Enhancing Six Sigma Projects with PI -...

40

Transcript of Enhancing Six Sigma Projects with PI -...

Page 1: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright
Page 2: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Enhancing Six Sigma Projects

with PI

Matt Corcoran

Page 3: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Who is RockTenn?

• One of North America’s leading manufacturers of paperboard, containerboard, consumer and corrugated packaging

• Annual net sales of approximately $2.8 billion

• Founded in 1917 and operates manufacturing facilities throughout the United States, Canada, Mexico, Argentina and Chile

• 10 Recycle Paperboard Mills, 2 Recycle Container-board Mill, 1 Bleached Board Mill

• 90+ Converting Plants

• Headquartered in Norcross, Georgia

Page 4: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Who is the Chattanooga Mill?

• 93 years old (The original paper mill in

RockTenn)

• Produces 100% Recycled Uncoated Paperboard

• Product calipers (thickness) range .014” - .060”

• Our products Include:

– Tube Board (Cores and Concrete Molds)

– Folding Carton Board (Boxes and frames)

– Partition Board (Partitions for breakable items)

– Specialty Board (Colors, water resistant)

– RTA Furniture Board (Backing for Furniture)

Page 5: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Page 6: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Six Sigma at RockTenn

• “RockTenn is creating a culture of innovation and high performance

to ensure that our company is the first choice of our customers, our

employees, and our shareholders." - Jim Rubright (2000 Annual

Report)

• Our strategy is to drive key initiatives consistent with our business

strategy, with a specific focus on:

– Implementing a long lasting process improvement initiative with

significant bottom line results and significant impact on customer

satisfaction

– Investing in our employees

– Leveraging the resources of a $2.8 Billion company over our six

operating divisions

• RockTenn’s Six Sigma dept was established to provide the tools and

expertise to put our strategy into action

Page 7: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

PI Implementation at RockTenn

• 2005 Pilot program at the Chattanooga

Mill

• 2006 EA began

• 2007 PI online for all our paper mills

Page 8: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

OSIsoft Enterprise Agreement

• Diane Bricco – Enterprise Project Manager

• Field Service Engineers

• Center of Excellence

– Brian Palmer

– Gopal Gopalkrishnan

Page 9: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Pre-Project – Study Process Capability

• Business Case– Customers requiring a more consistent product not

just in spec

• Shrinking Market– Strategic positioning to be the prime supplier to the

market

• Healthy Customers– A happy and healthy customer base is a prime

ingredient for long term success

• We’re not talking about just $$$ savings, we’re talking about staying in business.

Page 10: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Process Capability

• Having a normal distribution / bell curve

allows us to measure “process capability.”

• Process capability compares your process

variation to the product specifications and

provides an index or “grade.”

Page 11: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

The 3rd String KickerLSL USL

Page 12: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

The 1st String Kicker

LSL USL

Page 13: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Our Bench Mark

• Data Collection

– Data Sources

• PI DataLink

– Import to Excel

– Filtering

– Export to Minitab for analysis

• Process Capability

• You are here

• Shock and Awe

Page 14: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Data Collection

• DCS (Metso)

• 2 In-Line Sheet Scanners on each machine (Metso)

• Quality Database (IBM AS/400)

• All of the data from these sources are collected and archived on the PI Server.

• Access to this kind of data was nearly impossible before the PI Server was installed.

Page 15: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

PI DataLink

Page 16: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Minitab

Page 17: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Minitab Process Capability Analysis

Potential (Within) Capability

Cp 1.48

CPL 1.08

CPU 1.89

Cpk 1.08

Page 18: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Grade A Moisture

Cpk = 1.08

Page 19: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Grade B Moisture

12.010.59.07.56.04.53.0

LSL USL

LSL 4.5

Target *

USL 7

Sample Mean 4.93271

Sample N 1164

StDev (Within) 0.393161

StDev (O v erall) 0.734499

Process Data

C p 1.06

C PL 0.37

C PU 1.75

C pk 0.37

Pp 0.57

PPL 0.20

PPU 0.94

Ppk 0.20

C pm *

O v erall C apability

Potential (Within) C apability

% < LSL 22.51

% > USL 1.12

% Total 23.63

O bserv ed Performance

% < LSL 13.55

% > USL 0.00

% Total 13.55

Exp. Within Performance

% < LSL 27.79

% > USL 0.24

% Total 28.03

Exp. O v erall Performance

Within

Overall

Process Capability of Greif Drum Bottom .038 PM2 Reel Moisture (PI-5 min inc, Jan09, breaks excluded)

