CONCEPT APPROVAL NORTHERN ARIZONA UNIVERSITY (NAU) APPROVES THESE PLANS FOR CONCEPT ONLY. ALL LIABILITY FOR ERRORS OR OMISSIONS IS THE RESPONSIBILITY OF THE DESIGN ENGINEER.
AutoCAD SHX Text
AUTHORIZATION TO CONSTRUCT THE SIGNATURES ABOVE ARE REQUIRED BEFORE THE CONTRACTOR CAN COMMENCE. UNSIGNED, THESE PLANS HAVE NOT BEEN COMPLETED WITH RESPECT TO AGENCY REVIEW AND APPROVAL.
AutoCAD SHX Text
ENGINEER WOODSON ENGINEERING AND SURVEYING, INC. 124 N. ELDEN ST. FLAGSTAFF, AZ 86001 (928) 774-4636
AutoCAD SHX Text
OWNER NORTHERN ARIZONA UNIVERSITY 501 EAST PINE KNOLL DRIVE FLAGSTAFF, AZ 86011 (928) 523-4468
AutoCAD SHX Text
SHEET 1 OF 5
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
%%u VICINITY MAP
AutoCAD SHX Text
PROPOSED SIGN POST
AutoCAD SHX Text
6P
AutoCAD SHX Text
S
AutoCAD SHX Text
FOUND MONUMENT AS NOTED
AutoCAD SHX Text
FOUND REBAR AS NOTED
AutoCAD SHX Text
FOUND RIGHT-OF-WAY MONUMENT AS NOTED
AutoCAD SHX Text
AND P=PINE, J=JUNIPER, D=DECIDUOUS)
AutoCAD SHX Text
FOUND SECTION CORNER AS NOTED
AutoCAD SHX Text
EXISTING TREE TO REMAIN (DIAMETER
AutoCAD SHX Text
EXISTING UTILITY POLE
AutoCAD SHX Text
EXISTING ELECTRIC METER
AutoCAD SHX Text
EXISTING FIRE HYDRANT
AutoCAD SHX Text
EXISTING CATCH BASIN
AutoCAD SHX Text
EXISTING SANITARY SEWER MANHOLE
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
EXISTING FIBER OPTIC LINE
AutoCAD SHX Text
EXISTING STORM DRAIN
AutoCAD SHX Text
EXISTING OVERHEAD ELECTRIC LINE
AutoCAD SHX Text
EXISTING UNDERGROUND ELECTRIC LINE
AutoCAD SHX Text
EXISTING CABLE TV LINE
AutoCAD SHX Text
EXISTING GAS LINE
AutoCAD SHX Text
EXISTING TELEPHONE LINE
AutoCAD SHX Text
EXISTING SANITARY SEWER LINE
AutoCAD SHX Text
EXISTING RECLAIMED WATER LINE
AutoCAD SHX Text
%%u LEGEND
AutoCAD SHX Text
N
AutoCAD SHX Text
EXISTING PAVEMENT
AutoCAD SHX Text
EXISTING STRUCTURE
AutoCAD SHX Text
EXISTING CONCRETE
AutoCAD SHX Text
PROPOSED PAVEMENT
AutoCAD SHX Text
PROPOSED CONCRETE
AutoCAD SHX Text
FOUND PIPE AS NOTED
AutoCAD SHX Text
FOUND PANEL AS NOTED
AutoCAD SHX Text
FOUND NAIL AS NOTED
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
124 N. ELDEN ST. FLAGSTAFF, AZ 86001 PHONE: (928) 774-4636 FAX: (928) 774-4646
AutoCAD SHX Text
WOODSON ENGINEERING AND SURVEYING, INC.
AutoCAD SHX Text
DRAFTED BY:
AutoCAD SHX Text
FN:
AutoCAD SHX Text
5/20/20
AutoCAD SHX Text
120776
AutoCAD SHX Text
NORTHERN ARIZONA UNIVERSITY
AutoCAD SHX Text
2020 STREETS PAVEMENT MAINTENANCE
AutoCAD SHX Text
CONSTRUCTION PLANS
AutoCAD SHX Text
JBG
AutoCAD SHX Text
5/20/20
AutoCAD SHX Text
120776
AutoCAD SHX Text
01_COVER
AutoCAD SHX Text
A guide to getting underground facilities located before you digbefore you dig you dig
AutoCAD SHX Text
Know what's below. below. . Call before you dig.before you dig.
AutoCAD SHX Text
Call 811 or visit www.Arizona811.com
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1" = 600'
AutoCAD SHX Text
300
AutoCAD SHX Text
600
AutoCAD SHX Text
1200
AutoCAD SHX Text
N
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
I-40
AutoCAD SHX Text
I-17
AutoCAD SHX Text
I-40
AutoCAD SHX Text
MILTON RD
AutoCAD SHX Text
BUTLER AVE
AutoCAD SHX Text
MOUNTAIN VIEW DR
AutoCAD SHX Text
FRANKLIN AVE
AutoCAD SHX Text
LONETREE RD
AutoCAD SHX Text
SAN FRANCISCO ST
AutoCAD SHX Text
PINE KNOLL DR
AutoCAD SHX Text
MCCONNELL DR
AutoCAD SHX Text
MILTON RD
AutoCAD SHX Text
UNIVERSITY DR
AutoCAD SHX Text
KNOLES DR
AutoCAD SHX Text
ROUTE 66
AutoCAD SHX Text
UNIVERSITY DR
AutoCAD SHX Text
RIORDAN RD
AutoCAD SHX Text
EXISTING WATER LINE
AutoCAD SHX Text
EXISTING TUNNEL
AutoCAD SHX Text
(FOR UNDERGROUND UTILITIES)
AutoCAD SHX Text
NORTHERN ARIZONA UNIVERSITY
AutoCAD SHX Text
CONSTRUCTION PLANS
AutoCAD SHX Text
A PROPOSED IMPROVEMENT IN SECTIONS 21 AND 28, TOWNSHIP 21 NORTH, RANGE 7 EAST, GILA AND SALT RIVER BASE AND MERIDIAN, COCONINO COUNTY, ARIZONA
AutoCAD SHX Text
2020 STREETS PAVEMENT MAINTENANCE
AutoCAD SHX Text
JANES
AutoCAD SHX Text
MICHAEL S.
AutoCAD SHX Text
49111
·
WOODSON
E N G I N E E R I N G & S U R V E Y I N G1 2 4 N E L D E N S T , F L A G S T A F F , A Z 8 6 0 0 1
(928) 774-4636 | WWW.WOODSONENG.COM
HUFFER LANE IMPROVEMENTS
ROTC IMPROVEMENTS
AutoCAD SHX Text
THE CONTRACTOR SHALL BE RESPONSIBLE FOR RETAINING A REGISTERED LAND SURVEYOR, LICENSED TO PRACTICE IN ARIZONA WHO SHALL BE RESPONSIBLE FOR PROVIDING ALL STAKES NECESSARY TO ESTABLISH CONSTRUCTION LINES AND GRADES. STAKES PROVIDED SHALL BE OF SUFFICIENT NUMBER TO SATISFY THE ENGINEER THAT THE WORK MAY BE CONSTRUCTED IN ACCORDANCE WITH THE PLANS. ALL COSTS ASSOCIATED WITH STAKING ARE TO BE BORNE BY THE CONTRACTOR. NO ADDITIONAL PAYMENT TO THE CONTRACTOR FOR EXTRA STAKES OR FOR RESTAKING WILL BE ALLOWED.
