alternative

- Create Business Epic

- Review Assessment Products with ITAM

Process Activity Name: EDM-02.01 Perform Business Case Analysis Previous Activities EDM-02 Perform Business/Technical Assessments

Next Activities EDM-02.02 Modernize System?

Description The Business Team develops the business solution.  This includes gathering and clarifying intents and requirements (may include physical or logical modeling, determining ‘as-is’ and ‘to-be’ business architecture considerations). The Business Team focuses on developing the means to a solution the customer is seeking.

Activities include:

 • Gathering, collating and synthesizing data

 • Working with system architects to ensure models and logic are sound

 • Analyzing current guides, laws, and standards to ensure compliance is accounted for

 • Developing prototypes or working models or drafts

 • Developing reports to document findings and needs to help customers understand progress and potential issues with the development of the business solution

 • Helping business executives in their decision making

Page 50: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 46

Input Candidate List

Candidate Notification Letters

Data Capture System Tool

Market Survey Data

Output Business Case Document

Replacement Cost Analysis

Sustainment Cost Analysis

Associated Artifacts Business Case Technical Analysis (BCTA)

Responsible Role Business Team

Accountable Role System Owner

Consulted Role None Listed

Informed Role Legacy System Modernization Team; Portfolio Director; Program Manager; Project Manager; IT Account Manager; Solution Delivery Technical Reviewer

Tools and Websites VA Systems Inventory

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

Change Control Process Guide

VA Directive 6551, Enterprise Design Patterns

VA EA Vision and Strategy

More Info None Listed

Process Activity Name: EDM-02.02 Modernize System? Previous Activities EDM-02.01 Perform Business Case Analysis

Page 51: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 47

Next Activities If "Modernize":

EDM-02.03 Analyze System Alternatives

Or

If "Sustain":

EDM-03 Recommendation?

Description The Business Team makes a decision to modernize (Modernize) or sustain (Sustain) the system based upon the business case analysis.

Responsible Role Business Team

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Process Activity Name: EDM-02.03 Analyze System Alternatives Previous Activities EDM-02.02 Modernize System?

Next Activities EDM-02.04 Confirm Selected Alternative

Description The Analyze System Alternatives activity, performed by the Technical Team, identifies the benefits and drawbacks of each possible implementation change of the system to identify the most effective choice for the system to support the users' needs.

Input Business Case Document

Output Analysis of Alternatives

Associated Artifacts Analysis of Alternatives Template

Page 52: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 48

Responsible Role Technical Team

Accountable Role Portfolio Director

Consulted Role Business Team; Program Manager

Informed Role Legacy System Modernization Team

Tools and Websites Rational Requirements DOORS Next Generation

EPMD Legacy Systems Modernization Portal

VA Systems Inventory

Standards Legacy Systems Business Case Decommissioning Assessment Criteria

VA Directive 6551, Enterprise Design Patterns

VA Directive 6518, Enterprise Information Management

VA Directive 6500, Managing Information Security Risk: VA Information Security Program

More Info None Listed

Process Activity Name: EDM-02.04 Confirm Selected Alternative Previous Activities EDM-02.03 Analyze System Alternatives

Next Activities EDM-02.05 Create Business Epic

Description The Confirm Selected Alternative activity, performed by the Business Team, provides the business confirmation that the recommended technical solution matches the business users' needs.

Input Analysis of Alternatives

Business Case

Output Confirmed Analysis of Alternatives

Page 53: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 49

Updated Business Case

Associated Artifacts Analysis of Alternatives Template

Responsible Role Business Team

Accountable Role Portfolio Director

Consulted Role Program Manager; System Team

Informed Role Legacy System Modernization Team

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-02.05 Create Business Epic Previous Activities EDM-02.04 Confirm Selected Alternative

Next Activities EDM-02.06 Review Assessment Products with ITAM

Description The Create Business Epic activity initiates the VIP required documentation that describes the business requirements for the system's implementation change.

Input Alternative Analysis Results

Business Case

Output Business Epic

Associated Artifacts Business Epic Template

Page 54: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 50

Responsible Role Business Team

Accountable Role Portfolio Director

Consulted Role Program Manager

Informed Role Legacy System Modernization Team

Tools and Websites Rational Requirements DOORS Next Generation

Rational Team Concert (Change/Configuration Management)

Standards None Listed

More Info None Listed

Process Activity Name: EDM-02.06 Review Assessment Products with ITAM Previous Activities EDM-02.05 Create Business Epic

Next Activities EDM-03 Recommendation?

Description The Review Assessment Products with IT Account Manager (ITAM) activity addresses all the VIP activities and documents required to meet ITAM review needs.

Input Analysis of Alternatives

Business Case

Business Epics

VIP Required Artifacts

Output Approved Analysis of Alternatives

Approved Business Case

Approved Business Epics

Page 55: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 51

Associated Artifacts Analysis of Alternatives Template

Responsible Role Business Team

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Tools and Websites Rational Requirements DOORS Next Generation

Rational Team Concert (Change/Configuration Management)

Standards Veteran-focused Integration Process Request (VIPR) Submission Instruction

More Info None Listed

Process Activity Name: EDM-03 Recommendation? Previous Activities EDM-02.06 Review Assessment Products with ITAM

Next Activities If "Revise-Enhance":

EDM-04 Follow VIP for Upgrades

Or

If "Decommission":

EDM-06 OIT Intake, Analysis and Decisions

Description The System Team makes a recommendation to Revise/Enhance the System or to Decommission the System based upon the Business and Technical Assessment outcomes.

