Engineering and Commercial Infrastructure -
Water Services
Monthly Review
December 2017 - January 2018
Page 2
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
OVERVIEW ............................................................................................................................. 3
SAFETY ................................................................................................................................ 4
1.1. Incident Statistics ........................................................................................................ 4 1.2. Lost Time Injuries ........................................................................................................ 4
FINANCE .............................................................................................................................. 5
2.1. Water and Wastewater Financial Fund Report ........................................................... 5 2.2. Operating Result for Water and Waste Water Fund .................................................... 6 2.3. Accrued Water Operating Revenue Less Expenditure ................................................ 6 2.4. Accrued Wastewater Operating Revenue less Expenditure........................................ 7
CUSTOMER SERVICES ................................................................................................... 7
3.1. Requests ..................................................................................................................... 7 3.2. Request Types ............................................................................................................ 7 3.3. Plumbing Applications ................................................................................................. 8 3.4. Trade Waste Approvals ............................................................................................... 9 3.5. Annual Trade Waste Activity ....................................................................................... 9 3.6. Building Over Adjacent Sewers ................................................................................. 10 3.7. Scientific and Analytical Services .............................................................................. 10 3.8. Community Engagement ........................................................................................... 11 3.9. Leak Detection Notifications ...................................................................................... 12
ASSET MANAGEMENT.................................................................................................. 13
4.1. Surface Water Raw Water Storage Capacities ......................................................... 13 4.2. Annual Water Consumption vs Allocation by Source ................................................ 14 4.3. Water Consumption by Locality – Residential Customers Only ................................ 14 4.4. Significant Projects .................................................................................................... 15
REGULATORY COMPLIANCE ..................................................................................... 19
5.1. Drinking Water Compliance ....................................................................................... 19 5.2. Wastewater Compliance ........................................................................................... 20 5.3. Backflow Testing ....................................................................................................... 20
Page 3
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
OVERVIEW
This report is for Water Services activities for December 2017 and January 2018. Significant items in this period include:
No Lost Time Injuries occurred in December 2017 or January 2018
Round One of the $11.49M Works for Queensland State Government funded job creating and
supporting initiative was completed. The following projects were completed:
o A water main replacement along Smalleys Beach Road, Cape Hillsborough and
geobag protection works to the Campwin Beach Water Supply Main by the Water
Networks Team;
o Sarina Sewerage System cleaning, CCTV inspections and rehabilitation works by the
Sewer Networks Team with upgrades of two sewer overflows coordinated through
Planning & Sustainability;
o Redrilling and equipping of two bores, renewal of pumps and sheds for the other five
bores supplying the Nebo Road Water Treatment Plant and installation of an
educational display on the clarifier structures by the Water Treatment and Business
Services Teams;
Under bridge inspections of Water & Sewer Mains were completed on both Forgan Bridge and
Barnes Creek Bridge in January 2018
A condition assessment on the clarifier tanks was completed at the Nebo Road Water
Treatment Plant in January 2018. The work was completed with no incidents, no issues, whilst
ensuring steady and quality water supply to the region
As of Sunday, 28 January 2018, recycled water supplies at Recycled Water Storage 3, the main
2,200ML storage system within Mackay Water Recycling Project, were low. The pump station
was turned off and will remain off until supply has been replenished. Recycled Water Storage
2, the secondary 530ML storage system, is currently at 40% capacity. These storage systems
are used to distribute recycled water to sugar cane properties within the project area. Growers
have taken up approximately 3,100ML, or almost 40% of recycled water produced for the
Scheme since 1 July 2017.
Director Engineering & Commercial Infrastructure
Page 4
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
SAFETY
1.1. Incident Statistics
The incident statistic details a summary of the Water Services safety incident performance. Water Services aspires to achieve zero harm with a stretch target of zero injuries.
December 2017 and January 2018 Summary:
No of Incidents Mechanism of injury Injury Type
1 Bite / Sting Medical Treatment Injury
1 Contact with Electricity Medical Treatment Injury
1 Hitting Objects with a part of the body
First Aid Injury
1 Muscular Stress Medical Treatment Injury
3 Vehicle Incident Near miss
1 Hitting Objects with a part of the body
Non-Treatment Injury
1.2. Lost Time Injuries
Water Services aspires to achieve zero Lost Time Injuries by improving safety performance by developing a proactive safety culture and implementing best practice safety management across all business areas.