AutoCAD SHX Text
THE WORK SHALL BE DONE IN ACCORDANCE WITH THE MOST CURRENT EDITION(S) OF THE FOLLOWING SPECIFICATIONS AND THESE PLANS: NAU TECHNICAL STANDARDS, MAG UNIFORM MAG UNIFORM STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, MAG UNIFORM STANDARD DETAILS FOR PUBLIC WORKS CONSTRUCTION, CITY OF FLAGSTAFF ENGINEERING DESIGN AND CONSTRUCTION STANDARDS, ADHS (ADEQ) ENGINEERING BULLETINS NO. 8 AND 10 AND ARIZONA ADMINISTRATIVE CODE R18-4 (WATER SYSTEMS), ARIZONA ADMINISTRATIVE CODE R18-9-E301 (SEWAGE WORKS), AWWA STANDARDS, MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND ADOT STANDARD SPECIFICATIONS AND DRAWINGS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN COPIES OF THE ABOVE STANDARDS, SPECIFICATIONS, AND DETAILS, AS WELL AS ALL OTHER STANDARDS AND SPECIFICATIONS WHICH MAY BE NECESSARY TO COMPLETELY AND ACCURATELY INTERPRET THESE PLANS. ALL QUANTITIES SHOWN ARE APPROXIMATE AND ARE FURNISHED SOLELY FOR THE CONTRACTOR'S CONVENIENCE. THEY DO NOT NECESSARILY CORRESPOND TO BID SCHEDULE ITEMS. PAYMENT WILL BE BASED ON BID SCHEDULE ITEMS FOR THE ENTIRE JOB AS SHOWN OR INFERRED BY THESE PLANS. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR INDEPENDENTLY ESTIMATING QUANTITIES PRIOR TO BIDDING. THE LOCATION OF EXISTING FEATURES INDICATED ON THE PLANS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR MAKING COMPLETE AND ACCURATE ON-SITE DETERMINATIONS OF THE LOCATIONS OF ALL UTILITIES, STRUCTURES AND FIELD CONDITIONS, WHICH MAY AFFECT THE PROGRESS OF THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING WHAT PERMITS WILL BE REQUIRED FOR THE WORK AND OBTAINING AT HIS OWN EXPENSE ALL PERMITS REQUIRED UNLESS STATED OTHERWISE IN THE CONTRACT. CERTIFICATION OF PRIVATE/NON-BUILDING STRUCTURES MAY BE REQUIRED BY THE CITY OF FLAGSTAFF. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ANY REQUIRED CERTIFICATIONS. ALL ELEVATIONS SHOWN ON THE PLANS ARE FINISHED SURFACE ELEVATIONS (EXCEPT AS NOTED). THE REGISTRANTS DUTY TO SEAL PROFESSIONAL DOCUMENTS DOES NOT EXTEND TO STANDARD DETAILS OR SPECIFICATIONS THAT HAVE BEEN OFFICIALLY ADOPTED AND PROVIDED BY THE AGENCY THAT HAS JURISDICTION OVER THIS PROJECT. THE STANDARD DETAILS AND SPECIFICATIONS SHOWN WITH THESE DOCUMENTS ARE INCLUDED TO PROVIDE CLEAR AND COMPLETE INFORMATION AND WERE NOT PREPARED BY THE REGISTRANT.
AutoCAD SHX Text
ADEQUATE DRAINAGE, EROSION AND SEDIMENT CONTROL MEASURES, BEST MANAGEMENT PRACTICES, AND-OR OTHER STORMWATER MANAGEMENT FACILITIES SHALL BE PROVIDED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION. DAMAGES TO ADJACENT PROPERTY AND/OR THE CONSTRUCTION SITE CAUSED BY THE CONTRACTOR'S OR PROPERTY OWNER'S FAILURE TO PROVIDE AND MAINTAIN ADEQUATE DRAINAGE AND EROSION/SEDIMENT CONTROL FOR THE CONSTRUCTION AREA SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND/OR PROPERTY OWNER. CONSTRUCTION DRAINS SHALL BE PROVIDED AS NEEDED TO ENABLE WATER TO DRAIN FROM THE CONSTRUCTION AREA RAPIDLY AND WITHOUT DAMAGING THE WORK IN PROGRESS. TO FURTHER PROMOTE GOOD DRAINAGE OF THE SITE, DRAINAGE CHANNELS, CULVERTS, AND STRUCTURES, SHALL BE CONSTRUCTED FROM DOWNSTREAM TO UPSTREAM IN SUCH A WAY THAT, DURING CONSTRUCTION, THEY DO NOT IMPEDE THE FLOW OF WATER FROM THE CONSTRUCTION AREA. NO EXTENSION OF TIME SHALL BE GRANTED ON ACCOUNT OF THE TIME REQUIRED TO MAKE SUCH REPAIRS.
AutoCAD SHX Text
THE CONTRACTOR IS RESPONSIBLE FOR STABILIZATION OF SOILS AND PREVENTION OF EROSION DURING CONSTRUCTION. WHERE SLOPE STABILIZATION REQUIRES THE ESTABLISHMENT OF PLANTS, EROSION PROTECTION SHALL REMAIN IN PLACE UNTIL PLANTS ARE ESTABLISHED TO THE SATISFACTION OF THE OWNER AND THE APPROVING AGENCY.
AutoCAD SHX Text
THE ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATES STORM WATER DISCHARGES FROM CONSTRUCTION SITES UNDER THE NATIONAL STORM WATER PROGRAM. THE PROJECT OWNER AND THE CONSTRUCTION CONTRACTOR SHARE RESPONSIBILITY AND LIABILITY UNDER THIS PROGRAM. ACTIVITIES COVERED UNDER THIS PROGRAM INCLUDE CLEARING, GRADING, AND EXCAVATION. PROJECTS THAT ARE INCLUDED HAVE DISTURBED AREAS WITH MORE THAN 1 ACRES. UNDER NPDES THE CONTRACTOR MUST PREVENT POLLUTANTS FROM THE SITE FROM ENTERING WATERS OF THE US. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL EROSION AND RUNOFF FROM A CONSTRUCTION SITE. TO COMPLY WITH REGULATIONS, THE CONTRACTOR MUST FILE A NOTICE OF INTENT TO DISCHARGE (NOI) 2 DAYS BEFORE CONSTRUCTION BEGINS. A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) MUST BE DEVELOPED BY BOTH THE OWNER AND THE CONTRACTOR AS PART OF COMPLIANCE WITH THESE REGULATIONS. THE OWNER AND THE CONTRACTOR MUST ALSO IMPLEMENT THE SWPPP. DURING CONSTRUCTION, BOTH THE OWNER AND THE CONTRACTOR MUST CERTIFY THAT ALL WORK PERFORMED IS PER NPDES REGULATIONS. AFTER CONSTRUCTION IS COMPLETE, THE OWNER AND THE CONTRACTOR MUST FILE A NOTICE OF TERMINATION. ALL WORK DESCRIBED ABOVE MUST BE PERFORMED IN ACCORDANCE WITH NPDES AND THE NATIONAL STORM WATER PROGRAM REGULATIONS.
AutoCAD SHX Text
ALL PAVEMENT STRIPING SHALL CONFORM TO THE APPLICABLE ADOT SPECIFICATIONS FOR PAINT. ALL PARKING STALL STRIPING SHALL BE 4" WIDE, WHITE PAINT, TREATED FOR REFLECTIVITY. ALL STRIPING SHALL BE IN CONFORMANCE WITH THE MANUAL ON UNIFORM MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION., LATEST EDITION.
AutoCAD SHX Text
THROUGHOUT ALL PHASES OF THE CONSTRUCTION THE CONTRACTOR SHALL KEEP THE WORK AREA, ADJACENT PROPERTIES AND STREETS CLEAN AND FREE FROM RUBBISH, EXCESS MATERIALS, DUST AND DEBRIS GENERATED BY THE CONSTRUCTION ACTIVITY.
AutoCAD SHX Text
THE CONTRACTOR SHALL MAKE ARRANGEMENTS FOR AND PROVIDE ALL NECESSARY WATER FOR HIS CONSTRUCTION OPERATION AT HIS OWN EXPENSE.
AutoCAD SHX Text
REMOVALS NECESSITATED BY THE WORK AS IT PROGRESSES AND NOT SPECIFICALLY CALLED OUT ON THE PLANS WILL BE CONSIDERED INCIDENTAL WORK.