Cpk = 0.37

Page 20: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Grade C Moisture

98765432

LSL USL

LSL 3.5

Target *

USL 5.5

Sample Mean 4.35033

Sample N 381

StDev (Within) 0.463499

StDev (O v erall) 0.971134

Process Data

C p 0.72

C PL 0.61

C PU 0.83

C pk 0.61

Pp 0.34

PPL 0.29

PPU 0.39

Ppk 0.29

C pm *

O v erall C apability

Potential (Within) C apability

% < LSL 13.39

% > USL 10.76

% Total 24.15

O bserv ed Performance

% < LSL 3.33

% > USL 0.66

% Total 3.98

Exp. Within Performance

% < LSL 19.06

% > USL 11.82

% Total 30.89

Exp. O v erall Performance

Within

Overall

Process Capability of Pasted Oak .0385 PM2 Reel Moisture (PI-5 min inc, Jan09)

Cpk = 0.61

Page 21: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

12.010.59.07.56.04.53.0

LSL USL

LSL 4.5

Target *

USL 7

Sample Mean 4.93271

Sample N 1164

StDev (Within) 0.393161

StDev (O v erall) 0.734499

Process Data

C p 1.06

C PL 0.37

C PU 1.75

C pk 0.37

Pp 0.57

PPL 0.20

PPU 0.94

Ppk 0.20

C pm *

O v erall C apability

Potential (Within) C apability

% < LSL 22.51

% > USL 1.12

% Total 23.63

O bserv ed Performance

% < LSL 13.55

% > USL 0.00

% Total 13.55

Exp. Within Performance

% < LSL 27.79

% > USL 0.24

% Total 28.03

Exp. O v erall Performance

Within

Overall

Process Capability of Greif Drum Bottom .038 PM2 Reel Moisture (PI-5 min inc, Jan09, breaks excluded)

All Together – You Are Here

98765432

LSL USL

LSL 3.5

Target *

USL 5.5

Sample Mean 4.35033

Sample N 381

StDev (Within) 0.463499

StDev (O v erall) 0.971134

Process Data

C p 0.72

C PL 0.61

C PU 0.83

C pk 0.61

Pp 0.34

PPL 0.29

PPU 0.39

Ppk 0.29

C pm *

O v erall C apability

Potential (Within) C apability

% < LSL 13.39

% > USL 10.76

% Total 24.15

O bserv ed Performance

% < LSL 3.33

% > USL 0.66

% Total 3.98

Exp. Within Performance

% < LSL 19.06

% > USL 11.82

% Total 30.89

Exp. O v erall Performance

Within

Overall

Process Capability of Pasted Oak .0385 PM2 Reel Moisture (PI-5 min inc, Jan09)

Grade A

Cpk = 1.08

Grade B

Cpk = 0.37

Grade C

Cpk = 0.61

Page 22: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Project Goals

• Leverage knowledge of Grade A to our

other grades

• Improve process capability of our systems

• Improve customer quality and satisfaction

• Improve performance/efficiency

• Document and standardize procedures

• Develop continuous monitoring methods

(PI Displays & Reports)

Page 23: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

A Six Sigma Project Was Born

• Six Sigma Black Belt

• Kick Off meeting followed by weekly

meetings

• Divided the process into two parts

– Fiber Management

– Stock Prep/Machine Management

Page 24: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

What Was Different About Grade A?

• What do we do differently on Grade A, compared to the other grades?

• Keep in mind the 6M’s. All are sources of variation:

– Material

– Method

– Measurement

– Machine (Equipment)

– Man (People)

– Mother Nature

Page 25: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Material

• We were much more careful about what

fiber and how the bales were added to the

process.