Responsible Role System Team

Accountable Role Portfolio Director

Page 56: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 52

Consulted Role None Listed

Informed Role None Listed

Process Activity Name: EDM-04 Follow VIP for Upgrades Previous Activities EDM-03 Recommendation?

Next Activities EDM-05 Project Management Framework

Description The System Team follows the policy guidance contained in the Veteran-focused Integrated Process Guide (VIP Guide) detailing the activities that all OIT projects must adhere to.

Input Analysis of Alternatives

Business Case

Business Epics

Output Full Operating Capability Product

Associated Artifacts Required Artifacts

Responsible Role System Team

Accountable Role Portfolio Director

Consulted Role Business Team; Program Manager

Informed Role Acquisition Specialist; Legacy System Modernization Team; Receiving Organization

Tools and Websites Rational Requirements DOORS Next Generation

Rational Team Concert (Change/Configuration Management)

Standards Veteran-focused Integration Process Request (VIPR) Submission Instruction

Page 57: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 53

More Info None Listed

Process Activity Name: EDM-05 Project Management Framework Previous Activities EDM-04 Follow VIP for Upgrades

Next Activities If "Go To Project Management Framework":

Project Management Life Cycle Process

Or

If "Remain in EDM":

Process Ends

Description The System Team goes to the Project Management Framework in the Process Asset Library and follows the processes defined there for successful product delivery under the Veteran-focused Integration Process (VIP) Guide.

Input None Listed

Output Full Operating Capability Product

Required Artifacts

Associated Artifacts Required Artifacts

Responsible Role System Team

Accountable Role Program Manager

Consulted Role None Listed

Informed Role Stakeholders

Tools and Websites None Listed

Page 58: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 54

Standards None Listed

More Info None Listed

Process Activity Name: EDM-06 OIT Intake, Analysis and Decisions Previous Activities EDM-05 Project Management Framework

Next Activities EDM-06.01 Submit OIT Intake Request

Description The Perform OIT Intake, Analysis and Decisions sub-process includes all the activities defined by OIT intake, analysis and decision actions. The VIP Intake, Analysis and Decisions sub-process cycles through the following dependent activities:

- Submit OIT Intake Request

- Conduct Intake / Discovery

- Complete VIP Required Analysis

- Seek Portfolio Investment Management Board Approval

- Approved?

- Develop Required Planning Documents

- Perform Critical Decision 1

- Critical Decision 1 Approved?

- Develop Decommissioning Plan

- Perform Critical Decision 2

- Critical Decision 2 Approved?

Process Activity Name: EDM-06.01 Submit OIT Intake Request Previous Activities EDM-06 OIT Intake, Analysis and Decisions

Next Activities EDM-06.02 Conduct Intake / Discovery

Description The Business Owner submits an intake request into the VIPR Tool.

Input Business Case

Page 59: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 55

Business Epics

Business Sub-epics

VIPR Intake Request

Output Submitted VIPR Intake Request

Associated Artifacts Business Epic Template

VIPR Intake Request

Responsible Role Business Owner

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Tools and Websites VIPR Tool

Standards None Listed

More Info None Listed

Process Activity Name: EDM-06.02 Conduct Intake / Discovery Previous Activities EDM-06.01 Submit OIT Intake Request

Next Activities EDM-06.03 Complete Required Analyses

Description The Conduct Intake / Discovery activity, performed by Demand Management, addresses the OIT Intake process, specifically the actions that capture the framework of a new project.

Input Business Case

Page 60: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 56

Business Epic

VIPR Intake Request

Output Accepted Intake Request

Associated Artifacts VIPR Intake Request

Responsible Role Demand Management

Accountable Role Acquisition Integrated Product Team

Consulted Role None Listed

Informed Role None Listed

Tools and Websites VIPR Tool

Standards Veteran-focused Integration Process Request (VIPR) Submission Instruction

More Info None Listed

Process Activity Name: EDM-06.03 Complete Required Analyses Previous Activities EDM-06.02 Conduct Intake / Discovery

Or

EDM-06.05 Approved?

Next Activities EDM-06.04 Seek Portfolio Investment Management Board Approval

Description The Complete Required Analyses activity addresses complying with the VIP Process, Security and 508 Conformance requirements, specifically the actions that review and evaluate the new project.

Input Business Assessment

Page 61: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 57

Business Case

Business Epics

Technical Assessment

Output Updated Business Assessment

Updated Technical Assessment

Associated Artifacts Business Case Technical Analysis (BCTA)

Responsible Role Technical Team

Accountable Role Portfolio Director

Consulted Role Business Team

Informed Role Acquisition Specialist; Legacy System Modernization Team; Program Manager; Receiving Organization

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-06.04 Seek Portfolio Investment Management Board Approval Previous Activities EDM-06.03 Complete Required Analyses

Next Activities EDM-06.05 Approved?

Description The Seek Portfolio Investment Management Board Approval activity addresses the actions surrounding the Technical Team presentation to and analysis of the project to the Portfolio Investment Management Board.

Page 62: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 58

Input Analysis of Alternatives

Business Case

Technical Analysis

Output Portfolio Investment Management Board Approval

Portfolio Investment Management Board Presentation

Associated Artifacts None Listed

Responsible Role Technical Team

Accountable Role Portfolio Director

Consulted Role Legacy System Modernization Team

Informed Role Acquisition Specialist; Business Team; Demand Management Team; Intake and Analysis Team; IT Account Manager; Program Manager; Release Agent

Tools and Websites None Listed

Standards Portfolio Investment Management Board Charter

More Info None Listed

Process Activity Name: EDM-06.05 Approved? Previous Activities EDM-06.04 Seek Portfolio Investment Management Board Approval

Next Activities If "Yes":

EDM-06.06 Develop Required Planning Documents

Or

If "No":

EDM-06.03 Complete Required Analyses

Page 63: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 59

Description The Technical Team determines if the Portfolio Investment Management Board approved the project submission (Yes) or not (No).

