Engineering Solutions Event

29
Engineering Solutions Event Six students will design a solution to an engineering problem. Students will work as a team to design solutions. Teams will be receive a set of construction materials and pricing charts. There are potentially multiple solutions to the problem.

description

Engineering Solutions Event. Six students will design a solution to an engineering problem. Students will work as a team to design solutions. Teams will be receive a set of construction materials and pricing charts. There are potentially multiple solutions to the problem. - PowerPoint PPT Presentation

Transcript of Engineering Solutions Event

Page 1: Engineering Solutions Event

Engineering Solutions EventSix students will design a solution to an

engineering problem.Students will work as a team to

design solutions.Teams will be receive a set of

construction materials and pricing charts. There are potentially multiple

solutions to the problem.

Page 2: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 3: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 4: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 5: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 6: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 7: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 8: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 9: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 10: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 11: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 12: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 13: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 14: Engineering Solutions Event

University City is currently home to a number of new construction projects.

Page 15: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.

Page 16: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.

Each cube represents a hotel room.All 50 cubes must be used.

Page 17: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.

Entire hotel must be connected as one piece.

Page 18: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.

Entire hotel must be connected as one piece.

Page 19: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.

Entire hotel must be connected as one piece.

Page 20: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.

All rooms must have at least one window. (A window is any exposed vertical side of cube.)

Page 21: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.

All rooms must have at least one window. (A window is any exposed vertical side of cube.)

Page 22: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.

All rooms must have at least one window. (A window is any exposed vertical side of cube.)

Page 23: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.COSTS

Land costs $400 per square unit.Land refers to outline of top view of building.

Page 24: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.COSTS

Land costs $400 per square unit.Land refers to outline of top view of building.

18

Page 25: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.COSTS

Land costs $400 per square unit.Land refers to outline of top view of building.

1815

Page 26: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.COSTS

Land costs $400 per square unit.Land refers to outline of top view of building.

1815

Page 27: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.COSTS

A roof costs $10 each. ( A roof is any exposed top side of cube.)A window costs $5 each.

Page 28: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.COSTS

Taxes will be collected based on building height. 

Floors 1-10 —> 50%  x land costFloors 11-20 —> 1000% x land costFloors 21-30 —> 2000%Floors 31-40 —> 3000%Floors 41-50 —> 5000%

Page 29: Engineering Solutions Event

Engineering Solutions EventGoal: Build a hotel that yields the highest

profit.INCOME

4 windows, 1 roof = $6004 windows, 0 roof = $5003 windows, 1 roof = $3003 windows, 0 roof = $2502 windows, 1 roof = $2002 windows, 0 roof = $1751 window, 1 roof = $1501 window, 0 roof = $125