AutoCAD SHX Text
UNDERGROUND UTILITY LOCATIONS SHOWN ON THESE PLANS WERE DETERMINED FROM FIELD MEASUREMENTS, CONSTRUCTION PLANS, RECORD PLANS, UTILITY MAPS, GIS MAPPING FURNISHED BY OTHERS. LOCATIONS OF UNDERGROUND UTILITIES ARE TO BE REGARDED AS APPROXIMATE ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ESTABLISH IN THE FIELD THE ACTUAL LOCATIONS OF ALL UNDERGROUND LINES WHICH MAY IN ANY WAY AFFECT THE WORK. IT IS NOT WITHIN THE SCOPE OF THE PLANS FOR THE ENGINEER TO LOCATE, IDENTIFY OR FORESEE EVERY UTILITY CONFLICT WHICH MAY ARISE DURING THE CONSTRUCTION PHASE OF THE PROJECT. BUT IT IS THE INTENT OF THE OWNER TO REASONABLY COMPENSATE THE CONTRACTOR FOR THE WORK REQUIRED TO RELOCATE OR ADJUST UTILITIES CONFLICTING WITH THE CONSTRUCTION OF THE PROJECT. TO THAT END, UTILITIES (AS DEFINED IN MAG 101.2) WHICH ARE ENCOUNTERED WILL BE ADDRESSED AS FOLLOWS: 1) UTILITY RELOCATIONS OR ADJUSTMENTS NOTED ON THE PLANS SHALL BE PAID FOR PER THE BID SCHEDULE. 2) UTILITY RELOCATIONS OR ADJUSTMENTS NOT NOTED ON THE PLANS SHALL BE ADDRESSED ON A CASE BY CASE BASIS. THE ENGINEER SHALL DETERMINE WHAT WORK IS REQUIRED TO PRODUCE THE DESIRED FINAL PRODUCT. IF A UNIT BID PRICE DOES NOT EXIST THEN COMPENSATION MUTUALLY ACCEPTABLE TO THE OWNER, CONTRACTOR, AND ENGINEER SHALL BE MADE. IN EITHER SITUATION, WORK ON THE SPECIFIC CASE SHALL NOT PROCEED UNTIL THE AMOUNT OF COMPENSATION IS AGREED UPON. COMPENSATION FOR UTILITY RELOCATIONS AND ADJUSTMENTS SHALL NOT INCLUDE COSTS FOR REPAIR TO THE UTILITY DAMAGED BY THE CONTRACTOR OR HIS SUBCONTRACTOR(S). THE CONTRACTOR IS NOT RELIEVED OF THE RESPONSIBILITY FOR DETERMINING THE LOCATION OF ALL UTILITIES AFFECTING THE WORK. THE APPROPRIATE UTILITY COMPANIES SHALL BE NOTIFIED BY THE CONTRACTOR PRIOR TO ANY CONSTRUCTION. THE "BLUE STAKE" NUMBER IS 1-800-STAKEIT. CONTRACTOR SHALL ALLOW TWO WORKING DAYS AFTER "BLUE STAKE" IS NOTIFIED, BEFORE COMMENCING ANY EXCAVATION WORK IN THE PROXIMITY OF BURIED UTILITIES. AT LEAST 48 HOURS PRIOR NOTICE IS REQUIRED BEFORE DISRUPTING EXISTING UTILITY SERVICE TO MAKE CONNECTIONS OR DISCONNECTIONS. THE NOTICE MUST INCLUDE THE EXACT TIME OF THE DISRUPTION OF SERVICE AND THE EXPECTED DURATION OF THE LOSS OF SERVICE. CERTAIN UTILITIES ARE TO REMAIN IN SERVICE DURING THE CONSTRUCTION OF THE FILL AND UPON COMPLETION OF THE CONTRACT. THESE UTILITIES SHALL BE PROTECTED DURING THE CONSTRUCTION AND CUT OR FILL PLACEMENT SHALL NOT PROHIBIT MAINTENANCE ACCESS TO THESE UTILITIES.
AutoCAD SHX Text
WOODSON ENGINEERING GENERAL NOTES
AutoCAD SHX Text
CONSTRUCTION STAKES, LINES AND GRADES
AutoCAD SHX Text
UTILITIES
AutoCAD SHX Text
DRAINAGE MAINTENANCE DURING CONSTRUCTION
AutoCAD SHX Text
MISCELLANEOUS REMOVALS AND OTHER WORK
AutoCAD SHX Text
WATER SUPPLY
AutoCAD SHX Text
CLEANUP AND DUST CONTROL
AutoCAD SHX Text
GENERAL STRIPING NOTES
AutoCAD SHX Text
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTE
AutoCAD SHX Text
EROSION PROTECTION
AutoCAD SHX Text
%%UGENERAL CONSTRUCTION NOTES
AutoCAD SHX Text
1. NEITHER THE OWNER, THE ENGINEER, NOR ANY PUBLIC AGENCY WILL ENFORCE NEITHER THE OWNER, THE ENGINEER, NOR ANY PUBLIC AGENCY WILL ENFORCE SAFETY MEASURES OR REGULATIONS. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL LAWS AND REGULATIONS. 2. THE CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AND LOCATE EXISTING THE CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AND LOCATE EXISTING UNDERGROUND FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISION TO PLANS, IF REVISIONS ARE NECESSARY DUE TO ACTUAL LOCATIONS OF EXISTING FACILITIES. THE CONTRACTOR IS REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN HEREON, AND ANY OTHER EXISTING LINES NOT OF RECORD, OR NOT SHOWN ON THESE PLANS. 3. PRIOR TO EXCAVATING FOR THIS CONTRACT, VERIFY DEPTH AND LOCATION OF ALL PRIOR TO EXCAVATING FOR THIS CONTRACT, VERIFY DEPTH AND LOCATION OF ALL EXISTING UTILITIES. LOCATION OF UTILITIES SHOWN HEREON HAS BEEN DETERMINED BY A SEARCH OF AVAILABLE RECORDS. ALL EXISTING UTILITIES MAY OR MAY NOT BE SHOWN ON THE PLANS. CONTACT: NAU BLUE STAKE (928) 523-4227 (928) 523-4227 BLUE STAKE 1-800-STAKE IT 1-800-STAKE IT ARIZONA PUBLIC SERVICE (928) 773-6414 (928) 773-6414 CENTURYLINK (928) 779-4773 (928) 779-4773 SUDDENLINK (928) 779-3661 (928) 779-3661 AT&T (714) 963-7964 (714) 963-7964 UNISOURCE (928) 226-2214 (928) 226-2214 4. THE CONTRACTOR SHALL AT THEIR OWN COST AND EXPENSE PROVIDE NECESSARY THE CONTRACTOR SHALL AT THEIR OWN COST AND EXPENSE PROVIDE NECESSARY PERMITS, COMPLY WITH LOCAL ORDINANCES AND REGULATIONS, AND CONFORM TO ALL ZONING ORDINANCES AND COVENANTS GOVERNING THE PROJECT LOCATION. THE CONTRACTOR AT THEIR OWN COST AND EXPENSE SHALL BE RESPONSIBLE FOR THE ACQUISITION OF ANY NECESSARY EASEMENTS FOR CONSTRUCTION PURPOSES. 