0
1
2
3
4
5
6
7
8
Nu
mb
er
of
Inci
de
nts
Total Incidents Lost Time Injuries Total Recordable Injuries All Injuries
0
1
2
3
4
5
0
10
20
30
40
50
60
70
80
No
of
LT
Is
No
. o
f D
ays
Lo
st
Lost Time Injuries
Water Total Days Lost Water Total LTIs
Page 5
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
December 2017 and January 2018 Summary:
No Lost Time Injuries were sustained during December 2017 or January 2018. The table below shows the Lost Time Injuries over previous years.
FINANCE
2.1. Water and Wastewater Financial Fund Report
LTI Days Lost LTI Days Lost LTI Days Lost LTI Days Lost LTI Days Lost
Administration
Business Services
Planning & Sustainability
Water Network 4 9 3 71 0 0 1 13 2 35
Water Treatment
Infrastructure Delivery 1 27
Water Services 4 9 3 71 0 0 1 13 3 62
Department2013‐14 2014‐15 2015‐16 2016‐17 2017‐18
For January 2018
Operating Result AMD Budget YTD Budget YTD Actual YTD Variance %
Water6.01 - Commercial Infrastructure Management (41,062,447) (30,310,533) (30,024,195) 286,337 99%
6.02 - Planning & Sustainability 1,006,116 415,790 445,372 29,582 107%
6.03 - Infrastructure Delivery 268,338 79,779 74,619 (5,161) 94%
6.04 - Water Networks 6,410,456 3,798,919 3,501,464 (297,455) 92%
6.06 - Business Services 20,410,176 11,828,361 11,839,020 10,660 100%
6.07 - Water Treatment 5,252,470 3,136,048 2,993,984 (142,064) 95%
Total Water (7,714,893) (11,051,635) (11,169,736) (118,100) 101%
Sewerage6.01 - Commercial Infrastructure Management (42,668,490) (44,605,332) (44,635,260) (29,928) 100%
6.02 - Planning & Sustainability 806,723 328,573 321,561 (7,012) 98%6.03 - Infrastructure Delivery 639,652 89,734 61,367 (28,367) 68%
6.04 - Water Networks 5,304,767 2,949,025 2,711,550 (237,475) 92%
6.06 - Business Services 18,924,364 10,709,560 10,752,449 42,889 100%
6.07 - Water Treatment 6,069,185 3,708,080 3,642,051 (66,029) 98%
Total Sewerage (10,923,798) (26,820,360) (27,146,282) (325,922) 101%
TOTAL OPERATIONAL (18,638,691) (37,871,996) (38,316,018) (444,022) 101%
% Variance from YTD Budget
Actuals more than 10% over YTD Budget
Actuals between 5% and 10% over YTD Budget
Actuals between 5% over and 10% under YTD Budget
Actuals between 10% and 50% under YTD Budget
Actuals more than 50% under YTD Budget
Revenue higher ($150K) offset by increase in wages ($10K), increase in costs ($85K) and less plant hire ($11K).
Revenue higher ($45K) offset by budget over in wages ($16k) and costs less due to timing difference ($1K).
Saving against wages.
Saving against wages ($7K) and timing differences in costs ($21K).
Revenue higher ($2K), wages less ($128K), internal plant hire less ($12K) and timing difference in costs ($95K).
Less revenue ($24K) and Toolbox Talk's over budget ($21K) (which drives some of the wage savings in Water Networks). Depreciation less ($3K).
Water & Sewerage Fund Financial Report
Comments
Combination of slightly lower revenue ($301K), higher wages ($16K), timing difference in costs ($5K) & higher internal water sales ($26K).
Higher wages ($34K) partially offset by timing differences in costs ($5K).
Higher wages ($5K) partially offset by timing differences in costs ($10K).
Revenue less ($28K), less in wages ($231K), less in internal plant hire ($22K) and timing differences in costs ($72K).
Primarily charges to Toolbox Talk's being over budget $78K (which drives some of the wage savings in Water Networks). Offset by higher net income MiWater ($61K) and plumbing inspections ($5K).
