Engineering Quality Common Problem Series (1) - Civil Work

download Engineering Quality Common Problem Series (1) - Civil Work

of 16

Transcript of Engineering Quality Common Problem Series (1) - Civil Work

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    1/16

    HUAWEI TECHNOLOGIES CO., LTD.

    www.huawei.com

    Huawei Confidential

    Engineering Quality common problems

    Civil Work

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    2/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 2

    The common problems of civil work

    The type of problem The standards of Quality Check method

    The strength of basement

    1The base of tower falls intocrack

    2The sustainable cement blockis cracked

    3The base of the tower settles

    1The strength of the concrete should meet thedesign requirements. The strength after 28-day

    maintenance should not be less than C20.2Cement, water, sand, gravel and additives forthe concrete and mixing ration should meet the

    design requirements

    3The base backfill records are complete andcorrect

    1Reboundinstrument2check the deliveryinspection report

    3Check the recordsfor the concealed

    project

    The surface of base:1 concave, spongy surface2crack, defects of appearance

    Check the appearance of the base: No concave,

    spongy surface, crack (crack on the surface

    1mm), defects of appearance, etc.

    Visual measurement

    Tape measurement

    Design of civil work1The support of tower base does notmeet with the requirements

    2The support of ladder does not meetwith the requirements

    3The rabbet of feeder does not meetwith the requirements

    All installation should meet the design

    requirements

    Visual measurement

    Check against the

    drawing

    Fence1The spray paintcoatingdont meet with the requirements2No grounding

    1The coating of the Fence componentcomplies with the design and specifications

    requirements

    2The spray paint of the Fence componentcomplies with the design and specifications

    requirements

    Visual measurement

    Check the records for

    the concealed project

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    3/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 3

    Problem:The

    cracked

    concrete

    probably

    shows the

    badstrength of

    the base.

    The strength of the concrete

    Cracked surface of the base

    Suggestion:1.Test the

    strength of the

    base;

    2.If the strength

    meets the

    requirement,

    repair the base,

    otherwise

    rework.

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    4/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 4

    Problem:

    The

    sustainable

    cement

    block is

    cracked

    The strength of the concrete

    The sustainable cement block is cracked

    Suggestion:

    1.Test the

    strength of the

    base;

    2.If the strength

    meets therequirement,

    repair the base,

    otherwise

    rework.

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    5/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 5

    Suggestion:

    Repair the base

    and make sure

    the base is firm.

    Problem:

    The base of

    the tower

    are not

    rammed

    down with

    soil and

    sink

    The strength of the concrete

    The base of tower settles

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    6/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 6

    Suggestion:Remove the scratch

    and rework.

    Problem:Separation of the top

    layer from the base of

    the slab by a thin layer

    The surface of the base

    The defects of appearanceProblem:The surface is uneven.

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    7/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 7

    Suggestion:

    1.Repair

    2.Pay attention

    to the curing

    duration3. The step

    should be under

    the eave

    according with

    the design

    Problem:

    Surface

    collapse

    The surface of the base

    Disintegration of the surface

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    8/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 8

    Suggestion:

    1.Test the

    strength of the

    base;

    2.If the strength

    meets the

    requirement,

    repair the base,

    otherwise

    rework.

    Problem:

    The surface

    is spongy.

    The surface of the base

    Spongy surface

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    9/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 9

    Suggestion:1.Test the

    strength of the

    base;

    2.If the

    strength

    meets therequirement,

    repair the

    base,

    otherwise

    rework.

    Problem:

    Separation

    of the top

    layer of

    the slab

    from the

    base ofthe slab by

    a thin

    layer

    The surface of the base

    Delamination

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    10/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 10

    Problem:

    The base is

    unstable.

    Design of civil work

    The support of ladder dont meet with requirementsSuggestion:Make a concrete

    base.

    Pi t C f C E i i P bl Ci il W k

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    11/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 11

    Design of civil work

    The cable trough dont meet with requirementsProblem:

    The

    support of

    the trough

    is unstable.

    Suggestion:

    Make a

    concrete

    base to

    support the

    trough.

    Pi t C f C E i i P bl Ci il W k

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    12/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 12

    Fence installation

    The spray paint of the Fence component dont meetwith the requirements

    Problem:

    The paint

    comes

    unglued.

    Suggestion:

    Clean the

    bar and

    repaint.

    Picture Case of Common Engineering Problem Civil Work

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    13/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 13

    Appendix1 Tower-Civil Work Checklist

    Problem type Check Item

    A

    The examination records for the concealed project are complete and correctinclude1The pit (ditch) examination records for the groundwork are complete and correct 2The examination records of steel bars are complete and correct3The template records are complete and correct 4The concrete records are complete and correct5The base backfill records are complete and correct

    A The dimensions of tower base section should meet the design requirements, and thetolerance should be +15/-10mm

    B Check the smoothness of the towerbase surface. The deviation should be 5mm

    B Check the appearance of the base: No concave, spongy surface, crack (crack on the surface1mm), defects of appearance, etc.

    B The intensity of the concrete should meet the design requirements. The intensity after 28-day maintenance should not be less than C20.

    Picture Case of Common Engineering Problem Civil Work

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    14/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 14

    Appendix2 Shelter-Civil Work Checklist

    Problem type Check Item

    AThe examination records for the concealed project are completeincludeThe pit (ditch) examination records for the groundwork are complete

    The concrete records are complete

    ACheck the appearance of the base of the equipment room: No concave, spongy surface,

    crack (crack on the surface 1mm), defects of appearance, etc.

    BThe dimensions of base section of the equipment room should meet the design

    requirements, and the tolerance should be +15/-10mm

    BCheck the smoothness of the base surface of the equipment room. The deviation should be

    5mm

    Picture Case of Common Engineering Problem Civil Work

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    15/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 15

    Appendix3 Transmission Room-Civil Work Checklist

    Problem type Check Item

    A Brick laying records are complete

    ACheck that the dimensions and azimuth of the equipment room meet the design

    requirements

    A Check the verticality of each wall. The allowable deviation is 10mm

    B

    Smoothness of the surface (the allowable deviation for the cement mortar is 4mm; the

    allowable deviation for the terrazzo is 3mm; and the allowable deviation for the ground tile

    is 2mm)

    Picture Case of Common Engineering Problem Civil Work

  • 7/21/2019 Engineering Quality Common Problem Series (1) - Civil Work

    16/16

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Picture Case of Common Engineering Problem Civil Work

    Page 16

    Appendix4 Solar energy-Civil Work Checklist

    Problem type Check Item

    A The concrete records are complete and correct

    B

    For the cement base on the floor: The distance to the floor, the intensity of the base and the

    level deviation should conform to the design requirements. The level deviation of the base

    should be no more than 3mm/m; For the overhead cement base:Check whether the

    installation holes match the equipment against the construction drawings. The level

    deviation of the platform should be no more than 3mm/m

    BThe coating of the Fence component complies with the design and specifications

    requirements

    The spray paint of the Fence component complies with the design and specifications

    requirements