5/21/2018 Engineering Change Note
1/3
(P) LTD
ENGINEERING CHANGE NOTE
F/DEV/MEPL/10-R0 Page 1 of 2
Date of Receipt of revised Drawing / Engg. Specification:
Customer Name -
Part Name - Part Number -
ECN No / Date - Revised Rev. No. / Change level -
Change Details -
Change Review Remarks -
Review Date Reviewed By -
CHANGE IMPACT
1] Internal Documents
Sr.No.
Document TypeChange Required
Resp.TargetDate
Complt.Date
StatusVerified
byYes No
A INCOMING SATGE
Raw material drawing /specification
Bought out part drawing /
specificationIncoming material qualityplan
Specification mentioned inInspection report
External material testingplan
B IN-PROCESS STAGE
Job-setup approval format
For CNC ProgrammingChange
C ASSEMBLY STAGE
Assembly DrawingsD FINAL INSPECTION
Final inspection qualityplan
Specification mentioned infinal inspection / PDIreport
E TOOL
Tool drawing
Tool maintenancechecklist
F JIGS / FIXTURES
Drawing
Maintenance checklistVerification report
-
5/21/2018 Engineering Change Note
2/3
(P) LTD
ENGINEERING CHANGE NOTE
F/DEV/MEPL/10-R0 Page 2 of 2
2] SOP / Work Instruction
Sr.
No.
SOP / Work instructionfor Operation No.
Desc.
Change Required
Resp.TargetDate
Complt.Date
StatusVerified
byYes No
3] Implementation Record
Changes Actual implemented
On By Name Sign / Date
Designation
-
5/21/2018 Engineering Change Note
3/3