GENERAL INFORMATION 1
ECAR MAJOR MILESTONES
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
ECAR Presentation
JV SET UP
05.2002 AIRBUS and KASKOL signed MOU
10.2002 Registration of ECAR and Training Phase StartINTENSIVE TRAINING PHASE
03.2003 First Working Day in Moscow (25 FTE)
GROWTH OF INTERNAL STAFF
10.2007Planned Headcount Reached (180 FTE)
CRUISE MODECompletion of First Development Projects
05.2006 EN9100Certification
Customer diversification is approved by shareholders (ability to work not only for AIRBUS)
ECAR received category “A” as AIRBUS supplier
AIRBUS technical check signature rights received
3
ECAR KEY VALUES AND FACTS
ECAR Presentation 4
17 years on the market of engineering services
More than 120 completed projects for AIRBUS
Delivered more than 4 500 000 engineering hours
Own engineering staff is 180 engineers
Category “A” as AIRBUS supplier
99% - Right First Time Delivery, 100% - On Time Delivery
AIRBUS Awards for excellence 2017/2018
WORK IMPLEMENTATION ON ANY STAGE OF PRODUCT LIFE
Concept design Design development Serial production support
In-service support
Pre-design R&D projects
Detail design Structure optimization Manufacturing
drawings and Bill of material release
Development of structure modification
Manufacturing support and concessions
In-service modification design development
A/c reconfiguration Non-typical repair
ECAR Presentation 5
QUALITY MANAGEMENT CERTIFICATION CERTIFICATION OF ECAR QMS FOR ISO9001/EN9100
FROM 2006;
AIRBUS APPROVAL FROM 2006.
ECAR Presentation
Aviation Development License
MINPROMTORG license on the
development, production, tests and
repair of aviation technics.
6
Q6, SQCDP, LEAN & SAVINGS
Deployment started in 2010;
Weekly company/ engineering / project KPI
visualization: ON TIME, EVM, QUALITY;
Daily project progress visualization (Project
Management DATA BASE);
SCRUM;
Practical problem solving;
Saving programs.
ECAR Presentation 7
MAIN COMPETENCES 2
MAIN COMPETENCES (DESIGN DEVELOPMENT)
ECAR Presentation 9
ECAR DESIGN TEAM
Aircraft structure
Configuration management
Mechanical System
Installation
Electrical System
Installation
Composite design
3D Modelling
Mechanism
MAIN COMPETENCES (STRESS)
ECAR Presentation 10
ECAR STRESS TEAM
Static analysis
F & DT
Certification reporting
Composite analysisDynamic
Finite Element
Modeling
SRM
EXPERIENCE 3
А350 FAMILY ECAR ACTIVITIES
12
More than 6 000 drawings delivered; New connection principle of adjustable
fittings of PAX doors was proposed byECAR engineers and patented.
ECAR Presentation
LowerFrameworksBulk Cargo Floor
Integration of Section16/18
Circumferential joint C93(integration of Section16/18 and Section 19)
Rear fuselage A-brackets
Crown & CabinB-brackets.Cargo Lining
PAX and Bulkcargo doorinterface
SA FAMILY - ECAR ACTIVITIES
13
500-600 drawings per year. More than 6000 drawings delivered;
100% On Time Delivery.
ECAR Presentation
Design and stress activities forprimary and secondary structurefor fuselage and floor grids
Design ofMechanical andFluid SystemsInstallation
Standard modifications, Feasibility studies,Manufacturing and in-service support forfuselage sections
Modification of Aft Belly Fairingcomposite panels and metallicsub structure
LR FAMILY - ECAR ACTIVITIES
14
500-600 drawings per year. More than 6000 drawings delivered;
100% On Time Delivery.
ECAR Presentation
Design and stress activities forprimary and secondary structurefor fuselage sections
Design of Mechanicaland Fluid SystemsInstallation
Standard modifications, Feasibility studies,Manufacturing and in-service support forfuselage sections
Design of standard andcustomized PAX and Cargofloor panels
Integrated frames development for Be-200
NON-AIRBUS AVIATION PROJECTS
ECAR Presentation
Central luggage rack installation development for Il-96
ULD development (type LD-3, LD3-45W, PKC)
15
Fuselage central section development for SR-10
NON-AVIATION PROJECTS
ECAR Presentation
Stress calculations of cargo railcar frame
Test camera stress calculations
Bus cargo door mechanism
16
Turboexpander stress calculations
Conveyer structure development
Concept of covers for wind energy unit
This document and all information contained herein is the sole property of ECAR. No intellectual property rights are granted by the delivery of this document or the disclosure of its content. This document shall not be partially or globally reproduced or disclosed to a third party without the express written consent of ECAR. This document and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting grounds for these statements are not shown, ECAR will be pleased to explain the basis thereof.
Коммерческая тайна АО «Инженерный центр ИКАР» 127287, Россия, Москва, ул. 2-я Хуторская, д.38А, стр.9
ENGINEERING CENTER OF AIRBUS IN RUSSIA