Responsible Role Technical Team

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Process Activity Name: EDM-06.06 Develop Required Planning Documents Previous Activities EDM-06.05 Approved?

Or

EDM-06.08 Critical Decision 1 Approved?

Next Activities EDM-06.07 Perform Critical Decision 1

Description The Develop Required Planning Documents activity addresses the VIP process, specifically the actions involving the creation of plans and schedules for the project.

Input Business Epics

Business Sub-epics

Compliance Epics

Compliance Sub-epics

Critical Decision 1 Approval

Decommission Plan

Modernization Plan

Output Required Artifacts

Page 64: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 60

Associated Artifacts Required Artifacts

Responsible Role Technical Team

Accountable Role Portfolio Director

Consulted Role Business Owner; Product Owner; Demand Management Team; Program Manager; Release Agent

Informed Role Legacy System Modernization Team; Users; Information Security Officer; Acquisition Specialist; POLARIS Agent

Tools and Websites Product Documentation (DOC) Process

Project Initiation (PRI) Process

POLARIS Enterprise Release Calendar (PERC) Process

Polaris Landing Page

Rational Quality Manager (Quality Management)

Rational Team Concert (Change/Configuration Management)

Standards Veteran Focused Integration Process (VIP) Guide

Veteran-focused Integration Process (VIP) Release Process Guide

More Info None Listed

Process Activity Name: EDM-06.07 Perform Critical Decision 1 Previous Activities EDM-06.06 Develop Required Planning Documents

Next Activities EDM-06.08 Critical Decision 1 Approved?

Description The Perform Critical Decision 1 activity, performed by the Technical Team, addresses the VIP Process, specifically, the actions that move a project through the first Critical Decision milestone.

Page 65: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 61

Input Critical Decision 1 Presentation

Output Critical Decision 1 Approval

Associated Artifacts Critical Decision 1 Template

Responsible Role Technical Team

Accountable Role Portfolio Director

Consulted Role Intake and Analysis Team; Program Manager; System Team

Informed Role Acquisition Specialist; Contracting Officer; Information Security Officer; IT Account Manager; Receiving Organization; Release Agent

Tools and Websites None Listed

Standards Veteran Focused Integration Process (VIP) Guide

Veteran-focused Integration Process (VIP) Release Process Guide

More Info None Listed

Process Activity Name: EDM-06.08 Critical Decision 1 Approved? Previous Activities EDM-06.07 Perform Critical Decision 1

Next Activities If "Yes":

EDM-06.09 Develop Decommissioning Plan

Or

If "No":

EDM-06.06 Develop Required Planning Documents

Page 66: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 62

Description The Technical Team presents the Critical Decision 1 Presentation to the TRIAD and obtains approval (Yes) or not (No).

Responsible Role Technical Team

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Process Activity Name: EDM-06.09 Develop Decommissioning Plan Previous Activities EDM-06.08 Critical Decision 1 Approved?

Next Activities EDM-06.10 Perform Critical Decision 2

Description The Develop Decommissioning Plan activity results in the creation of a detailed approach to the retirement or modernization activities associated with the project.

Input Business Epic

Business Sub-epic

Compliance Epic

Compliance Sub-Epic

Output Decommissioning Plan

Associated Artifacts Project Management Plan (PMP) Template

Responsible Role Technical Team

Accountable Role Portfolio Director

Page 67: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 63

Consulted Role Intake and Analysis Team; Release Agent; System Team

Informed Role Acquisition Specialist; Information Security Officer

Tools and Websites POLARIS Enterprise Release Calendar

Rational Requirements DOORS Next Generation

Rational Quality Manager (Quality Management)

Rational Team Concert (Change/Configuration Management)

Standards Veteran Focused Integration Process (VIP) Guide

Veteran-focused Integration Process (VIP) Release Process Guide

More Info None Listed

Process Activity Name: EDM-06.10 Perform Critical Decision 2 Previous Activities EDM-06.09 Develop Decommissioning Plan

Next Activities EDM-06.11 Critical Decision 2 Approved?

Description The Perform Critical Decision 2 activity addresses the VIP Process, specifically, the actions that move a project through the second Critical Decision milestone.

Input Decommissioning Plan

Output Critical Decision 2 Presentation

Associated Artifacts Critical Decision 2 Template

Responsible Role Technical Team

Accountable Role Portfolio Director

Page 68: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 64

Consulted Role Intake and Analysis Team; Program Manager; System Team

Informed Role Acquisition Specialist; Contracting Officer; Information Security Officer; IT Account Manager; Receiving Organization; Release Agent

Tools and Websites Rational Requirements DOORS Next Generation

Rational Team Concert (Change/Configuration Management)

Standards Veteran Focused Integration Process (VIP) Guide

Veteran-focused Integration Process (VIP) Release Process Guide

More Info None Listed

Process Activity Name: EDM-06.11 Critical Decision 2 Approved? Previous Activities EDM-06.10 Perform Critical Decision 2

Next Activities If "YES":

EDM-07 OIT Intake Process

Or

If "N0":

EDM-06.09 Develop Decommissioning Plan

Description The Technical Team determines if the Critical Decision 2 is approved (Yes) or not (N0).

Responsible Role Technical Team

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Page 69: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 65

Process Activity Name: EDM-07 OIT Intake Process Previous Activities EDM-06.11 Critical Decision 2 Approved?

