Engineering and Commercial Infrastructure - Water Services Monthly Review December 2017 - January 2018

Transcript of Engineering and Commercial Infrastructure - Water Services · The following chart displays a...

Page 1: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

Engineering and Commercial Infrastructure -

Water Services

Monthly Review

December 2017 - January 2018

Page 2: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 2

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

OVERVIEW ............................................................................................................................. 3 

SAFETY ................................................................................................................................ 4 

1.1.  Incident Statistics ........................................................................................................ 4 1.2.  Lost Time Injuries ........................................................................................................ 4 

FINANCE .............................................................................................................................. 5 

2.1.  Water and Wastewater Financial Fund Report ........................................................... 5 2.2.  Operating Result for Water and Waste Water Fund .................................................... 6 2.3.  Accrued Water Operating Revenue Less Expenditure ................................................ 6 2.4.  Accrued Wastewater Operating Revenue less Expenditure........................................ 7 

CUSTOMER SERVICES ................................................................................................... 7 

3.1.  Requests ..................................................................................................................... 7 3.2.  Request Types ............................................................................................................ 7 3.3.  Plumbing Applications ................................................................................................. 8 3.4.  Trade Waste Approvals ............................................................................................... 9 3.5.  Annual Trade Waste Activity ....................................................................................... 9 3.6.  Building Over Adjacent Sewers ................................................................................. 10 3.7.  Scientific and Analytical Services .............................................................................. 10 3.8.  Community Engagement ........................................................................................... 11 3.9.  Leak Detection Notifications ...................................................................................... 12 

ASSET MANAGEMENT.................................................................................................. 13 

4.1.  Surface Water Raw Water Storage Capacities ......................................................... 13 4.2.  Annual Water Consumption vs Allocation by Source ................................................ 14 4.3.  Water Consumption by Locality – Residential Customers Only ................................ 14 4.4.  Significant Projects .................................................................................................... 15 

REGULATORY COMPLIANCE ..................................................................................... 19 

5.1.  Drinking Water Compliance ....................................................................................... 19 5.2.  Wastewater Compliance ........................................................................................... 20 5.3.  Backflow Testing ....................................................................................................... 20 

 

Page 3: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 3

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

OVERVIEW

This report is for Water Services activities for December 2017 and January 2018. Significant items in this period include:

No Lost Time Injuries occurred in December 2017 or January 2018

Round One of the $11.49M Works for Queensland State Government funded job creating and

supporting initiative was completed. The following projects were completed:

o A water main replacement along Smalleys Beach Road, Cape Hillsborough and

geobag protection works to the Campwin Beach Water Supply Main by the Water

Networks Team;

o Sarina Sewerage System cleaning, CCTV inspections and rehabilitation works by the

Sewer Networks Team with upgrades of two sewer overflows coordinated through

Planning & Sustainability;

o Redrilling and equipping of two bores, renewal of pumps and sheds for the other five

bores supplying the Nebo Road Water Treatment Plant and installation of an

educational display on the clarifier structures by the Water Treatment and Business

Services Teams;

Under bridge inspections of Water & Sewer Mains were completed on both Forgan Bridge and

Barnes Creek Bridge in January 2018

A condition assessment on the clarifier tanks was completed at the Nebo Road Water

Treatment Plant in January 2018. The work was completed with no incidents, no issues, whilst

ensuring steady and quality water supply to the region

As of Sunday, 28 January 2018, recycled water supplies at Recycled Water Storage 3, the main

2,200ML storage system within Mackay Water Recycling Project, were low. The pump station

was turned off and will remain off until supply has been replenished. Recycled Water Storage

2, the secondary 530ML storage system, is currently at 40% capacity. These storage systems

are used to distribute recycled water to sugar cane properties within the project area. Growers

have taken up approximately 3,100ML, or almost 40% of recycled water produced for the

Scheme since 1 July 2017.

 

Director Engineering & Commercial Infrastructure  

Page 4: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 4

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

SAFETY

1.1. Incident Statistics

The incident statistic details a summary of the Water Services safety incident performance. Water Services aspires to achieve zero harm with a stretch target of zero injuries.