5. THE CONTRACTOR SHALL MAINTAIN AND CONTINUALLY UPDATE A COMPLETE SET OF THE CONTRACTOR SHALL MAINTAIN AND CONTINUALLY UPDATE A COMPLETE SET OF "AS-BUILT" PLANS ON THE PROJECT. SAID PLANS SHALL BE MADE AVAILABLE TO THE OWNER AND/OR ENGINEER FOR REVIEW UPON REQUEST AS THE WORK PROGRESSES. IN ADDITION TO ALL CHANGES AND MODIFICATIONS TO THE WORK UNDER THIS PROJECT, SAID AS-BUILTS SHALL CONTAIN LOCATION AND ELEVATION OF ALL EXISTING UTILITIES FOUND DURING CONSTRUCTION. A COMPLETE SET OF "AS-BUILT" PLANS SHALL BE SUBMITTED TO THE OWNER UPON COMPLETION AND PRIOR TO ACCEPTANCE OF THE WORK. 6. THE CONTRACTOR SHALL SUBMIT TO OWNER FOR APPROVAL ALL SHOP DRAWINGS, THE CONTRACTOR SHALL SUBMIT TO OWNER FOR APPROVAL ALL SHOP DRAWINGS, AGGREGATE GRADATIONS, MIX DESIGNS, ETC., AS APPROPRIATE, FOR ALL MATERIALS SCHEDULED FOR USE IN THIS PROJECT. COPIES OF ALL SUBMITTALS SHALL BE MADE TO THE ENGINEER OF WORK AS WELL AS ANY REQUESTING AGENCY OF JURISDICTION. PRIOR TO INCORPORATING ANY OF THE SUBMITTED MATERIAL INTO THE WORK, APPROVAL OF OWNER, ENGINEER, AS WELL AS ANY AGENCY OF JURISDICTION IS REQUIRED. 7. ANY GRADING AND/OR SAWCUT LIMITS SHOWN ON THE PLANS SHALL BE ANY GRADING AND/OR SAWCUT LIMITS SHOWN ON THE PLANS SHALL BE CONSIDERED APPROXIMATE AND ARE SUBJECT TO ADJUSTMENTS AT THE TIME OF CONSTRUCTION. NAU WILL ATTEMPT TO WORK WITH THE CONTRACTOR IN AUTHORIZING/ASSIGNING. 8. NAU WILL ATTEMPT TO WORK WITH THE CONTRACTOR IN AUTHORIZING/ASSIGNING A NAU WILL ATTEMPT TO WORK WITH THE CONTRACTOR IN AUTHORIZING/ASSIGNING A "STAGING AREA" FOR THE CONTRACTOR'S EQUIPMENT, MATERIALS, TEMPORARY SANITARY FACILITIES, ETC .. EQUIPMENT SHALL BE PARKED WITHIN THIS DESIGNATED AREA DURING NON-WORKING HOURS. STORED MATERIALS SHALL ALSO BE STOCKPILED IN THE STAGING AREA. EQUIPMENT AND MATERIALS ARE NOT TO BE PARKED OR STORED AT THE VARIOUS WORK SITES. UPON COMPLETION OF THE PROJECT, THE STAGING AREA SHALL BE RE-GRADED, CLEANED OR OTHERWISE RE-STORED TO THE ORIGINAL OR BETTER CONDITION. 9. QUANTITIES SHOWN ON THE PLANS ARE APPROXIMATE ONLY, THE CONTRACTOR IS QUANTITIES SHOWN ON THE PLANS ARE APPROXIMATE ONLY, THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING THEIR OWN QUANTITIES PRIOR TO BIDDING. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER AND ENGINEER A MINIMUM OF FIVE (5) DAYS PRIOR TO BIDS BEING DUE. 10. THE CONTRACTOR IS RESPONSIBLE TO REMOVE ALL BLUE STAKE MARKINGS MADE AS THE CONTRACTOR IS RESPONSIBLE TO REMOVE ALL BLUE STAKE MARKINGS MADE AS PART OF THIS PROJECT ONCE IT IS 100% COMPLETE WITH UNDERGROUND OR SURFACE PENETRATING WORK.
AutoCAD SHX Text
THE CONTRACTOR SHALL COMPLY WITH ALL OF THE PROVISIONS OF THE NAU OFFICE OF REGULATORY COMPLIANCE FOR STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND AZPDES DESIGN MANUAL RELATING TO EROSION CONTROL. STORMWATER POLLUTION PREVENTION PLANS ARE REQUIRED FOR ANY LAND DISTURBING ACTIVITY BETWEEN 1 AND 5 ACRES. THE CONTRACTOR SHALL RESEED ALL DISTURBED AREA. THE WORK SHALL CONSIST OF FURNISHING, HAULING, PLACING, AND APPLYING EROSION CONTROL (SEED, MULCH, AND EROSION CONTROL BLANKETS) TO ALL DISTURBED AREAS WITHIN THE PROJECT AREAS AS SHOWN ON THE PLANS. PERMANENT OR TEMPORARY SOIL STABILIZATION SHOULD BE APPLIED TO DENUDED AREAS WITHIN FIFTEEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. SOIL STABILIZATION SHOULD ALSO BE APPLIED WITHIN FIFTEEN DAYS TO DENUDED AREAS WHICH MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN SIXTY DAYS. APPLICABLE PRACTICES INCLUDE BUT ARE NOT LIMITED TO TEMPORARY EROSION CONTROL MATERIAL, VEGETATIVE ESTABLISHMENT, MULCHING AND THE EARLY APPLICATION OF A GRAVEL BASE IN AREAS TO BE PAVED. ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. DAMAGES WHICH MAY OCCUR TO ADJACENT PROPERTY DURING CONSTRUCTION ARE THE RESPONSIBILITY OF THE PROPERTY OWNER AND/OR THE PERMITTEE.
AutoCAD SHX Text
THE QUANTITIES SHOWN ON THE PLANS ARE APPROXIMATE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR INDEPENDENTLY ESTIMATING THE CONTRACT QUANTITIES. BY SUBMITTING HIS BID, THE CONTRACTOR REPRESENTS THAT THE TOTAL CONTRACT SUM IS ADEQUATE COMPENSATION FOR COMPLETING THE ENTIRE PROJECT AS SHOWN ON THE PLANS.
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
2
AutoCAD SHX Text
02 NOTES
AutoCAD SHX Text
%%UPAVING NOTES
AutoCAD SHX Text
1. EXACT POINT OF MATCHING TERMINATION AND OVERLAY, IF NECESSARY, SHALL BE EXACT POINT OF MATCHING TERMINATION AND OVERLAY, IF NECESSARY, SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER OR HIS AUTHORIZED REPRESENTATIVE. 2. NO JOB WILL BE CONSIDERED COMPLETED UNTIL: NO JOB WILL BE CONSIDERED COMPLETED UNTIL: A. ALL CURBS, PAVEMENTS, SIDEWALKS AND MANHOLES HAVE BEEN CLEANED OF ALL ALL CURBS, PAVEMENTS, SIDEWALKS AND MANHOLES HAVE BEEN CLEANED OF ALL DIRT AND DEBRIS; B. SURVEY MONUMENTS ARE INSTALLED AND STAMPED,· SURVEY MONUMENTS ARE INSTALLED AND STAMPED,· C. ALL FRAMES, COVERS AND VALVE BOXES ARE ADJUSTED TO GRADE; ALL FRAMES, COVERS AND VALVE BOXES ARE ADJUSTED TO GRADE; D. WHILE WORKING ON OR NEAR STORM SEWER MANHOLES AND/OR CATCH BASINS, WHILE WORKING ON OR NEAR STORM SEWER MANHOLES AND/OR CATCH BASINS, PIPELINES ARE TO BE FLUSHED AND CLEANED. 3 NO PAVING CONSTRUCTION SHALL BE STARTED UNTIL ALL UTILITY LINES ARE COMPLETED AND APPROVED UNDER PROPOSED PAVED AREAS. 4. BASE COURSE WILL NOT BE PLACED UNTIL SUB-GRADE HAS BEEN APPROVED BY BASE COURSE WILL NOT BE PLACED UNTIL SUB-GRADE HAS BEEN APPROVED BY THE ENGINEER OR HIS AUTHORIZED REPRESENTATIVE. 5. THE LOCATION OF ALL WATER VALVES, FIRE HYDRANTS, AND MANHOLES MUST AT THE LOCATION OF ALL WATER VALVES, FIRE HYDRANTS, AND MANHOLES MUST AT ALL TIMES DURING CONSTRUCTION BE REFERENCED AND MADE ACCESSIBLE TO THE CITY AND UNIVERSITY. 