Revenue higher ($84K), saving against wages ($7K), savings against plant hire ($4K) and timing differences in costs ($47K).
Page 6
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
2.2. Operating Result for Water and Waste Water Fund
January 2018 Summary:
Overall the Water and Waste Water budgets are tracking in line with expected YTD expenditure for the first five months of the year. Budgets are continuing to be reviewed closely along with remaining forecast revenue predications.
2.3. Accrued Water Operating Revenue Less Expenditure
The following shows the estimation of the accrued revenue less expenditure. Capital revenue has been excluded.
January 2018 Summary:
The annual surplus (before tax & dividends) is projected to be in line with the budget.
(45,000,000)
(40,000,000)
(35,000,000)
(30,000,000)
(25,000,000)
(20,000,000)
(15,000,000)
(10,000,000)
(5,000,000)
-July August September October November December January February March April May June
Operating Result
YTD Budget YTD Actual
0
2000000
4000000
6000000
8000000
10000000
12000000
Re
ven
ue
less
ex
pe
nd
itu
re (m
arg
in)
Operational Hours
Budget - Water Accrual Actual - Water Accrual Proj. Accrual Actuals - Water
Page 7
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
2.4. Accrued Wastewater Operating Revenue Less Expenditure
The following shows the estimation of the accrued revenue less expenditure. Capital revenue has been excluded.
January 2018 Summary:
The annual surplus (before tax and dividends) is projected to be $449,200 more than budget.
CUSTOMER SERVICES
3.1. Requests
This chart details the customer requests received and recorded via pathways that relate to the Water Business. The target is to have 90% of all customer requests closed at any one point in time.
January 2018 Summary:
The number of requests received in January 2018 is higher than previous months. 90% of Customer Requests were completed within the specified time frames, which is on target. 100% of Customer Requests were completed within the specified timeframe during December 2017.
3.2. Request Types
The following chart displays a summary of the customer request types received for the month.
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
16000000
Reve
nue
less
exp
endi
ture
(mar
gin)
Operational Hours
Budget - Sewerage Accrual Actual - Sewerage Accrual Proj. Accrual Actuals - Sewarage
0%
20%
40%
60%
80%
100%
0
50
100
150
200
250
300
350
400
450
% C
lie
nt R
eq
ue
sts
Co
mp
lete
d
To
tal
Cli
en
t Re
qu
est
s
Monthly Client Requests Received % of total Client Requests Completed Completion Target %
Page 8
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
January 2018 Summary:
The number of requests received in January was 360 with the majority of requests being for Water Leak Services; i.e. 188 requests.
3.3. Plumbing Applications
In accordance with the Plumbing and Drainage Act, a plumbing application is required for all new or modifications to plumbing installations. A plumbing application must be lodged to Local Government. Water Services has a regulatory time frame of 20 business days to assess a plumbing application. An internal target of five business days has been set for all residential plumbing applications.
January 2018 Summary:
The number of Plumbing Applications approved decreased slightly from 30 in December 2017 to 29 in January 2018. The Approval Turnaround times is at two days which is within the five-day target.
0
500
1000
1500
2000
0
50
100
150
200
Sew
erag
e bl
ock
age/
spill
Sew
erag
e od
our
Sew
er M
isce
llane
ous
Sew
er -
Man
hole
s
Sub
sid
ence
in G
roun
d
Dirt
y w
ater
/Clo
udy
wa
ter
Fir
e H
ydra
nt /
Ser
vice
Val
ve
No
Wa
ter
/ Low
Wa
ter
Pub
lic A
men
itie
s /
Re
cF
aci
litie
s
Wat
er L
eak
Ser
vice
Wat
er -
Sto
pco
ckM
alfu
nctio
nin
g
Wat
er L
eak
Mai
n
Wat
er M
ete
rB
roke
n/Le
akin
g
Wat
er O
dou
r/T
ast
e/S
mel
l
Wat
er M
isce
llan
eous
Ye
arl
y T
ren
d T
ota
l R
eq
ue
sts
To
tal
Cli
en
t Re
qu
est
s
Monthly Client Service Requests Yearly Client Service Request Trend
0
2
4
6
0
50
100
Ap
pro
val
Tim
e (D
ays
)
Ap
pli
cati
on
s
Total Approved Plumbing Applications Information Requests Sent
Average Approval Time Target Plumbing Approval Turn around Time
Page 9
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
3.4. Trade Waste Approvals
There is an ongoing program for undertaking trade waste assessment and licensing applicable businesses that discharge trade waste. As part of the trade waste assessment process a temporary Trade Waste Approval is established while the formal approval process is undertaken. The table below summarises the number of Trade Waste Approvals for the Mackay region.