December 2017 and January 2018 Summary:

No of Incidents Mechanism of injury Injury Type

1 Bite / Sting Medical Treatment Injury

1 Contact with Electricity Medical Treatment Injury

1 Hitting Objects with a part of the body

First Aid Injury

1 Muscular Stress Medical Treatment Injury

3 Vehicle Incident Near miss

1 Hitting Objects with a part of the body

Non-Treatment Injury

1.2. Lost Time Injuries

Water Services aspires to achieve zero Lost Time Injuries by improving safety performance by developing a proactive safety culture and implementing best practice safety management across all business areas.

0

1

2

3

4

5

6

7

8

Nu

mb

er

of

Inci

de

nts

Total Incidents Lost Time Injuries Total Recordable Injuries All Injuries

0

1

2

3

4

5

0

10

20

30

40

50

60

70

80

No

of

LT

Is

No

. o

f D

ays

Lo

st

Lost Time Injuries

Water Total Days Lost Water Total LTIs

Page 5: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 5

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

December 2017 and January 2018 Summary:

No Lost Time Injuries were sustained during December 2017 or January 2018. The table below shows the Lost Time Injuries over previous years.

FINANCE

2.1. Water and Wastewater Financial Fund Report

 

LTI Days Lost LTI Days Lost LTI Days Lost LTI Days Lost LTI Days Lost

Administration

Business Services

Planning & Sustainability

Water Network 4 9 3 71 0 0 1 13 2 35

Water Treatment

Infrastructure Delivery 1 27

Water Services 4 9 3 71 0 0 1 13 3 62

Department2013‐14 2014‐15 2015‐16 2016‐17 2017‐18

For January 2018

Operating Result AMD Budget YTD Budget YTD Actual YTD Variance %

Water6.01 - Commercial Infrastructure Management (41,062,447) (30,310,533) (30,024,195) 286,337 99%

6.02 - Planning & Sustainability 1,006,116 415,790 445,372 29,582 107%

6.03 - Infrastructure Delivery 268,338 79,779 74,619 (5,161) 94%

6.04 - Water Networks 6,410,456 3,798,919 3,501,464 (297,455) 92%

6.06 - Business Services 20,410,176 11,828,361 11,839,020 10,660 100%

6.07 - Water Treatment 5,252,470 3,136,048 2,993,984 (142,064) 95%

Total Water (7,714,893) (11,051,635) (11,169,736) (118,100) 101%

Sewerage6.01 - Commercial Infrastructure Management (42,668,490) (44,605,332) (44,635,260) (29,928) 100%

6.02 - Planning & Sustainability 806,723 328,573 321,561 (7,012) 98%6.03 - Infrastructure Delivery 639,652 89,734 61,367 (28,367) 68%

6.04 - Water Networks 5,304,767 2,949,025 2,711,550 (237,475) 92%

6.06 - Business Services 18,924,364 10,709,560 10,752,449 42,889 100%

6.07 - Water Treatment 6,069,185 3,708,080 3,642,051 (66,029) 98%

Total Sewerage (10,923,798) (26,820,360) (27,146,282) (325,922) 101%

TOTAL OPERATIONAL (18,638,691) (37,871,996) (38,316,018) (444,022) 101%

% Variance from YTD Budget

Actuals more than 10% over YTD Budget

Actuals between 5% and 10% over YTD Budget

Actuals between 5% over and 10% under YTD Budget

Actuals between 10% and 50% under YTD Budget

Actuals more than 50% under YTD Budget

Revenue higher ($150K) offset by increase in wages ($10K), increase in costs ($85K) and less plant hire ($11K).

Revenue higher ($45K) offset by budget over in wages ($16k) and costs less due to timing difference ($1K).

Saving against wages.

Saving against wages ($7K) and timing differences in costs ($21K).

Revenue higher ($2K), wages less ($128K), internal plant hire less ($12K) and timing difference in costs ($95K).

Less revenue ($24K) and Toolbox Talk's over budget ($21K) (which drives some of the wage savings in Water Networks). Depreciation less ($3K).

Water & Sewerage Fund Financial Report

Comments

Combination of slightly lower revenue ($301K), higher wages ($16K), timing difference in costs ($5K) & higher internal water sales ($26K).

Higher wages ($34K) partially offset by timing differences in costs ($5K).

Higher wages ($5K) partially offset by timing differences in costs ($10K).

Revenue less ($28K), less in wages ($231K), less in internal plant hire ($22K) and timing differences in costs ($72K).

