English
-
Upload
sarifa-rangunwala-sen -
Category
Documents
-
view
212 -
download
0
description
Transcript of English
-
7/17/2019 English
1/60
Handbook 2010
FINE FORMWORK SYSTEMOne Stop Solution of Formwork System
http://www.fineform.co.kr
FINE FORM CO.,LTD
-
7/17/2019 English
2/60
We, FINE FORM CO.,LTD is a company specializing in concrete formwork system and carry on its best to
construct concrete structures at various construction sites economically, safely and promptly.
We have obtained venture business quali ficat ion and INNOBIZ certif ication and is constantly researching to
provide a safe and economical concrete formwork system by setting up a technology research institute within
the company, and possesses more than 40 patents concerning to concrete formwork system at home and
abroad. Furthermore, the company has been running two factories at Tianjin in China in order to provide
products at low price.
Our FINE FORM not only being produce and supplies products but also provides overall engineering
services from plan stage to construction closing including design and structural calculation and dispatching
professional engineers to keep high quality finish economically with safety. Also, we have rich experiences of
accomplishing various projects successfully which require a high level technologies such as power plants,
roads, dams, harbor structures, high speed railways, underground roadways and industrial plants.
Also we have running a lot of projects through agents in Vietnam and Russia as well as Korea and China
successfully including New Bong power plant project in Pakistan.
We will do our best to keep developing and innovating the construction technologies and reach top group
in concrete formwork fields.
We would be appreciated your attentions.
FINE FORM Family
GREETINGS
2
ABOUT FINE FORM
-
7/17/2019 English
3/60
FINE FORM HISTORY
May 1997 Established TIANHAIXING (TIANJIN) CONSTRUCTION MATERIALS CO.,LTD)
IN CHINA
September 2001 Established TAEYANG JUNGKEON CO.,LTD
April 2005 Established FINE FORM CO.,LTD
May 2006 Increased the capital (4 hundred million of capital)
April 2007 Established Pyeongtaek Branch (The second factory)
Established Tianjin Fine Form CO.,LTD in China
August 2007 Obtained the certification of venture business
September 2007 Increased the capital (9 hundred million of capital)
November 2007 Opened SEOUL OFFICE
April 2008 Obtained the Innobiz certi ficat ion of innovat ive company
December 2008 Increased the capital (11 hundred million of capital)
December 2009 Increased the capital (14 hundred million of capital)
February 2010 Established the technology lab of FINE FORM CO.,LTD
September 2010 Started Construction on a new factory in Incheon Main Office
3
ABOUT FINE FORM
-
7/17/2019 English
4/60
FAMILY SITE
Head office (The 1st Factory)
410-142 ORYU-DONG SEO-GU INCHEON
TEL : 82-32-564-1862
FAX : 82-32-568-6559
Seoul Office
#1215 NO.8 DAEYUNG TECHNO TOWN,
GASAN-DONG, GEUMCHEON-GU, SEOUL, SOUTH KOREA
TEL : 82-2-2163-8710
FAX : 82-2-2163-8719
http://www.fineform.co.kr
e-mail : [email protected]
Pyeongtaek (The 2nd Factory)
331-8 YULPO-RI, GODEOK-MYEONO,
PYEONGTAEK-SI, GYEONGGI-DO
TEL : 82-31-663-6560
FAX : 82-31-663-6559
#9669 JINBEI-ROAD, DONGLIQU, TIANJIN,300300 CHINA
TEL : 86-22-2439-9014
FAX : 86-22-2496-1095
e-mail : [email protected]
FINE FORM CO.,LTD
TIANJIN FINE FORM CO.,LTD
4
ABOUT FINE FORM
-
7/17/2019 English
5/60
FINE FORM CI
THE LOGO OF FINE FORM is derived from the initial alphabet FF of company name and its shape
stands for two birds are rising up vertically to the sky and it is expressed to create a new technology
with creative spirits to pursue the expansion of the company.
The red color symbolize passionate and creat ive spiri ts toward to be the top in this f ield and the green
color symbolize corporate philosophies to keep Green Environment Business and contribute to the
society.
