ENGINEERING ANALYSIS AND CODES

Alfredo PortoneFusion for Energy

Page 2: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 2

1. Mission of the F4E Engineering Analysis Group2. Core activities: Analysis, Codes & Standards3. Modus operandi, contracts and grants

OVERVIEW

Page 3: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 3

F4E requires a whole range of engineering support activities in the field of general mechanics, remote handling, plant systems, nuclear and safety engineering:

• Conceptual and detailed designs• CAD support• FE analysis• Integration of systems• Safety and nuclear engineering• Cost assessment• Welding and fabrication • Standardization of components • Risk analysis• Quality assurance

ENGINEERING SUPPORT

Page 4: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 4

Provide technical support in the area of Analysis, Codes &Standards to F4E Procurement Groups

WHY?

Support F4E Procurement Groups in handling of• Design/ Engineering Change Requests• Non-Conformities Reports approval• Backup Solutions investigations…Remark: Due to the large differences in procurement and

commissioning schedule, the design maturity of the ITER components varies from quite detailed (magnets) to rather conceptual (blanket) some areas need a lot of design/analysis work to be carried out provide support to ITER IO

GROUP MISSION

Page 5: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 5

Page 6: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 6

• Mechanical Analyses• Thermo-hydraulic Analyses• Electromagnetic Analyses

Toroidal Field CoilNb3Sn, 18 coils

Vacuum Vessel9 sectors

Central SolenoidNb3Sn, 6 modules

Additional HeatingIC, EC, NBI

Inner Divertor54 cassettes

Poloidal Field Coils6 coils

Blanket Module421 modules

+ DiagnosticsRemote Handling

Tritium PlantPumping/Fuelling Power Supplies…

• Civil Engineering Analyses• Neutronic Analyses• Material expertise, …

Analysis and Codes needs

GROUP MISSION

Page 7: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 7

ANALYSISSeismicElectro-magnetic

Mechanical

Portion of VV

Blanket module #16

Blanket module #17

Flexible housings + stub keys and pads

Neutronic

Page 8: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 8

ANALYSISElectro-mechanical analyses features• Coupled electromagnetic-mechanical analysis

through plasma (~mass-less) dynamics• Computation of eddy currents (linear) and

magnetization (nonlinear) to assess heating in cold structures, Lorentz forces, etc.

• Large & complex 3D models of vacuum vessel, blanket, FW, buildings (shell, solid,…)

• Wide range of mechanical analysis types (static, dynamic, linear, nonlinear, buckling, fatigue, cryogenics T, …)

Reference software• ANSYS (ITER IO) • Additional: ABAQUS, SAP 2000, Civil Fem

Choice impact on QA

Page 9: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 9

Civil engineering analysis features• Definition of equivalent static forces• Floor response spectra computation• Soil-structure interaction modeling• Design of seismic isolators• Airplane crash• …

Reference softwareANSYS/CIVIL FEMSAP2000

ANALYSIS

Page 10: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 10

Neutronic analysis features• Complex 3D geometries & neutron sources!• Transport calculations of neutron fluxes &

spectra for high energy neutrons in presence of thick shields (large flux gradients), penetrations (streaming), multiple materials, sky shine in the Tokamak complex and other controlled buildings;

• Computation of gamma spectra, nuclear heat & damage, material activation, T production (TBM), inventories, doses & occupational exposure…;

• Parallel processing acceleration, MC/FE acceleration algorithms, automated processing software;

• Benchmarking, development of tools and models, improvement of calculation techniques.

Reference software• MCNP5 v1.5, FISPACT 2007, FENDL 2.1 and

EAF 2007 nuclear data libraries, mesh tallies techniques, rigorous-two-step (R2S) when possible

ANALYSIS

1.E+10

1.E+11

1.E+12

1.E+13

1.E+14

1.E+15

1.E-10 1.E-08 1.E-06 1.E-04 1.E-02 1.E+00

ener

1

gy (MeV)

flux

per u

nit l

etha

rgy

(n/c

m2-

s

c9180 (fw)

c9218 (blanket)

1.E+10

1.E+11

1.E+12

1.E+13

1.E+14

1.E+15

1.E-10 1.E-08 1.E-06 1.E-04 1.E-02 1.E+00

energy (MeV)

flux

per u

nit l

etha

rgy

(n/c

m2-

1

s

c9180 (fw)

c9218 (blanket)