Primarily charges to Toolbox Talk's being over budget $78K (which drives some of the wage savings in Water Networks). Offset by higher net income MiWater ($61K) and plumbing inspections ($5K).

Revenue higher ($84K), saving against wages ($7K), savings against plant hire ($4K) and timing differences in costs ($47K).

Page 6: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 6

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

2.2. Operating Result for Water and Waste Water Fund

 

January 2018 Summary:

Overall the Water and Waste Water budgets are tracking in line with expected YTD expenditure for the first five months of the year. Budgets are continuing to be reviewed closely along with remaining forecast revenue predications. 

 

2.3. Accrued Water Operating Revenue Less Expenditure

The following shows the estimation of the accrued revenue less expenditure. Capital revenue has been excluded.

January 2018 Summary:

The annual surplus (before tax & dividends) is projected to be in line with the budget.  

(45,000,000)

(40,000,000)

(35,000,000)

(30,000,000)

(25,000,000)

(20,000,000)

(15,000,000)

(10,000,000)

(5,000,000)

-July August September October November December January February March April May June

Operating Result

YTD Budget YTD Actual

0

2000000

4000000

6000000

8000000

10000000

12000000

Re

ven

ue

less

ex

pe

nd

itu

re (m

arg

in)

Operational Hours

Budget - Water Accrual Actual - Water Accrual Proj. Accrual Actuals - Water

Page 7: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 7

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

2.4. Accrued Wastewater Operating Revenue Less Expenditure

The following shows the estimation of the accrued revenue less expenditure. Capital revenue has been excluded.

January 2018 Summary:

The annual surplus (before tax and dividends) is projected to be $449,200 more than budget.

CUSTOMER SERVICES

3.1. Requests

This chart details the customer requests received and recorded via pathways that relate to the Water Business. The target is to have 90% of all customer requests closed at any one point in time.

January 2018 Summary:

The number of requests received in January 2018 is higher than previous months. 90% of Customer Requests were completed within the specified time frames, which is on target.   100% of Customer Requests were completed within the specified timeframe during December 2017.

3.2. Request Types

The following chart displays a summary of the customer request types received for the month.

0

2000000

4000000

6000000

8000000

10000000

12000000

14000000

16000000

Reve

nue

less

exp

endi

ture

(mar

gin)

Operational Hours

Budget - Sewerage Accrual Actual - Sewerage Accrual Proj. Accrual Actuals - Sewarage

0%

20%

40%

60%

80%

100%

0

50

100

150

200

250

300

350

400

450

% C

lie

nt R

eq

ue

sts

Co

mp

lete

d

To

tal

Cli

en

t Re

qu

est

s

Monthly Client Requests Received % of total Client Requests Completed Completion Target %

Page 8: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 8

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

January 2018 Summary:

The number of requests received in January was 360 with the majority of requests being for Water Leak Services; i.e. 188 requests.

3.3. Plumbing Applications

In accordance with the Plumbing and Drainage Act, a plumbing application is required for all new or modifications to plumbing installations. A plumbing application must be lodged to Local Government. Water Services has a regulatory time frame of 20 business days to assess a plumbing application. An internal target of five business days has been set for all residential plumbing applications.

January 2018 Summary:

The number of Plumbing Applications approved decreased slightly from 30 in December 2017 to 29 in January 2018. The Approval Turnaround times is at two days which is within the five-day target.

0

500

1000

1500

2000

0

50

100

150

200

Sew

erag

e bl

ock

age/

spill

Sew

erag

e od

our

Sew

er M

isce

llane

ous

Sew

er -

Man

hole

s

Sub

sid

ence

in G

roun

d

Dirt

y w

ater

/Clo

udy

wa

ter

Fir

e H

ydra

nt /

Ser

vice

Val

ve

No

Wa

ter

/ Low

Wa

ter

Pub

lic A

men

itie

s /

Re

cF

aci

litie

s

Wat

er L

eak

Ser

vice

Wat

er -

Sto

pco

ckM

alfu

nctio

nin

g

Wat

er L

eak

Mai

n

Wat

er M

ete

rB

roke

n/Le

akin

g

Wat

er O

dou

r/T

ast

e/S

mel

l

Wat

er M

isce

llan

eous

Ye

arl

y T

ren

d T

ota

l R

eq

ue

sts

To

tal

Cli

en

t Re

qu

est

s

Monthly Client Service Requests Yearly Client Service Request Trend

0

2

4

6

0

50

100

Ap

pro

val

Tim

e (D

ays

)

