Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President – Innovation

Transcript of Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability...

Page 1: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

Enhancing the Ability to Meet Customer Needs

May 15, 2007

Clark W. GellingsVice President – Innovation

Page 2: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

2© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

IntelliGrid Vision

A new electric delivery infrastructure that integrates advances in communications,

computing, and electronics to meet the energy needs of the digital society

Page 3: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

3© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Needed: An Interstate Electricity Communications Superhighway

CWG/9857P

Page 4: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

4© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Deploy Sensors

Page 5: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

5© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Integrated Electric & Communications Systems

Page 6: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

6© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Deploy Local Computational Agents

Page 7: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

7© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Apply Power Flow Control

Page 8: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

8© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Apply Dynamic Thermal Circuit Rating (DTCR)

Page 9: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

9© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Apply Dynamic Thermal Circuit Rating

Page 10: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

10© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Apply Fault Anticipation & Distribution Electronics

Page 11: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

11© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Apply Fault Anticipation

Page 12: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

12© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Enable A Self-Healing Power Delivery System

Page 13: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

13© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Consumer Portal

Page 14: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

14© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

The IntelliGrid VisionKey Technologies

• Communications• Monitoring• Embedded computing• Advanced components

– Superconductors, power electronics, storage, etc.

• Advanced configurations– Looped circuits, microgrids, DC

service

Data: collecting, moving and converting data into useful information

Page 15: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

15© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

The Power Delivery System of the Future: Characteristics

The power delivery system of the future will be:– Interactive with consumers and markets

– Self-Healing and Adaptive

– Optimized to make best use of resources and equipment

– Predictive rather than reactive, to prevent emergencies

– Accommodates a variety of generation options

– Integrated, merging monitoring, control, protection, maintenance, EMS, DMS, marketing, and IT

– More Secure from attack

Page 16: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

16© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Achieving the Power Delivery System of the Future:Integrating Two Infrastructures

Electrical Infrastructure

“Intelligence” Infrastructure

Page 17: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

17© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

The Intelligent Grid

Page 18: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

18© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

IntelliGrid ProgramDeveloping the Technical Foundation

Communications:Enable devices and controllers to “talk” to each other• IntelliGrid Architecture: a framework consisting of principles for

interoperability, tools, methodologies, recommendations for standards and technologies and best practices that are applied during the design and deployment of grid upgrades

• Consumer Portal: two-way communications gateway between consumers and service providers

Computing:Software to run the smart grid must model and simulate the power system faster than

real time• Fast Simulation and Modeling: high-performance look-ahead and optimization capability

of software for both the transmission and distribution system (Functional requirements completed, prototypes in development)

Monitoring:Measurement of parameters necessary for operating and maintaining an intelligent grid• Integrated Monitoring: defines data requirements – single measurements for multiple

applications

Page 19: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

19© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

IntelliGrid Partners Cut Across All Stakeholder Groups

U.S. Utilities• Kansas City Power & Light• Long Island Power Authority• New York Power Authority • Salt River Project• TXU• Public Service New Mexico• Tri-State G&T• Arkansas Electric Cooperative• Great River Energy• Richmond Power & Light• Dairyland Power Cooperative• Golden Valley Electric Assn.• Hoosier Energy Rural Electric

Cooperative• Lincoln Electric• Hetch Hetchy Water & Power

International Utilities• Electricite de France • Polish Power Grid Company• Korea Electric Power

Public Agencies• Association of State Energy

Research and Technology Transfer Institutions

• International Brotherhood of Electrical Workers

• National Association of Regulatory Utility Commissioners

• National Association of State Energy Officials

• National Conference of State Legislatures

• National Governors Association

• State Energy Offices and Research Programs

Manufacturers• ABB• Hitachi

Electricity

Industry

Technology

Providers

Public Sector/

Consumers

Page 20: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

20© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Applications of the IntelliGrid Architecture

• Southern California Edison – applying the IntelliGrid Architecture $1.5B AMI project

• TXU – applying IntelliGrid Architecture to $400M automated meter reading project

• Salt River Project – applying IntelliGrid Architecture for substation data integration

• Alliant Energy – applying IntelliGrid Architecture for distribution monitoring system

• Long Island Power Authority – Utility and Consumer Device SCADA via Broadband over Power Line (BPL) and Wireless Communications

• Polish Power Grid Operator – applying the IntelliGrid Architecture and Fast Simulation and Modeling for Volt/VAR control of the Polish Transmission Grid

DevelopmentApplication

Page 21: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

21© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

How is Southern California Edison Using IntelliGrid Results?