5
ABOUT FINE FORM
-
7/17/2019 English
6/60
-
7/17/2019 English
7/60
TYPICAL PROJECTS
PURIFICATION PLANT
HOUSING & BUILDINGS
POWER PLANT INDUSTRIAL PLANTS
INDUSTRIAL PLANTS
DAM & DOCKS
CANAL & HARBORS
RAILWAY & TUNNELS
-
7/17/2019 English
8/60
8
PURIFICATION PLANT
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Janghanpyeong Jungnyang-gu Seoul
: Construction of Jungrayngcheon Water Supply
: Korea Water Resource Corporation
: GS E&C Co.,Ltd
: Daese C & E Co.,Ltd
: April 2010
FINE MIGHTY WALL FORM SYSTEM is made as a large gang form panel of various shapes by combining modularized
panels in order to install and move at once and it is designed to minimize weight to move the wider gang form panel with a
crane (about 50kg/m2).
-
7/17/2019 English
9/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Paju-si, Kyunggi-do
: New Construction of Daelim Paju Condo
: Daelim Industrial Co.,Ltd
: Daelim Industrial Co.,Ltd
: Kwangyoung Development Co.,Ltd
: March 2008
9
HOUSING & BUILDINGS
FINE MIGHTY WALL FORM SYSTEM is designed to assemble of panel promptly with a small number of workers by using
only a hammer with less number of panel clamps. Our Form-tie System is designed uniquely for easy use at less cost.
-
7/17/2019 English
10/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
10
: Ilsan-si, Kyunggi-do
: Construction of Ilsan Xi Complex 2 in Ilsan Siksa District
: GS E&C Co.,Ltd
: GS E&C Co.,Ltd
: Taesung Civil Engineering Co.,Ltd
: September 2008
HOUSING & BUILDINGS
FINE MIGHTY FORM FACE PANEL is made plastic laminated water proof plywood which leaves fine concrete surface and
almost no need cleaning by merely using a small amount of form oil. This face panel has strong durability that can be used
more than 100 times It can be simply repaired damaged parts such as scratches or broken holes and use economically by
replacing of worn face panel easily.
-
7/17/2019 English
11/60
11
HOUSING & BUILDINGS
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Banpo-dong, Seocho-gu, Seoul
: Apartment Redevelopment Construction in Banpo District
: Reconstruction Union of Banpo District
: GS E&C Co.,Ltd
: Gamro Construction Co.,Ltd
: September 2007
-
7/17/2019 English
12/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
12
: Jung-dong Giheung-gu Yongin-si, Gyeonggi-do
: Construction of Dongbaek Apartment Industrial Facilities in Yongin
: -
: Daewoo E&C Co.,Ltd
: Bogwang geoneop(Construction) Co.,Ltd
: April 2009
HOUSING & BUILDINGS
FINE MIGHTY WALL & COLUMN FORM SYSTEM use the same panel and accessories as concrete wall form and column
form and can be formed just by replacing a clamp. It is a real economical system by being use with no double materials
and higher compatibility of making various size of columns by adjusting at 50mm intervals according to the size of columns.
-
7/17/2019 English
13/60
13
HOUSING & BUILDINGS
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Bang bae-dong, Seocho-gu, Seoul
: Redevelopment Construction of Seoriful Apartment in Bangbae
: Reconstruction Union of Bangbae Seoriful
: Daelim Industrial Co.,Ltd
: Kwangyoung Development Co.,Ltd
: March 2008
-
7/17/2019 English
14/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Yangji-ri Onam-eup Namnyangju, gyeonggi
: Construction of Yangji e-pyeonhansesang in Namyangju
: Cel Group Co.,Ltd
: Daelim Industrial Co.,Ltd
: Kwangyoung Development Co.,Ltd
: August 2007
14
HOUSING & BUILDINGS
FINE TABLE FORM SYSTEM is a system that moves the slab form promptly by assembling in a large size and using a Table
lift truck without disassembling the form after placing concrete. FINE DROP HEAD SLAB FORM SYSTEM can be effective
saving materials by disassembling slab panel and girders in early stage leaving the supports only.
-
7/17/2019 English
15/60
15
HOUSING & BUILDINGS
FINE GREEN BOARD is made plastic laminated on both side of waterproof plywood and put plastic bumper on sides,
which leaves fine concrete surface and long last. FINE TIMBER STEEL BEAM consisting of plastic laminated timber on steel
frame is durability, light weight and long last.