Ap

pli

cati

on

s

Total Approved Plumbing Applications Information Requests Sent

Average Approval Time Target Plumbing Approval Turn around Time

Page 9: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 9

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

3.4. Trade Waste Approvals

There is an ongoing program for undertaking trade waste assessment and licensing applicable businesses that discharge trade waste. As part of the trade waste assessment process a temporary Trade Waste Approval is established while the formal approval process is undertaken. The table below summarises the number of Trade Waste Approvals for the Mackay region.

December 2017 and January 2018 Summary:

Six new Trade Waste approvals were provided to businesses during December 2017 and 10 new Trade Waste approvals were provided to businesses during January 2018 after they completed the Trade Waste requirements. These businesses were in the following categories: four new home based businesses, two business renovations/upgrades, one business relocation, one change of business owner, four new businesses, three new businesses at existing locations and one existing business.

3.5. Annual Trade Waste Activity

Annual targets are set for the Trade Waste team with respect to licensing trade waste businesses. The target has been set at 250 for new licensed businesses and audits completed by June 2018. The following chart shows the actual approvals, temporary approvals and audits achieved and the number of the target remaining.

December 2017 and January 2018 Summary:

Six approvals were issued and 11 audits were completed during December 2017. 10 approvals and 13 audits were completed during January 2018. 

69

125

51 38

125

0% 20% 40% 60% 80% 100%

Target Trade Waste Approvals & Audits Completed

YTD Audits Remaining Audits YTD Approvals

Temporary Approvals Remaining Approvals

Target Audits =

Target Approvals =

Total Approved

Businesses

Temporary Approvals in

Place

New Approved Businesses for

the Month

Mackay South 762 36 9

Mackay North 73 0 1

Sarina 54 1 0

Mirani/Marian 28 1 0

Total 917 38 10

Page 10: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 10

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

3.6. Building Over Adjacent Sewers

Building over adjacent sewer (BOAS) applications are lodged where the construction of a structure is proposed within close proximity of a sewer main. The application is assessed against Queensland Development Code Mandatory Part 1.4 with council reviewing applications that do not comply with acceptable solutions identified in the code. Building over sewer applications are assessed within a target timeframe of 20 business days.

 

December 2017 and January 2018 Summary:

Three new BOAS referrals were received in December 2017 and none in January 2018. Plumbing Inspectors continue to handle enquiries and provide information on infrastructure locations and general information regarding the Queensland Development Code. 

3.7. Scientific and Analytical Services

Scientific and Analytical Services provides laboratory analysis in accordance with National Association of Testing Authorities (NATA) Standards to both Mackay Regional Council and external customers. A summary of the laboratory activities is detailed below.

December 2017 and January 2018 Summary:

The number of sample batches registered and the number of samples tested fell in December 2017. During December 2017, several tests were completed for Whitsunday Regional Council; i.e. Bowen Sewerage characterisation. The number of sample batches registered, samples tested and tests performed increased significantly in January 2018. During January 2018, most the quarterly requirements for potable water (Mackay Regional Council and Isaac Regional Council) were performed. Overall, more than 29,000 tests were performed during January 2018.

0

5000

10000

15000

20000

25000

30000

35000

40000

0

200

400

600

800

1000

1200

1400

Tes

t P

erfo

rmed

Sam

ple

s

Samples Analysed Test Performed

Building Over Adjacent Sewers Applications

Month Number Month Number

February 2017 0 August 2017 1

March 2017 1 September 2017 1

April 2017 0 October 2017 3

May 2017 1 November 2017 0

June 2017 1 December 2017 3

July 2017 1 January 2018 0

Page 11: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 11

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

3.8. Community Engagement

Water Services engagement with the community on the services provided is monitored. The following chart shows the number of media releases, media updates and the number of people that were reached by the Media Releases on Facebook.