Next Activities If "Go To OITI":

OIT Intake Process

Or

If "Remain in EDM":

EDM-08 Decommission Action?

Description The System Team goes to the OIT Intake process and follows the activities there and then returns to the Enterprise Decommissioning Modernization Process to complete activities there.

Input None Listed

Output None Listed

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Page 70: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 66

Process Activity Name: EDM-08 Decommission Action? Previous Activities EDM-07 OIT Intake Process

Next Activities If "Retire":

EDM-10 Perform System Retirement

Or

If "Integrate":

EDM-09 Develop Migrating Functionality

Or

If "End":

Process Ends

Description The System Team determines which decommission action is to be taken: Decommission, Integrate, or Sustain.

Responsible Role System Team

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Process Activity Name: EDM-09 Develop Migrating Functionality Previous Activities EDM-08 Decommission Action?

Next Activities EDM-09.01 Design Migrating Solution

Description The Develop Migrating Functionality sub-process performs the transfer of functionality from the retiring system to a new system by developing new code and moving existing data to be integrated as part of the new system. The Develop Migrating Functionality sub-process cycles through the following dependent activities:

- Design Migrating Solution

Page 71: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 67

- Code Migrating Functionality

- Transfer Migrating Functionality

- Perform Testing

- All Migrations Implemented?

- Update Documentation

- Develop User Training

- Provide User Training

- Critical Decision 2

- Release New Version of Updated System

Process Activity Name: EDM-09.01 Design Migrating Solution Previous Activities EDM-09 Develop Migrating Functionality

Or

EDM-09.05 All Migrations Implemented?

Or

EDM-09.09 Critical Decision 2 Approved?

Next Activities EDM-09.02 Transfer Migrating Data

And

EDM-09.03 Code Migrating Functionality

Description The first step in migrating functionality, performed by the System Implementation Team, is performing design analysis and development so that a smooth integration can be completed.

Input Business Epic

Decommissioning Plan

System Architecture

System Context Diagram

Output Revised System Architecture

Revised System Context Diagram

Page 72: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 68

Associated Artifacts System Context Diagram

Responsible Role System Implementation Team

Accountable Role Portfolio Director

Consulted Role Contracting Officer; Information Security Officer; Program Manager; Receiving Organization; Release Agent; System Team

Informed Role Acquisition Specialist; Intake and Analysis Team; IT Account Manager

Tools and Websites None Listed

Standards VA Enterprise Design Patterns: 2. Enterprise Architecture 2.2. End-to-End Application Performance Management (APM)

VA EA Enterprise Technical Architecture (ETA) Compliance Criteria

Veteran Focused Integration Process (VIP) Guide

Veteran-focused Integration Process (VIP) Release Process Guide

More Info None Listed

Process Activity Name: EDM-09.02 Transfer Migrating Data Concurrent Activities EDM-09.03 Code Migrating Functionality

Previous Activities EDM-09.01 Design Migrating Solution

Next Activities EDM-09.04 Perform Testing

Description The System Implementation Team transfers all data existing in the retiring system that is needed to perform the migrating functionality to the new system in accordance with the VA policies and standards.

Page 73: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 69

Input Revised System Architecture

System Context Diagram

Output Migrated Data

Revised System Context Diagram

Associated Artifacts System Context Diagram

Responsible Role System Implementation Team

Accountable Role Portfolio Director

Consulted Role Contracting Officer; Information Security Officer; Receiving Organization; Release Agent

Informed Role Acquisition Specialist; Intake and Analysis Team; IT Account Manager

Tools and Websites Rational Team Concert (Change/Configuration Management)

Standards VA Enterprise Design Patterns: Data-as-a-Service (DaaS)

VA Enterprise Target Application Architecture

More Info None Listed

Process Activity Name: EDM-09.03 Code Migrating Functionality Concurrent Activities EDM-09.02 Transfer Migrating Data

Previous Activities EDM-09.01 Design Migrating Solution

Next Activities EDM-09.04 Perform Testing

Description Using the design solution, the System Implementation Team develops the migrating functionality in the new system, following the guidance in the VIP Process Guide.

Page 74: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 70

Input Design Patterns

System Context Diagram

Output Migrating Functionality Code

Associated Artifacts None Listed

Responsible Role System Implementation Team

Accountable Role Portfolio Director

Consulted Role Contracting Officer; Information Security Officer; Project Manager; Receiving Organization; System Team

Informed Role Acquisition Specialist; Intake and Analysis Team; IT Account Manager

Tools and Websites Rational Team Concert (Change/Configuration Management)

Standards Enterprise Design Patterns

VA Enterprise Design Patterns: Data-as-a-Service (DaaS)

VA Enterprise Target Application Architecture

More Info None Listed

Process Activity Name: EDM-09.04 Perform Testing Previous Activities EDM-09.02 Transfer Migrating Data

AND

EDM-09.03 Code Migrating Functionality

Next Activities EDM-09.05 All Migrations Implemented?

Page 75: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 71

Description The Perform Testing activity, accomplished by the System Implementation Team, exercises the code developed to support the migration of the functionality to the new system; in alignment with the VIP Process.