6. ALL EXTERIOR CONCRETE SHALL BE 4000 PSI WITH 5% - 7% AIR ENTRAINMENT, ALL EXTERIOR CONCRETE SHALL BE 4000 PSI WITH 5% - 7% AIR ENTRAINMENT, SLUMP OF 3-5'; AND CONTAIN FIBER MESH PER NAU TECHNICAL STANDARDS UNLESS WRITTEN AUTHORIZATION FROM THE ENGINEER HAS BEEN MADE. 7. THE CONTRACTOR SHALL BE AWARE THAT WET SUBGRADE/SUB-BASE CONDITIONS THE CONTRACTOR SHALL BE AWARE THAT WET SUBGRADE/SUB-BASE CONDITIONS MAY BE FOUND IN SOME LOCATIONS. (SEE MAG SPECIFICATION SECTION 109.4.2) UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED AS PER MAG SPECIFICATION SECTIONS 205 & 211, AND AS APPROVED BY THE ENGINEER. 8. ALL CONSTRUCTION NEAR STORM DRAINS AND CATCH BASIN INLETS MUST BE ALL CONSTRUCTION NEAR STORM DRAINS AND CATCH BASIN INLETS MUST BE PROTECTED FROM ALL DEBRIS/WASTE DUE TO CONSTRUCTION ACTIVITIES. STORM DRAINS AND CATCH BASINS ARE TO BE CLEANED/FLUSHED WITHIN THE IMPROVEMENT/CONSTRUCTION BOUNDARY AFTER CONSTRUCTION IS COMPLETE. 9. SINGLE CURB CONSTRUCTION SHALL BE PER M.A.G. S.D. 222, TYPE "A" UNLESS SINGLE CURB CONSTRUCTION SHALL BE PER M.A.G. S.D. 222, TYPE "A" UNLESS OTHERWISE NOTED. 10. AT PARKING LOT CONSTRUCTION/REPAIR/CHIP-SEAL SITES WITH PRECAST CURB AT PARKING LOT CONSTRUCTION/REPAIR/CHIP-SEAL SITES WITH PRECAST CURB BUMPERS, THE CONTRACTOR SHALL CAREFULLY REMOVE BUMPERS AS REQUIRED TO PERFORM HIS CONSTRUCTION ACTIVITIES AND REPLACE IN A CONDITION/ METHOD EQUAL TO EXISTING IMMEDIATELY FOLLOWING THE COMPLETION OF THE RELATED WORK. IN THE EVENT BUMPERS NEED TO BE TEMPORARILY STORED, THEY SHALL BE NEATLY STACKED IN A LOCATION SELECTED BY THE ENGINEER. 11. THE CONTRACTOR SHALL VISUALLY INSPECT OIL ASPHALT SURFACES (WHICH ARE TO THE CONTRACTOR SHALL VISUALLY INSPECT OIL ASPHALT SURFACES (WHICH ARE TO BE CHIP-SEALED) FOR UTILITY BOXES AND SURVEY MONUMENTS PRIOR TO SEALING AND MARK EACH WITH ADOT STANDARD CHIP SEAL MARKERS. WITHIN 24 HOURS OF APPLYING THE CHIP SEAL, ALL UTILITY BOXES ARE TO BE UNCOVERED. THE CONTRACTOR SHALL CONDUCT THEIR OWN INSPECTION AND RECORD THE LOCATIONS OF ANY BOXES OR MONUMENTS FOR THE AS-BUILT DRAWINGS. THE LOCATIONS OF ALL UTILITY BOXES ARE TO BE WALKED WITH THE OWNER OR THE ENGINEER PRIOR TO CHIP SEALING. ALL UTILITY BOXES, COVERS, LIDS, AND CONCRETE COLLARS SHALL BE PROTECTED FROM BEING COVERED DURING THE CHIP SEAL PROCESS. 12. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL EXISTING CONCRETE THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL EXISTING CONCRETE FROM TACK COAT AND FOG SEAL OVERSPRAY, INCLUDING BUT NOT LIMITED TO CONCRETE COLLARS, CURB AND GUTTER, SIDEWALK, VALLEY GUTTERS, ETC. ALL OVERSPRAY SHALL BE PROMPTLY CLEANED FROM ALL CONCRETE AND RESTORED TO ORIGINAL CONDITION. ANY EXISTING OVERSPRAY FROM PREVIOUS PROJECTS SHALL BE DOCUMENTED BY THE CONTRACTOR PRIOR TO ANY ASPHALT REPAIR OR MAINTENANCE OPERATIONS. 13. QUANTITIES FOR CRACK FILL ARE APPROXIMATE ONLY. IN THE EVENT THE QUANTITIES FOR CRACK FILL ARE APPROXIMATE ONLY. IN THE EVENT THE CONTRACTOR HAS EXCESS MATERIAL, ADDITIONAL LOCATIONS ON CAMPUS WILL BE PROVIDED BY THE OWNER OR ENGINEER.
AutoCAD SHX Text
%%UEARTHWORK
AutoCAD SHX Text
1. THE CONTRACTOR SHALL SUPPLY ALL WATER AND SPRAY EQUIPMENT AS REQUIRED THE CONTRACTOR SHALL SUPPLY ALL WATER AND SPRAY EQUIPMENT AS REQUIRED TO MAINTAIN PROJECT DUST CONTROL TO THE SATISFACTION OF NAU AND MAG SECTION 225. 2. ALL GRADING/WORK AREAS RE-GRADED OR OTHERWISE DISTURBED DURING ALL GRADING/WORK AREAS RE-GRADED OR OTHERWISE DISTURBED DURING CONSTRUCTION OF THIS PROJECT SHALL BE FINISHED GRADED AS PER MAG SECTION 424, THE PROJECT SPECIFICATIONS, AND TO THE SATISFACTION OF THE OWNER /ENGINEER.
AutoCAD SHX Text
%%UTRAFFIC CONTROL
AutoCAD SHX Text
1. THE CONTRACTOR SHALL PROVIDE ANY NECESSARY TRAFFIC CONTROL DEVICES THE CONTRACTOR SHALL PROVIDE ANY NECESSARY TRAFFIC CONTROL DEVICES REQUIRED FOR THE CONTROL OF VEHICLE AND PEDESTRIAN TRAFFIC AFFECTED BY THE CONSTRUCTION. ALL TRAFFIC CONTROL PLANS MUST BE APPROVED BY THE OWNER OR HIS REPRESENTATIVE PRIOR TO IMPLEMENTATION. TRAFFIC CONTROL SHALL BE AS REQUIRED BY MAG SECTION 401. 2. IF AT ANY TIME THE OWNER/ENGINEER DETERMINES THAT PROPER PROVISIONS FOR IF AT ANY TIME THE OWNER/ENGINEER DETERMINES THAT PROPER PROVISIONS FOR SAFE TRAFFIC CONTROL ARE NOT BEING PROVIDED OR MAINTAINED, SUSPENSION OF THE WORK MAY BE ORDERED UNTIL THE PROPER LEVEL OF TRAFFIC CONTROL IS ACHIEVED. IN CASE OF SERIOUS OR WILLFUL DISREGARD FOR SAFETY OF WORKMEN OR THE PUBLIC, THE OWNER/ENGINEER MAY PROCEED FORTHWITH TO PLACE TRAFFIC CONTROL MEASURES TN PROPER CONDITION AND DEDUCT THE COST THEREOF FROM MONIES DUE OR BECOMING DUE THE CONTRACTOR. 3. NO PROVISION OF THIS SECTION SHALL BE CONSTRUED TO RELIEVE THE NO PROVISION OF THIS SECTION SHALL BE CONSTRUED TO RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO PROVIDE JOBSITE SAFETY TO BOTH WORKMEN AND THE PUBLIC. 4. ACCESS TO ALL BUILDINGS, FACILITIES, EVENTS ETC. SHALL BE MAINTAINED AT ALL ACCESS TO ALL BUILDINGS, FACILITIES, EVENTS ETC. SHALL BE MAINTAINED AT ALL TIMES. THIS MAY REQUIRE PHASED TYPE OF CONSTRUCTION, FENCED PATHWAYS, WEEKEND/EVENING WORK, ETC. TO ACCOMMODATE, NAU STAFF, STUDENTS, AND THE GENERAL PUBLIC TO THE FULLEST EXTENT POSSIBLE. 5. THE CONTRACTOR SHALL WORK WITH NAU STAFF TO COORDINATE ACCESS, THE CONTRACTOR SHALL WORK WITH NAU STAFF TO COORDINATE ACCESS, CONSTRUCTION SCHEDULE, FENCING, TRAFFIC CONTROL, ETC. FOR SCHEDULED WORK.