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Yangchon-myeon, Kimpo-si, Kyunggi-do
: Construction of Yangchon EZEN Apartment Industrial Facilities in Gimpo
: NS EZEN Co.,Ltd
: Sungjee Construction Co.,Ltd
: Chunghaejin Construction Co.,Ltd
: September 2007
-
7/17/2019 English
16/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Gampo-eup Gyeongju-si, Gyeongbuk
: Construction of the Second Nuclear Power Plant in Sinwolseong
: Korea Hydro Nuclear Power
: Construction Division of Samsung C&T Co.,Ltd
: V.S.L Korea Co.,Ltd
: August 2008
16
POWER PLANT INDUSTRIAL PLANTS
FINE MIGHTY WALL FORM SYSTEM can be used curved concrete wall simply composed by inserting the standardized
hinge panels.
-
7/17/2019 English
17/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Songsan-myeon Dangjin-gun, Chungnam
: Construction of Hyundai Green Power, Steel Thermal Power Station
: Hyundai Green Power
: Amco Co.,Ltd
: Jinol Construction Co.,Ltd
: October 2008
17
POWER PLANT INDUSTRIAL PLANTS
FINE MIGHTY COLUMN FORM SYSTEM can complete panel assembly by clamping a few panel clamps at each corners
without using form-ties and even tal l columns higher than 6 meters can constructed promptly with a small number of
workers. This is a certif ied product for economical feasibility by the super ior surface of concrete which is no need another
finishing works.
-
7/17/2019 English
18/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
18
: Songsan-myeon Dangjin-gun, Chungnam
: Construction of Hyundai Steel, Integrated Steel Mill Plate Factory
: Hyundai Steel
: Amco Co.,Ltd
: Nanjing ENG Civil Engineering Co.,Ltd
: December 2007
INDUSTRIAL PLANTS
-
7/17/2019 English
19/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Miam-ri Jeungpyeong-eup, Chungbuk
: Construction of Jeungpyeong Industrial Park
: Korea Land and Housing Corporation, LH
: Poonglim Industry Co.,Ltd
: Yeonil Construction Co.,Ltd
: June 2009
19
INDUSTRIAL PLANTS
-
7/17/2019 English
20/60
FINE CLIMBING SYSTEM is the suitable system for the single faced wall form which can not use form-ties such as wall
construction of DAM and DOCKS. This system can be used high concrete wall form works promptly and safely.
In addition, it can be used slope wall conveniently by adjusting the angle of form panel and working deck freely.
20
DAM & DOCKS
-
7/17/2019 English
21/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Samhoeup Yeongamgun, Jeonnam
: Construction of Hyundai Samho Heavy Industries Co.,Ltd, Mokpo Ship Building #2 Dock
: Hyundai Samho Heavy Industries Co.,Ltd
: Halla Construction Co.,Ltd
: Jaehyung Construction Co.,Ltd
: November 2008
FINE SOLDIER SYSTEM is possible to assemble to various heights and has the strong body. It is the system suitable for
the large wall construction that is possible for concrete placing up to 6m height maximum at once. Furthermore this system
can be placing concrete without form-ties which shorten construction period and keep superior surface quality with safety.
21
DAM & DOCKS
-
7/17/2019 English
22/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Hwawon-myeon Haenam-gun, Jeonnam
: Extension Work of Haenam Daehan Ship Building #2 DOCK
: Daehan Ship Building
: Daeju Construction Co.,Ltd
: JST Construction Co.,Ltd
: December 2008
22
DAM & DOCKS
FINE CLIMBING SYSTEM is a multi system with a simple and solid structure easy to assemble and disassemble and can
be used together with MIGHTY FORM and UNI-WALL FORM SYSTEM by just replacing of some assembled parts and
especially can be easily used with other foreign systems.
-
7/17/2019 English
23/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Hongnongeup Yeonggwang-gun, Jeonnam
: Construction of TKS Yeonggwang Ship Building Dock
: TKS Yeonggwang Ship Building
: Gumgwang Engineering & Cosntruction Co.,Ltd
: Gongyeong Civil Engineering Co.,Ltd
: September 2008
23
DAM & DOCKS
FINE SOLDIER SYSTEM has a combination structure and can be assembled as 3.0m, 3.6m, 4.2m, 4.8m, 5.4m and 6.0m
based on the concrete placing height. It can be used together with MIGHTY-6 & MIGHTY12 form panel and Uni Wall Form
system just by replacement of some assembled parts and can be easily used with other foreign systems.