Input Migrating Functionality

Transferred Migrating Data

Output Test Plan

Test Results

Test Cases Test Scripts

Associated Artifacts Test Case Test Scripts

Test Results

Responsible Role System Implementation Team

Accountable Role Portfolio Director

Consulted Role Contracting Officer; Information Security Officer; Program Manager; Receiving Organization; Release Agent; System Team

Informed Role Acquisition Specialist; Intake and Analysis Team; IT Account Manager

Tools and Websites Rational Quality Manager (Quality Management)

Rational Requirements DOORS Next Generation

Standards Enterprise Testing Service Testing Guide

More Info None Listed

Process Activity Name: EDM-09.05 All Migrations Implemented? Previous Activities EDM-09.04 Perform Testing

Page 76: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 72

Next Activities If "YES":

EDM-09.06 Update Documentation

And

EDM-09.07 Develop User Training

Or

If "NO":

EDM-09.01 Design Migrating Solution

Description The Systems Implementation Team determines if all migrations have been implemented (Yes) or not (No).

Responsible Role System Implementation Team

Accountable Role Portfolio Director

Consulted Role None Listed

Informed Role None Listed

Process Activity Name: EDM-09.06 Update Documentation Concurrent Activities EDM-09.07 Develop User Training

Previous Activities EDM-09.05 All Migrations Implemented?

Next Activities EDM-09.08 Provide User Training

Description The documentation for the new system is revised by the System Implementation Team to include the new functionality as part of this activity.

Input System Documentation

Page 77: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 73

Output Updated System Documentation

Associated Artifacts None Listed

Responsible Role System Implementation Team

Accountable Role Portfolio Director

Consulted Role Contracting Officer; Information Security Officer; Project Manager; Receiving Organization; Release Agent

Informed Role Acquisition Specialist; Intake and Analysis Team; IT Account Manager

Tools and Websites Rational Quality Manager (Quality Management)

Standards Veteran Focused Integration Process (VIP) Guide

Veteran-focused Integration Process (VIP) Release Process Guide

More Info None Listed

Process Activity Name: EDM-09.07 Develop User Training Concurrent Activities EDM-09.06 Update Documentation

Previous Activities EDM-09.05 All Migrations Implemented?

Next Activities EDM-09.08 Provide User Training

Description The System Implementation Team develops user training in this activity which includes revision to any existing training for the new system and identifying changes to how the training needs to be accomplished due to the new functionality.

Input Existing User Training Documents

Page 78: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 74

Output Revised User Training documents

Associated Artifacts None Listed

Responsible Role System Implementation Team

Accountable Role Portfolio Director

Consulted Role Contracting Officer; Information Security Officer; Receiving Organization; Release Agent; System Implementation Team

Informed Role Acquisition Specialist; Intake and Analysis Team; IT Account Manager

Tools and Websites Rational Quality Manager (Quality Management)

Standards None Listed

More Info None Listed

Process Activity Name: EDM-09.08 Provide User Training Previous Activities EDM-09.06 Update Documentation

AND

EDM-09.07 Develop User Training

Next Activities EDM-09.09 Critical Decision 2 Approved?

Description The Provide User Training activity addresses the delivery of the education material, developed by the System Implementation Team, associated with the revised system.

Input External User Documentation

External User Training Materials

Page 79: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 75

Internal User Documentation

Internal User Training Materials

Output Trained User Certifications

Associated Artifacts None Listed

Responsible Role System Implementation Team

Accountable Role Portfolio Director

Consulted Role Contracting Officer; Information Security Officer; Program Manager; Receiving Organization; Release Agent; System Implementation Team

Informed Role Acquisition Specialist; Intake and Analysis Team; IT Account Manager

Tools and Websites Rational Quality Manager (Quality Management)

Standards None Listed

More Info None Listed

Process Activity Name: EDM-09.09 Critical Decision 2 Approved? Previous Activities EDM-09.08 Provide User Training

Next Activities If "YES":

EDM-09.10 Release New Version of Updated System

Or

If "NO":

EDM-09.01 Design Migrating Solution

Description The Systems Technical Team presents the Critical Decision 1 Presentation to the TRIAD and obtains approval (Yes) or not (No).

Page 80: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 76

Responsible Role System Implementation Team

Accountable Role Portfolio Director

Consulted Role Contracting Officer; Information Security Officer; Program Manager; Receiving Organization; Release Agent; System Implementation Team

Informed Role Acquisition Specialist; IT Account Manager; Intake and Analysis Team

Process Activity Name: EDM-09.10 Release New Version of Updated System Previous Activities EDM-09.09 Critical Decision 2 Approved?

Next Activities EDM-10 Perform System Retirement

Description The last step in this development sub-process performed by the Systems Implementation Team is to perform a controlled release of the revised system to reach full operational capability.

Input CD2 Approval

Decommissioning Plan

Output Configuration Management Plan

Deployment, Installation, Rollback, Back-out Guide Template

Software Configuration Management Plan

Associated Artifacts Configuration Management Plan Template

Deployment, Installation, Rollback, Back-out Guide Template

Responsible Role System Implementation Team

Accountable Role Portfolio Director

Page 81: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 77

Consulted Role None Listed

Informed Role Contracting Officer; Information Security Officer; Program Manager; Receiving Organization; Release Agent; System Team

Tools and Websites Rational Quality Manager (Quality Management)

Standards Veteran Focused Integration Process (VIP) Guide

Veteran-focused Integration Process (VIP) Release Process Guide

More Info None Listed

Process Activity Name: EDM-10 Perform System Retirement Previous Activities EDM-09.10 Release New Version of Updated System

Next Activities EDM-10.01 Remove User Access to Retiring System

Description The Perform System Retirement sub-process includes all the actions needed to turn off a system securely, minimizing the negative impact on users transitioning to integrate or new systems. The Perform System Retirement sub-process cycles through the following dependent activities:

- Remove User Access to Retiring System

- Update Links

- Archive Retiring System Data

- Archive Software

- Dispose of Retiring System Hardware

- Make Necessary Network Changes

- Remove Security Certificates

Process Activity Name: EDM-10.01 Remove User Access to Retiring System Previous Activities EDM-10 Perform System Retirement

Page 82: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 78

Next Activities EDM-10.02 Update Links

Description The Remove User Access to Retiring System activity, performed by the System Retirement Team, must be performed first in the retiring sub-process so that no new data is added into the retiring system.