December 2017 and January 2018 Summary:

Media Releases Media Updates

Water main cleaning in Midge Point (Dec-17)

Residents asked to limit outdoor water use (Jan-18)

The following chart shows the number of likes and positive comments, the number of neutral comments and the number of negative comments received on Facebook from Media Releases and Media updates for Water Services

December 2017 and January 2018 Summary:

Facebook Likes

Six for post on “Water mains clearing in Midge Point” Eight for post on “New look water bottle refill station at Blue Water Quay”

31 for post on “Residents to limit outdoor water use”

Negative Comment

A negative comment was received in regard to the “Residents asked to limit outdoor water use”, which was about the timing of the clarifier investigation works during hot weather and school holidays.

0

50,000

100,000

150,000

200,000

250,000

300,000

0

1

2

3

4

5

6

7

8

9

10

Rea

ch o

n Fa

cebo

ok (P

eopl

e)

Rel

ease

s

Media Releases Media Update Facebook People Reached

0

100

200

300

400

500

600

700

Face

book

Fee

dbac

k

Likes Neutral Negative

Page 12: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 12

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

The following chart shows the cumulative number of myh2o registrations for the reporting period. The target number of registrations for the 2017/18 financial year is 13,000.

December 2017 and January 2018 Summary:

There were 36 new registrations in December 2017 and 70 new registrations in January 2018, bringing the total number of myh2o registrations to 12,204.

3.9. Leak Detection Notifications

Leak Detection notifications are sent to customers, when a leak identified is greater than 10 litres per hour. Follow up notices are sent to residents, monthly for a three-month period after the initial notification.

January 2018 Summary:

The number of new leaks identified during January 2018 for residential customers was 1,764 and for non-residential customers was 251. This was an increase for both residential customers and non-residential customers from the previous month. The number of meters with leaks at the end of the reporting period has increased to 1,024 for residential customer and increased to 336 for non-residential customers. The number of leaks ceased during the period for residential customers has increased to 1,591 and non-residential customers has decreased to 217.

0

2,000

4,000

6,000

8,000

10,000

12,000

Nu

mb

er

of

Myh

2o R

eg

istr

ati

on

s

myh2o registrations myh20 Target Registrations 2017/2018

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Num

ber

of L

eaks

Meters with Leaks (End of Period) - Res Meters with Leaks (End of Period) - Non Res

New Leaks in Period - Res New Leaks in Period - Non Res

Leaks Ceased During Period - Res Leaks Ceased During Period - Non Res

Page 13: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 13

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

The average leak days shows the average number of days a leak exists before any action is taken by the customer to rectify. The average leak days for ceased leaks shows the average number of days that the leak exists before being repaired.

January 2018 Summary:

The Average Leak Days (current leaks) for both residential and non-residential customers decreased during January 2018. The difference between non-residential and residential for current leak days is 132 days. The Average Leak Days (Ceased Leaks) show that the residential customer has the leaks repaired within 14 days on average, whereas the non-residential customer takes 31 days to have leaks repaired on average. Considerable effort is undertaken with non-residential customers to encourage attention to fix the identified leaks, however, some of these leaks are very difficult to track down due to the size and complexity of their property.

ASSET MANAGEMENT 4.1. Surface Water Raw Water Storage Capacities

Water is sourced from a combination of surface and groundwater sources. With the exception of Middle Creek Dam, the storage facilities are owned and operated by SunWater. Middle Creek Dam is under Council’s control. The water stored in each of the storages is detailed below.

January 2018 Summary:

Marian and Dumbleton Weirs are at full capacity. Mirani Weir, Teemburra Dam and Peter Faust Dam are at 88%, 88% and 70% capacity respectively which is a decrease in capacity from the previous month. Middle Creek Dam is at 45% capacity.  

0

50

100

150

200

250

Num

ber

of D

ays

Average Leak Days (Current Leaks) - Res Average Leak Days (Current Leaks) - Non Res

Average Leak Days (Ceased Leaks) - Res Average Leak Days (Ceased Leaks) - Non Res

2,80

0

3,98

5

6,10

8

1,12

0

491,

490

147,

556

0%

20%

40%

60%

80%

100%

Mirani Weir Marian Weir DumbletonWeir

MiddleCreek Dam

Peter FaustDam

TeemburraDam

% Vo

lum

e St

ored

Volume Stored

ML

ML

ML

ML M

L

ML

Page 14: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 14

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

4.2. Annual Water Consumption vs Allocation by Source

Water Services has an annual water allocation or water license for each water source. The water allocation and year to date water consumption for each of the water source is detailed below.