-
7/17/2019 English
24/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Miho-dong Daedeok-gu Daejeon-si
: Emergency Spillway Construction of Daecheong Dam
: Korea Water Resource Corporation
: Construction Division of Samsung C&T Co.,Ltd
: Gusan Construction Co.,Ltd
: April 2010
24
DAM & DOCKS
-
7/17/2019 English
25/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Seongbuk-dong Ganseo-gu, Busan
: Construction Work of Pusan Newport for Exterior Shore Protection
: Busan Port Authority
: Construction Division of Samsung C&T Co.,Ltd
: Nanjing ENG Civil Engineering Co.,Ltd
: July 2008
25
CANAL & HARBORS
-
7/17/2019 English
26/60
26
CANAL & HARBORS
FINE MIGHTY WALL FORM SYSTEM is equipped with Form support, Waller, Working deck, Ladders, Crane hook etc.
accessories to use conveniently for various concrete construction.
In case of the climbing wall form like exterior wall of building, it can be used easily and safely by adding Kicker panel and
Working deck system without Install ing scaffo lding.
-
7/17/2019 English
27/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Oryudong Seogu Incheon-si
: Construction of Kyungin Canal, Ara waterway Area 1
: Korea Water Resource Corporation
: Hyundai Engineering & Construction Co.,Ltd
: Seohyun Constech Co.,Ltd
: February 2010
27
CANAL & HARBORS
-
7/17/2019 English
28/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
28
: Iksansi, Jeonbuk
: Double Track Railway Construction from Jeonlla Iksan to Sinrigan
: Korea Rail Network Authority
: Ssangyong Engineering & Construction Co.,Ltd
: Jinsung Civil Engineering Co.,Ltd
: October 2008
RAILWAY & TUNNELS
FINE UNI-FORM SYSTEM shows excellent effect in constructing bridge of road and railway, which shorten construction
period and keep high quality with safety.
-
7/17/2019 English
29/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Daehwadong Goyangsi, Gyeonggido
: Construction of Local Road Route 357 Daehwa Underground Driveway
: Seoul Regional Construction Management Office
: Hanshin Engineering Construction Co.,Ltd
: Jinsung Civil Engineering Co.,Ltd
: August 2009
29
RAILWAY & TUNNELS
-
7/17/2019 English
30/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
30
: Changwon-si, Gyeoongnam
: Roadbed Construction Area 4 of Gyeongjeon line and Track Railway
: Korea Rail network Authority
: Hyundai Engineering and Construction Co.,Ltd
: Juil Construction Co.,Ltd
: June 2009
RAILWAY & TUNNELS
FINE MIGHTY TUNNEL FORM which used in construction of box type form such as underground roadways, power cable
and water canals can be composed basically with standard of FINE MIGHTY WALL FORM SYSTEM and FMP-60 PROP
SYSTEM with adding Hinge type hunch panel and movable wheel system
-
7/17/2019 English
31/60
Site Location
The construction Name
Ordering Organization
Constructor
Subcontractor
Delivery Date
: Gimpo-si, Kyunggi
: Construction of Power Supply Facility around Gimpo
: Korea Electric Power Corporation
: Namkwang Engineering & Construction Co.,Ltd
: Heungyang Co.,Ltd
: May 2010
31
RAILWAY & TUNNELS
-
7/17/2019 English
32/60
-
7/17/2019 English
33/60
PRODUCTS
FINE MIGHTY 6 & 12 WALL and COLUMN FORMWORKS
SOLDIER SYSTEM for SINGLE FACE FORMWORKS
CLIMBING BRACKET SYSTEM for WALL FORMWORKS
FMP60 MULTI PROP SYSTEM
FINE-UNI SLAB FORM SYSTEM
-
7/17/2019 English
34/60
34
Economic Formwork Systems
for Wall and Column Formworks
FINE MIGHTY-6 FORM PANEL SERIES
Light weight panels fo High rise buildings and Housings.
FINE MIGHTY-12 FORM PANEL SERIESHeavy duty panels for Heavy duty concrete formworks such as Power plants, Dams, Docks, Industrial plants.
QUICK & SIMPLE FORMWORKS
Used only hammer for panel clamping. Provided patent form tie system for quick works.
VARIOUS FORMWORKS ACCESSORIES
Provied Form supports, Working decks, Ladders, Wallers, Crane hook & Etc.
