Engineering Change Note

download Engineering Change Note

of 2

description

ISO

Transcript of Engineering Change Note

  • 5/21/2018 Engineering Change Note

    1/3

    (P) LTD

    ENGINEERING CHANGE NOTE

    F/DEV/MEPL/10-R0 Page 1 of 2

    Date of Receipt of revised Drawing / Engg. Specification:

    Customer Name -

    Part Name - Part Number -

    ECN No / Date - Revised Rev. No. / Change level -

    Change Details -

    Change Review Remarks -

    Review Date Reviewed By -

    CHANGE IMPACT

    1] Internal Documents

    Sr.No.

    Document TypeChange Required

    Resp.TargetDate

    Complt.Date

    StatusVerified

    byYes No

    A INCOMING SATGE

    Raw material drawing /specification

    Bought out part drawing /

    specificationIncoming material qualityplan

    Specification mentioned inInspection report

    External material testingplan

    B IN-PROCESS STAGE

    Job-setup approval format

    For CNC ProgrammingChange

    C ASSEMBLY STAGE

    Assembly DrawingsD FINAL INSPECTION

    Final inspection qualityplan

    Specification mentioned infinal inspection / PDIreport

    E TOOL

    Tool drawing

    Tool maintenancechecklist

    F JIGS / FIXTURES

    Drawing

    Maintenance checklistVerification report

  • 5/21/2018 Engineering Change Note

    2/3

    (P) LTD

    ENGINEERING CHANGE NOTE

    F/DEV/MEPL/10-R0 Page 2 of 2

    2] SOP / Work Instruction

    Sr.

    No.

    SOP / Work instructionfor Operation No.

    Desc.

    Change Required

    Resp.TargetDate

    Complt.Date

    StatusVerified

    byYes No

    3] Implementation Record

    Changes Actual implemented

    On By Name Sign / Date

    Designation

  • 5/21/2018 Engineering Change Note

    3/3