** Calen Water Usage figures are not based on Water Allocation, but show the amount of water usage for the area to date.

4.3. Water Consumption by Locality – Residential Customers Only

Water Services supplies potable water to both residential and commercial customers throughout the Mackay region. The average water consumption in each of the three major community centres is detailed below for residential customers only. The water consumption is presented as litres per equivalent population per day (l/p/d).

January 2018 Summary:

Water consumption for all three major community centres has increased over December 2017 and January 2018 due to the minimal rainfall in the region. When there is rainfall, the three centres of Mackay, Sarina and Marian/Mirani generally show similar water consumption. It is only when there is no rainfall that Marian/Mirani consumption increases above Mackay and Sarina.

165,9744090018048821040511258

481504012952363001009549022270062150352304660460

0% 50% 100%

Calen Water Usage **Dumbleton

Nebo Rd BoresPlane Creek

Sarina BoresMirani Bore

Marian BoresMarwood Bores

Bloomsbury BoreProserpine River

Eton BoresBally Keel BoreKoumala Bores

Armstrong Beach BoreFinch Hatton Bore

Gargett BoresMarian Weir

Wa

ter

Vo

lum

e (M

L)

YTD Water Consumed (ML) Allocation

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

450.00

500.00

0

100

200

300

400

500

600

700

800

900

Res

iden

tial

Wat

er C

onsu

mpt

ion

(l/p/

d)

Rai

nfal

l (m

m)

Rainfall Mackay Sarina Marian/Mirani Target

Page 15: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 15

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

4.4. Significant Projects

Water Services undertakes a range of projects across the water business. Projects take the form of Capital works projects, planning studies and investigations. Information for the significant projects in Water Services is provided in the table below and was current as at 31 January 2018. Significant Projects are assessed on the following criteria: Dollar Amount, Risk and/or Community Interest

Council Project Management Phases 1. Planning (Plan) 2. Design (Des) 3. Procurement (Proc) 4. Construction (Con)

Indicators On Track Potential Issue Definite Issue

PROJECT PHASE PHASE %

COMPLETE INDICATORS

ORIGINAL BUDGET DETAILS

COMMENTS

Sewerage Network Refurbishments (Relining)

Proc 80% Schedule Scheduled Completion Date:

30/06/2018

Original Budget:

$2,525,260

The project includes 17km of sewer inspection and condition assessment using CCTV and the internal relining repair of 8.4 km of sewer in the size range 150 to 900mm diameter. A number of Tender Information Requests have been issued in September and October to address incomplete Tender responses and facilitate parity. Based on the responses received, a potential issue with availability of Contractors impacting the timing of the works has resulted in an advice to Tenderers to program resources to commence relining works in April 2018 - outside of the critical wet weather period when sewers are more accessible. Associated with this change, most expenditure is being forecast into 18/19.

The Principal has re-visited the Technology offerings in terms of risk mitigation during construction and further clarifications have been issued together with an extension to validity period. Tender evaluation is expected to be completed in February 2018.

Budget

Other Issues/ Risk

Sewerage Network Refurbishments (Maintenance Holes (MH))

Proc 60% Schedule Scheduled Completion Date:

30/06/2018

Original Budget:

$857,778

Tender awarded for MHs requiring condition assessment inspection works by external contractor. Works in progress with 305 of 510 MHs inspected. These works on schedule to be completed by end of Feb'18.

Approx. 250 MHs of 275 have been repaired, incorporating repairs to bench, channel, neck/cone and lid by WWS Networks Sewer Crew. CCTV survey of 70 of 165 buried MHs completed by WWS Networks Camera Crew.

Requests for quotes issued for two packages of MH rehabilitation works, submissions due end of January 2018.

Budget

Other Issues/ Risk

Con 95% Schedule Scheduled Completion Date: Budget

Page 16: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 16

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

PROJECT PHASE PHASE %

COMPLETE INDICATORS

ORIGINAL BUDGET DETAILS

COMMENTS

Domestic Water Meter Replacements

Other Issues/ Risk

30/06/2018

Original Budget:

$119,000

There are approx. 600 properties identified for meter replacements with works for 593 properties completed to date.