AutoCAD SHX Text
NEITHER THE PROFESSIONAL ACTIVITIES OF THE DESIGN PROFESSIONAL, NOR THE PRESENCE OF THE DESIGN PROFESSIONAL OR HIS OR HER EMPLOYEES AND SUB CONSULTANTS AT A CONSTRUCTION SITE, SHALL RELIEVE THE GENERAL CONTRACTOR AND ANY OTHER ENTITY OF THEIR OBLIGATIONS, DUTIES AND RESPONSIBILITIES INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, SUPERINTENDING OR COORDINATING ALL PORTIONS OF THE WORK OF CONSTRUCTION IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND ANY HEALTH OR SAFETY PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES. THE DESIGN PROFESSIONAL AND HIS OR HER PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY CONTROL OVER ANY CONSTRUCTION CONTRACTOR OR OTHER ENTITY OR THEIR EMPLOYEES IN CONNECTION WITH THEIR WORK OR ANY HEALTH OR SAFETY PRECAUTIONS. THE CLIENT AGREES THAT THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR JOBSITE SAFETY, AND WARRANTS THAT THIS INTENT SHALL BE MADE EVIDENT IN THE CLIENT'S AGREEMENT WITH THE GENERAL CONTRACTOR. THE CLIENT ALSO AGREES THAT THE CLIENT, THE DESIGN PROFESSIONAL AND THE DESIGN PROFESSIONAL'S CONSULTANTS SHALL BE INDEMNIFIED AND SHALL BE MADE ADDITIONAL INSUREDS UNDER THE GENERAL CONTRACTOR'S GENERAL LIABILITY INSURANCE POLICY.
AutoCAD SHX Text
JOBSITE SAFETY
AutoCAD SHX Text
EROSION CONTROL
AutoCAD SHX Text
THE QUANTITIES SHOWN ABOVE FOR ASPHALT RECLAMATION AND OVERLAY ARE BASED ON THE TYPICAL SECTION FOR OVERLAY BELOW ALONG CENTRAL ROAD CENTERLINE FOR THE LIMITS SHOWN. THE QUANTITIES SHOWN ABOVE FOR DOUBLE CHIP SEAL ARE BASED ON SURVEY OF THE EXISTING EDGE OF PAVEMENT WITHIN THE LIMITS SHOWN. THE CONTRACT WILL BE PAID BASED UPON THESE QUANTITIES. BY SUBMITTING HIS BID, THE CONTRACTOR REPRESENTS THAT THE TOTAL CONTRACT SUM IS ADEQUATE COMPENSATION FOR COMPLETING THE ENTIRE PROJECT AS SHOWN ON THE PLANS.
AutoCAD SHX Text
APPROXIMATE QUANTITIES
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
PRIVATE IMPROVEMENTS
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
CLEAR AND GRUB REMOVE PAVEMENT 4" AC ON 6" AB REMOVE CURB & GUTTER 6" VERTICAL CURB & GUTTER 6' VALLEY GUTTER REMOVE SLURRY ENCASEMENT 5' X 5' RIPRAP APRON V-DITCH CHANNEL CROSSWALK W/ STOP BAR
AutoCAD SHX Text
1 LS 1,979 SY 1,979 SY 190 LF 190 LF 138 SF 1 LS 1 LS 1 LS 1 LS 1 LS
AutoCAD SHX Text
FN:
AutoCAD SHX Text
124 N. ELDEN ST. FLAGSTAFF, AZ 86001 PHONE: (928) 774-4636 FAX: (928) 774-4646
AutoCAD SHX Text
WOODSON ENGINEERING AND SURVEYING, INC.
AutoCAD SHX Text
SHEET NO.:
AutoCAD SHX Text
AGENCY NO.:
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
VERT SCALE:
AutoCAD SHX Text
HOR SCALE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAFTED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
ENGINEERING AND SURVEYING, INC.
AutoCAD SHX Text
WOODSON
AutoCAD SHX Text
PHONE: (928) 774-4636 FAX: (928) 774-4646
AutoCAD SHX Text
FLAGSTAFF, AZ 86001
AutoCAD SHX Text
124 N. ELDEN ST.
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
FN:
AutoCAD SHX Text
A guide to getting underground
AutoCAD SHX Text
facilities located
AutoCAD SHX Text
before
AutoCAD SHX Text
you dig
AutoCAD SHX Text
Know what's
AutoCAD SHX Text
below
AutoCAD SHX Text
.
AutoCAD SHX Text
Call
AutoCAD SHX Text
before you dig.
AutoCAD SHX Text
Call 811 or visit www.Arizona811.com
AutoCAD SHX Text
5/20/20
AutoCAD SHX Text
120776
AutoCAD SHX Text
NORTHERN ARIZONA UNIVERSITY
AutoCAD SHX Text
2020 STREETS PAVEMENT MAINTENANCE
AutoCAD SHX Text
CONSTRUCTION PLANS
AutoCAD SHX Text
JBG
AutoCAD SHX Text
JBG
AutoCAD SHX Text
MJ
AutoCAD SHX Text
1" = 20'
AutoCAD SHX Text
1" = 2'
AutoCAD SHX Text
5/20/20
AutoCAD SHX Text
120776
AutoCAD SHX Text
2020 STREETS PAVEMENT
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
OF 5
AutoCAD SHX Text
NORTHERN ARIZONA UNIVERSITY
AutoCAD SHX Text
REMOVE PAVEMENT 4" AC ON 6" AB ROAD STRIPING STOP BAR
AutoCAD SHX Text
1,727 SY 1,920 SY 1 LS 1 LS
AutoCAD SHX Text
JANES
AutoCAD SHX Text
MICHAEL S.
AutoCAD SHX Text
49111
AutoCAD SHX Text
N/A
AutoCAD SHX Text
N/A
WOODSON
E N G I N E E R I N G & S U R V E Y I N G1 2 4 N E L D E N S T , F L A G S T A F F , A Z 8 6 0 0 1
(928) 774-4636 | WWW.WOODSONENG.COM
AutoCAD SHX Text
FN:
AutoCAD SHX Text
124 N. ELDEN ST. FLAGSTAFF, AZ 86001 PHONE: (928) 774-4636 FAX: (928) 774-4646
AutoCAD SHX Text
WOODSON ENGINEERING AND SURVEYING, INC.
AutoCAD SHX Text
SHEET NO.:
AutoCAD SHX Text
AGENCY NO.:
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
VERT SCALE:
AutoCAD SHX Text
HOR SCALE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAFTED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
ENGINEERING AND SURVEYING, INC.
AutoCAD SHX Text
WOODSON
AutoCAD SHX Text
PHONE: (928) 774-4636 FAX: (928) 774-4646
AutoCAD SHX Text
FLAGSTAFF, AZ 86001
AutoCAD SHX Text
124 N. ELDEN ST.
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
FN:
AutoCAD SHX Text
A guide to getting underground
AutoCAD SHX Text
facilities located
AutoCAD SHX Text
before
AutoCAD SHX Text
you dig
AutoCAD SHX Text
Know what's
AutoCAD SHX Text
below
AutoCAD SHX Text
.
AutoCAD SHX Text
Call
AutoCAD SHX Text
before you dig.
