vu ENTERED
Ventilation Systems Capital Asset Projects Safety Significant Confinement Ventilation System (15-D-411)
Exhaust Shaft (15-D-412)
Ronald E. Gill Acting Federal Project Director I Operations Activity Manager
Carlsbad Field Office Office of Environmental Management
February 19, 2016
160215.5
11111111111111111111111111111111111111111111111111
• DOE Order 413.38 "Program and Project Management for t he Acquisition of Capital Assets"
• Disciplined approach for acquiring capital assets
• Project goes through 11Critical Decisions (CD)" during the development and approval of the project
• Many independent reviews by other organizations to ensure acquired asset will meet the mission need
• Secretary of Energy Memorandum December 2014 " Improving the Department's Management of Projects"
• Additional r_eview requirements
• Independent Analysis of Alternatives to General Accounting Office standards
• Additional design maturity requirements for Hazard Category 2 Nuclear Faci lity at CD-2
Line Item Funding
d . 1odeflfndtn1 Base Fun 1ng Requrst Revltwto
~PED ;•mls VoiWi"~
1 Op~rating PEO . +---- Funds Funtls
I + onJtrutdon
t·.md
Cl)..() Critic:t~l ppt·ove Deci,~Jon Mission ? Seed
D-Approve
All r·rn.a tive Sel~don
nd C011t lbng'f
D·l Appi"''Vl'
Perlot·mftnce Dnsdlnr: (I~B)
0-J f>prave iSfnrt
or
(D
0· pprovt'
Sim•l of
Oct. 24, 2014 Dec. 23, 2015 , '
11 PARS U R~P?rdn@ for ProjeciJ :!: SIOM •t
NOTES: 1. Operntin:g Fo11ds ma;• be used prJor to C0-4 ror trAIUidou, startup. a:nd tralitlilrt con •• 2. PED funds: .rnn br t~sed nf'l·er CD-3 for drs:lj!.ll.
Base Funding
/ llUY11! --'":
I I ' ' I I ' ' I I
• CD-1 documentation and reviews consisted of the following: • Acquisition Strategy
• Preliminary Project Execution Plan
• Tailoring Strategy
• Independent Analysis of Alternatives
• Independent Cost Review
• Independent Project Review
• Conceptual Design Report I Conceptual Safety Validation Report
• Conceptual Safety Design Report
• National Environmental Policy Act Strategy
• Nuclear Waste Partnership (NWP) proposed a total of 24 alternatives with 2 requiring additional study through Conceptual Design • Alternative 1-A
• Provide a new unfiltered exhaust shaft for mining operations and use existing exhaust shaft with additional filtration capacity for full waste handling and disposal operations
• Alternative 1-D • Existing exhaust shaft with filtered ventilation sufficient for full mining and
waste handling and disposal operations
• An Independent Analysis of Alternatives was contracted with Trinity Engineering Associates that developed 4 alternatives that were similar to the ones developed by N.WP
• Approved Acquisition Strategy
• Approved Preliminary Project Execution Plan
• Approved Tailoring Strategy that combined CD-2 and CD-3
• Alternative 1-A selected with two projects, cost ranges, and proposed CD schedule
• Safety Significant Confinement Ventilation System (15-D-411)
• Use existing exhaust shaft with additional filtration capacity for waste handling and disposal operations
• $189M to $280M
• Exhaust Shaft (15-D-412)
• New unfiltered exhaust shaft for mining operations
• $81M to $118M
• Design Request for Proposal on the two projects
• Design in Fiscal Year 2016, completion in Fiscal Year 2017
• Long Lead Procurements in Fiscal Year 2017
• Salt Removal Systems
• Exhaust Fans
• Filter Housings
• Diesel Standby Generators
WIPP Integrated
Performance Measurement Baseline Workshop
U.S. Department of Energy
Waste Isolation Pilot Plant
February 19, 2016
fnt~grttl>d
1\-rform•rwe M'!"~~ul't.'fntnt i}a .. elirro
Agenda
• Introduction and Workshop Objective
• Integrated Performance
Measurement Baseline
• Integrated PMB Details
• CD-1 Process - Permanent
Ventilation System
• Questions and Answers
2
3/10/2016
Combustible Control Zone
.. if"J., :-,. { - !. !