Advanced Metering Infrastructure• Apply methods & tools

to capture requirements

• Build on defined applications

• Apply approach for mappingrequirements to technologies

• Apply recommendations for standards and technologies

• Contribute the results of their work to the industry

Page 22: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

22© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

IntelliGrid ProgramKey Results To Date

• Communications– IntelliGrid Architecture volumes 1-4– Guidelines for Implementing the IntelliGrid

Architecture– Case Studies on Implementations of the IntelliGrid

Architecture– Consumer Portal concepts, drivers and barriers to

development – Consumer Portal Telecommunications Assessment– Consumer Portal Business Case

• Computing– Distributed Computing Conceptual framework and

Computational Architecture– Business Case

• Monitoring– Requirements and Technology Assessment

Page 23: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

Energy Efficiency (EE) & Demand Response (DR)

Page 24: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

24© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Strategies for Efficient Use of Electricity

Three Interrelated Strategies• Energy Efficiency (EE)• Demand Response (DR)• Dynamic Systems (DS)

Implemented Through anElectricity Efficiency Infrastructure

EE

DSDR

Page 25: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

25© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

0

500

1000

1500

2000

2500

3000

3500

1990 1995 2000 2005 2010 2015 2020 2025 2030

U.S

. Ele

ctri

c S

ecto

rC

O2

Em

issi

on

s (m

illio

n m

etri

c to

ns)

U.S. Electricity Sector CO2 Emissions

• Base case from EIA “Annual Energy Outlook 2007”

– includes some efficiency, new renewables, new nuclear

– assumes no CO2 capture or storage due to high costs

Page 26: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

26© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

0

500

1000

1500

2000

2500

3000

3500

1990 1995 2000 2005 2010 2015 2020 2025 2030

U.S

. Ele

ctri

c S

ecto

rC

O2 E

mis

sio

ns

(mill

ion

met

ric

ton

s)

EIA Base Case 2007

CO2 Reductions … Technical Potential*

150 GWe Plant Upgrades46% New Plant Efficiency

by 2020; 49% in 2030

No Existing Plant Upgrades40% New Plant Efficiency

by 2020–2030Advanced Coal Generation

5% of Base Load in 2030< 0.1% of Base Load in 2030DER

10% of New Vehicle Sales by 2017; +2%/yr Thereafter NonePHEV

Widely Deployed After 2020NoneCCS

64 GWe by 203012.5 GWe by 2030Nuclear Generation

70 GWe by 203030 GWe by 2030Renewables

Load Growth ~ +1.1%/yrLoad Growth ~ +1.5%/yrEfficiency

TargetEIA 2007 ReferenceTechnology

* Achieving all targets is very aggressive, but potentially feasible.

Page 27: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

27© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

0

500

1000

1500

2000

2500

3000

3500

1990 1995 2000 2005 2010 2015 2020 2025 2030

U.S

. Ele

ctri

c S

ecto

rC

O2 E

mis

sio

ns

(mill

ion

met

ric

ton

s)

EIA Base Case 2007

9% reduction in base load by 2030

Benefit of Achieving Efficiency Target

150 GWe Plant Upgrades46% New Plant Efficiency

by 2020; 49% in 2030

No Existing Plant Upgrades40% New Plant Efficiency

by 2020–2030Advanced Coal Generation

5% of Base Load in 2030< 0.1% of Base Load in 2030DER

10% of New Vehicle Sales by 2017; +2%/yr Thereafter NonePHEV

Widely Deployed After 2020NoneCCS

64 GWe by 203012.5 GWe by 2030Nuclear Generation

70 GWe by 203030 GWe by 2030Renewables

Load Growth ~ +1.1%/yrLoad Growth ~ +1.5%/yrEfficiency

TargetEIA 2007 ReferenceTechnology

Page 28: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

28© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Energy Efficiency – 5th Fuel

Source: Energy Information Administration / Annual Energy Outlook 2006

Petroleum3.0%

Natural Gas18.7%

OtherRenewables2.3%

Nuclear19.3%

Hydroelectric6.5%

Coal49.7%

Petroleum3.0%

Natural Gas16.7%

OtherRenewables5%

Nuclear19.3%

Hydroelectric6.5%

Coal43.7%

Energy Efficiency6.0%

2005 Resource Mix Could This be 2015 Resource Mix?

Page 29: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

29© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Per Capita Electricity Consumption

Page 30: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

30© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,00019

75

1976

1977

1978

1979

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

GW

h/y

ear

Appliance Standards

Building Standards

Utility Efficiency Programs at a cost of

~1% of electric bill

~15% of Annual Electricity Use in California in 2003

Annual Energy Savings from Efficiency Programs & Standards

Source: California Energy Commission

Page 31: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

31© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Energy Efficiency Potential Estimates

0%

5%

10%

15%

20%

25%

30%

2010 2020 2030

Potential (%)

10.8%

21.8%

27.3%

Technical Potential

Technical Potential

Achievable Potential

(5.5%)Savings from ProgramsNaturally Occurring

Savings from Programs

Naturally Occurring

Savings from Programs

Naturally Occurring

1.3%

1.9% 4.5%

1.9%

6.9%

1.9%

Technical Potential

Page 32: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

32© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Energy Savings Opportunities & Associated Levelized Costs