December 2017 and January 2018 Summary:
Six new Trade Waste approvals were provided to businesses during December 2017 and 10 new Trade Waste approvals were provided to businesses during January 2018 after they completed the Trade Waste requirements. These businesses were in the following categories: four new home based businesses, two business renovations/upgrades, one business relocation, one change of business owner, four new businesses, three new businesses at existing locations and one existing business.
3.5. Annual Trade Waste Activity
Annual targets are set for the Trade Waste team with respect to licensing trade waste businesses. The target has been set at 250 for new licensed businesses and audits completed by June 2018. The following chart shows the actual approvals, temporary approvals and audits achieved and the number of the target remaining.
December 2017 and January 2018 Summary:
Six approvals were issued and 11 audits were completed during December 2017. 10 approvals and 13 audits were completed during January 2018.
69
125
51 38
125
0% 20% 40% 60% 80% 100%
Target Trade Waste Approvals & Audits Completed
YTD Audits Remaining Audits YTD Approvals
Temporary Approvals Remaining Approvals
Target Audits =
Target Approvals =
Total Approved
Businesses
Temporary Approvals in
Place
New Approved Businesses for
the Month
Mackay South 762 36 9
Mackay North 73 0 1
Sarina 54 1 0
Mirani/Marian 28 1 0
Total 917 38 10
Page 10
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
3.6. Building Over Adjacent Sewers
Building over adjacent sewer (BOAS) applications are lodged where the construction of a structure is proposed within close proximity of a sewer main. The application is assessed against Queensland Development Code Mandatory Part 1.4 with council reviewing applications that do not comply with acceptable solutions identified in the code. Building over sewer applications are assessed within a target timeframe of 20 business days.
December 2017 and January 2018 Summary:
Three new BOAS referrals were received in December 2017 and none in January 2018. Plumbing Inspectors continue to handle enquiries and provide information on infrastructure locations and general information regarding the Queensland Development Code.
3.7. Scientific and Analytical Services
Scientific and Analytical Services provides laboratory analysis in accordance with National Association of Testing Authorities (NATA) Standards to both Mackay Regional Council and external customers. A summary of the laboratory activities is detailed below.
December 2017 and January 2018 Summary:
The number of sample batches registered and the number of samples tested fell in December 2017. During December 2017, several tests were completed for Whitsunday Regional Council; i.e. Bowen Sewerage characterisation. The number of sample batches registered, samples tested and tests performed increased significantly in January 2018. During January 2018, most the quarterly requirements for potable water (Mackay Regional Council and Isaac Regional Council) were performed. Overall, more than 29,000 tests were performed during January 2018.
0
5000
10000
15000
20000
25000
30000
35000
40000
0
200
400
600
800
1000
1200
1400
Tes
t P
erfo
rmed
Sam
ple
s
Samples Analysed Test Performed
Building Over Adjacent Sewers Applications
Month Number Month Number
February 2017 0 August 2017 1
March 2017 1 September 2017 1
April 2017 0 October 2017 3
May 2017 1 November 2017 0
June 2017 1 December 2017 3
July 2017 1 January 2018 0
Page 11
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
3.8. Community Engagement
Water Services engagement with the community on the services provided is monitored. The following chart shows the number of media releases, media updates and the number of people that were reached by the Media Releases on Facebook.
December 2017 and January 2018 Summary:
Media Releases Media Updates
Water main cleaning in Midge Point (Dec-17)
Residents asked to limit outdoor water use (Jan-18)
The following chart shows the number of likes and positive comments, the number of neutral comments and the number of negative comments received on Facebook from Media Releases and Media updates for Water Services
December 2017 and January 2018 Summary:
Facebook Likes
Six for post on “Water mains clearing in Midge Point” Eight for post on “New look water bottle refill station at Blue Water Quay”
31 for post on “Residents to limit outdoor water use”
Negative Comment
A negative comment was received in regard to the “Residents asked to limit outdoor water use”, which was about the timing of the clarifier investigation works during hot weather and school holidays.