Mt Pleasant Reservoir No. 1 Refurbishments

Con 75% Schedule Scheduled Completion Date:

30/12/2017

Original Budget:

$1,661,016

17/18 Budget: $2,661,016

Installation of the new Post Tensioning (PT) bands has commenced with approx. 50% installed at the end of January 2018. During preparation/cleaning of the internal coating, additional areas requiring repair have been identified and are being treated as defects for the supplier of the coating to address.

There are a number of potential repair methods which are being considered to get the best possible solution for these, along with the previously identified internal repairs. The additional internal repairs are currently the critical path for getting the reservoir back in service and have pushed the timing from end of February 2018, into March 2018.

Budget

Other Issues/ Risk

Water Main (WM) Renewals

Des and Con

80% Des

50% Con

Schedule Scheduled Completion Date:

30/06/2018

Original Budget:

$1,296,359

Design works for Ready Street WM are complete with construction expected to commence late February 2018.

Design alignment and extent of works for Lambrook Street water main replacement have been through a number of iterations. Stakeholder engagement has now been completed and the design can be finalised. Estimated design completion is now late February 2018 with Construction to commence in April 2018.

Design of Alfred Street (between Brisbane and Carlyle Streets) is nearing completion. Final reviews to be completed early February 2018.

An emergent project at Risley Parade, Cape Hillsborough, has been identified and given priority in the internal crew's construction program. Construction expected to be completed in February 2018. This additional scope will impact the budget by approximately $100,000. A separate budget request will be made for this emergent work in the next quarterly budget review.

Budget

Other Issues/ Risk

Water Main Replacements (WMR) - Roads Driven

Des and Con

85% Des

50% Con

Schedule Scheduled Completion Date:

30/06/2018

Original Budget:

$1,640,770

There have been issues identified with the suitability of the thrust blocks on the Vines Creek WMR; an alternative option has been identified and Contractors are moving ahead with it. Department of Transport and Main Roads are administering the works.

Budget

Other Issues/ Risk

Page 17: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 17

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

PROJECT PHASE PHASE %

COMPLETE INDICATORS

ORIGINAL BUDGET DETAILS

COMMENTS

MRC internal Infrastructure Delivery Crew are progressing on Maud Street, Mirani, expected to be complete in mid-February 2018.

Emergent relocation work on Ferries Terrace, Sarina Beach, have commenced, expected to be complete in February 2018.

Eton Water Supply

Plan / Des

40% Schedule Scheduled Completion Date:

30/06/2018

Original Budget:

$650,000

Drilling of an investigation bore commenced in November 2017. It was confirmed that there were two aquifers, though a complication was identified during drilling leading to potential cross contamination between the two aquifers. Technical resolution required that the existing investigation bore be supplemented by the drilling of a second trial bore in the shallower aquifer, completed in December 2017. Better water quality results have been recorded on the shallow trial bore so drilling the final production bore located in the shallower aquifer is scheduled to commence late January 2017. Hydraulic Modelling work is complete. Specifications are prepared for the water softening equipment and civil works.

Recent analysis of Eton water samples indicated that pH correction is also required to stabilise the water quality in the networks. As a consequence, additional concept design work and Technical Specifications are required for pH correction equipment to be installed under the contract works. This additional scope will impact the budget with the quantum to be established once the process concept design and specifications are established.

Council's consultant is working on a revised specification. Once the pH correction specification is complete and the contract conditions and schedules are finalised, a tender will be released and this is now expected by end of February 2018.

Budget

Other Issues/ Risk

Shakespeare Street sewer realignment

Con 95% Schedule Scheduled Completion Date:

30/12/2017

Original Budget:

$450,250

The sewer construction is complete (January 2018). The contractor has re-established the lawns, garden beds and fencing. Watering of the lawns is ongoing.

Still to be completed by Council is the replacement of a carport/shed structure and vegetation in the garden beds. Procurement for these services is in progress, however, shortages of supply of sheds and associated works are impacting finalisation dates.

Budget

Other Issues/ Risk

Page 18: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 18

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

PROJECT PHASE PHASE %

COMPLETE INDICATORS

ORIGINAL BUDGET DETAILS

COMMENTS

Mirani Storage Plan / Des

85% Schedule Scheduled Completion Date:

31/01/2019

17/18 Original Budget:

$683,000

Detailed design is being reviewed and is expected to be complete early February 2018.

The current schedule still has construction commencing mid-2018.