Page 26: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Method

• We had specifics on raw material, refiner

settings and machine settings GRADE SPECIFICATION CARD

Grade: Grade A

Caliper: 0.035

Beater Room Furnish Dye Chemical

Top Liner

Filler 33% News

33% Mix

33% Soft Box

Back Liner 100% DLK

Wet End Stock Dye Chemical

Top Liner

Filler #2-#8 Size #1 & #9

Back Liner #1 & #9

Dry End Top Back

Wet Stack All All

Calendar Solution none none

Dry Stack Skip Skip

Manufacturing Specifications

Parameter Test Frequency Target Action Reject Profile 2-Sig Max

Caliper Continuous 35 34.5-35.5 34-36 1

Basis Weight Continuous 123 7

Moisture Continuous 5.5 5-6 4.5-7 1

ZDT 5 per Reel 60 55 50

Mullen 3 per Reel 185 180 175

Water Drop 1 per Reel 2 1-3 .75-5

Special Instructions:

Beater Room: -Pull from Warehouse A

Wet End: -Filler Refiners set to 350 CSF

-Liner Refiners set to 400 CSF

Dry End: -Load calender stack to 20 psi

Quality Lab:

Page 27: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Measurement

Page 28: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Fiber Management

• We overhauled the way we purchased our

raw material

• The fiber warehouses were reorganized

• The fiber feeding method was revised

• We tracked every bale we used.

Page 29: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Fiber Management - Warehousing

• Reorganized warehouses

• Improved inventory tracking and

reordering

• Created fiber staging area

Page 30: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Fiber Management - Feeding

• Established weight based recipes rather

than “bale” based recipes

• Redistributed sludge, broke, and screen

returns to better manage fiber consistency

• Established a fiber use tracking system

that records fiber type and weight that was

used

Shift: 1 Machine: 1 Liner Pulper:1 Filler Pulper 1

2 2 2 2

3 3

4

Grade(s) Running:____________________________

Operator:_________________________________

Date: ___________________________________

Grade: Put grade at the top of the column and the weights for THAT grade below it.

Start a new column if you need another grade or need to continue the grade you are running.

IF RUNNING FSC - NOTATE FSC IN COLUMN

______ ______ ______ ______ ______ ______ ______ ______ ______

Page 31: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Stock Prep/Machine Management

• With fiber feed managed stock

consistency variation decreased

• Run stock refiners in automatic rather than

manual

• Utilize PI ProcessBook and RtAlerts to

provide real time information and process

alerts

Page 32: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

#1 PM Filler Refiner Control - 2009#1PM 600HP Filler Refiner Freeness

2/9/09 - 2/13/09

200

250

300

350

400

450

500

550

PASTED O

AK

PASTED O

AK

RT-ULT

RA BEAM

DRY PARTIT

ION B

OARD

DRY PARTIT

ION B

OARD

DRY PARTIT

ION B

OARD

PASTED O

AK

RT-ULT

RA BEAM

BENDING C

HIP

BENDING C

HIP

PLAIN

CHIP

PASTED O

AK

PASTED O

AK

PASTED O

AK

PASTED O

AK

ULTRAGUARDIA

N

PLAIN

CHIP

BROWN ST

AIN

BROWN ST

AIN

PASTED O

AK

PASTED O

AK

PAN-L-F

ILLERS

BLEACHED M

ANILA

BENDING C

HIP

PINK M

ANILA

PINK M

ANILA

PINK M

ANILA

PINK M

ANILA

PINK M

ANILA

PAN-L-F

ILLERS

PAN-L-F

ILLERS

PAN-L-F

ILLERS

PASTED O

AK

BENDING C

HIP

PM1 600 hp Filler Refiner Freeness PM1 600 hp Filler Refiner Freeness Set Point PM1 600 hp Filler Refiner Power

Page 33: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

#1PM Filler Refiner Control - 2010#1PM 600HP Filler Refiner Freeness

2/5/10 - 2/9/10

200

250

300

350

400

450

500

550

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

PLAIN

CHIP

PLAIN

CHIP

ROCK SOLID

PLAIN

CHIP

D F FU

RNITURE FI

LLER O

AK

D F FU

RNITURE FI

LLER O

AK

BROWN ST

AIN

BROWN ST

AIN

BROWN ST

AIN

D F FU

RNITURE FI

LLER O

AK

BLACK 1

SIDE

BLACK 1

SIDE

BLACK 1

SIDE

D F FU

RNITURE FI

LLER O

AK

D F FU

RNITURE FI

LLER O

AK

D F FU

RNITURE FI

LLER O

AK

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

BENDING C

HIP

QUEBECOR FILL

ER

QUEBECOR FILL

ER

QUEBECOR FILL

ER

PM1 600 hp Filler Refiner Freeness PM1 600 hp Filler Refiner Freeness Set Point PM1 600 hp Filler Refiner Power

Page 34: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Project Results – Capability