0
50,000
100,000
150,000
200,000
250,000
300,000
0
1
2
3
4
5
6
7
8
9
10
Rea
ch o
n Fa
cebo
ok (P
eopl
e)
Rel
ease
s
Media Releases Media Update Facebook People Reached
0
100
200
300
400
500
600
700
Face
book
Fee
dbac
k
Likes Neutral Negative
Page 12
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
The following chart shows the cumulative number of myh2o registrations for the reporting period. The target number of registrations for the 2017/18 financial year is 13,000.
December 2017 and January 2018 Summary:
There were 36 new registrations in December 2017 and 70 new registrations in January 2018, bringing the total number of myh2o registrations to 12,204.
3.9. Leak Detection Notifications
Leak Detection notifications are sent to customers, when a leak identified is greater than 10 litres per hour. Follow up notices are sent to residents, monthly for a three-month period after the initial notification.
January 2018 Summary:
The number of new leaks identified during January 2018 for residential customers was 1,764 and for non-residential customers was 251. This was an increase for both residential customers and non-residential customers from the previous month. The number of meters with leaks at the end of the reporting period has increased to 1,024 for residential customer and increased to 336 for non-residential customers. The number of leaks ceased during the period for residential customers has increased to 1,591 and non-residential customers has decreased to 217.
0
2,000
4,000
6,000
8,000
10,000
12,000
Nu
mb
er
of
Myh
2o R
eg
istr
ati
on
s
myh2o registrations myh20 Target Registrations 2017/2018
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Num
ber
of L
eaks
Meters with Leaks (End of Period) - Res Meters with Leaks (End of Period) - Non Res
New Leaks in Period - Res New Leaks in Period - Non Res
Leaks Ceased During Period - Res Leaks Ceased During Period - Non Res
Page 13
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
The average leak days shows the average number of days a leak exists before any action is taken by the customer to rectify. The average leak days for ceased leaks shows the average number of days that the leak exists before being repaired.
January 2018 Summary:
The Average Leak Days (current leaks) for both residential and non-residential customers decreased during January 2018. The difference between non-residential and residential for current leak days is 132 days. The Average Leak Days (Ceased Leaks) show that the residential customer has the leaks repaired within 14 days on average, whereas the non-residential customer takes 31 days to have leaks repaired on average. Considerable effort is undertaken with non-residential customers to encourage attention to fix the identified leaks, however, some of these leaks are very difficult to track down due to the size and complexity of their property.
ASSET MANAGEMENT 4.1. Surface Water Raw Water Storage Capacities
Water is sourced from a combination of surface and groundwater sources. With the exception of Middle Creek Dam, the storage facilities are owned and operated by SunWater. Middle Creek Dam is under Council’s control. The water stored in each of the storages is detailed below.
January 2018 Summary:
Marian and Dumbleton Weirs are at full capacity. Mirani Weir, Teemburra Dam and Peter Faust Dam are at 88%, 88% and 70% capacity respectively which is a decrease in capacity from the previous month. Middle Creek Dam is at 45% capacity.
0
50
100
150
200
250
Num
ber
of D
ays
Average Leak Days (Current Leaks) - Res Average Leak Days (Current Leaks) - Non Res
Average Leak Days (Ceased Leaks) - Res Average Leak Days (Ceased Leaks) - Non Res
2,80
0
3,98
5
6,10
8
1,12
0
491,
490
147,
556
0%
20%
40%
60%
80%
100%
Mirani Weir Marian Weir DumbletonWeir
MiddleCreek Dam
Peter FaustDam
TeemburraDam
% Vo
lum
e St
ored
Volume Stored
ML
ML
ML
ML M
L
ML
Page 14
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
4.2. Annual Water Consumption vs Allocation by Source
Water Services has an annual water allocation or water license for each water source. The water allocation and year to date water consumption for each of the water source is detailed below.