• • ~ I~ --· AIB/SMP Corrective Actions
1
Introductions and Workshop Objective
3
Introductions
The objective of this workshop is to provide a forum for a detailed discussion of the WIPP Integrated Performance Measurement Baseline and to address stakeholder questions and comments
The review will include: Development of the Integrated Performance Measurement Baseline The scope and schedule critical path specific to the recovery effort Integrated PMB costs The risks and challenges associated with the recovery effort How progress is being monitored and measured
Integrated Performance Measurement Baseline (PMB)
Wh1t Ia thelntearated PMB?
The DOE WIPP Project includes several participants • Carlsbad Federal Office (CBFO)
Nuclear Waste Partnership (NWP) los Alamos National laboratory-carlsbad LANL) Sandia National labs (SNL) Carlsbad Technical Assistant Contr.tctor (CTAC)
The integrated PMB presents the scope, cost and schedule activities for all of the WIPP participants. It combines the previously issued Recovery PMB with Base Operations activities and the capital Asset Project (Permanent Ventilation System)
The integrated PMB is primarily focused on FY16 and FY17. This represents the current contract period.
The integrated PMB was developed to an 80% confidence level.
The integrated PMB was built utilizing 3 tools : Activity Based Cost sheets, Primavera P6 Scheduling Software and Cobra cost processor.
Changes to the baseline scope, schedule and estimate are being managed through a formal Change Control Process
3/10/2016
4
2
Integrated PMB - Key Assumptions
Waste emplacement is scheduled to begin in December 2016, after a DOE Operational Readiness Review with the CH TRU waste stored at WIPP and site-derived TRU waste .
• Pre-event emplacement rates is not expected to be achieved until the Permanent Ventilation System is brought online. After the emplacement of the Site-Derived waste and Contact Handled (CH) waste stored in the Waste Handling Building, then waste emplacement from the active TRU waste generator sites will begin with up to 5 shipments per week.
• The waste hoist controller upgrades will start in FY17.
5
3/10/2016
Integrated PMB Key Assumptions .. continued
• Pre-start required improvements in the Safety Management Programs at the WIPP site from the corrective action plans, in response to the Accident Investigation Reports, will be completed.
Annual audits of CBFO and direct CBFO participants (NWP, SNL-CB, LANL-CB), certification audits for the approval of new processes and for the initial certification of the CCP characterization activities at each TRU waste generator site and annually thereafter will continue to be required.
• Support for the Carlsbad Environmental Monitoring and Research Center for its independent monitoring function will continue.
6
3
(f I - ..................... t:i::i:: t::i:t: d ! l t • io;.,.:..:...:....:...:...:... ;. ... ;.. . :... ;, ... ;. ... ;.. ... ! ' [ I H~JUf[H ip Hi ~~{ •
~E ~ i ;) l c ... =-
iff HJ 1 l i ~t{H~dH I' . -.
~ • t f, ! 'iti ~ ' ! td ~ I ' i' 1 f a ~ t i t ~
i ~
~ !
! ~ f
oooooooooJn "' ... ~ .. ..
z
~ ~ ~ s " !l.
[ ll < .. ~ ;::
~ :: -~ ~ E ~ [ ~ ~
~
~ ~ i! i ~ [ ~·
~ ::! ~ ~
~
~ .. , 0
"' ,
~
00
I'I""M~. TSR(PAATif'-Y
Ccn..._.,d~OIIC&IIA.d
o...!Gpl:hft~l-•~·<rl-j5BIM)
Proc"""'-"'-'~
-TOCMk.OI~---s..m-..-,
o.t-ydOSA-TSI'IIoceFOio~el
8VT- CtlfO-- -""""""· ~ DSA. ~~a-.1 -SIIclllcl
--DSA3001-2'0H~Oii<rlao.un.