Input Configuration Management Plan

Decommissioning Plan

Output Disposition of User Accounts & Security Certificates Report

Associated Artifacts Disposition of User Accounts & Security Certificates Report

Responsible Role System Retirement Team

Accountable Role Information Security Officer

Consulted Role IT Account Manager; System Team

Informed Role Acquisition Specialist; Intake and Analysis Team; Program Manager; Release Agent

Tools and Websites Rational Quality Manager (Quality Management)

Rational Team Concert (Change/Configuration Management)

Standards None Listed

More Info None Listed

Process Activity Name: EDM-10.02 Update Links Previous Activities EDM-10.01 Remove User Access to Retiring System

Page 83: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 79

Next Activities EDM-10.03 Archive Retiring System Data

Description The System Retirement Team, as part of the re-direction of users to a new system, removes or changes all links and execution statements that would activate the retiring system to link to the new system.

Input Decommissioning Plan

Output User Access Links Removed or Updated

Associated Artifacts None Listed

Responsible Role System Retirement Team

Accountable Role Information Security Officer

Consulted Role IT Account Manager

Informed Role Acquisition Specialist; Intake and Analysis Team; Program Manager; Release Agent

Tools and Websites Rational Quality Manager (Quality Management)

Rational Team Concert (Change/Configuration Management)

Standards None Listed

More Info None Listed

Process Activity Name: EDM-10.03 Archive Retiring System Data Previous Activities EDM-10.02 Update Links

Next Activities EDM-10.04 Archive Software

Page 84: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 80

Description Archive Software, performed by the Systems Retirement Team, involves storing or deleting the data files of the system being shut down, or migrating them to other systems. It addresses the process for preserving the business value and context of the data, maintaining audit trails, and ensuring that data remains accessible in accordance with Federal and VA Systems retention rules and policies.

Input Decommissioning Plan

OIT File Plan

Systems Data Map

Output SP 258 Agreement to Transfer Records to National Archives

Migrated or Archived Data

Associated Artifacts OIT File Plan Template

Responsible Role System Retirement Team

Accountable Role Information Security Officer

Consulted Role None Listed

Informed Role Acquisition Specialist; Intake and Analysis Team; Portfolio Director

Tools and Websites Rational Quality Manager (Quality Management)

Rational Team Concert (Change/Configuration Management)

Records Management Process

Standards VA Directive 6300, Records and Information Management

VA Handbook 6300.1, Records Management Procedures

VA Handbook 6500.1, Electronic Media Sanitization

More Info None Listed

Page 85: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 81

Process Activity Name: EDM-10.04 Archive Software Previous Activities EDM-10.03 Archive Retiring System Data

Next Activities EDM-10.05 Dispose of Retiring System Hardware

Description Archive Software, performed by the Systems Retirement Team, involves removal of the software program(s) and preparing the software for disposal or reuse. It also involves updating the software asset inventory and ensuring license fees are properly terminated.

Input Decommission Plan

Software Configuration Management Plan

Output Updated Software Configuration Management Plan

Updated VA Systems Inventory

Associated Artifacts None Listed

Responsible Role System Retirement Team

Accountable Role Program Manager

Consulted Role System Team

Informed Role Acquisition Specialist; Information Security Officer; Intake and Analysis Team; Portfolio Director

Tools and Websites Rational Quality Manager (Quality Management)

Rational Team Concert (Change/Configuration Management)

VA Systems Inventory

Standards Software Configuration Management Plan Standard

VA Directive 6404, VA Systems Inventory

Page 86: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 82

VA Handbook 6500.1, Electronic Media Sanitization

More Info None Listed

Process Activity Name: EDM-10.05 Dispose of Retiring System Hardware Previous Activities EDM-10.04 Archive Software

Next Activities EDM-10.06 Make Necessary Network Changes

Description When all code and data is removed from a hardware asset, the Dispose of Retiring System Hardware activity, performed by the Systems Retirement Team, ensures that the asset is released from service at the VA in accordance with agency policies.

Input Configuration Management Plan

Decommission Plan

Output VA Form 751 IT Sanitization Certificate

VA System Inventory Update

Associated Artifacts None Listed

Responsible Role System Retirement Team

Accountable Role Program Manager

Consulted Role System Team

Informed Role Acquisition Specialist; Information Security Officer; Intake and Analysis Team

Tools and Websites Rational Quality Manager (Quality Management)

Rational Team Concert (Change/Configuration Management)

VA Systems Inventory

Page 87: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 83

Standards VA Directive 6004, Configuration, Change, and Release Management Programs

VA Directive 6404, VA Systems Inventory

More Info None Listed

Process Activity Name: EDM-10.06 Make Necessary Network Changes Previous Activities EDM-10.05 Dispose of Retiring System Hardware

Next Activities EDM-10.07 Remove Security Certificates

Description The Systems Retirement Team makes any needed modifications to the network. Removal of a hardware asset means that the VA Network may need to be updated to reflect the deletion.