** Calen Water Usage figures are not based on Water Allocation, but show the amount of water usage for the area to date.
4.3. Water Consumption by Locality – Residential Customers Only
Water Services supplies potable water to both residential and commercial customers throughout the Mackay region. The average water consumption in each of the three major community centres is detailed below for residential customers only. The water consumption is presented as litres per equivalent population per day (l/p/d).
January 2018 Summary:
Water consumption for all three major community centres has increased over December 2017 and January 2018 due to the minimal rainfall in the region. When there is rainfall, the three centres of Mackay, Sarina and Marian/Mirani generally show similar water consumption. It is only when there is no rainfall that Marian/Mirani consumption increases above Mackay and Sarina.
165,9744090018048821040511258
481504012952363001009549022270062150352304660460
0% 50% 100%
Calen Water Usage **Dumbleton
Nebo Rd BoresPlane Creek
Sarina BoresMirani Bore
Marian BoresMarwood Bores
Bloomsbury BoreProserpine River
Eton BoresBally Keel BoreKoumala Bores
Armstrong Beach BoreFinch Hatton Bore
Gargett BoresMarian Weir
Wa
ter
Vo
lum
e (M
L)
YTD Water Consumed (ML) Allocation
0.00
50.00
100.00
150.00
200.00
250.00
300.00
350.00
400.00
450.00
500.00
0
100
200
300
400
500
600
700
800
900
Res
iden
tial
Wat
er C
onsu
mpt
ion
(l/p/
d)
Rai
nfal
l (m
m)
Rainfall Mackay Sarina Marian/Mirani Target
Page 15
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
4.4. Significant Projects
Water Services undertakes a range of projects across the water business. Projects take the form of Capital works projects, planning studies and investigations. Information for the significant projects in Water Services is provided in the table below and was current as at 31 January 2018. Significant Projects are assessed on the following criteria: Dollar Amount, Risk and/or Community Interest
Council Project Management Phases 1. Planning (Plan) 2. Design (Des) 3. Procurement (Proc) 4. Construction (Con)
Indicators On Track Potential Issue Definite Issue
PROJECT PHASE PHASE %
COMPLETE INDICATORS
ORIGINAL BUDGET DETAILS
COMMENTS
Sewerage Network Refurbishments (Relining)
Proc 80% Schedule Scheduled Completion Date:
30/06/2018
Original Budget:
$2,525,260
The project includes 17km of sewer inspection and condition assessment using CCTV and the internal relining repair of 8.4 km of sewer in the size range 150 to 900mm diameter. A number of Tender Information Requests have been issued in September and October to address incomplete Tender responses and facilitate parity. Based on the responses received, a potential issue with availability of Contractors impacting the timing of the works has resulted in an advice to Tenderers to program resources to commence relining works in April 2018 - outside of the critical wet weather period when sewers are more accessible. Associated with this change, most expenditure is being forecast into 18/19.
The Principal has re-visited the Technology offerings in terms of risk mitigation during construction and further clarifications have been issued together with an extension to validity period. Tender evaluation is expected to be completed in February 2018.
Budget
Other Issues/ Risk
Sewerage Network Refurbishments (Maintenance Holes (MH))
Proc 60% Schedule Scheduled Completion Date:
30/06/2018
Original Budget:
$857,778
Tender awarded for MHs requiring condition assessment inspection works by external contractor. Works in progress with 305 of 510 MHs inspected. These works on schedule to be completed by end of Feb'18.
Approx. 250 MHs of 275 have been repaired, incorporating repairs to bench, channel, neck/cone and lid by WWS Networks Sewer Crew. CCTV survey of 70 of 165 buried MHs completed by WWS Networks Camera Crew.
Requests for quotes issued for two packages of MH rehabilitation works, submissions due end of January 2018.
Budget
Other Issues/ Risk
Con 95% Schedule Scheduled Completion Date: Budget
Page 16
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
PROJECT PHASE PHASE %
COMPLETE INDICATORS
ORIGINAL BUDGET DETAILS
COMMENTS
Domestic Water Meter Replacements
Other Issues/ Risk
30/06/2018
Original Budget:
$119,000
There are approx. 600 properties identified for meter replacements with works for 593 properties completed to date.