Improvements

• 21.2% over all improvement in caliper

process capability

• 10.4% over all improvement in moisture

process capability

• Reduced beater tons due to variation and

out of spec material

Page 35: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

12.010.59.07.56.04.53.0

LSL USL

LSL 4.5

Target *

USL 7

Sample Mean 5.06078

Sample N 66

StDev (Within) 0.197654

StDev (O v erall) 0.280022

Process Data

C p 2.11

C PL 0.95

C PU 3.27

C pk 0.95

Pp 1.49

PPL 0.67

PPU 2.31

Ppk 0.67

C pm *

O v erall C apability

Potential (Within) C apability

PPM < LSL 30303.03

PPM > USL 0.00

PPM Total 30303.03

O bserv ed Performance

PPM < LSL 2275.61

PPM > USL 0.00

PPM Total 2275.61

Exp. Within Performance

PPM < LSL 22608.21

PPM > USL 0.00

PPM Total 22608.21

Exp. O v erall Performance

Within

Overall

Process Capability of Moisture_2

Grade B

Cpk = 0.95

12.010.59.07.56.04.53.0

LSL USL

LSL 4.5

Target *

USL 7

Sample Mean 4.93271

Sample N 1164

StDev (Within) 0.393161

StDev (O v erall) 0.734499

Process Data

C p 1.06

C PL 0.37

C PU 1.75

C pk 0.37

Pp 0.57

PPL 0.20

PPU 0.94

Ppk 0.20

C pm *

O v erall C apability

Potential (Within) C apability

% < LSL 22.51

% > USL 1.12

% Total 23.63

O bserv ed Performance

% < LSL 13.55

% > USL 0.00

% Total 13.55

Exp. Within Performance

% < LSL 27.79

% > USL 0.24

% Total 28.03

Exp. O v erall Performance

Within

Overall

Process Capability of Greif Drum Bottom .038 PM2 Reel Moisture (PI-5 min inc, Jan09, breaks excluded)

Cpk = 0.37

Before After

Page 36: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

98765432

LSL USL

LSL 3.5

Target *

USL 5.5

Sample Mean 4.25299

Sample N 99

StDev (Within) 0.237397

StDev (O v erall) 0.41126

Process Data

C p 1.40

C PL 1.06

C PU 1.75

C pk 1.06

Pp 0.81

PPL 0.61

PPU 1.01

Ppk 0.61

C pm *

O v erall C apability

Potential (Within) C apability

PPM < LSL 0.00

PPM > USL 0.00

PPM Total 0.00

O bserv ed Performance

PPM < LSL 757.37

PPM > USL 0.07

PPM Total 757.45

Exp. Within Performance

PPM < LSL 33555.83

PPM > USL 1213.98

PPM Total 34769.81

Exp. O v erall Performance

Within

Overall

Process Capability of Moisture_5

Grade C

Cpk =1.06

98765432

LSL USL

LSL 3.5

Target *

USL 5.5

Sample Mean 4.35033

Sample N 381

StDev (Within) 0.463499

StDev (O v erall) 0.971134

Process Data

C p 0.72

C PL 0.61

C PU 0.83

C pk 0.61

Pp 0.34

PPL 0.29

PPU 0.39

Ppk 0.29

C pm *

O v erall C apability

Potential (Within) C apability

% < LSL 13.39

% > USL 10.76

% Total 24.15

O bserv ed Performance

% < LSL 3.33

% > USL 0.66

% Total 3.98

Exp. Within Performance

% < LSL 19.06

% > USL 11.82

% Total 30.89

Exp. O v erall Performance

Within

Overall

Process Capability of Pasted Oak .0385 PM2 Reel Moisture (PI-5 min inc, Jan09)

Cpk = 0.61

Before After

Page 37: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Project Results – Value of Better

Process Capability

• More consistent product for our customers

• More consistent process for better

production efficiency

Page 38: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Project Results – Reduced Beater

TonsFY09 Beater tons for Caliper/Moisture/Profile/2Sig

(as a % of total beater tons)

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09

% o

f to

tal b

eat

er

ton

s

~15%

~7%

47%

reduction

Page 39: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

© Copyright 2010, OSIsoft LLC. All rights reserved.

Sustainability

Page 40: Enhancing Six Sigma Projects with PI - OSIsoftcdn.osisoft.com/corp/en/media/presentations/2010/UsersConference... · Enhancing Six Sigma Projects with PI Matt Corcoran © Copyright

Thank you

© Copyright 2010 OSIsoft, LLC., 777 Davis St., San Leandro, CA 94577