Input Configuration Management Plan

Decommission Plan

Output Network Modifications

Updated VA Systems Inventory

Associated Artifacts None Listed

Responsible Role System Retirement Team

Accountable Role Information Security Officer

Consulted Role IT Account Manager; System Team

Informed Role Acquisition Specialist; Intake and Analysis Team; Program Manager; Release Agent

Tools and Websites None Listed

Page 88: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 84

Standards None Listed

More Info None Listed

Process Activity Name: EDM-10.07 Remove Security Certificates Previous Activities EDM-10.06 Make Necessary Network Changes

Next Activities EDM-11 Perform Decommissioning Closeout

Description The System Retirement Team ensures all security certificates for the retiring system are removed. When a system is retired, all security certificates associated with that system need to be removed from active service.

Input Decommission Plan

Hardware Disposal Checklist

OIT File Plan

SF258 Agreement to Transfer Records to National Archives

VA Form 751 IT Sanitization Certificate

Output Disposition of User Accounts & Security Certificates Report

Associated Artifacts Disposition of User Accounts & Security Certificates Report

Responsible Role System Retirement Team

Accountable Role Information Security Officer

Consulted Role System Team

Informed Role Acquisition Specialist; Intake and Analysis Team; Release Agent

Page 89: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 85

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-11 Perform Decommissioning Closeout Previous Activities EDM-10.07 Remove Security Certificates

Next Activities EDM-11.01 Notify Help Desk

Description The Perform Decommissioning Closeout sub-process, performed by the System Team, covers the communication and documentation requirements associated with system retirement.

The sub-process cycles through the following dependent activities:

- Notify Help Desk

- Prepare Official Information for Dissemination

- Additional Notifications

- Disseminate Internal Notice

- Disseminate Public Release

- Perform Necessary Outreach

- Update System of Record Notice

- Notify Architecture Team

- Notify Open Source

- Revise Budget to any System Involved

- Prepare Post-decommissioning Report

- Send Update to RiskVision / ATO Tracker

- Send Update to VASI

Process Activity Name: EDM-11.01 Notify Help Desk Previous Activities EDM-11 Perform Decommissioning Closeout

Next Activities EDM-11.02 Prepare Official Information for Dissemination

Page 90: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 86

Description The Help Desk accessed by system users needs to be notified by the Systems Team that the retiring system is no longer available and how any potential user can accomplish the functions that the old system used to support.

Input Process Changes

Support Changes

Systems Changes

Output Help Desk Notification

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Program Manager

Consulted Role None Listed

Informed Role Acquisition Specialist; Business Team; Intake and Analysis Team; Portfolio Director

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-11.02 Prepare Official Information for Dissemination Previous Activities EDM-11.01 Notify Help Desk

Next Activities EDM-11.03 Additional Notifications?

Page 91: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 87

And

EDM-11.07 Update System of Record Notice

Description The Prepare Official Information for Dissemination activity addresses the existing detailed VA procedures on how to communicate to the Veterans, employees and the public.

Input Community and Public Affairs Details

Output External Communication Plan

Associated Artifacts Communications Plan Template

Document Drafting Handbook - Update System of Records Notice

Responsible Role System Team

Accountable Role Program Manager

Consulted Role None Listed

Informed Role None Listed

Tools and Websites None Listed

Standards 41 U.S.C. 2101 - Restrictions on Obtaining and Disclosing Certain Information

More Info None Listed

Process Activity Name: EDM-11.03 Additional Notifications? Previous Activities EDM-02 Perform Business/Technical Assessments

Next Activities If "VA Employees":

EDM-11.04 Disseminate Internal Notice

Page 92: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 88

Or

If "External VA":

EDM-11.05 Disseminate Public Release

Or

If "External Critical":

EDM-11.06 Perform Necessary Outreach

Description The Systems Team decides if additional notifications are needed for VA Employees, External VA, or External Critical.

Responsible Role System Team

Accountable Role Program Manager

Consulted Role None Listed

Informed Role None Listed

Process Activity Name: EDM-11.04 Disseminate Internal Notice Previous Activities EDM-11.03 Additional Notifications?

Next Activities Process Ends

Description The Disseminate Internal Notice activity, performed by the Systems Team, covers the communication actions required to tell employees about the retiring system.

Input Decommission Plan

Output Community and Public Affairs Details

Employee Communication Plan

Associated Artifacts Communications Plan Template

Page 93: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 89

Responsible Role System Team

Accountable Role Program Manager

Consulted Role None Listed

Informed Role Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-11.05 Disseminate Public Release Previous Activities EDM-11.03 Additional Notifications?

Next Activities Process Ends

Description The Disseminate Public Release activity, performed by the Systems Team, covers the communication actions required to tell the public about the retiring system.

Input Decommission Plan

Output Public Communication Plan

Associated Artifacts Communications Plan Template

Responsible Role System Team

Page 94: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 90

Accountable Role Program Manager

Consulted Role None Listed

Informed Role Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-11.06 Perform Necessary Outreach Previous Activities EDM-11.03 Additional Notifications?

Next Activities Process Ends

Description The Perform Necessary Outreach activity, performed by the Systems Team, covers the communication actions required to tell Veterans and their representatives about the retiring system and to offer any needed support.

Input Decommission Plan

Output Outreach Communication Plan

Associated Artifacts Communications Plan Template

Responsible Role System Team

Accountable Role Program Manager

Page 95: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 91

Consulted Role None Listed

Informed Role Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-11.07 Update System of Record Notice Previous Activities EDM-11.02 Prepare Official Information for Dissemination

Next Activities EDM-11.08 Notify Architecture Team

Description The Update System of Record Notice activity, performed by the Systems Team, includes the modification of the notice for a system that has been partially decommissioned and the deletion of a fully retired system.