Mt Pleasant Reservoir No. 1 Refurbishments
Con 75% Schedule Scheduled Completion Date:
30/12/2017
Original Budget:
$1,661,016
17/18 Budget: $2,661,016
Installation of the new Post Tensioning (PT) bands has commenced with approx. 50% installed at the end of January 2018. During preparation/cleaning of the internal coating, additional areas requiring repair have been identified and are being treated as defects for the supplier of the coating to address.
There are a number of potential repair methods which are being considered to get the best possible solution for these, along with the previously identified internal repairs. The additional internal repairs are currently the critical path for getting the reservoir back in service and have pushed the timing from end of February 2018, into March 2018.
Budget
Other Issues/ Risk
Water Main (WM) Renewals
Des and Con
80% Des
50% Con
Schedule Scheduled Completion Date:
30/06/2018
Original Budget:
$1,296,359
Design works for Ready Street WM are complete with construction expected to commence late February 2018.
Design alignment and extent of works for Lambrook Street water main replacement have been through a number of iterations. Stakeholder engagement has now been completed and the design can be finalised. Estimated design completion is now late February 2018 with Construction to commence in April 2018.
Design of Alfred Street (between Brisbane and Carlyle Streets) is nearing completion. Final reviews to be completed early February 2018.
An emergent project at Risley Parade, Cape Hillsborough, has been identified and given priority in the internal crew's construction program. Construction expected to be completed in February 2018. This additional scope will impact the budget by approximately $100,000. A separate budget request will be made for this emergent work in the next quarterly budget review.
Budget
Other Issues/ Risk
Water Main Replacements (WMR) - Roads Driven
Des and Con
85% Des
50% Con
Schedule Scheduled Completion Date:
30/06/2018
Original Budget:
$1,640,770
There have been issues identified with the suitability of the thrust blocks on the Vines Creek WMR; an alternative option has been identified and Contractors are moving ahead with it. Department of Transport and Main Roads are administering the works.
Budget
Other Issues/ Risk
Page 17
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
PROJECT PHASE PHASE %
COMPLETE INDICATORS
ORIGINAL BUDGET DETAILS
COMMENTS
MRC internal Infrastructure Delivery Crew are progressing on Maud Street, Mirani, expected to be complete in mid-February 2018.
Emergent relocation work on Ferries Terrace, Sarina Beach, have commenced, expected to be complete in February 2018.
Eton Water Supply
Plan / Des
40% Schedule Scheduled Completion Date:
30/06/2018
Original Budget:
$650,000
Drilling of an investigation bore commenced in November 2017. It was confirmed that there were two aquifers, though a complication was identified during drilling leading to potential cross contamination between the two aquifers. Technical resolution required that the existing investigation bore be supplemented by the drilling of a second trial bore in the shallower aquifer, completed in December 2017. Better water quality results have been recorded on the shallow trial bore so drilling the final production bore located in the shallower aquifer is scheduled to commence late January 2017. Hydraulic Modelling work is complete. Specifications are prepared for the water softening equipment and civil works.
Recent analysis of Eton water samples indicated that pH correction is also required to stabilise the water quality in the networks. As a consequence, additional concept design work and Technical Specifications are required for pH correction equipment to be installed under the contract works. This additional scope will impact the budget with the quantum to be established once the process concept design and specifications are established.
Council's consultant is working on a revised specification. Once the pH correction specification is complete and the contract conditions and schedules are finalised, a tender will be released and this is now expected by end of February 2018.
Budget
Other Issues/ Risk
Shakespeare Street sewer realignment
Con 95% Schedule Scheduled Completion Date:
30/12/2017
Original Budget:
$450,250
The sewer construction is complete (January 2018). The contractor has re-established the lawns, garden beds and fencing. Watering of the lawns is ongoing.
Still to be completed by Council is the replacement of a carport/shed structure and vegetation in the garden beds. Procurement for these services is in progress, however, shortages of supply of sheds and associated works are impacting finalisation dates.
Budget
Other Issues/ Risk
Page 18
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
PROJECT PHASE PHASE %
COMPLETE INDICATORS
ORIGINAL BUDGET DETAILS
COMMENTS
Mirani Storage Plan / Des
85% Schedule Scheduled Completion Date:
31/01/2019
17/18 Original Budget:
$683,000
Detailed design is being reviewed and is expected to be complete early February 2018.
The current schedule still has construction commencing mid-2018.