Page 11: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 11

Nuclear database:• A fully qualified nuclear cross-section

database + validated computational tools are at the basis of any QA neutron & activation calculations as well as of their uncertainties assessment;

• F4E is driving a unique effort on the development of qualified nuclear data for fusion applications oriented to ITER, IFMIF and DEMO;

• This effort brings together recognized Experts and resources from EURATOM Associations and European industry

• This Nuclear Data R&D programme is part of the EU voluntary contribution (i.e. non credited) to ITER 0 2 4 6 8 10 12 14 16

0.0

0.5

1.0

1.5FZK'06

JENDL-3.3

C/E

Neutron Energy, MeV

ENDF-B6

10-4

10-3

10-2

10-1

FZK'06

JENDL-3.3

LLNL' Experiment

ENDF-B6

Ta shell: R = 3.4 cm (1mfp)

Leak

age

Spec

trum

, 1/s

r/MeV

NUCLEAR DATA R&D

Li2CO3pellets

Page 12: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 12

Key features• To qualify the ITER components, it is necessary to verify the analysis results

according to different codes & standards Suppliers must have proven experience;

• ASME BPVC• RCC-MR• PED, ESPN• SDC-IC• SDC for Buildings• Eurocodes• EN…

CODES & STANDARDS

Multi-code approach for the ITER components• No single industrial code covers the variety of ITER components & loads;• Specific existing codes cover some particular operational requirements;• Some components (magnet, in-vessels) need special codes developments.

Page 13: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 13

Component PED Categoryor ESPN category & level

Selected Codes Comments

Magnets Magnet structure no PEDManifolds and piping PED

Design – Structural Design Criteria - MagnetManufacturing – Technical specificationAcceptance criteria – SDC-MC, based on ASME XI

Notified Body is not involved.

Vacuum Vessel

ESPN:Category IV for pressure and Nuclear Level N2/N3

Metallic partsDesign and Manufacturing: RCC-MR 2007 Non-metallic windowsTechnical specifications

Agreed Notified Body shall check design, manufacturing and conformity.

Blanket

System

Blanket Modules – Cat. IVPiping and manifold – Cat. I, Level N3+ TBD

Design – Structural Design Criteria – In-Vessel Components

Manufacturing, inspection: ASME or EN standards (conventional parts) and TechSPecs

Agreed Notified Body shall check design, manufacturing and conformity. Divertor case to be considered

Tritium Plant and

Detritiation

Categories I-IV, Level N2, N3 or non-nuclear

Design and Manufacturing:- Vessels ASME Section VIII, Div. 2- Piping ASME B 31.3, Category M- Valves ASME B16.34-…And Technical Specifications

Conformity with PED/ESPN required, Agrreed notifyedBody required.Use of EN standards under consideration.

Complete table in “Codes and Standards for ITER Mechanical Components”

CODES & STANDARDS: Mechanical Engineering

Page 14: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 14

RCC-MR 2002

Requirements of ESP and ESPN

Introduction of European (Harmonized) Standards

RCC-MR 2007

ITER needs - box type structure -

Generic - Integrated in the base Code - Rules for bolts (RB 3280 +A6) - Materials - Electron Beam and Laser

welding - Pressure test - Rules for box structures

(RC3800+RC4000)

Specific - Appendix A19 - Categorization of welded joints - Special rules for permanent

attachments sealing welds and Cu coating

- Use of alternative NDE methods (Ultrasonic Testing and Photo Thermal Camera)

- Low Co materials

EFDA - F4E Active involvement

CODES & STANDARDS: Mechanical Engineering

Page 15: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 15

Use of international electrical standards (IEC) and adoption of French Standards + European Directives for (1) installation & operation rule, (2) design, manufacturing & testing of components affecting safety (nuclear and personnel) and fire protection

ITER Electrical Design Handbook, Part 3: Codes and Standards

CODES & STANDARDS: Electrical Engineering

SSEN EQUIPMENT Manufacturing Standard

Indoor / Outdoor Facilities

Site Installation Standard

Nuclear Safety Personal Safety

Tokamak Complex Test

MV / LV DISTRIBUTION TRANSFORMERS

IEC 60076-1 IEC 60076-2 IEC 60076-… IEC 60296 IEC 60664-1 IEC 61000-5 IEC 61000-6-2 IEC 61000-6-4 HD 538-2 S1 NF C 52-112 / NF EN 50464