AutoCAD SHX Text
Call 811 or visit www.Arizona811.com
AutoCAD SHX Text
5/20/20
AutoCAD SHX Text
120776
AutoCAD SHX Text
NORTHERN ARIZONA UNIVERSITY
AutoCAD SHX Text
2020 STREETS PAVEMENT MAINTENANCE
AutoCAD SHX Text
CONSTRUCTION PLANS
AutoCAD SHX Text
JBG
AutoCAD SHX Text
JBG
AutoCAD SHX Text
MJ
AutoCAD SHX Text
1" = 20'
AutoCAD SHX Text
1" = 2'
AutoCAD SHX Text
5/20/20
AutoCAD SHX Text
120776
AutoCAD SHX Text
2020 STREETS PAVEMENT
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
OF 5
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
3
AutoCAD SHX Text
4" AC PAVEMENT
AutoCAD SHX Text
6" ABC
AutoCAD SHX Text
9"
AutoCAD SHX Text
SCARIFY SUBGRADE TO 9" AND COMPACT TO 95% (SUBGRADE PREPARATION PER MAG SS 301)
AutoCAD SHX Text
INSTALLED PER MAG SS 310 & 702
AutoCAD SHX Text
INSTALLED PER MAG SS 321
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FOR REMOVE & REPLACE
AutoCAD SHX Text
TYPICAL PAVEMENT SECTION
AutoCAD SHX Text
N/A
AutoCAD SHX Text
NORTHERN ARIZONA UNIVERSITY
AutoCAD SHX Text
1
AutoCAD SHX Text
2.0 MAX
AutoCAD SHX Text
1
AutoCAD SHX Text
2.0 MAX
AutoCAD SHX Text
TYPICAL SECTION
AutoCAD SHX Text
EXISTING R/W VARIES
AutoCAD SHX Text
R/W
AutoCAD SHX Text
R/W
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
C&G
AutoCAD SHX Text
2'
AutoCAD SHX Text
S/W
AutoCAD SHX Text
5'
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
EB TRAVEL LANE
AutoCAD SHX Text
WB TRAVEL LANE
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
& ROW
AutoCAD SHX Text
ROADWAY
AutoCAD SHX Text
2'
AutoCAD SHX Text
EX CURB
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TYPICAL ROAD CROSS SECTION
AutoCAD SHX Text
JANES
AutoCAD SHX Text
MICHAEL S.
AutoCAD SHX Text
49111
AutoCAD SHX Text
N/A
WOODSON
E N G I N E E R I N G & S U R V E Y I N G1 2 4 N E L D E N S T , F L A G S T A F F , A Z 8 6 0 0 1
(928) 774-4636 | WWW.WOODSONENG.COM
AutoCAD SHX Text
J
AutoCAD SHX Text
J
AutoCAD SHX Text
T
AutoCAD SHX Text
INV=82.9
AutoCAD SHX Text
CP #802
AutoCAD SHX Text
CP #800
AutoCAD SHX Text
CP #801
AutoCAD SHX Text
PVC
AutoCAD SHX Text
J
AutoCAD SHX Text
J
AutoCAD SHX Text
T
AutoCAD SHX Text
INV=82.9
AutoCAD SHX Text
CP #802
AutoCAD SHX Text
CP #800
AutoCAD SHX Text
CP #801
AutoCAD SHX Text
PVC
AutoCAD SHX Text
CP #800
AutoCAD SHX Text
CP #801
AutoCAD SHX Text
CP #802
AutoCAD SHX Text
6886
AutoCAD SHX Text
6887
AutoCAD SHX Text
6886
AutoCAD SHX Text
6888
AutoCAD SHX Text
6892
AutoCAD SHX Text
6893
AutoCAD SHX Text
6885
AutoCAD SHX Text
6884
AutoCAD SHX Text
24" CMP
AutoCAD SHX Text
INV=84.0
AutoCAD SHX Text
LOW POINT
AutoCAD SHX Text
6887.73
AutoCAD SHX Text
HIGH POINT
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
N/A
AutoCAD SHX Text
FN:
AutoCAD SHX Text
124 N. ELDEN ST. FLAGSTAFF, AZ 86001 PHONE: (928) 774-4636 FAX: (928) 774-4646
AutoCAD SHX Text
WOODSON ENGINEERING AND SURVEYING, INC.
AutoCAD SHX Text
SHEET NO.:
AutoCAD SHX Text
AGENCY NO.:
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
VERT SCALE:
AutoCAD SHX Text
HOR SCALE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAFTED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
ENGINEERING AND SURVEYING, INC.
AutoCAD SHX Text
WOODSON
AutoCAD SHX Text
PHONE: (928) 774-4636 FAX: (928) 774-4646
AutoCAD SHX Text
FLAGSTAFF, AZ 86001
AutoCAD SHX Text
124 N. ELDEN ST.
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
FN:
AutoCAD SHX Text
A guide to getting underground
AutoCAD SHX Text
facilities located
AutoCAD SHX Text
before
AutoCAD SHX Text
you dig
AutoCAD SHX Text
Know what's
AutoCAD SHX Text
below
AutoCAD SHX Text
.
AutoCAD SHX Text
Call
AutoCAD SHX Text
before you dig.
AutoCAD SHX Text
Call 811 or visit www.Arizona811.com
AutoCAD SHX Text
5/20/20
AutoCAD SHX Text
120776
AutoCAD SHX Text
NORTHERN ARIZONA UNIVERSITY
AutoCAD SHX Text
2020 STREETS PAVEMENT MAINTENANCE
AutoCAD SHX Text
CONSTRUCTION PLANS
AutoCAD SHX Text
JBG
AutoCAD SHX Text
JBG
AutoCAD SHX Text
MJ
AutoCAD SHX Text
1" = 20'
AutoCAD SHX Text
1" = 2'
AutoCAD SHX Text
5/20/20
AutoCAD SHX Text
120776
AutoCAD SHX Text
2020 STREETS PAVEMENT
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
OF 5
AutoCAD SHX Text
NORTHERN ARIZONA UNIVERSITY
AutoCAD SHX Text
4
AutoCAD SHX Text
STREET PLANS
AutoCAD SHX Text
1" = 20'
AutoCAD SHX Text
HUFFER LANE
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1" = 20'
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
CONTOUR INTERVAL:
AutoCAD SHX Text
'
AutoCAD SHX Text
N
AutoCAD SHX Text
1
AutoCAD SHX Text
PROPOSED GRADE AT CENTERLINE
AutoCAD SHX Text
EXISTING GRADE AT CENTERLINE
AutoCAD SHX Text
PROPOSED GRADE AT CENTERLINE
AutoCAD SHX Text
EXISTING GRADE AT CENTERLINE
AutoCAD SHX Text
5' CURB OPENING
AutoCAD SHX Text
E PINE KNOLL
AutoCAD SHX Text
CONSTRUCTION NOTES
AutoCAD SHX Text
CLEAR & GRUB PER MAG SS 201.
AutoCAD SHX Text
100
AutoCAD SHX Text
SAWCUT, REMOVE AND DISPOSE OF EXISTING CURB AND GUTTER PER MAG SS 350.
AutoCAD SHX Text
103
AutoCAD SHX Text
SAWCUT AND REMOVE EXISTING A.C. PAVEMENT AND SOIL MATERIAL PER MAG SS 350 AND 336. SCARIFY SUBGRADE TO 9" DEPTH AND COMPACT TO 95%. DISPOSE OF MATERIAL OFFSITE AT AN APPROVED LOCATION.
AutoCAD SHX Text
104
AutoCAD SHX Text
110
AutoCAD SHX Text
REMOVE AND REPLACE EXISTING ROCK BOULDERS.
AutoCAD SHX Text
200
AutoCAD SHX Text
ASPHALT CONCRETE AND AGGREGATE BASE COURSE PER MAG SS 310 & 321. TYPICAL PAVEMENT SECTION 1 PER DETAIL ON SHEET 3. PER DETAIL ON SHEET 3.PER DETAIL ON SHEET 3.
AutoCAD SHX Text
210
AutoCAD SHX Text
6" (TYPE "A") VERTICAL CURB AND GUTTER PER MAG SD 220, MODIFIED TO PLACE 3" AB UNDER ALL CURB. UNDER ALL CURB.UNDER ALL CURB.
AutoCAD SHX Text
213
AutoCAD SHX Text
CURB TERMINATION PER MAG SD 222.
AutoCAD SHX Text
214
AutoCAD SHX Text
6' VALLEY GUTTER PER MAG SD 240.
AutoCAD SHX Text
227
AutoCAD SHX Text
REMOVE AND DISPOSE TOP LAYER OF SLURRY ENCASEMENT TO PROVIDE FOR NEW GRADES. TACK COAT TOP OF SLURRY PRIOR TO NEW ASPHALT PLACEMENT.