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
35/60
35
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
36/60
36
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
37/60
37
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
38/60
38
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
39/60
39
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
40/60
40
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
41/60
41
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
42/60
42
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
43/60
43
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
44/60
44
FINE MIGHTY WALL and COLUMN FORM
-
7/17/2019 English
45/60
45
FINE SOLDIER SYSTEM that can be assembled
in various heights and has a solid structure
Possible to Pile up concrete to a maximum maximum height of 6m at once
Possible to pile up concrete wall to a maximum height of 6m at once without form tie
Assembly structure that is possible to install in various heights according to placing heightPossible to assemble as 3.0m, 3.6m, 4.2m, 4.8m, 5.4m, 6.0m according to concrete placing height
Possible to be used for various form panels
It is not only possible to use with Mighty-6 & Mighty-12 form panel system and Uni-wall system by replacement of minor parts but
also assemble with panels of other systems.
SOLDIER SYSTEM for SINGLE FACE FORMWORKS
-
7/17/2019 English
46/60
46
SOLDIER SYSTEM for SINGLE FACE FORMWORKS
-
7/17/2019 English
47/60
47
FINE CLIMBING SYSTEM that can be simply assembled
and dissembled in a simple and strong structure
The ultimate product for the construction of high composite wall concrete structure
Guaranteed high performance of construction of a high concrete retaining wall such as Dam and Dock without form ties.
Concrete wall on a slope can be constructed quite freelyGuaranteed high performance of concrete wall on a slope by simply adjusting of Form panel and Working deck freely.
Possible to use with various form panels
Possible to use with Mighty-6 & Mighty-12 form panel system and Uni-wall system by replacement of minor parts and also
compatible with panels of other systems.
CLIMBING BRACKETS for HIGH RISE WALL FORMS
-
7/17/2019 English
48/60
48
CLIMBING BRACKETS for HIGH RISE WALL FORMS
-
7/17/2019 English
49/60
49
CLIMBING BRACKETS for HIGH RISE WALL FORMS
-
7/17/2019 English
50/60
50
CLIMBING BRACKETS for HIGH RISE WALL FORMS
-
7/17/2019 English
51/60
51
FINE MULTI PROP SYSTEM that is designed to
be used for various purposes
Various uses
Multipurpose Prop system that can be used for various purposes such as Support, System support, Table form understructure,
Drop head slab system and Working tower
Unique connection structure of Main post and Horizontal bracing
It is convenient as the connector that connects Post and Horizontal bracing is prefabricated in order to install the Horizontal
bracing at the desired height of Main post
Monolithic construction of Post and Jack screw
When you move and recover the assembled system support, it is convenient as a special device is built for not to separate the
post and jack screw
-FMP60- FINE MULTI PROP SYSTEM
-
7/17/2019 English
52/60
52
-FMP60- FINE MULTI PROP SYSTEM
-
7/17/2019 English
53/60
53
-FMP60- FINE MULTI PROP SYSTEM
-
7/17/2019 English
54/60
54
FINE UNI-SLAB FORM SYSTEM
that is designed to construct quickly and safely
TABLE FORM SYSTEM
Designed to move the assembled Slab Form of large size by Table Lift Truck without disassembling the form after placing
concrete
DROP HEAD SYSTEM
Designed to shorten construction period by dissembling the Slab Form early leaving Supports only by using Drop Head.
FINE GREEN BOARD & TIMBER STEEL BEAM
Fine green board can be used for a long time by laminating Plastic Sheet on both sides of waterproof plywood and putting Plastic
Bumper on the edges.
Timber steel beam made of timber on steel frame is lightweight and durable to perform high constructabil ity.
FINE UNI-SLAB FORMWORK SYSTEM
-
7/17/2019 English
55/60
55
FINE UNI-SLAB FORMWORK SYSTEM
-
7/17/2019 English
56/60
56
FINE UNI-SLAB FORMWORK SYSTEM
-
7/17/2019 English
57/60
57
FINE UNI-SLAB FORMWORK SYSTEM
-
7/17/2019 English
58/60
58
FINE UNI-SLAB FORMWORK SYSTEM
-
7/17/2019 English
59/60
59
FINE UNI-SLAB FORMWORK SYSTEM
-
7/17/2019 English
60/60
FINE FORM CO.,LTD
HEAD OFFICE410-142 ORYU-DONG SEO-GU INCHEON
TEL : 82-32-564-1862 FAX : 82-32-568-6559