~fanaii)SA:JOOI.20\4 /I,._,.IIIIGI
P--,...,..,C~MI-EI.c:UIIr:o~"r..tn
p.,......,~~-
~,.....~
p-..,c..nctOJ~IIi-HI-{~)
P ......... Colnlf.ci<I"ORR~i<rl'-nKIMUo
P-c.-t....~
~fOil ...... ~
P-...OOEOporotd\II~•R-(DC)RR)
p-~~
Sc-....l.hl:wt-yllo.flw
AUN;r~.~OikltlloPfoc- - ecmrn..ct ..... tE~.., ..
-~· _ ...... ,._... • • - WIPPintegratedBasehne L7St•IUtnaf01-0ct-15 1 9 - "--.,....,.~ Level7 Activities Pnnl o.• 01-f•o-111 - C.b:MR~ ..... c--• ~1of1
Documented Safety Analysis (DSA)
Safety Basis Documents are reviewed and approved by DOE as the rules (controls) to operate a nuclear facility.
The Safety Basis consists of 2 documents:
Documented Safety Analysis (DSA) • The DSA documents the facility configuration, the processes to be performed,
and analyzes accident scenarios appropriate for the facility and operations.
Technical Safety Requirements (TSRs) • TSRs are "the rules" that come from the DSA analysis, and these rules are in
place to reduce the probability and/or consequences of accident scenarios.
3/10/2016
10
5
DSA Hazard Analysis
Types of Accidents Analyzed in DSA
Natural Phenomena Hazards (Earthquake, Tornado, Wind, Snow)
Fires (pool fires, combustible fires, internal drum fires)
Explosions, deflagrations
Roof Falls
Drops
Punctures
"Repeat Event" from February 2014 drum rupture (exothermic chemical reaction)
The most significant accidents are fire, explosion and loss of confinement.
11
Sequence of Implementation
~
Procedures andWorlc Documents updated (on hold)
Trilininl Conducted ;; Surveillances Performed 1 conauctea 1/ SODs Updated
ISIPerforrMd l Bac:kfitAnillys/sPerformed -----~ :-~-
+ . ~:~·~::~:~~s : . ;;~v:;ulion •Y"em• DOE Review ilnd Approvill of Relused : - =: Jlld ul&liquid fue&ed
OSA/TSR in the form of a D;lily and Shift 1 _ w~ste hoio.t
S..fetyEviiluationReport(SER) Surveillances :- ll<!altirne ftiiOnitorincath-t And Authorintion A&:reement Performed 1 6/7
I OMs not Authoriz•: :- SV5 op«alion .+------------------------:·- WnteH.o ....... fCHOI'RH)
llf l : =E~,:'~~wute * l_ _________ ________ ,
~ ~ ~
3/10/2016
6
Cclra\ultlorld~IIIO&IIAiovS
P-DIOAITSR ............. IIi<IIS<nw..ry
Owolap0r.ft5ot.ly8MOI !mcumeniiii"'M"""'I511Ml
Pro;-~'~
rNV1P T.:Mteel ~.ntr-"--&.lronal)l
o.lofw)ldOIJ ... _T51111oC8f'OiorAppr'""el
SVT ·CIFO~-~~~
e-os.-.r-,c~-$1p.:!IIC I
-~·"-"" OS...lOOI-201' .............. -.ao..e
p;;,;j,.... ___..Sell'·""-.....,.. E•-m r-n P«<"""MIIIao-n-t5elf• .... lftlmet'ili
~MSACoftcdveACIIO:I
r>.fomoCooW1octO'~R-u~ cCORR J
--Surlpor!CO'I_.,......