AutoCAD SHX Text
506
AutoCAD SHX Text
INSTALL RIPRAP (STONE D50=6", STONE DEPTH=12") PER THE DIMENSIONS SHOWN ON THESE PLANS.
AutoCAD SHX Text
509
AutoCAD SHX Text
CONSTRUCT V-DITCH (3:1 SIDE SLOPES, 1' MIN DEPTH) PER THE LOCATION SHOWN ON THESE PLANS.
AutoCAD SHX Text
617
AutoCAD SHX Text
INSTALL WHITE STRIPING FOR CROSSWALK PER NAU STANDARDS..
AutoCAD SHX Text
618
AutoCAD SHX Text
INSTALL NEW STOP BAR PER NAU STANDARDS.
AutoCAD SHX Text
** WARNING ** CONTRACTOR TO VERIFY UNDERGROUND ELECTRICAL DEPTH
AutoCAD SHX Text
HUFFER LANE PAVING
AutoCAD SHX Text
GIS DATA PROVIDED BY NAU, 2016. FIELD TOPOGRAPHY AND BOUNDARY SURVEY INFORMATION USED TO PREPARE THIS DRAWING WERE MADE BY WOODSON ENGINEERING & SURVEYING, INC. IN MARCH 2020. SEE PAVEMENT SECTION DETAILS ON SHEET 3. ALL ELEVATIONS SHOWN ON THE PLANS ARE FINISHED SURFACE ELEVATIONS (EXCEPT AS NOTED). THE INFORMATION ON THESE CONSTRUCTION PLANS CONCERNING THE TYPE, SIZE, AND LOCATION OF UTILITIES HAS BEEN SHOWN BASED ON THE BEST INFORMATION AVAILABLE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINATION OF EXACT LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. IT IS THE CONTRACTORS RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES, IN PLACE, UNLESS OTHERWISE NOTED OR SPECIFIED.
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
±1% SLOPE
AutoCAD SHX Text
JANES
AutoCAD SHX Text
MICHAEL S.
AutoCAD SHX Text
49111
AutoCAD SHX Text
R=2'
AutoCAD SHX Text
R=2'
AutoCAD SHX Text
MATCH EXISTING END NEW C&G STA=14+50.00
AutoCAD SHX Text
MATCH EXISTING BEGIN NEW C&G STA=12+50.00
AutoCAD SHX Text
D/W
AutoCAD SHX Text
D/W
AutoCAD SHX Text
VALLEY GUTTER
AutoCAD SHX Text
RIPRAP L=5' W=5'
WOODSON
E N G I N E E R I N G & S U R V E Y I N G1 2 4 N E L D E N S T , F L A G S T A F F , A Z 8 6 0 0 1
(928) 774-4636 | WWW.WOODSONENG.COM
AutoCAD SHX Text
SCALE: 1" = 20'
AutoCAD SHX Text
FN:
AutoCAD SHX Text
124 N. ELDEN ST. FLAGSTAFF, AZ 86001 PHONE: (928) 774-4636 FAX: (928) 774-4646
AutoCAD SHX Text
WOODSON ENGINEERING AND SURVEYING, INC.
AutoCAD SHX Text
SHEET NO.:
AutoCAD SHX Text
AGENCY NO.:
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
VERT SCALE:
AutoCAD SHX Text
HOR SCALE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAFTED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
ENGINEERING AND SURVEYING, INC.
AutoCAD SHX Text
WOODSON
AutoCAD SHX Text
PHONE: (928) 774-4636 FAX: (928) 774-4646
AutoCAD SHX Text
FLAGSTAFF, AZ 86001
AutoCAD SHX Text
124 N. ELDEN ST.
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
FN:
AutoCAD SHX Text
A guide to getting underground
AutoCAD SHX Text
facilities located
AutoCAD SHX Text
before
AutoCAD SHX Text
you dig
AutoCAD SHX Text
Know what's
AutoCAD SHX Text
below
AutoCAD SHX Text
.
AutoCAD SHX Text
Call
AutoCAD SHX Text
before you dig.
AutoCAD SHX Text
Call 811 or visit www.Arizona811.com
AutoCAD SHX Text
5/20/20
AutoCAD SHX Text
120776
AutoCAD SHX Text
NORTHERN ARIZONA UNIVERSITY
AutoCAD SHX Text
2020 STREETS PAVEMENT MAINTENANCE
AutoCAD SHX Text
CONSTRUCTION PLANS
AutoCAD SHX Text
JBG
AutoCAD SHX Text
JBG
AutoCAD SHX Text
MJ
AutoCAD SHX Text
1" = 20'
AutoCAD SHX Text
1" = 2'
AutoCAD SHX Text
5/20/20
AutoCAD SHX Text
120776
AutoCAD SHX Text
2020 STREETS PAVEMENT
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
OF 5
AutoCAD SHX Text
NORTHERN ARIZONA UNIVERSITY
AutoCAD SHX Text
5
AutoCAD SHX Text
STREET PLANS
AutoCAD SHX Text
SAN RANSICO STREET
AutoCAD SHX Text
P38
AutoCAD SHX Text
P33
AutoCAD SHX Text
PROTECT BOLLARD IN PLACE
AutoCAD SHX Text
CONSTRUCTION NOTES
AutoCAD SHX Text
SAWCUT AND REMOVE EXISTING A.C. PAVEMENT AND SOIL MATERIAL PER MAG SS 350 AND 336. SCARIFY SUBGRADE TO 9" DEPTH AND COMPACT TO 95%. DISPOSE OF MATERIAL OFFSITE AT AN APPROVED LOCATION.
AutoCAD SHX Text
104
AutoCAD SHX Text
200
AutoCAD SHX Text
ASPHALT CONCRETE AND AGGREGATE BASE COURSE PER MAG SS 310 & 321. TYPICAL PAVEMENT SECTION 1 PER DETAIL ON SHEET 3. PER DETAIL ON SHEET 3.PER DETAIL ON SHEET 3.
AutoCAD SHX Text
600
AutoCAD SHX Text
DOUBLE YELLOW 4" STRIPE, 6" APART FOR CENTERLINE OF ROAD PER ADOT STANDARD SPECIFICATIONS SECTION 708.
AutoCAD SHX Text
616
AutoCAD SHX Text
4" YELLOW CROSS HATCH TO MATCH EXISTING OR PER NAU STANDARDS.
AutoCAD SHX Text
618
AutoCAD SHX Text
INSTALL NEW STOP BAR PER NAU STANDARDS.
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1" = 20'
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
CONTOUR INTERVAL:
AutoCAD SHX Text
'
AutoCAD SHX Text
N
AutoCAD SHX Text
1
AutoCAD SHX Text
ROTC BUILDING
AutoCAD SHX Text
** NOTE ** NOTE ** NEW PAVEMENT TO MAINTAIN EXISTING GRADES AND SLOPES.
AutoCAD SHX Text
EX SAWCUT LINE
AutoCAD SHX Text
EX SAWCUT LINE
AutoCAD SHX Text
ROTC PAVING
AutoCAD SHX Text
GIS DATA PROVIDED BY NAU, 2016. FIELD TOPOGRAPHY AND BOUNDARY SURVEY INFORMATION USED TO PREPARE THIS DRAWING WERE MADE BY WOODSON ENGINEERING & SURVEYING, INC. IN MARCH 2020. SEE PAVEMENT SECTION DETAILS ON SHEET 3. ALL ELEVATIONS SHOWN ON THE PLANS ARE FINISHED SURFACE ELEVATIONS (EXCEPT AS NOTED). THE INFORMATION ON THESE CONSTRUCTION PLANS CONCERNING THE TYPE, SIZE, AND LOCATION OF UTILITIES HAS BEEN SHOWN BASED ON THE BEST INFORMATION AVAILABLE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINATION OF EXACT LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. IT IS THE CONTRACTORS RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES, IN PLACE, UNLESS OTHERWISE NOTED OR SPECIFIED.