Land purchase has been finalised.

Budget

Other Issues/ Risk

Mirani Water Recycling Facility Upgrade

Proc 25% Schedule Scheduled Completion Date:

31/01/2021

17/18 Original Budget:

$815,888

Submissions for the Expression of Interest have been evaluated and recommendation for shortlisting will be presented to Council in February 2018.

Environmental Assessment Report has been submitted to Department of Environment and Heritage Protection to confirm license conditions.

A request for further information has been received and responded to.

Budget

Other Issues/ Risk

Water Laboratory relocation

Plan / Des

10% Schedule Scheduled Completion Date:

31/06/2018

17/18 Original Budget:

$1,750,000

Property and building purchase has been finalised with the settlement on 31 January 2018.

A Design Brief for the fitout of the building has been sent out for quotation and submissions are due at the end of January 2018.

Preliminary layout concepts have been developed for the building to establish the scope for detail design and revised estimates and updated estimates that are slightly higher than original budget. The quantum to be established once detailed designs are complete.

Budget

Other Issues/ Risk

  

 

Page 19: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 19

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

REGULATORY COMPLIANCE 5.1. Drinking Water Compliance

Potable water is provided in accordance with the requirements of the Water Supply Safety and Reliability Act, measured against the Australian Drinking Water Quality Guidelines. Drinking Water samples are taken at the outlet of Water Treatment Plants and at various locations within the reticulation network. Please note: These results are reported one month in arrears. A summary of the performance is detailed below.

December 2017 Summary:

Eton reticulation samples for Selenium continue to be in the range of 10-12 ug/L. pH was detected to be below the Australian Drinking Water Quality Aesthetic Guideline Value of 6.5 recommended limit at Gargett, being 6.37 on one occasion.

December 2017 Summary:

Eton continues to have high values for the aesthetic parameter of hardness (>200 mg/l), with values ranging from 370 mg/l to 405 mg/l respectively. These hardness levels will be addressed in the future with the planned provision of water softening plants as part of the Scheme. 

60

65

70

75

80

85

90

95

100

0

20

40

60

80

100

120

140

160

180

Co

mp

lia

nce

(%)

Te

sts

Co

nd

uct

ed

Health Parameter Test Results

Drinking Water Test Completed Non Compliant Health Parameter Tests % Compliance Target

0

20

40

60

80

100

120

140

160

180

Te

sts

Co

nd

uct

ed

Aesthetic Parameter Test Results

Drinking Water Test Completed Non-Compliant Aesthetic Parameter Tests

Page 20: Engineering and Commercial Infrastructure - Water Services · The following chart displays a summary of the customer request types received for the month. 0 2000000 4000000 6000000

 

 

Page 20

Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018

5.2. Wastewater Compliance

The discharges from wastewater treatment facilities are regulated by Development Approvals issued by the Department of Environment and Heritage Protection. The licence requirements differ based on the year the Development Approval was issued and the receiving environment associated with discharges.

December 2017 and January 2018 Summary:

Three wastewater tests were non-compliant in December 2017. These related to a breach of suspended solids for Recycled Water Storage 2 releases to water due to algal growth; pH for Nebo Road WTP supernatant released to water; and total phosphorus for Sarina Water Recycled Facility permeate released to environmental waters. One wastewater test was non-compliant in January 2018. This relates to non-compliance for faecal coliforms at Seaforth Wastewater Treatment Plant. The Regulator was informed of each occurrence within appropriate timeframes.

5.3. Backflow Testing

Backflow devices are installed on water services where there is a risk that water could return from a private property back into the Water Reticulation network. The requirement for backflow devices is regulated in accordance with the Standard Plumbing and Drainage Regulation.

December 2017 and January 2018 Summary:

13 new devices were registered, while 10 devices were cancelled in December 2017. 19 new devices were registered, while 12 devices were cancelled in January 2018. Council performed 55 tests on backflow devices in December 2017 and 45 tests on backflow devices in January 2018.

0

10

20

30

Te

sts

Co

nd

uct

ed

Samples Tested Non Compliant tests

Wastewater Test Results

0

10

20

30

40

50

60

70

0

10

20

30

40

50

Test

ed b

y C

ounc

il

No

of D

evic

es R

egis

tere

d/C

ance

lled

Monthly Devices Registered Devices Cancelled Tested By Council