Land purchase has been finalised.
Budget
Other Issues/ Risk
Mirani Water Recycling Facility Upgrade
Proc 25% Schedule Scheduled Completion Date:
31/01/2021
17/18 Original Budget:
$815,888
Submissions for the Expression of Interest have been evaluated and recommendation for shortlisting will be presented to Council in February 2018.
Environmental Assessment Report has been submitted to Department of Environment and Heritage Protection to confirm license conditions.
A request for further information has been received and responded to.
Budget
Other Issues/ Risk
Water Laboratory relocation
Plan / Des
10% Schedule Scheduled Completion Date:
31/06/2018
17/18 Original Budget:
$1,750,000
Property and building purchase has been finalised with the settlement on 31 January 2018.
A Design Brief for the fitout of the building has been sent out for quotation and submissions are due at the end of January 2018.
Preliminary layout concepts have been developed for the building to establish the scope for detail design and revised estimates and updated estimates that are slightly higher than original budget. The quantum to be established once detailed designs are complete.
Budget
Other Issues/ Risk
Page 19
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
REGULATORY COMPLIANCE 5.1. Drinking Water Compliance
Potable water is provided in accordance with the requirements of the Water Supply Safety and Reliability Act, measured against the Australian Drinking Water Quality Guidelines. Drinking Water samples are taken at the outlet of Water Treatment Plants and at various locations within the reticulation network. Please note: These results are reported one month in arrears. A summary of the performance is detailed below.
December 2017 Summary:
Eton reticulation samples for Selenium continue to be in the range of 10-12 ug/L. pH was detected to be below the Australian Drinking Water Quality Aesthetic Guideline Value of 6.5 recommended limit at Gargett, being 6.37 on one occasion.
December 2017 Summary:
Eton continues to have high values for the aesthetic parameter of hardness (>200 mg/l), with values ranging from 370 mg/l to 405 mg/l respectively. These hardness levels will be addressed in the future with the planned provision of water softening plants as part of the Scheme.
60
65
70
75
80
85
90
95
100
0
20
40
60
80
100
120
140
160
180
Co
mp
lia
nce
(%)
Te
sts
Co
nd
uct
ed
Health Parameter Test Results
Drinking Water Test Completed Non Compliant Health Parameter Tests % Compliance Target
0
20
40
60
80
100
120
140
160
180
Te
sts
Co
nd
uct
ed
Aesthetic Parameter Test Results
Drinking Water Test Completed Non-Compliant Aesthetic Parameter Tests
Page 20
Engineering & Commercial Infrastructure Monthly Review > December 2017 - January 2018
5.2. Wastewater Compliance
The discharges from wastewater treatment facilities are regulated by Development Approvals issued by the Department of Environment and Heritage Protection. The licence requirements differ based on the year the Development Approval was issued and the receiving environment associated with discharges.
December 2017 and January 2018 Summary:
Three wastewater tests were non-compliant in December 2017. These related to a breach of suspended solids for Recycled Water Storage 2 releases to water due to algal growth; pH for Nebo Road WTP supernatant released to water; and total phosphorus for Sarina Water Recycled Facility permeate released to environmental waters. One wastewater test was non-compliant in January 2018. This relates to non-compliance for faecal coliforms at Seaforth Wastewater Treatment Plant. The Regulator was informed of each occurrence within appropriate timeframes.
5.3. Backflow Testing
Backflow devices are installed on water services where there is a risk that water could return from a private property back into the Water Reticulation network. The requirement for backflow devices is regulated in accordance with the Standard Plumbing and Drainage Regulation.
December 2017 and January 2018 Summary:
13 new devices were registered, while 10 devices were cancelled in December 2017. 19 new devices were registered, while 12 devices were cancelled in January 2018. Council performed 55 tests on backflow devices in December 2017 and 45 tests on backflow devices in January 2018.
0
10
20
30
Te
sts
Co
nd
uct
ed
Samples Tested Non Compliant tests
Wastewater Test Results
0
10
20
30
40
50
60
70
0
10
20
30
40
50
Test
ed b
y C
ounc
il
No
of D
evic
es R
egis
tere
d/C
ance
lled
Monthly Devices Registered Devices Cancelled Tested By Council