IEC 60068-1 IEC 60364

IEC 60076-7 IEC 60364 IEC 60905 IEC 61000-5 IEC 61140 NF C15-100

IEC 60068-3-3 IEC 60780 (SR) IEC 60980 (SR)

IEC 60364-4 IEC 60479 IEC 61140 NF C15-100

IEC 60754 IEC 61249-2-21

IEC 60068-3-3 IEC 60076-1 IEC 60076-2 IEC 60076-… IEC 60076-11 IEC 60664-1 IEC 60754 IEC 61000-6-2 IEC 61000-6-4 IEC 61249-2-21

CIRCUIT BREAKER

IEC 60664-1 IEC 60947-1 IEC 60947-2 IEC 61000-5 IEC 61000-6-2 IEC 61000-6-4

IEC 60068-1 IEC 60364

IEC 60364 IEC 60947-1 IEC 60947-2 IEC 61000-5 IEC 61140 NF C15-100

IEC 60068-3-3

IEC 60364-4 IEC 60479 IEC 61140 NF C15-100

IEC 60754 IEC 61249-2-21

IEC 60068-3-3 IEC 60439-1 IEC 60664-1 IEC 60947-1 IEC 60947-2 IEC 61000-4-2 IEC 61000-4-4

SSEN EQUIPMENT Manufacturing Standard

Indoor / Outdoor Facilities

Site Installation Standard

Nuclear Safety Personal Safety

Tokamak Complex Test

MV / LV DISTRIBUTION TRANSFORMERS

IEC 60076-1 IEC 60076-2 IEC 60076-… IEC 60296 IEC 60664-1 IEC 61000-5 IEC 61000-6-2 IEC 61000-6-4 HD 538-2 S1 NF C 52-112 / NF EN 50464

IEC 60068-1 IEC 60364

IEC 60076-7 IEC 60364 IEC 60905 IEC 61000-5 IEC 61140 NF C15-100

IEC 60068-3-3 IEC 60780 (SR) IEC 60980 (SR)

IEC 60364-4 IEC 60479 IEC 61140 NF C15-100

IEC 60754 IEC 61249-2-21

IEC 60068-3-3 IEC 60076-1 IEC 60076-2 IEC 60076-… IEC 60076-11 IEC 60664-1 IEC 60754 IEC 61000-6-2 IEC 61000-6-4 IEC 61249-2-21

CIRCUIT BREAKER

IEC 60664-1 IEC 60947-1 IEC 60947-2 IEC 61000-5 IEC 61000-6-2 IEC 61000-6-4

IEC 60068-1 IEC 60364

IEC 60364 IEC 60947-1 IEC 60947-2 IEC 61000-5 IEC 61140 NF C15-100

IEC 60068-3-3

IEC 60364-4 IEC 60479 IEC 61140 NF C15-100

IEC 60754 IEC 61249-2-21

IEC 60068-3-3 IEC 60439-1 IEC 60664-1 IEC 60947-1 IEC 60947-2 IEC 61000-4-2 IEC 61000-4-4

Page 16: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 16

Safety Related Buildings - ITER Structural Design Code for Buildings– Adaptation of state-of-the-art structural design criteria for civil works – Specificities of the configurations and loads of a fusion nuclear plant– Based on the concept of the limit state design used jointly with the method of

the partial factors, as stipulated in Eurocode EN 1990– First part devoted to the design specifications of the safety important

buildings of ITER – Construction rules defined in second part (topography, tolerances,

earthworks, concrete works, formwork, reinforcement, base isolation and elastomeric bearings, leak-tight metal parts on containment, etc.).