• < 5 cents/kWh– Residential: appliance removal, audits, lighting, O&M, HVAC

tune-up – Commercial/Industrial: refrigeration

• 5-10 cents/kWh– Commercial: lighting, motors– Industrial: motors, compressed air systems, process

• 10-20 cents/kWh– Residential: Energy Star appliances– Commercial: audits, equipment tune-up,

cooling, new construction– Industrial: lighting, cooling

• > 20 cents/KWh– Residential: HVAC, fans, new construction

Page 33: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

33© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Dynamic Systems Infrastructure: Basics

EfficientBuildingSystems

UtilityCommunications

DynamicSystemsControl

SmartEnd-UseDevices

ControlInterface

AdvancedMetering

Consumer Portal& Building EMS

Internet

Page 34: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

34© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

The Portal Empowers Consumers

Communications

Communications ElectricityElectricity

Choice Convenience Value

• Connectivityto electricity markets

• Information on consumption

• Access toother services

• Connectivityto electricity markets

• Information on consumption

• Access toother services

Page 35: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

35© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

The Portal Empowers Consumers

Communications

Communications ElectricityElectricity

• Choose suppliers• Select tariff• Monitoring usage• Respond to price signals• Monitor appliances

and devices• Remotely program

operations• Consolidate bills• Outage detection• PQ monitoring• Security• Data• Entertainment

• Choose suppliers• Select tariff• Monitoring usage• Respond to price signals• Monitor appliances

and devices• Remotely program

operations• Consolidate bills• Outage detection• PQ monitoring• Security• Data• Entertainment

Page 36: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

36© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Dynamic Systems Infrastructure:Utility Operations

EfficientBuildingSystems

UtilityCommunications

DynamicSystemsControl

DataManagement

DistributionOperations

SmartEnd-UseDevices

ControlInterface

AdvancedMetering

Consumer Portal& Building EMS

Internet

Page 37: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

37© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Dynamic Systems Infrastructure:Consumer Opportunities

EfficientBuildingSystems

UtilityCommunications

DynamicSystemsControl

DataManagement

DistributionOperations

Plug-In Hybrids

SmartEnd-UseDevices

ControlInterface

AdvancedMetering

Consumer Portal& Building EMS

Internet

Page 38: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

38© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

Dynamic Systems Infrastructure:Consumer Opportunities

EfficientBuildingSystems

UtilityCommunications

DynamicSystemsControl

DataManagement

DistributionOperations

DistributedGeneration& Storage

Plug-In Hybrids

SmartEnd-UseDevices

ControlInterface

AdvancedMetering

Consumer Portal& Building EMS

Internet Renewables

PV

Page 39: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

39© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

EfficientBuildingSystems

UtilityCommunications

DynamicSystemsControl

DataManagement

DistributionOperations

DistributedGeneration& Storage

Plug-In Hybrids

SmartEnd-UseDevices

ControlInterface

AdvancedMetering

Consumer Portal& Building EMS

Internet Renewables

PV

Dynamic Systems Infrastructure

Interoperabilityand

Functionality

Page 40: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

40© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

EfficientBuildingSystems

UtilityCommunications

DynamicSystemsControl

DataManagement

DistributionOperations

DistributedGeneration& Storage

Plug-In Hybrids

SmartEnd-UseDevices

ControlInterface

AdvancedMetering

Consumer Portal& Building EMS

Internet Renewables

PV

Dynamic Systems Infrastructure

IP AddressableDevices & Tools

For DataIntegration

Page 41: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

41© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

EfficientBuildingSystems

UtilityCommunications

DynamicSystemsControl

DataManagement

DistributionOperations

DistributedGeneration& Storage

Plug-In Hybrids

SmartEnd-UseDevices

ControlInterface

AdvancedMetering

Consumer Portal& Building EMS

Internet Renewables

PV

Dynamic Systems Infrastructure – Example

• Thermostat receivesday-ahead hourlyprices

• Consumer sets upperand lower limits

• Thermostat “learns”thermal, consumerand weather impacts

Page 42: Enhancing the Ability to Meet Customer Needs May 2007.pdf · 2012-05-22 · Enhancing the Ability to Meet Customer Needs May 15, 2007 Clark W. Gellings Vice President ... • IntelliGrid

42© 2007 Electric Power Research Institute, Inc. All rights reserved.

CWG/9857P

EfficientBuildingSystems

DynamicSystemsControl

DataManagement

DistributedGeneration& Storage

Plug-In Hybrids

SmartEnd-UseDevices

ControlInterface

AdvancedMetering

Consumer Portal& Building EMS

Internet Renewables

PV

Dynamic Systems Infrastructure – Example

Time of Day

UtilityCommunications

DistributionOperations12

Midnight12

Midnight12

Noon

Demand

PreCool

Clip

Recover