P.-I.....,OOE~I<rloi~IA-ICOAI'l
Sc-...Lt>c.-tllrly8uft•
""""""'"'IOIIIOPrOC- · CO'rvNnceWI.oi•E"'*<.,M
""'-
_ 0 .... 11-...-WlPP Integrated Baseline
Level7 Activities L7S!fllUsHof01-0et·15
PrlntOete 08-Feb-16 Pllg~t1of1
Perform Integrated Cold Runs
• Demonstrate the Plant, People and Procedures are ready:
Plant • Equipment necessary for receipt, processing and downloading of
waste is available and properly functioning • U/G Notification System, Localized Fire Suppression Systems in u/g
People Demonstrate Nuclear Safety Culture and Conduct of Operations Standards
• Proficiency with new DSA controls (surveillances, operator rounds) • Waste emplacement activities utilizing empty containers
Maintenance evolutions
Process Safety Management Program pre-start improvements are demonstrated
Notffication System Radio
• Examples: Fire Protection, Radiological Controls, Emergency Management Conduct drills (Radiological event, injury, f ire)
3/10/2016
7
1 •• , I .. I I o...lapn-oiD$A.R.,.~
CORECISRDS.O.JII20f R.,;oeO..~. TSRtPAIITBJ8immlty
RECISRD6A3i10 COI'IIItlulllton l:l ~d~RwS
---1~ ·-- - · -Perl'armDS.It./T9RimplamttU(JanSWrlmlll)l tt-Ft6-t'
REC3VOOA o.....I~D-IftSalotyBttillmiiiiii....CIIj a'I MOllil<)$81M)
REC3800C ~PrO;-~~~~ CORECISRD&ot.lliXII -T.::Mk:OI£dii"'Q""'~So.o'roMly
t -CORE0sifOs.o.:iiiOJ__, o.i-y~- 06AMdlsiitoCIII'OIG"Appto.tlll REC974fl SVT-C8FOR...., __ ~at
Ctrob;:l 0SA T,....,g (G.n•at- 5!>KI!IC )
12-F.II ~ - ............... _
11 REC3iOOF PerlamiVR
l"rot.4ckRM<ineiOSiJPI'Q'I 01-Feu-t& 19-r.le:rtti
= ---'o,..oc. ~p~enw~~~e - li.r!t..ta.-..·· ,._~;;:,, .,._. -;;:;-.,.,,
" llgatffi3"
---~,-- -os:w;;;, Ma'y-11
-
-R-gWall
<>-<- ..... ~ ., ..... . •••·-·- ~- • - •-*- T • • - - ·· ·-- •• ·~ " - · - ·~ P.t"arm ...._,._ Self-As-·-·-·-~---- · ·--.. 1$-Me:r\6
19- lolty-16 P.tonnMon_...,ts..--Ar.sHsmtnr
~~Corro:trvtAcbanl
Suwortc-acliOns
~p;f;,..,:,-iiOE-o;.,...lonolli;;-•R-toMRl
p.-can.ctn..Actlons
s.c-.i.u.cen*'!yBuff•
Auti'IOilllticr>toProc--CCtro'rltnc•..,...••Enl*c.on.:t --
06-M .... t6
,,., .. ,":,,
- 14-.1..-.ti
11--"'g-11
11.,t.wg.16 ..._,. "'""'""
WIPP Integrated Baseline level 7 Activities
- C<IIII:IIIR....rmgwcn
~' ·~·" 06-"'-"-1 a. .... ,.,.
~1 18-Jun-1&
11-J-1
11 -Au(l-1 8
11-Au(r-18
l7 Stall.Jsn GI'OI-Oct-15 ~ PrintDIIte· oe-Feb-16 I
Polgelofl
Readiness Activities Readiness Activities are governed under DOE 0 425.1D, StartiiP and Rt:stort af Nuclt:ar Facilities.
The type of readiness activity to be performed is evaluated based on whether the activity is new, the length of time since an activity has been last performed and the complexity of the activity.
• Readiness activities range from a checklist to a formal review DOE approves the type of readiness activity
The type of readiness activity for resumption of waste emplacement at WIPP has been determined to be a DOE led Operational Readiness Review.
Prior to DOE conducting the Operational Readiness Review (ORR), it is prudent for the Contractor to conduct additional assessments to ensure they are ready.
These include a Management Self Assessment and a Contractor ORR.