No safety related buildings - Application of Eurocode (mainly)

CODES & STANDARDS: Civil Engineering

Page 17: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 17

Internal analyses activity• Analysis and Codes group (5 people) provides “in house”, light analysis

capabilities + general computational expertise (brain-storming phase with “clients” from other groups, problem formulation, check interfaces, …)

• Medium/large (>1 month) design work orders carried out – typically -through industrial contracts of different types;External contracts

• Large use of framework contracts, multiple lots, 3 cascade winners;• Specific contracts are also issued for well specified work packages via

single (<50 kEuro), restricted (<250 kEuro) or open tenders;• Grants (40% F4E contribution) rarely used, mostly for

University/Association R&D activities (e.g. nuclear data, code development, …)

• Yearly expenditure for analysis and codes activity ~ 1÷2 M€

MODUS OPERANDI

Page 18: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 18

Contract deliverables and IPR• All MCNP/FE models, including input and result files, routines, and mesh

quality summaries are asked to be given to F4E as part of the ADP (Acceptance Data Package) to allow F4E to repeat all the calculations performed by the Supplier.

• The intellectual property of all routines, input files, databases and result files developed by the Supplier under the contract will belong to F4E.

• If the Supplier needs to use any database or routine developed in the past under any contract (excluding past F4E and EFDA), it shoulddeclare this beforehand in the Background Declaration Form.

CONTRACTS DELIVERABLES

Page 19: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 19

REQUIREMENTS RECOMMENDED SOFTWARE

ALTERNATIVE

A unique CAD system (mechanical and networks)

CATIA v5 r19 SP 3IGEXAO

A unique analysis software ANSYS ( Civil FEM, LS-DYNA, FLUENT)

ABAQUS **

Enovia VPM (IO), EnoviaSmarteam (f4e,associations, suppliers)Primavera

Autocad (Buildings)

An efficient computer aided data management system

An efficient project management software

Microsoft Project **

* Suppliers may use any CAD SW but F4E must receive everything in CATIA v5 format

** Upon approval by F4E on special cases

CONTRACTSENGINEERING TOOLS

Page 20: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 20

1. Nuclear Data Libraries• Improvement of European Fusion File (EFF) and European Activation

File (EAF) as part of the nuclear data source for ITER (by means of the FENDL activities), TBM and broader approach activities and safety studies (IO requirement from French Nuclear Authority).

• Benchmarking of updated and extended nuclear data evaluations2. Nuclear Data Experiments

• Development of measuring techniques for activation and T production• Integral benchmark experiments for data validation covering materials

relevant to ITER and fusion in general, including neutronic and nuclear data analysis of specific impurities for fusion relevant neutron spectra

• Design and implementation of experiments on fusion relevant mock-ups for evaluation and assessment of neutronic calculations

3. Nuclear Data Tools: • Development and validation of advanced numerical methods and

computational tools, in the field of nuclear models and covariances and uncertainties

NUCLEAR DATA R&D

Page 21: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 21

ITER DB

ITER CATIA V5 data: Exported by ITER to DA (incl. trace-ability):studied component + context

Native CATIA V5 r19 sp3or:

Multi-CAD approach (Solidworks, Mechanical

Desktop…)

F4EDB

SUPPLIERS

INSTITUTES

ITER DMU review Saving into ENOVIA (Reconciliation)ITER DIDO MeetingsApproval process

Opportunity of CAD data exchanges (ITER + DA):

when required

CATIA V5 data only exported by F4E to ITER (incl. traceability, DET):studied component only

Process for Stable interfaces (frozen design)

FTP

FTP

FTP

ENGINEERING SUPPORTCAD scheme 1-Asynchronous

Page 22: ENGINEERING ANALYSIS AND CODES - swissilo.chiter.swissilo.ch/wp-content/uploads/2009/10/F4E-Analysis-Codes.pdf · NF C15-100 IEC 60754 IEC 61249-2-21 ... routine developed in the

2 October 09 Engineering analysis and Codes 22

• Native CATIA V5 r19 sp3or:• Multi-CAD approach (Solidworks, Mechanical Desktop…)

F4ESMARTEAM DB

SUPPLIERS

INSTITUTES

ITER DMU review ITER DIDO MeetingsApproval process

Opportunity of CAD data exchanges (ITER + DA):

when required

Data Base sharing

F4E

ITER ENOVIA VPM DB

F4E WS Enovia VPM

F4EENOVIA VPMREMOTE DIRECT ACCESS

Process dedicated to collaborative design tasks

ENGINEERING SUPPORTCAD Scheme 2-Synchronous