Input Decommission Plan

System of Record Notice

Output Updated System of Record Notice

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Records Steward

Page 96: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 92

Consulted Role None Listed

Informed Role Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team

Tools and Websites Records Management Process

Standards VA Handbook 6300.1, Records Management Procedures

VA Handbook 6300.4: Procedures for Processing Requests for Records Subject to the Privacy Act

VA Handbook 6500, Risk Management Framework for VA Information Systems - Tier 3: VA Information Security Program

More Info None Listed

Process Activity Name: EDM-11.08 Notify Architecture Team Previous Activities EDM-11.07 Update System of Record Notice

Next Activities EDM-11.09 Notify Open Source

Description The System Team notifies the architecture teams within VA that the retiring system is no longer available and where a user can accomplish the functions that the old system used to support.

Input Decommission Plan

Output Email Notification to Architecture Teams

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Program Manager

Page 97: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 93

Consulted Role None Listed

Informed Role Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-11.09 Notify Open Source Previous Activities EDM-11.08 Notify Architecture Team

Next Activities EDM-11.10 Revise Budget to Any System Involved

Description The group(s) tracking any Open Source code used by the retiring system need to be notified by the Systems Team that the Open Source code is no longer in use.

Input Decommission Plan

Output Email Notification to Open Source

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Program Manager

Consulted Role None Listed

Page 98: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 94

Informed Role Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-11.10 Revise Budget to Any System Involved Previous Activities EDM-11.09 Notify Open Source

Next Activities EDM-11.11 Prepare Post-decommissioning Report

Description The Systems Team notifies ITRM that the VA budget must be updated to reflect that the retiring system no longer needs any funds.

Input Decommission Plan

Output ITRM Notification Email

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Program Manager

Consulted Role Acquisition Specialist

Informed Role Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

Page 99: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 95

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-11.11 Prepare Post-decommissioning Report Previous Activities EDM-11.10 Revise Budget to Any System Involved

Next Activities EDM-11.12 Send Update to RiskVision / ATO Tracker

Description All decommissioning activities and results need to be documented in a Post Decommissioning Report prepared by the Systems Team. This includes an Application Disposition Statement.

Input Decommission Plan

Decommission Report

Electronic Media Sanitization Report

Records Management Report

VA Form 751 IT Sanitization Certificate

Output Post-decommission Report

Associated Artifacts Post Decommission Operations Report

Responsible Role System Team

Accountable Role Program Manager

Consulted Role None Listed

Page 100: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 96

Informed Role Acquisition Specialist; Business Team; Intake and Analysis Team; Information Security Officer; IT Account Manager; Legacy System Modernization Team

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-11.12 Send Update to RiskVision / ATO Tracker Previous Activities EDM-11.11 Prepare Post-decommissioning Report

Next Activities EDM-11.13 Send Update to VASI

Description The System Lead notifies the ATO team that the ATO Tracker must be updated to reflect that the retiring system no longer will be accessed and therefore, any security certificates can be retired. Also RiskVision must be updated to reflect the retired system and any replacement or upgraded system.

Input Decommission Plan

Post Decommission Report

Output ATO Notification

Risk Vision Notification

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Product Manager

Page 101: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 97

Consulted Role None Listed

Informed Role Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-11.13 Send Update to VASI Previous Activities EDM-11.11 Prepare Post-decommissioning Report

Next Activities EDM-12 Track Decommissioning Projects

Description The Systems Team sends the VA System Inventory a notification that a system is no longer active.

Input Post-decommissioning Report

Output Notification to VASI

Associated Artifacts None Listed

Responsible Role System Team

Accountable Role Project Manager

Consulted Role None Listed

Page 102: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 98

Informed Role Acquisition Specialist; Business Team; Intake and Analysis Team; Legacy System Modernization Team; Portfolio Director

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-12 Track Decommissioning Projects Previous Activities EDM-11.01 Notify Help Desk

Next Activities EDM-13 Capture Assessment Lessons Learned

Description The Legacy System Modernization team performs the Track Decommissioning Project activity in order to understand the progress being made on the system retirement efforts.

Input Lessons Learned Reports

Output Analyzed Lessons Learned Reports

Associated Artifacts Lessons Learned Report Template

Responsible Role Legacy System Modernization Team

Accountable Role Legacy System Modernization Team

Consulted Role None Listed

Informed Role Program Manager; Portfolio Director; IT Account Manager; Intake and Analysis Team; Receiving Organization; Release Agent; Contracting Officer; Information Security Officer; System Team; Acquisition Specialist; Business Team

Page 103: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 99

Tools and Websites None Listed

Standards None Listed

More Info None Listed

Process Activity Name: EDM-13 Capture Assessment Lessons Learned Previous Activities EDM-11.12 Send Update to RiskVision / ATO Tracker

Next Activities Process Ends

Description The Capture Assessment Lessons Learned activity is a Legacy System Modernization team effort to constantly improve the support that the team can offer decommissioning systems.

Input Lessons Learned

Post-decommissioning Report

Output Analyzed Lessons Learned

Associated Artifacts Lessons Learned Report Template

Responsible Role Legacy System Modernization Team

Accountable Role Legacy System Modernization Team

Consulted Role Acquisition Specialist; Business Team; Intake and Analysis Team; IT Account Manager; Portfolio Director; Program Manager; Receiving Organization; Release Agent; System Team

Informed Role None Listed

Page 104: Enterprise Decommission Modernization · Enterprise Decommission Modernization 9 . EDM-09.01 Design Migrating Solution EDM-09.02 Transfer Migrating Data EDM-09.03 Code Migrating Functionality

Enterprise Decommission Modernization 100

Tools and Websites None Listed

Standards None Listed

More Info None Listed END OF PROCESS