16
3/10/2016
8
_I"' COIItEOSROS,I.lt2l:l ~WIICIIOM_,
PMICIIM C)ISIO,.I TSR lm~oti.., lilmfrl..y
o.v.lap 0rfi11Sttory8 ... ol""'tiMI'IIII:I Ift MIIIu)S81Ml
Pra:-~'~ COIIEOSitOSAJ5201 -TcPiflie>ll£<!1tJAg---Sommary
CDIIEOSRDS.t.l&20J DIIOtr ..... oiD&.-..,ciTP ioC8f01a"~
"""'~
"'"""'
!i1VT·C8FOR..,_....a~lll
CoWctCIS.o\T.-g~OIIon<l~t!lc l
PrcJ.oldoo --~~ DSA.:!OQS.201 ' 1mplerral1....,.,Ciooon
~diotl d0SA3()118.201' /!ft'lli-.illlla>
~--;!CO!ct~.
p.,;,.-;;;,;_.s.w ........ omen~E~...,Teom p.,.....,_,_....,... _ ..... _..., ... Suq:oort MS.a.eort.:t>ve '-tllant
tt RECSTAATUP
""
""" Pwfclm Conhct«ORII Eaowen r .... ee~...,..
Pioif.....,:OOE'()poinoiCI'Ioll'ie-•11-(IXlllll)
f---
Sc-l*lc«tllnlyBu!f•
Auii>O'IzltiCRtoProc- -~• V..OIII•E"l*.,.,., .. -·-
01:1! I ~~=~$ I ~:.
n.·r-;..,._,, 0 !>-f.l.;is o&:Mey-11 lt-May-18
20-M .... I6
11-AlQ-11
~~· ,._ ..
- ll. ........ gWc;rlo
WIPP lntegr'iited B;aseline Level 7 Activities
- Clillclllll........,gWorlo
~
t 11·"'-v-18
11-Auv-18
.._ ..
L7St..tusouof01-0ct-1$
Prln!Oete~:~~~~ 117
Contractor Readiness Review (CORR) • Conducted by NWP prior to the DOE ORR utilizing a team of independent Subject Matter
Experts
• A Plan of Action for the CORR is developed to document the scope of the review and approved by the DOE
• The CORR will focus on: Implementation of corrective actions associated with the AlB reports Implementation of Safety Management Program corrective actions
• Ensure the plant, people and the processes are ready for safe and compliant resumption of waste emplacement activities
• From the Contractor ORR - Good Practices, Findings and Opportunities for Improvement may be identified. Findings that are considered to be pre-starts will be evaluated for closure prior to beginning the DOE Operational Read iness Review (CORR) or during the DOE ORR.
NWP will formally declare readiness to the DOE, prior to start of the DOE ORR. 18
3/10/2016
9
~OICI:SA.illwor'
R..,MCII-S TSRIPARTIJ&IIMwy
~OI DiwlcapmwtOIO&tt.RwS
Petfom~O&tt.. / T ~Implti!WIIItiCfl&l.mmll)"
o.r..lapthoiiStfollyBatlt i ii\PI_,.MICI'IM~)SI IM)
Pro:.wr.~l~
INIPTot""'e"Edol.ng-~So.mmlol'y
o.w.ryOIDSAMCITSIIIOcaf'OIG"~IO
SVT-C8FOM..,_.,..,~IO
CordJct OSA TrtiiWIIJ (Gen•IO _, 311*:1111: )
- p-1\/R ,.,..,..-.--~5..-t
OSAlDIII!I-2014 .......... -.ao.n
~ -=..--~......... .. . .. p..,."""..,."'"'eciO*IAI.on
~s. ..... --E•......,......, p..,....., ...... _..$tll .... __
~101SA~ • .a.t~l
-.-PoofQmi~<:II'~ R-t.......,rt:Of!RJ
-~<:II'ORR~TMmeet-
P..,.ormOOE~....,."-..._•R-IDORRI
P.,.,Car;ecr;.,..focl~on~
s.:~1ii<.rtiiliiiYikllf•
~raProc--C<nwow~e•~••e,... • .., .. ~-......
- -wort • • .w..r- WIPPintegrated Baseline L7&.tusKof01-0ct-1~ ~ 19 - R.....rw!gWo1< Levei7Activities F'!ini:Oate· oa-Feb-16 - C.-R--.ngWo11 Paga1~t
3/10/2016
DOE Readiness Review (DORR)
Conducted by the DOE utilizing a team of independent Subject Matter Experts to assess and determine if waste emplacement activities can be resumed.
Similar to the CORR, the DORR will focus on: • Implementation of corrective actions associated with the AlB reports • Implementation of Safety Management Program corrective actions • The assessment will ensure the plant, people and the processes are ready for safe and
compliant resumption of waste emplacement activities.
From the DOE ORR- Good Practices, Findings and Opportunities for Improvement may be identified. Findings considered to be a prestart activity for commencement of waste emplacement will be addressed and closed.
DOE will provide concurrence with the closure of the prestart findings.
20
10
- A--Wen
Co'l-d~GICIISAA.vS
Peof"""O&l.ITSR~---WII
o...lapO.ftS~bst. lmci.,_.., ,.. III..,.J5111111
Proc-~·'~
lfNPTKMicol £Gillng--..5ur'lvrloly
~<$0&A.-l's.loc:&fOI<r~el
SVT -C8FO--~
Ccrd.ICI DSA 1'l'aor*>g IGenlni- 15iPC*I
OSA:U.201,....,.._,.111an~o
~<IDSA301»-201' 11,._,.11111cn
PIM'I"""W.g~~~ttdCdi:I"
PIM'I"""~8<11-A$t.eSo.mentEoecull<r1Diom
p.,-"""~s. ..... ...,.-101'11 ~MSAc:..r.wvoAct""'l
Plffcnncar..ctcrer.-oi-R-n!W_...I(X)fllltl
PwfOIOI'!Ccirftd:GrOAit~cwonr..tnlct,..ll
~c.-- ....... SUqlalc-~
PM"""DOE()ponllaniiAir-•R-lOORRI
Pwbmeon.c~~
k,_.I.\'IC..,_.....,..,. N:tkaNII!molaPiac ... - c.anwn.ncol'lll•oE"'*'c..,lll .......
WIPP Integrated Baaetine Level7 Activities
- Oilll:oiR--W<n
l7Sll*llllof01-0ct-15 P!tltO.Ilt 08-Feb-18
Plio-loti
Authorization to Proceed - Commence VVaste Emplacement
Once the DOE has completed the DOE Operational Readiness Review and agreed upon prestart findings have been satisfactorily closed, authorization to Commence Waste Emplacement will be provided to NWP.
In conjunction with the DOE, NMED will perform an evaluation of readiness to restart waste emplacement activities as it applies to their areas of oversight.
The current schedule has resumption of waste emplacement starting in December 2016
22
3/10/2016
11
Or.o.lcpn..W:CIIOSA-~
ANMa..!ITSAIPAATI) S\INnlly
Cor'Ckluati<lfl cri ~CIIO&OI.Ar~S
Petrarm D&AITSA lmpl-nlotl.., ~~
Oewlap Chlth1ilri8""'1""'_ ... ... ... ...,.)S81hl)
Proc.ot.n~/~
rNVPlKMiciiElllitlll--......~
o.llvwyCIID& ... _lSIIIocai'Ob~
SVT-C.FOII.-ot\0~111
~OSA.T-G~-Sp«Jk)
l"t'..-..__s~
0S...:J009.201• ..........,11b!ac.n
~ =~..:.-:- - ···~ ~:.:.:=::/~Mia> PetriX!III-IoQII'IWIIW ...... _wn_ ~MSAc.r.:t:Ne ~IIGI•
Pwfi:f!'ri~• O,.IItioNIII.-IIIIIMiwfCOAA I
-..,Cclni'KtoORII.~T-.KI"'--
Petlcrm OOEep.r.I0'\11 ll.>t-·11.-1()011.11.)
~ll:kw!IDPrOC-·Como'MrleeVW•eE"'*.,.,_.. _ .... WIPP Integrated Baseline L7 !btuns orOt-Oct-15 ~ 23
Level 7 Activities Print 0.11!1 Oll..fet..\6 -Cf- II.~WG11 Paget~t
Integrated PMB- Risk Approach How were risks Identified?
A comprehensive risk and estimating uncertainty assessment was performed . The initial Recovery risk register was expanded to include those risks that could impact the WIPP base operational activity program to form an integrated risk register containing both Recovery Project and Base operational activity risks and opportunities.
Because the integrated baseline is primarily focused on FY16 and FY17 and the resumption of waste emplacement operations, a specific risk analysis was conducted for the risk items that have the potential to impact the resumption of waste emplacement operations.
Estimate Uncertainty (Management Reserve and Contingency)
A cost probability distribution was developed for each risk using the best, most likely and worst case residual cost impacts. The management reserve and contingency estimates have been rolled back into work activities to support resumption of waste emplacement.
Schedule Uncertainty The analysis provides and estimate of schedule duration necessary to respond to realized risks .
An 800/a schedule uncertainty was derived for the recovery scope.
3/10/2016
24
12
-.. 00 1
'"
022
023
Oll
OJO
Example - Resumption of Waste Emplacement Risk Events
--QualifiW
I ~;:'!nNot Av~labk:
~
·~ Witll I r-;.,.1}PCr.lc df..qu~ lkNps(ISV .tSVS) itoofBoltiiC
I w...,._~ ..... -ConlaauOO ,,_ IBolti"Cf\JG
Euavllti011 Adivitics
I~ of WorlD!~£
I (Bollu'll'-• l'onlamiutcd
~ """ .. UIIIIWlliAAlllll
I· OPPOII.TIJNI
-""-N"T
'""
'""
=II v.::-11 = Vesyl.ikdy Si&adicant II Mill&alc
""" MNJmal II Mill&llk!
I Ukdy Si&lllfictlnti i Mill&lk
-......... v.., Uldikdy
... ...,
"""
-c-
M.,Paal
-....-low
-c-c... .. so
..... ._ ""' •• 100
M..,Pul I Moden.le llSO I soo
Sisllill<.::.nt IMockAtc 1 100 1200
~V.'P I UlllliDlly ........ II M···· II """"'' I >u.o;..o I Low 25 ISO
/I.'WP I Likdy SIIIUIK.Int II Mlll&flle I I l..ikdy Sig•fic.~~t I Modcnoloill I2S I7S
--,-.... c-c.o ..... • •
..... ._ .... -""" ..... ISO I Mill I2Mthf I JMihl
7SO !Mdl I lMthf I JMdu:
)()() 2M• I4Mthl I 6Mthal
100 IMth I 2Mtb$
ISO lMtlls I ISMIM
NWl' l lnlikdy E•""lllloMII I Eilha!M:e Unlikl.iy EJOcqJtioul I Modcnlc I (JOO) I (300) I ( ISO) ~IM) I ~W) (2 Mtbs)
T I' I I L_ _
25
Schedule Uncertainty Buffer
• The Integrated PMB was developed with an 80% schedule confidence level.
The schedule buffer provides additional time to mitigate risks that affect the critical path schedule; eliminating or greatly reducing the potential to impact the commencement of waste emplacement .
26
3/10/2016
13
Integrated PMB -Monitoring of Progress
Plan of the Day (POD) meetings (Monday. Wednesday and Friday) Review of the current two week window of schedule activities The Champions status schedule activities to be performed in that window that are scheduled to start or scheduled to complete
• Issues that would prevent activities from starting or completing as scheduled are discussed and a path forward is developed to minimize impact
Plan of the Week meetings (Tuesday) A review of the critical path schedule
• A review of the programmatic activities (Safety Management Programs, AlB actions) Actions are taken to mitigate the critical path activities
Monthly Project Status Meetings with CBFO • Cost and schedule performance are reviewed against the baseline
Monthly Change Control Board Meeting • Changes to the baseline (schedule or cost) that impact schedule milestones or 27
cost impacts greater than $250,000 are reviewed.
3/10/2016
14
II II 1111 1111 II!! t i I
!d !
C"l a = = Q.. ~ 0
= a ......
w ........ ...... 0 ........ N 0 ...... 0"1